CN107524255A - Assembling type steel structure girder steel laminated floor slab connection method - Google Patents
Assembling type steel structure girder steel laminated floor slab connection method Download PDFInfo
- Publication number
- CN107524255A CN107524255A CN201710809155.3A CN201710809155A CN107524255A CN 107524255 A CN107524255 A CN 107524255A CN 201710809155 A CN201710809155 A CN 201710809155A CN 107524255 A CN107524255 A CN 107524255A
- Authority
- CN
- China
- Prior art keywords
- girder steel
- superimposed sheet
- floor slab
- lower flange
- laminated floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
- E04B5/23—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
- E04B5/29—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated the prefabricated parts of the beams consisting wholly of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/92—Protection against other undesired influences or dangers
- E04B1/94—Protection against other undesired influences or dangers against fire
- E04B1/941—Building elements specially adapted therefor
- E04B1/943—Building elements specially adapted therefor elongated
- E04B1/944—Building elements specially adapted therefor elongated covered with fire-proofing material
Abstract
The present invention relates to a kind of assembling type steel structure girder steel laminated floor slab connection method, laminated floor slab time girder steel lower flange is prefabricated in laminated floor slab, and the connecting node position concrete of time girder steel and main girder steel in structure reserves the connection gap of installation in superimposed sheet;Superimposed sheet is being tapped to the pre- retained tongue and groove in the main girder steel position of structure;The main girder steel top flange width of structure is less than lower flange width;Superimposed sheet is arranged on the lower flange of the main girder steel of structure;After superimposed sheet installs, in structure main girder steel lower flange direction formwork, casting concrete, concrete grout flows into girder steel lower flange along gap;Superimposed sheet last layer has been poured, and after ground surface finishing layer has been constructed, girder steel has all been rolled in floor.Assembling type steel structure girder steel laminated floor slab of the present invention and attaching method thereof, avoid girder steel exposure in atmosphere, avoid girder steel brush antirust fireproof paint in use, furred ceiling expense is reduced, saves truss bars, reduces the height of floor, construction cost is reduced, improves efficiency of construction, ensures construction quality.
Description
Technical field
The present invention relates to a kind of construction techniques, is to be related to a kind of assembling type steel structure girder steel overlapping building specifically
Plate connection method.
Background technology
In assembling type steel structure engineering, superimposed sheet is typically mounted at the top flange of girder steel.Because girder steel is all in floor
Below, in use, girder steel needs brush Fireproof antirust coating;In order that seen with process Sino-U.S., it is necessary in girder steel lower flange
Hang one layer of top;The building of same function, in order to meet the requirement of clear height in specification, the floor height of steel building is typically all than other
Structure type is high;Need to configure truss bars in laminated floor slab;So as to cause steel building cost higher.
The content of the invention
For above-mentioned deficiency of the prior art, the present invention provides a kind of reduction construction cost, improves efficiency of construction, ensures
The assembling type steel structure girder steel laminated floor slab connection method of construction quality.
The technical solution used in the present invention is:
A kind of assembling type steel structure girder steel laminated floor slab connection method,
Laminated floor slab time girder steel lower flange is prefabricated in laminated floor slab, and lower flange meets that fire prevention will away from the following edge thickness of superimposed sheet
Ask;
The connecting node position concrete of time girder steel and the main girder steel of structure reserves the connection gap of installation in superimposed sheet;
Superimposed sheet is being tapped to the pre- retained tongue and groove in the main girder steel position of structure;
The main girder steel top flange width of structure is less than lower flange width;
Superimposed sheet is arranged on the lower flange of the main girder steel of structure;Crouched under superimposed sheet to the main girder steel lower flange of structure;Superimposed sheet edge
Reserve gap in the main girder steel direction of structure;
After component installs, in structure main girder steel lower flange direction formwork, casting concrete, concrete grout flows into along gap
Girder steel lower flange;
Superimposed sheet last layer has been poured, and after ground surface finishing layer has been constructed, girder steel has all been rolled in floor.
It is 1000mm, spacing 500mm, gap width 50mm that the superimposed sheet reserves gap length along main body girder steel direction.
The superimposed sheet is tapped to the pre- retained tongue and groove in the main girder steel position of structure, and superimposed sheet is tapped to lower flange of girder edge 20mm.
The secondary girder steel is prefabricated in laminated floor slab.
The connecting node position concrete of time girder steel and the main girder steel of structure reserves the connection gap of installation in the superimposed sheet.
The beneficial effect of the present invention compared with the prior art:
Assembling type steel structure girder steel laminated floor slab connection method of the present invention, avoid girder steel exposure in atmosphere, avoid girder steel and exist
Brush antirust fireproof paint during use, furred ceiling expense is reduced, saves truss bars, reduce the height of floor, reduce construction cost,
Efficiency of construction is improved, ensures construction quality.
