CN107525229A - The method and device of air-conditioning electric heating control - Google Patents

The method and device of air-conditioning electric heating control Download PDF

Info

Publication number
CN107525229A
CN107525229A CN201710657744.4A CN201710657744A CN107525229A CN 107525229 A CN107525229 A CN 107525229A CN 201710657744 A CN201710657744 A CN 201710657744A CN 107525229 A CN107525229 A CN 107525229A
Authority
CN
China
Prior art keywords
current
air
humidity
conditioning
opening time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710657744.4A
Other languages
Chinese (zh)
Other versions
CN107525229B (en
Inventor
许文明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haier Air Conditioner Gen Corp Ltd
Original Assignee
Qingdao Haier Air Conditioner Gen Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haier Air Conditioner Gen Corp Ltd filed Critical Qingdao Haier Air Conditioner Gen Corp Ltd
Priority to CN201710657744.4A priority Critical patent/CN107525229B/en
Priority to PCT/CN2017/109306 priority patent/WO2019024301A1/en
Publication of CN107525229A publication Critical patent/CN107525229A/en
Application granted granted Critical
Publication of CN107525229B publication Critical patent/CN107525229B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2221/00Details or features not otherwise provided for
    • F24F2221/34Heater, e.g. gas burner, electric air heater

Abstract

The invention discloses the method and device of air-conditioning electric heating control, belong to air-conditioning technical field.This method includes:Obtain current humidity value corresponding with current period in the air-conditioning zone of action;According to the current humidity value, and the target humidity value of setting, current humidity deviation is determined;According to the current humidity deviation, and the humidity deviation in a upper cycle, ratio, integration, differential (PID) control were carried out, determines opening time of the air-conditioning electrical heating in the current period;According to the current opening time, the electrically heated switch is controlled.So so that electrically heated power output PID corresponding with humidity calculates power match, realizes electrically heated intelligent control, reduces the consuming of the energy.

Description

The method and device of air-conditioning electric heating control
Technical field
The present invention relates to the method and device of air-conditioning technical field, more particularly to air-conditioning electric heating control.
Background technology
With the improvement of living standards, air-conditioning more prevalent use.At present, there is electric heating function in domestic air conditioning, During winter air-conditioning heating in the case of heating capacity deficiency, electric heating function automatically turns on or user opens electricity by remote control Heating.But electrically heated power output is certain, can not be automatically adjusted as needed, this electrically heated control Mode does not save uncomfortable yet.For example, winter user sets room temperature as 30 DEG C, but during the operation of air-conditioning full load only Room temperature can be promoted to 27 DEG C, now user opens electric heating function, and electrically heated power output is 1000w.But increase After the electrical heating power for adding 1000W, room temperature can be caused to be promoted to more than 30 DEG C rapidly, now user needs manual-lock electric Heating, otherwise room temperature, which continues rising, to overheat room temperature, uncomfortable.
It can be seen that electrically heated control mode can only be controlled according to user instruction, can't be intelligent than less saving Control the electrically heated power output of air-conditioning.
The content of the invention
The embodiments of the invention provide a kind of method and device of air-conditioning electric heating control.For the embodiment to disclosure Some aspects have a basic understanding, shown below is simple summary.The summarized section is not extensive overview, nor will Determine key/critical component or describe the protection domain of these embodiments.Its sole purpose is presented with simple form Some concepts, in this, as the preamble of following detailed description.
First aspect according to embodiments of the present invention, there is provided a kind of method of air-conditioning electric heating control, including:
Obtain current humidity value corresponding with current period in the air-conditioning zone of action;
According to the current humidity value, and the target humidity value of setting, current humidity deviation is determined;
According to the current humidity deviation, and the humidity deviation in a upper cycle, ratio, integration, differential (PID) control were carried out System, determines opening time of the air-conditioning electrical heating in the current period;
According to the current opening time, the electrically heated switch is controlled.
It is described according to the current humidity value, and the target humidity value of setting in one embodiment of the invention, it is determined that currently Humidity deviation includes:
By the difference between the current humidity value and the target humidity value of setting, it is defined as the current humidity deviation; Or,
Humidity value corresponding to the top n continuous cycle of the current humidity value and the current period is weighted Average calculating operation, obtains current presumption humidity value, and by the difference between the current presumption humidity value and the target humidity value of setting Value, is defined as the current humidity deviation.
In one embodiment of the invention, the opening time bag for determining the air-conditioning electrical heating in the current period Include:
According to the current humidity deviation, and the humidity deviation in a upper cycle, the changing value of humidity deviation was obtained;
According to formula (1), and formula (2), opening time of the air-conditioning electrical heating in the current period is determined Ratio;Wherein,
Δ Heater_p=Int ((Heater_Ki×ΔRH+DRH×Heater_Kp) × 100)/100---- formula (1)
Heater_p=Δs Heater_p+Heater_p1-------------------------------------- Formula (2)
Δ RH is the current humidity deviation, and DRH is the changing value of the humidity deviation, Heater_Ki, Heater_KpFor Revisable PID calculating parameters, Δ Heater_p are the electrically heated opening time proportional difference of the air-conditioning, and Heater_p is institute State opening time ratio of the air-conditioning electrical heating in the current period, Heater_p1It is the air-conditioning electrical heating on described Opening time ratio in one cycle.
In one embodiment of the invention, the changing value for obtaining humidity deviation includes:
When the current humidity deviation is in setting range, the current humidity deviation is defined as zero, and by institute The changing value for stating humidity deviation is defined as zero.
In one embodiment of the invention, the opening time ratio for determining the air-conditioning electrical heating in the current period Also include:
When the electrically heated opening time proportional difference of the air-conditioning obtained according to formula (1) is more than the first setting value, The electrically heated opening time proportional difference of the air-conditioning is defined as first setting value, and, obtained when according to formula (1) The air-conditioning electrically heated opening time proportional difference when being less than the second setting value, by the air-conditioning electrically heated opening time Proportional difference is defined as second setting value;
When opening time ratio of the air-conditioning electrical heating obtained according to formula (2) in the current period is less than the It is the 3rd setting value by opening time ratio-dependent of the air-conditioning electrical heating in the current period during three setting values, with And the opening time ratio when the air-conditioning electrical heating obtained according to formula (2) in the current period is set more than the 4th It is the 4th setting value by opening time ratio-dependent of the air-conditioning electrical heating in the current period during definite value.
Second aspect according to embodiments of the present invention, there is provided a kind of device of air-conditioning electric heating control, including:
Acquiring unit, for obtaining current humidity value corresponding with current period in the air-conditioning zone of action;
Deviation determination unit, for according to the current humidity value, and the target humidity value of setting, determining current humidity Deviation;
PID unit, for according to the current humidity deviation, and the humidity deviation in a upper cycle, carrying out ratio, product Divide, differential (PID) control, determine opening time of the air-conditioning electrical heating in the current period;
Control unit, for according to the current opening time, controlling the electrically heated switch.
In one embodiment of the invention, the deviation determination unit, the target by the current humidity value and setting is additionally operable to Difference between humidity value, it is defined as the current humidity deviation;Or, by the current humidity value and the current period it Humidity value corresponding to the top n continuous cycle is weighted average calculating operation, obtains current presumption humidity value, and currently push away described Determine the difference between humidity value and the target humidity value of setting, be defined as the current humidity deviation.
In one embodiment of the invention, the PID unit, it was additionally operable to according to the current humidity deviation, and a upper cycle Humidity deviation, obtain the changing value of humidity deviation;According to formula (1), and formula (2), determine that the air-conditioning electrical heating exists Opening time ratio in the current period;Wherein,
Δ Heater_p=Int ((Heater_Ki×ΔRH+DRH×Heater_Kp) × 100)/100---- formula (1)
Heater_p=Δs Heater_p+Heater_p1-------------------------------------- Formula (2)