Brief description of the drawings
Fig. 1 is the construction schematic front view of assembling type steel structure girder steel laminated floor slab connection method of the present invention;
Fig. 2 is Fig. 1 1-1 cross section structure diagrams
Fig. 3 is the overlooking the structure diagram of the laminated floor slab of assembling type steel structure girder steel laminated floor slab connection method of the present invention;
Fig. 4 is the side structure schematic view of the laminated floor slab of assembling type steel structure girder steel laminated floor slab connection method of the present invention.
Critical piece symbol description in accompanying drawing:
In figure:
1st, superimposed sheet 2, secondary girder steel
3rd, gap 4, tongue and groove are connected
5th, main girder steel 6, steel column
7th, gap between gap 8, last layer 9, plate is reserved.
Embodiment
Referring to the drawings and embodiment the present invention will be described in detail:
Knowable to accompanying drawing 1-4, a kind of assembling type steel structure girder steel laminated floor slab connection method.
The secondary lower flange of girder steel 2 is prefabricated in laminated floor slab 1, and lower flange meets fire protection requirement away from the following edge thickness of superimposed sheet;
It can be fallen vertically during in order to facilitate installation superimposed sheet 1, the connecting node position of the secondary girder steel 2 in superimposed sheet 1 and main girder steel 5
Concrete reserves connection gap 3;
The pre- retained tongue and groove 4 in the main position of girder steel 5 is tapped at the edge of superimposed sheet 1;
The main top flange width of girder steel 5 is less than lower flange width;
Superimposed sheet 1 is arranged on the lower flange of main girder steel 5
Crouched under superimposed sheet 1 to the main lower flange of girder steel 5;
Superimposed sheet 1 reserves gap 7 along main body girder steel direction;
Gap 9 is left between superimposed sheet.
After superimposed sheet 1 installs, in the main lower flange direction formwork of girder steel 1, casting concrete, concrete grout is along gap
Flow into girder steel lower flange;
Superimposed sheet last layer 8 has been poured, and after ground surface finishing layer has been constructed, girder steel has all been rolled in floor.
It is 1000mm, spacing 500mm, gap width 50mm that the superimposed sheet reserves gap length along main body girder steel direction.
The superimposed sheet is tapped to lower flange of girder edge 20mm.
Assembling type steel structure girder steel laminated floor slab connection method of the present invention, avoid girder steel exposure in atmosphere, avoid steel
Beam brush antirust fireproof paint in use, furred ceiling expense is reduced, save truss bars, reduce the height of floor, reduce construction
Cost, efficiency of construction is improved, ensure construction quality.
The above described is only a preferred embodiment of the present invention, not the structure of the present invention is made any formal
Limitation.Any simple modification, equivalent change and modification that every technical spirit according to the present invention is made to above example,
Belong in the range of technical scheme.
Claims (5)
- A kind of 1. assembling type steel structure girder steel laminated floor slab connection method, it is characterised in thatLaminated floor slab time girder steel lower flange is prefabricated in laminated floor slab, and lower flange meets that fire prevention will away from the following edge thickness of superimposed sheet Ask;The connecting node position concrete of time girder steel and the main girder steel of structure reserves the connection gap of installation in superimposed sheet;Superimposed sheet is being tapped to the pre- retained tongue and groove in the main girder steel position of structure;The main girder steel top flange width of structure is less than lower flange width;Superimposed sheet is arranged on the lower flange of the main girder steel of structure;Superimposed sheet Under crouch to the main girder steel lower flange of structure;Superimposed sheet reserves gap along the main girder steel direction of structure;After component installs, in structure main girder steel lower flange direction formwork, casting concrete, concrete grout flows into along gap Girder steel lower flange;Superimposed sheet last layer has been poured, and after ground surface finishing layer has been constructed, girder steel has all been rolled in floor.
- 2. assembling type steel structure girder steel laminated floor slab connection method according to claim 1, it is characterised in that:The superimposed sheet It is 1000mm, spacing 500mm, gap width 50mm to reserve gap length along main girder steel direction.
- 3. assembling type steel structure girder steel laminated floor slab connection method according to claim 1, it is characterised in that:The superimposed sheet The pre- retained tongue and groove in the main girder steel position of structure is tapped to, superimposed sheet is tapped to 20 millimeters of lower flange.
- 4. assembling type steel structure girder steel laminated floor slab connection method according to claim 1, it is characterised in that:Secondary girder steel is prefabricated In laminated floor slab.