Δ RH is the current humidity deviation, and DRH is the changing value of the humidity deviation, Heater_Ki, Heater_KpFor Revisable PID calculating parameters, Δ Heater_p are the electrically heated opening time proportional difference of the air-conditioning, and Heater_p is institute State opening time ratio of the air-conditioning electrical heating in the current period, Heater_p1It is the air-conditioning electrical heating on described Opening time ratio in one cycle.
In one embodiment of the invention, the PID unit, it is additionally operable to when the current humidity deviation is in setting range, The current humidity deviation is defined as zero, and the changing value of the humidity deviation is defined as zero.
In one embodiment of the invention, the PID unit, it is additionally operable to when the air-conditioning electrical heating obtained according to formula (1) Opening time proportional difference when being more than the first setting value, the electrically heated opening time proportional difference of the air-conditioning is defined as institute The first setting value is stated, and, when the electrically heated opening time proportional difference of the air-conditioning obtained according to formula (1) is less than second During setting value, the electrically heated opening time proportional difference of the air-conditioning is defined as second setting value;When according to formula (2) When opening time ratio of the air-conditioning electrical heating obtained in the current period is less than three setting values, by the air-conditioning Opening time ratio-dependent of the electrical heating in the current period is the 3rd setting value, and, when what is obtained according to formula (2) When opening time ratio of the air-conditioning electrical heating in the current period is more than four setting values, by the air-conditioning electrical heating Opening time ratio-dependent in the current period is the 4th setting value.
Technical scheme provided in an embodiment of the present invention can include the following benefits:
In the embodiment of the present invention, according to the deviation of humidity in the air-conditioning zone of action, PID control is carried out, it is determined that being calculated with PID The air-conditioning electrically heated opening time in the setting cycle of power match, so as to by when setting electrically heated start-stop in the cycle Between control electrically heated power output so that electrically heated power output PID corresponding with humidity calculates power match, realizes Electrically heated intelligent control, reduces the consuming of the energy.
It should be appreciated that the general description and following detailed description of the above are only exemplary and explanatory, not Can the limitation present invention.
Brief description of the drawings
Accompanying drawing herein is merged in specification and forms the part of this specification, shows the implementation for meeting the present invention Example, and for explaining principle of the invention together with specification.
Fig. 1 is a kind of schematic flow sheet of air-conditioning electric heating controlling method according to an exemplary embodiment;
Fig. 2 is a kind of schematic flow sheet of air-conditioning electric heating controlling method according to an exemplary embodiment;
Fig. 3 is opening time computing of a kind of air-conditioning electrical heating in current period according to an exemplary embodiment Corresponding schematic diagram;
Fig. 4 is a kind of block diagram of air-conditioning electric heating control device according to an exemplary embodiment;
Fig. 5 is a kind of block diagram of air-conditioning electric heating control device according to an exemplary embodiment.
Embodiment
The following description and drawings fully show specific embodiments of the present invention, to enable those skilled in the art to Put into practice them.Embodiment only represents possible change.Unless explicitly requested, otherwise single components and functionality is optional, and And the order of operation can change.The part of some embodiments and feature can be included in or replace other embodiments Part and feature.The scope of embodiment of the present invention includes the gamut of claims, and the institute of claims There is obtainable equivalent.Herein, each embodiment can individually or generally be represented that this is only with term " invention " It is merely for convenience, and if in fact disclosing the invention more than one, it is not meant to automatically limit the scope of the application For any single invention or inventive concept.Herein, such as first and second or the like relational terms are used only for one Entity or operation make a distinction with another entity or operation, exist without requiring or implying between these entities or operation Any actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant be intended to it is non-exclusive Property includes, so that process, method or equipment including a series of elements not only include those key elements, but also including The other element being not expressly set out.Each embodiment herein is described by the way of progressive, and each embodiment stresses Be all difference with other embodiment, between each embodiment identical similar portion mutually referring to.For implementing For structure, product etc. disclosed in example, due to its with embodiment disclosed in part it is corresponding, so fairly simple, the phase of description Part is closed referring to method part illustration.
Air-conditioning has been electrical equipment common in daily life, can be with the temperature in regulation room, you can heating or cooling so that Indoor temperature and user preset Temperature Matching.Electrical heating is the heat-production functions of one auxiliary of air-conditioning, and user can be according to reality at present Application environment controls electrically heated opening and closing, that is, switchs., can be according to wet in the air-conditioning zone of action in the embodiment of the present invention The deviation of degree, PID control is carried out, it is determined that the air-conditioning electrically heated opening time in the setting cycle of power match is calculated with PID, from And by within the setting cycle electrically heated start/stop time control electrically heated power output so that electrically heated output work Rate PID corresponding with humidity calculates power match, realizes electrically heated intelligent control, reduces the consuming of the energy.
Fig. 1 is a kind of flow chart of air-conditioning electric heating controlling method according to an exemplary embodiment.Such as Fig. 1 institutes Show, as shown in figure 1, the process of air-conditioning electric heating control includes:
Step 101:Obtain current humidity value corresponding with current period in the air-conditioning zone of action.
, can be by controlling electrically heated switch time in the setting cycle, so as to control electrical heating in the embodiment of the present invention Power output.Therefore, the cycle can be preset, such as:A cycle 5 minutes, 8 minutes, 10 minutes, 12 minutes etc..Week Phase length refers to the processing speed of the processor of air-conditioning, and firing rate, power etc. the parameter of electrical heating hardware is come really It is fixed.
After the default cycle is determined, for each cycle, the control that can be all electrically heated.Here, air-conditioning is obtained Current humidity value corresponding with current period in the zone of action.Current temperature value can be obtained by humidity sensor, can also led to Acquisition current temperature value is crossed, current temperature value is obtained after carrying out computing.For example, according to current temperature value, interior machine coil temperature value, Compressor operating frequency value, and opening value, the current humidity value in current temperature and humidity value is obtained by following formula.
Rhn=A2*Tn1+B2*Tn2+C2*hzn+D*fn+F
Wherein, RhnFor current humidity value, Tn1 is current temperature value, Tn2 be interior machine coil temperature value, hznTransported for compressor Line frequency value, fnFor opening value, AA2、B2、C2, D, E, F be respectively according to the type of air-conditioning determine constant, n is current period Order.
Such as:Current period is the 50th cycle, then can obtain current humidity value Rh according to above-mentioned formulan=35%.
Step 102:According to current humidity value, and the target humidity value of setting, current humidity deviation is determined.
Can direct goal-selling humidity value, such as:Rht=45%.Or after user sets preset temperature value, according to Corresponding relation between the temperature value and comfort humidity value of preservation, it is determined that comfort temperature value corresponding with preset temperature, so that, can The comfort humidity value of determination is defined as to the target humidity value of setting.
Obtain current humidity value, and after the target humidity value of setting, can be directly by by current humidity value and setting Difference between target humidity value, it is defined as current humidity deviation.
Because electrical heating divides the cycle to be controlled, therefore, further to improve the accuracy of control, contingency is reduced The probability of error, in another embodiment of the present invention, determining the process of current humidity deviation may include:By current humidity value and work as Humidity value corresponding to the top n continuous cycle in preceding cycle is weighted average calculating operation, obtains current presumption humidity value, and ought Difference between preceding presumption humidity value and the target humidity value of setting, is defined as current humidity deviation.
Such as:N=5, so, can be according to Rhn, Rhn-1, Rhn-2, Rhn-3, Rhn-4, Rhn-5This six data, are averaged Computing, current presumption humidity value Rhp is obtained, so as to current humidity deviation delta RH=Rhp-Rht
Step 103:According to current humidity deviation, and the humidity deviation in a upper cycle, ratio, integration, differential were carried out (PID) control, determine opening time of the air-conditioning electrical heating in current period.
Current humidity deviation is had determined, also, humidity deviation value corresponding to each cycle can be preserved, from And it also would know that the humidity deviation in a cycle.Or humidity value and the mesh of setting according to corresponding to each cycle of preservation Humidity value is marked, can also obtain the humidity deviation of a cycle.
So that the changing value of humidity deviation according to current humidity deviation, and the humidity deviation in a upper cycle, can be obtained, That is the changing value DRH=Δ RH- Δs RH of humidity deviation1, wherein, Δ RH1For the humidity deviation in a upper cycle.
Then, according to formula (1), and formula (2), opening time ratio of the air-conditioning electrical heating in current period is determined Example;Wherein,
Δ Heater_p=Int ((Heater_Ki×ΔRH+DRH×Heater_Kp) × 100)/100---- formula (1)
Heater_p=Δs Heater_p+Heater_p1-------------------------------------- Formula (2)
Δ RH is current humidity deviation, and DRH is the changing value of humidity deviation, Heater_Ki,
Heater_KpFor revisable ratio, integration, differential (proportion, integral, derivative, PID) Calculating parameter, Δ Heater_p are the electrically heated opening time proportional difference of air-conditioning, and Heater_p is air-conditioning electrical heating current Opening time ratio in cycle, Heater_p1For opening time ratio of the air-conditioning electrical heating within a upper cycle.
Equally, air-conditioning can preserve the opening time ratio in each cycle.Such as:Air conditioner electric can determine that by formula (1) The opening time proportional difference Δ Heater_p=5% of heating, and the opening time ratio Heater_p in a upper cycle1= 30%, so as to which opening time ratio Heater_p=35% of the air-conditioning electrical heating in current period can be obtained.
Finally, it can determine air-conditioning electrical heating in current period according to cycle and opening time ratio Heater_p Opening time.Such as:If the cycle set is 8 minutes, and 1% is i.e. corresponding 4.8 seconds, so as to, it may be determined that in current period, electricity adds The opening time of heat is the 4.8*35=168 seconds, and the time that electrical heating is closed is 312 seconds.
Step 104:According to the current opening time, electrically heated switch is controlled.
After the electrically heated opening time is determined, you can according to the current opening time, control electrically heated switch.Such as: Within the cycle of current 8 minutes, electrical heating opens operation 168 seconds to set power, and other are interior in remaining 312 seconds, and electricity adds Heat is closed.
It can be seen that in the present embodiment, according to the deviation of humidity in the air-conditioning zone of action, PID control is carried out, it is determined that being counted with PID The air-conditioning electrically heated opening time in the setting cycle of power match is calculated, so as to pass through the electrically heated start-stop within the setting cycle Time controls electrically heated power output so that electrically heated power output PID corresponding with humidity calculates power match, real Electrically heated intelligent control is showed, also, electrical heating is not to run always, reduces the consuming of the energy.
To reduce the operating load of air-conditioning, typically, when obtaining smaller in step 102, illustrate very close to setting Target humidity value, at this point it is possible to without adjusting opening time of the air-conditioning electrical heating in current period, therefore, the present invention is another In individual embodiment, when current humidity deviation is in setting range, current humidity deviation is defined as zero, and by humidity deviation Changing value be defined as zero.Such as:-5<ΔRH<5, then Δ RH=0 is can determine that, and the changing value DRH=0 of humidity deviation is determined, So as to, Δ Heater_p=0, and Heater_p=Heater_p1, so, adjustment air-conditioning electrical heating can not had in current week Opening time in phase.Typically, in the setting range of target humidity value, it is more approximate that air conditioner user experiences level of comfort, Therefore, if current humidity deviation is in setting range, when just not having to continue to adjust unlatching of the air-conditioning electrical heating in current period Between, so, the consuming to resource can be reduced.
In addition, the embodiment of the present invention further can be controlled to the electrically heated opening time proportional difference of air-conditioning, also will Δ Heater_p is controlled in certain scope, therefore, when the electrically heated opening time ratio of the air-conditioning obtained according to formula (1) When difference is more than the first setting value, the electrically heated opening time proportional difference of air-conditioning is defined as the first setting value, and, work as root When the electrically heated opening time proportional difference of air-conditioning obtained according to formula (1) is less than the second setting value, open air-conditioning is electrically heated Open time scale difference and be defined as the second setting value.
Such as:As Δ Heater_p >=5%, Δ Heater_p=5% is determined, and as Heater_p≤- 5%, really Determine Δ Heater_p=-5%.
In the embodiment of the present invention, if opening time ratio of the air-conditioning electrical heating in current period is bigger, air-conditioning active region Indoor temperature and humid control precision in domain is higher, but has higher energy consumption, and air-conditioning electrical heating is in current period Opening time ratio is got over, and the indoor temperature and humid control precision in the air-conditioning zone of action are lower, therefore, take into account energy consumption and control Precision processed, can be according to electrically heated performance, the model of air-conditioning, can be for opening time ratio of the air-conditioning electrical heating in current period Example also can control within the specific limits, so, when unlatching of the air-conditioning electrical heating obtained according to formula (2) in current period Between ratio when being less than three setting values, be the 3rd setting by opening time ratio-dependent of the air-conditioning electrical heating in current period Value, and, when opening time ratio of the air-conditioning electrical heating obtained according to formula (2) in current period is more than the 4th setting value When, it is the 4th setting value by opening time ratio-dependent of the air-conditioning electrical heating in current period.Such as:During Heater_p≤0, It can determine that Heater_p=0, and Heater_p >=50%, it may be determined that Heater_p=50%.