- 5. assembling type steel structure girder steel laminated floor slab connection method according to claim 1, it is characterised in that:It is secondary in superimposed sheet The connecting node position concrete of girder steel and the main girder steel of structure reserves the connection gap of installation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710809155.3A CN107524255A (en) | 2017-09-10 | 2017-09-10 | Assembling type steel structure girder steel laminated floor slab connection method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710809155.3A CN107524255A (en) | 2017-09-10 | 2017-09-10 | Assembling type steel structure girder steel laminated floor slab connection method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107524255A true CN107524255A (en) | 2017-12-29 |
Family
ID=60736616
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710809155.3A Pending CN107524255A (en) | 2017-09-10 | 2017-09-10 | Assembling type steel structure girder steel laminated floor slab connection method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107524255A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108894421A (en) * | 2018-06-29 | 2018-11-27 | 宁波普利凯建筑科技有限公司 | A kind of general laminated floor slab and its construction method |
CN110258878A (en) * | 2019-07-08 | 2019-09-20 | 江苏广兴集团有限公司 | Stealthy beam assembled disassembly-free heat-insulation floor construction |
CN110306666A (en) * | 2019-06-28 | 2019-10-08 | 中国二十二冶集团有限公司 | Assembling type steel structure Indoor Residential Ecological girder steel is without exposed structure and its construction method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10102659A (en) * | 1996-10-01 | 1998-04-21 | Nkk Corp | Concrete casting method in steel framed concrete composite beam |
CN202577704U (en) * | 2012-01-13 | 2012-12-05 | 湖北弘毅建筑装饰工程有限公司 | Composite floor slab for steel structure building |
CN104895231A (en) * | 2015-04-30 | 2015-09-09 | 宁波大学 | Assembled composite floor slab and manufacturing method thereof |
CN106522441A (en) * | 2016-10-26 | 2017-03-22 | 中国二十二冶集团有限公司 | Connecting method of prefabricated composite multi-ribbed floor slabs and steel beams of assembly type steel structure house |
-
2017
- 2017-09-10 CN CN201710809155.3A patent/CN107524255A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10102659A (en) * | 1996-10-01 | 1998-04-21 | Nkk Corp | Concrete casting method in steel framed concrete composite beam |
CN202577704U (en) * | 2012-01-13 | 2012-12-05 | 湖北弘毅建筑装饰工程有限公司 | Composite floor slab for steel structure building |
CN104895231A (en) * | 2015-04-30 | 2015-09-09 | 宁波大学 | Assembled composite floor slab and manufacturing method thereof |
CN106522441A (en) * | 2016-10-26 | 2017-03-22 | 中国二十二冶集团有限公司 | Connecting method of prefabricated composite multi-ribbed floor slabs and steel beams of assembly type steel structure house |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108894421A (en) * | 2018-06-29 | 2018-11-27 | 宁波普利凯建筑科技有限公司 | A kind of general laminated floor slab and its construction method |
CN108894421B (en) * | 2018-06-29 | 2023-12-26 | 宁波普利凯建筑科技有限公司 | Universal composite floor slab and construction method thereof |
CN110306666A (en) * | 2019-06-28 | 2019-10-08 | 中国二十二冶集团有限公司 | Assembling type steel structure Indoor Residential Ecological girder steel is without exposed structure and its construction method |
CN110258878A (en) * | 2019-07-08 | 2019-09-20 | 江苏广兴集团有限公司 | Stealthy beam assembled disassembly-free heat-insulation floor construction |
CN110258878B (en) * | 2019-07-08 | 2024-04-05 | 江苏广兴集团有限公司 | Hidden beam assembled disassembly-free heat preservation floor structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107524255A (en) | Assembling type steel structure girder steel laminated floor slab connection method | |
CN101265748B (en) | Tools type section steel fastener steel tube outer scaffold | |
CN102134907A (en) | Construction method of steel bar truss floor support plate | |
CN204266583U (en) | Side, the ater-casting formwork system of shear wall or floor | |
CN103603491B (en) | A kind of erection method of beam slab alter-pouring strips mould plate bracing frame | |
CN207582950U (en) | Steel structural plant roof concrete parapet external mold formwork erecting structure | |
CN103306463A (en) | Metal liner concrete air channel construction method | |
CN204098314U (en) | Steel plate combination floor | |
EP3529426B1 (en) | Wall construction system comprising drywall construction combination profiled sections, and method for constructing a wall | |
CN107190897A (en) | Assembling type steel structure zigzag laminated floor slab connection method | |
CN204401802U (en) | The connected node of concrete column and girder steel | |
CN204081182U (en) | A kind of two-way mixing cross wise reinforcement truss self-supporting floor support plate | |
CN109736514A (en) | A kind of connecting structure and preparation method thereof of prefabricated daughter's wallboard | |
CN103276848B (en) | Open-web flat beam, steel concrete flitch girder and construction method thereof | |
CN106759950B (en) | Construction process for prefabricated plate wall I-shaped steel welding joint | |
CN205088947U (en) | Thin metal connecting plate and built -up plate | |
CN211499410U (en) | Hoisting hole | |
CN204435427U (en) | The vertical alter-pouring strips mould plate of basement shear wall | |
CN211369529U (en) | A template for expansion joint department | |
CN202187455U (en) | Suspended-ceiling suspension device below a floor support plate in a steel structure | |
CN204626653U (en) | A kind of with the precast beam of liner plate and the connected node of precast plate | |
CN104847111A (en) | Construction method, mounting structure and combined structure for coupling beam between shear wall limbs | |
CN202689319U (en) | Novel building material | |
DE102019105735A1 (en) | Semi-prefabricated construction wall | |
CN211874020U (en) | Parking and charging intensive complex structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171229 |