Certainly, (- 5,5) are not limited in above-mentioned setting range, can be (- 3,3), (- 4, -4) etc.;And the first setting Value, the second setting value are also not necessarily limited to 5%, -5% or 3%, -3%, or 4%, -4% etc.;Equally, the 3rd setting Value, the 4th setting value are also not necessarily limited to 0,50% or 1%, 40%, or, 0,35% etc., particularly as not enumerating .
Below by operating process set into specific embodiment, the method that the embodiment of the present disclosure provides is illustrated.
In the present embodiment, the cycle can be 10 minutes, setting range (- 5,5), the first setting value, and the second setting value is respectively 3%, -3%, the 3rd setting value, the 4th setting value is respectively 0, and 40%.
Fig. 2 is a kind of schematic flow sheet of air-conditioning electric heating controlling method according to an exemplary embodiment, such as Fig. 2 Shown, the process of air-conditioning electric heating control includes:
Step 201:Obtain current humidity value corresponding with current period in the air-conditioning zone of action.
Current temperature value, interior machine coil temperature value are obtained by temperature sensor, and obtain compressor operating frequency value, from And following current humidity values obtained in current temperature and humidity value can be passed through.
Rh=A1*T1+B1*T2+C1*hz+E
Wherein, Rh is current humidity value, and T1 is current temperature value, and T2 is interior machine coil temperature value, and hz is compressor operating Frequency values, A1、B1、C1, E be respectively according to the type of air-conditioning determine constant.
Step 202:Humidity value corresponding to the top n of the current humidity value and current period continuous cycle is weighted Average calculating operation, obtain current presumption humidity value.
Here, N=11, if current humidity value is Rhn, so that, can be by Rhn, Rhn-1, Rhn-2…Rhn-11This 12 number summations After remove average, you can obtain current presumption humidity value Rhp.
Step 203:By the difference between current presumption humidity value and the target humidity value of setting, it is inclined to be defined as current humidity Difference.
Current presumption humidity value Rhp, the target humidity value Rh of settingt, so as to current humidity deviation delta RH=Rhp-Rht
Step 204:According to current humidity deviation, and the humidity deviation in a upper cycle, the changing value of humidity deviation was obtained.
So as to the changing value DRH=Δ RH- Δs RH of humidity deviation1
Here, also need to judge Δ RH whether between setting range (- 5,5), if, it may be determined that Δ RH=0, DRH=0.
Step 205:According to formula (1), and formula (2), opening time of the air-conditioning electrical heating in current period is determined Ratio.
Δ Heater_p=Int ((Heater_Ki×ΔRH+DRH×Heater_Kp) × 100)/100---- formula (1)
Heater_p=Δs Heater_p+Heater_p1-------------------------------------- Formula (2)
Wherein, Δ RH is current humidity deviation, and DRH is the changing value of humidity deviation, Heater_Ki, Heater_KpFor can The PID calculating parameters of modification, Δ Heater_p are the electrically heated opening time proportional difference of air-conditioning, and Heater_p adds for air conditioner electric Opening time ratio of the heat in current period, Heater_p1For opening time ratio of the air-conditioning electrical heating within a upper cycle.
Such as:For the air-conditioning in the present embodiment, Heater_Ki=0.001, and Heater_Kp=0.003, according to Δ RH =10, and DRH=5, so as to can determine that Δ Heater_p=(0.001*10+0.003*5)=0.025 according to formula (1), i.e., 2.5%, then, can formula (2) determine Heater_p.
Equally, if Δ Heater_p is more than or equal to 3%, Δ Heater_p=3% is determined, and Δ Heater_p is less than etc. When -3%, Δ Heater_p=-3% is determined;And Heater_p determines Heater_p=0 when being less than or equal to 0, and Heater_ P is more than or equal to 40%, it is determined that Heater_p=40%.
Step 206:According to default cycle, and opening time ratio of the air-conditioning electrical heating in current period, it is determined that Opening time of the air-conditioning electrical heating in current period.
Cycle is 10 minutes, therefore, the 1%=6 seconds, so as to which Heater_p=X%, the opening time is the X*6 seconds.
Fig. 3 is opening time computing of a kind of air-conditioning electrical heating in current period according to an exemplary embodiment Corresponding schematic diagram.If as shown in figure 3, Heater_p=40%., then air-conditioning electrical heating is within this 10 minute cycle, during unlatching Between be 240 seconds.If Heater_p=5%, within this 10 minute cycle, the opening time is 30 seconds for air-conditioning electrical heating.
Step 207:According to the current opening time, electrically heated switch is controlled.
After the electrically heated opening time is determined, you can according to the current opening time, control electrically heated switch.Such as: Within the cycle of current 10 minutes, electrical heating opens operation 240 seconds to set power, and other are interior in remaining 360 seconds, and electricity adds Heat is closed.
It can be seen that in the present embodiment, according to the deviation of humidity in the air-conditioning zone of action, PID control is carried out, it is determined that being counted with PID The air-conditioning electrically heated opening time in the setting cycle of power match is calculated, so as to pass through the electrically heated start-stop within the setting cycle Time controls electrically heated power output so that electrically heated power output PID corresponding with humidity calculates power match, real Electrically heated intelligent control is showed, also, electrical heating is not to run always, reduces the consuming of the energy.
Following is embodiment of the present disclosure, can be used for performing embodiments of the present disclosure.
According to the process of above-mentioned air-conditioning electric heating control, a kind of device of air-conditioning electric heating control can be built.
Fig. 4 is a kind of block diagram of air-conditioning electric heating control device according to an exemplary embodiment.As shown in figure 4, The device includes:Acquiring unit 410, deviation determination unit 420, PID unit 430 and control unit 440, wherein,
Acquiring unit 410, for obtaining current humidity value corresponding with current period in the air-conditioning zone of action.
Deviation determination unit 420, for according to current humidity value, and the target humidity value of setting, determining current humidity Deviation.
PID unit 430, for according to current humidity deviation, and the humidity deviation in a upper cycle, carried out ratio, integration, Differential (PID) controls, and determines opening time of the air-conditioning electrical heating in current period.
Control unit 440, for according to the current opening time, controlling electrically heated switch.
In one embodiment of the invention, deviation determination unit 420, the target humidity value by current humidity value and setting is additionally operable to Between difference, be defined as current humidity deviation;Or, by the top n of the current humidity value and current period continuous cycle pair The humidity value answered is weighted average calculating operation, obtains current presumption humidity value, and estimate humidity value and the target of setting by current Difference between humidity value, it is defined as current humidity deviation.
In one embodiment of the invention, PID unit 430, it was additionally operable to according to current humidity deviation, and the humidity in a upper cycle Deviation, obtain the changing value of humidity deviation;According to formula (1), and formula (2), determine air-conditioning electrical heating in current period Opening time ratio;Wherein,
Δ Heater_p=Int ((Heater_Ki×ΔRH+DRH×Heater_Kp) × 100)/100---- formula (1)
Heater_p=Δs Heater_p+Heater_p1-------------------------------------- Formula (2)
Δ RH is current humidity deviation, and DRH is the changing value of humidity deviation, Heater_Ki, Heater_KpTo be revisable PID calculating parameters, Δ Heater_p are the electrically heated opening time proportional difference of air-conditioning, and Heater_p is that air-conditioning electrical heating is being worked as Opening time ratio in the preceding cycle, Heater_p1For opening time ratio of the air-conditioning electrical heating within a upper cycle.
In one embodiment of the invention, PID unit 430, it is additionally operable to when current humidity deviation is in setting range, will be current Humidity deviation is defined as zero, and the changing value of humidity deviation is defined as into zero.
In one embodiment of the invention, PID unit 430, it is additionally operable to when the electrically heated unlatching of air-conditioning obtained according to formula (1) When time scale difference is more than the first setting value, the electrically heated opening time proportional difference of air-conditioning is defined as the first setting value, And when the electrically heated opening time proportional difference of the air-conditioning obtained according to formula (1) is less than the second setting value, by air conditioner electric The opening time proportional difference of heating is defined as the second setting value;When all currently according to the air-conditioning electrical heating that formula (2) obtains When opening time ratio in phase is less than three setting values, by opening time ratio-dependent of the air-conditioning electrical heating in current period For the 3rd setting value, and, when opening time ratio of the air-conditioning electrical heating obtained according to formula (2) in current period is more than It is the 4th setting value by opening time ratio-dependent of the air-conditioning electrical heating in current period during four setting values.
The device of embodiment of the present disclosure offer is provided.
Fig. 5 is a kind of block diagram of air-conditioning electric heating control device according to an exemplary embodiment.As shown in figure 5, The device includes:Acquiring unit 410, deviation determination unit 420, PID unit 430 and control unit 440.
Wherein, acquiring unit 410 can according to the current temperature value obtained by temperature sensor, interior machine coil temperature value, And the compressor operating frequency value obtained, pass through following current humidity values obtained in current temperature and humidity value.
Rh=A1*T1+B1*T2+C1*hz+E
Wherein, Rh is current humidity value, and T1 is current temperature value, and T2 is interior machine coil temperature value, and hz is compressor operating Frequency values, A1、B1、C1, E be respectively according to the type of air-conditioning determine constant.
So, deviation determination unit 420 can be weighted average calculating operation to 12 humidity values, obtain current presumption humidity value Rhp.12 humidity values are respectively Rhn, Rhn-1, Rhn-2…RhN-11,Wherein, RhnFor current humidity value.Then, deviation determines single Member 420 according to current humidity deviation, and the humidity deviation in a upper cycle, can obtain the changing value of humidity deviation.It is i.e. current wet Spent deviation delta RH, the humidity deviation Δ RH in a upper cycle1, the changing value DRH=Δ RH- Δs RH of humidity deviation1
And PID unit 430 can determine air-conditioning electrical heating opening in current period according to formula (1), and formula (2) Open time scale.
Wherein, if Δ Heater_p is more than or equal to 3%, PID unit 430 can determine that Δ Heater_p=3%, and Δ When Heater_p is less than or equal to -3%, PID unit 430 can determine that Δ Heater_p=-3%;And Heater_p is less than or equal to 0 When, PID unit 430 can determine that Heater_p=0, and Heater_p is more than or equal to 40%, then PID unit 430 can determine that Heater_p=40%.
Also, PID unit 430 can also be according to the default cycle, and during unlatching of the air-conditioning electrical heating in current period Between ratio, determine opening time of the air-conditioning electrical heating in current period.Fig. 3 is equally can refer to, if Heater_p=40%., Then within this 10 minute cycle, the opening time is 240 seconds for air-conditioning electrical heating.If Heater_p=5%, air-conditioning electrical heating exists In this 10 minute cycle, the opening time is 30 seconds.
So as to which control unit 440 can control electrically heated switch according to the current opening time.Electrically heated unlatching is determined After time, control unit 440 can control electrically heated switch according to the current opening time.Such as:The week of current 10 minutes In phase, electrical heating opens operation 240 seconds to set power, and other are interior in remaining 360 seconds, and electrical heating is closed.
It can be seen that in the present embodiment, according to the deviation of humidity in the air-conditioning zone of action, PID control is carried out, it is determined that being counted with PID The air-conditioning electrically heated opening time in the setting cycle of power match is calculated, so as to pass through the electrically heated start-stop within the setting cycle Time controls electrically heated power output so that electrically heated power output PID corresponding with humidity calculates power match, real Electrically heated intelligent control is showed, also, electrical heating is not to run always, reduces the consuming of the energy.
It should be understood by those skilled in the art that, embodiments of the invention can be provided as method, system or computer program Product.Therefore, the present invention can use the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware Apply the form of example.Moreover, the present invention can use the computer for wherein including computer usable program code in one or more The shape for the computer program product that usable storage medium is implemented on (including but is not limited to magnetic disk storage and optical memory etc.) Formula.
The present invention is the flow with reference to method according to embodiments of the present invention, equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that can be by every first-class in computer program instructions implementation process figure and/or block diagram Journey and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computer programs can be provided The processors of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce A raw machine so that produced by the instruction of computer or the computing device of other programmable data processing devices for real The device for the function of being specified in present one flow of flow chart or one square frame of multiple flows and/or block diagram or multiple square frames.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that the instruction being stored in the computer-readable memory, which produces, to be included referring to Make the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one square frame of block diagram or The function of being specified in multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that counted Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented processing, so as in computer or The instruction performed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in individual square frame or multiple square frames.
It should be appreciated that the invention is not limited in the flow and structure for being described above and being shown in the drawings, And various modifications and changes can be being carried out without departing from the scope.The scope of the present invention is only limited by appended claim System.

Claims (10)

  1. A kind of 1. method of air-conditioning electric heating control, it is characterised in that including:
    Obtain current humidity value corresponding with current period in the air-conditioning zone of action;
    According to the current humidity value, and the target humidity value of setting, current humidity deviation is determined;
    According to the current humidity deviation, and the humidity deviation in a upper cycle, ratio, integration, differential (PID) control were carried out, Determine opening time of the air-conditioning electrical heating in the current period;
    According to the current opening time, the electrically heated switch is controlled.
  2. 2. the method as described in claim 1, it is characterised in that described according to the current humidity value, and the target of setting Humidity value, determine that current humidity deviation includes:
    By the difference between the current humidity value and the target humidity value of setting, it is defined as the current humidity deviation;Or,
    Humidity value corresponding to the top n continuous cycle of the current humidity value and the current period is weighted average Computing, obtains current presumption humidity value, and by the difference between the current presumption humidity value and the target humidity value of setting, really It is set to the current humidity deviation.
  3. 3. the method as described in claim 1, it is characterised in that described to determine the air-conditioning electrical heating in the current period Opening time include:
    According to the current humidity deviation, and the humidity deviation in a upper cycle, the changing value of humidity deviation was obtained;
    According to formula (1), and formula (2), opening time ratio of the air-conditioning electrical heating in the current period is determined; Wherein,
    Δ Heater_p=Int ((Heater_Ki×ΔRH+DRH×Heater_Kp) × 100)/100---- formula (1)
    Heater_p=Δs Heater_p+Heater_p1--- --- --- --- --- --- --- --- --- --- --- --- -- formula (2)
    Δ RH is the current humidity deviation, and DRH is the changing value of the humidity deviation, Heater_Ki, Heater_KpFor that can repair The PID calculating parameters changed, Δ Heater_p are the electrically heated opening time proportional difference of the air-conditioning, and Heater_p is the sky Adjust opening time ratio of the electrical heating in the current period, Heater_p1It is the air-conditioning electrical heating one week on described Opening time ratio in phase.
  4. 4. method as claimed in claim 3, it is characterised in that the changing value for obtaining humidity deviation includes:
    When the current humidity deviation is in setting range, the current humidity deviation is defined as zero, and will be described wet The changing value of degree deviation is defined as zero.
  5. 5. method as claimed in claim 3, it is characterised in that described to determine the air-conditioning electrical heating in the current period Opening time ratio also include:
    When the electrically heated opening time proportional difference of the air-conditioning obtained according to formula (1) is more than the first setting value, by institute State the electrically heated opening time proportional difference of air-conditioning and be defined as first setting value, and, when the institute obtained according to formula (1) When stating the electrically heated opening time proportional difference of air-conditioning and being less than the second setting value, by the electrically heated opening time ratio of the air-conditioning Difference is defined as second setting value;
    When opening time ratio of the air-conditioning electrical heating obtained according to formula (2) in the current period is set less than the 3rd It is the 3rd setting value by opening time ratio-dependent of the air-conditioning electrical heating in the current period during definite value, and, when Opening time ratio of the air-conditioning electrical heating obtained according to formula (2) in the current period is more than the 4th setting value When, it is the 4th setting value by opening time ratio-dependent of the air-conditioning electrical heating in the current period.
  6. A kind of 6. device of air-conditioning electric heating control, it is characterised in that including:
    Acquiring unit, for obtaining current humidity value corresponding with current period in the air-conditioning zone of action;
    Deviation determination unit, for according to the current humidity value, and the target humidity value of setting, determining that current humidity is inclined Difference;
    PID unit, for according to the current humidity deviation, and the humidity deviation in a upper cycle, carrying out ratio, integration, micro- Divide (PID) control, determine opening time of the air-conditioning electrical heating in the current period;
    Control unit, for according to the current opening time, controlling the electrically heated switch.
  7. 7. device as claimed in claim 6, it is characterised in that
    The deviation determination unit, it is additionally operable to the difference between the current humidity value and the target humidity value of setting, it is determined that For the current humidity deviation;Or, by corresponding to the top n continuous cycle of the current humidity value and the current period Humidity value is weighted average calculating operation, obtains current presumption humidity value, and currently estimate humidity value and the target of setting by described Difference between humidity value, it is defined as the current humidity deviation.
  8. 8. device as claimed in claim 6, it is characterised in that
    The PID unit, it is additionally operable to, according to the current humidity deviation, and the humidity deviation in a upper cycle, it is inclined to obtain humidity The changing value of difference;According to formula (1), and formula (2), when determining unlatching of the air-conditioning electrical heating in the current period Between ratio;Wherein,
    Δ Heater_p=Int ((Heater_Ki×ΔRH+DRH×Heater_Kp) × 100)/100---- formula (1)
    Heater_p=Δs Heater_p+Heater_p1--- --- --- --- --- --- --- --- --- --- --- --- -- formula (2)
    Δ RH is the current humidity deviation, and DRH is the changing value of the humidity deviation, Heater_Ki, Heater_KpFor that can repair The PID calculating parameters changed, Δ Heater_p are the electrically heated opening time proportional difference of the air-conditioning, and Heater_p is the sky Adjust opening time ratio of the electrical heating in the current period, Heater_p1It is the air-conditioning electrical heating one week on described Opening time ratio in phase.
  9. 9. device as claimed in claim 8, it is characterised in that
    The PID unit, it is additionally operable to when the current humidity deviation is in setting range, the current humidity deviation is determined It is zero, and the changing value of the humidity deviation is defined as zero.
  10. 10. device as claimed in claim 8, it is characterised in that
    The PID unit, it is additionally operable to when the electrically heated opening time proportional difference of the air-conditioning obtained according to formula (1) is more than During the first setting value, the electrically heated opening time proportional difference of the air-conditioning is defined as first setting value, and, work as root When the electrically heated opening time proportional difference of the air-conditioning obtained according to formula (1) is less than the second setting value, by the air conditioner electric The opening time proportional difference of heating is defined as second setting value;When the air-conditioning electrical heating obtained according to formula (2) When opening time ratio in the current period is less than three setting values, by the air-conditioning electrical heating in the current period Interior opening time ratio-dependent is the 3rd setting value, and, when the air-conditioning electrical heating obtained according to formula (2) is described When opening time ratio in current period is more than four setting values, by air-conditioning electrical heating the opening in the current period Open time scale and be defined as the 4th setting value.
CN201710657744.4A 2017-08-03 2017-08-03 Method and device for controlling electric heating of air conditioner Active CN107525229B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710657744.4A CN107525229B (en) 2017-08-03 2017-08-03 Method and device for controlling electric heating of air conditioner
PCT/CN2017/109306 WO2019024301A1 (en) 2017-08-03 2017-11-03 Control method and device for self-cleaning of air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710657744.4A CN107525229B (en) 2017-08-03 2017-08-03 Method and device for controlling electric heating of air conditioner

Publications (2)

Publication Number Publication Date
CN107525229A true CN107525229A (en) 2017-12-29
CN107525229B CN107525229B (en) 2019-12-06

Family

ID=60680437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710657744.4A Active CN107525229B (en) 2017-08-03 2017-08-03 Method and device for controlling electric heating of air conditioner

Country Status (1)

Country Link
CN (1) CN107525229B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109357380A (en) * 2018-11-02 2019-02-19 青岛海尔空调器有限总公司 The method, apparatus and computer storage medium of airconditioning control
CN109357381A (en) * 2018-11-02 2019-02-19 青岛海尔空调器有限总公司 The method, apparatus and computer storage medium of airconditioning control
CN109357379A (en) * 2018-11-02 2019-02-19 青岛海尔空调器有限总公司 The method, apparatus and computer storage medium of airconditioning control
CN110427059A (en) * 2019-07-23 2019-11-08 江苏拓米洛环境试验设备有限公司 The method for testing temperature and humidity and device of moisture-heat test-box
CN111237997A (en) * 2020-01-19 2020-06-05 广东美的制冷设备有限公司 Air conditioner and control method and control device thereof
CN112212474A (en) * 2020-09-14 2021-01-12 海信(山东)空调有限公司 Dehumidifier and dehumidification control method
CN114811825A (en) * 2022-03-23 2022-07-29 青岛海尔空调器有限总公司 Control method and device for preventing condensation of air conditioner, storage medium and air conditioner
CN115220485A (en) * 2022-07-25 2022-10-21 欧伏电气股份有限公司 Humidity control method, device and system and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59202347A (en) * 1983-05-04 1984-11-16 Hitachi Ltd Air conditioner
CN201401875Y (en) * 2009-04-17 2010-02-10 广东志高空调有限公司 Dewdrop-free air conditioner
CN103727622A (en) * 2014-01-10 2014-04-16 海信(山东)空调有限公司 Constant-temperature and constant-humidity air conditioner and control method thereof
CN105674477A (en) * 2016-01-04 2016-06-15 珠海格力电器股份有限公司 Control method and device for auxiliary electric heating of air conditioner

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59202347A (en) * 1983-05-04 1984-11-16 Hitachi Ltd Air conditioner
CN201401875Y (en) * 2009-04-17 2010-02-10 广东志高空调有限公司 Dewdrop-free air conditioner
CN103727622A (en) * 2014-01-10 2014-04-16 海信(山东)空调有限公司 Constant-temperature and constant-humidity air conditioner and control method thereof
CN105674477A (en) * 2016-01-04 2016-06-15 珠海格力电器股份有限公司 Control method and device for auxiliary electric heating of air conditioner

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张少军,夏东培: "《建筑弱电系统与工程实践》", 31 January 2014, 中国电力出版社 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109357380A (en) * 2018-11-02 2019-02-19 青岛海尔空调器有限总公司 The method, apparatus and computer storage medium of airconditioning control
CN109357381A (en) * 2018-11-02 2019-02-19 青岛海尔空调器有限总公司 The method, apparatus and computer storage medium of airconditioning control
CN109357379A (en) * 2018-11-02 2019-02-19 青岛海尔空调器有限总公司 The method, apparatus and computer storage medium of airconditioning control
CN109357381B (en) * 2018-11-02 2021-04-20 青岛海尔空调器有限总公司 Air conditioner control method and device and computer storage medium
CN109357380B (en) * 2018-11-02 2021-04-20 青岛海尔空调器有限总公司 Air conditioner control method and device and computer storage medium
CN109357379B (en) * 2018-11-02 2021-05-25 青岛海尔空调器有限总公司 Air conditioner control method and device and computer storage medium
CN110427059A (en) * 2019-07-23 2019-11-08 江苏拓米洛环境试验设备有限公司 The method for testing temperature and humidity and device of moisture-heat test-box
CN110427059B (en) * 2019-07-23 2021-06-04 江苏拓米洛环境试验设备有限公司 Temperature and humidity testing method and device for damp-heat test box
CN111237997A (en) * 2020-01-19 2020-06-05 广东美的制冷设备有限公司 Air conditioner and control method and control device thereof
CN112212474A (en) * 2020-09-14 2021-01-12 海信(山东)空调有限公司 Dehumidifier and dehumidification control method
CN114811825A (en) * 2022-03-23 2022-07-29 青岛海尔空调器有限总公司 Control method and device for preventing condensation of air conditioner, storage medium and air conditioner
CN115220485A (en) * 2022-07-25 2022-10-21 欧伏电气股份有限公司 Humidity control method, device and system and storage medium

Also Published As

Publication number Publication date
CN107525229B (en) 2019-12-06

Similar Documents

Publication Publication Date Title
CN107525229A (en) The method and device of air-conditioning electric heating control
CN110332664B (en) Air conditioner control method and air conditioner
CN101968249B (en) Method for regulating normal operating frequency of DC inverter compressor
CN108375175B (en) Air conditioner system control method and device
KR0164917B1 (en) Operating control method of airconditioner
EP3564596A1 (en) Control method for heating operation of air-conditioner
CN107421074B (en) Air conditioner control method and device
EP2806223A1 (en) Air-conditioning system that adjusts temperature and humidity
CN106524355B (en) Air conditioner energy saving control method
CN107084491A (en) The control method and device of air-conditioner outdoor unit electric heater
WO2018196578A1 (en) Method for controlling heating operation of air conditioner
CN105571068A (en) Operation control method and device for air conditioner
CN110595009A (en) Air conditioner control method and device and air conditioner
CN108917117B (en) Air conditioner and control method and device thereof
CN106871360A (en) The control method of air-conditioner
CN106907827A (en) A kind of air-conditioning PTC electric heater Poewr control method and device
US20140012423A1 (en) Energy saving controlling method and device of inverter air-conditioner
CN108731211A (en) Air conditioner and its control method
CN111473465B (en) Air conditioner control method and device and air conditioner
CN105674477A (en) Control method and device for auxiliary electric heating of air conditioner
CN108534313A (en) The method, apparatus and computer storage media of air conditioner dehumidification control
CN106885339A (en) The control method of air-conditioner
WO2020107721A1 (en) Control method for heat-pump water heater, and heat-pump water heater
CN108278740A (en) A kind of control method and device of convertible frequency air-conditioner auxiliary electrical heater
CN107062532A (en) The control method of air conditioner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant