CN107524255A - Assembling type steel structure girder steel laminated floor slab connection method - Google Patents

Assembling type steel structure girder steel laminated floor slab connection method Download PDF

Info

Publication number
CN107524255A
CN107524255A CN201710809155.3A CN201710809155A CN107524255A CN 107524255 A CN107524255 A CN 107524255A CN 201710809155 A CN201710809155 A CN 201710809155A CN 107524255 A CN107524255 A CN 107524255A
Authority
CN
China
Prior art keywords
girder steel
superimposed sheet
floor slab
lower flange
laminated floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710809155.3A
Other languages
Chinese (zh)
Inventor
张晓峰
李晓亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201710809155.3A priority Critical patent/CN107524255A/en
Publication of CN107524255A publication Critical patent/CN107524255A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • E04B5/29Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated the prefabricated parts of the beams consisting wholly of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/94Protection against other undesired influences or dangers against fire
    • E04B1/941Building elements specially adapted therefor
    • E04B1/943Building elements specially adapted therefor elongated
    • E04B1/944Building elements specially adapted therefor elongated covered with fire-proofing material

Abstract

The present invention relates to a kind of assembling type steel structure girder steel laminated floor slab connection method, laminated floor slab time girder steel lower flange is prefabricated in laminated floor slab, and the connecting node position concrete of time girder steel and main girder steel in structure reserves the connection gap of installation in superimposed sheet;Superimposed sheet is being tapped to the pre- retained tongue and groove in the main girder steel position of structure;The main girder steel top flange width of structure is less than lower flange width;Superimposed sheet is arranged on the lower flange of the main girder steel of structure;After superimposed sheet installs, in structure main girder steel lower flange direction formwork, casting concrete, concrete grout flows into girder steel lower flange along gap;Superimposed sheet last layer has been poured, and after ground surface finishing layer has been constructed, girder steel has all been rolled in floor.Assembling type steel structure girder steel laminated floor slab of the present invention and attaching method thereof, avoid girder steel exposure in atmosphere, avoid girder steel brush antirust fireproof paint in use, furred ceiling expense is reduced, saves truss bars, reduces the height of floor, construction cost is reduced, improves efficiency of construction, ensures construction quality.

Description

Assembling type steel structure girder steel laminated floor slab connection method
Technical field
The present invention relates to a kind of construction techniques, is to be related to a kind of assembling type steel structure girder steel overlapping building specifically Plate connection method.
Background technology
In assembling type steel structure engineering, superimposed sheet is typically mounted at the top flange of girder steel.Because girder steel is all in floor Below, in use, girder steel needs brush Fireproof antirust coating;In order that seen with process Sino-U.S., it is necessary in girder steel lower flange Hang one layer of top;The building of same function, in order to meet the requirement of clear height in specification, the floor height of steel building is typically all than other Structure type is high;Need to configure truss bars in laminated floor slab;So as to cause steel building cost higher.
The content of the invention
For above-mentioned deficiency of the prior art, the present invention provides a kind of reduction construction cost, improves efficiency of construction, ensures The assembling type steel structure girder steel laminated floor slab connection method of construction quality.
The technical solution used in the present invention is:
A kind of assembling type steel structure girder steel laminated floor slab connection method,
Laminated floor slab time girder steel lower flange is prefabricated in laminated floor slab, and lower flange meets that fire prevention will away from the following edge thickness of superimposed sheet Ask;
The connecting node position concrete of time girder steel and the main girder steel of structure reserves the connection gap of installation in superimposed sheet;
Superimposed sheet is being tapped to the pre- retained tongue and groove in the main girder steel position of structure;
The main girder steel top flange width of structure is less than lower flange width;
Superimposed sheet is arranged on the lower flange of the main girder steel of structure;Crouched under superimposed sheet to the main girder steel lower flange of structure;Superimposed sheet edge Reserve gap in the main girder steel direction of structure;
After component installs, in structure main girder steel lower flange direction formwork, casting concrete, concrete grout flows into along gap Girder steel lower flange;
Superimposed sheet last layer has been poured, and after ground surface finishing layer has been constructed, girder steel has all been rolled in floor.
It is 1000mm, spacing 500mm, gap width 50mm that the superimposed sheet reserves gap length along main body girder steel direction.
The superimposed sheet is tapped to the pre- retained tongue and groove in the main girder steel position of structure, and superimposed sheet is tapped to lower flange of girder edge 20mm.
The secondary girder steel is prefabricated in laminated floor slab.
The connecting node position concrete of time girder steel and the main girder steel of structure reserves the connection gap of installation in the superimposed sheet.
The beneficial effect of the present invention compared with the prior art:
Assembling type steel structure girder steel laminated floor slab connection method of the present invention, avoid girder steel exposure in atmosphere, avoid girder steel and exist Brush antirust fireproof paint during use, furred ceiling expense is reduced, saves truss bars, reduce the height of floor, reduce construction cost, Efficiency of construction is improved, ensures construction quality.
Brief description of the drawings
Fig. 1 is the construction schematic front view of assembling type steel structure girder steel laminated floor slab connection method of the present invention;
Fig. 2 is Fig. 1 1-1 cross section structure diagrams
Fig. 3 is the overlooking the structure diagram of the laminated floor slab of assembling type steel structure girder steel laminated floor slab connection method of the present invention;
Fig. 4 is the side structure schematic view of the laminated floor slab of assembling type steel structure girder steel laminated floor slab connection method of the present invention.
Critical piece symbol description in accompanying drawing:
In figure:
1st, superimposed sheet 2, secondary girder steel
3rd, gap 4, tongue and groove are connected
5th, main girder steel 6, steel column
7th, gap between gap 8, last layer 9, plate is reserved.
Embodiment
Referring to the drawings and embodiment the present invention will be described in detail:
Knowable to accompanying drawing 1-4, a kind of assembling type steel structure girder steel laminated floor slab connection method.
The secondary lower flange of girder steel 2 is prefabricated in laminated floor slab 1, and lower flange meets fire protection requirement away from the following edge thickness of superimposed sheet;
It can be fallen vertically during in order to facilitate installation superimposed sheet 1, the connecting node position of the secondary girder steel 2 in superimposed sheet 1 and main girder steel 5 Concrete reserves connection gap 3;
The pre- retained tongue and groove 4 in the main position of girder steel 5 is tapped at the edge of superimposed sheet 1;
The main top flange width of girder steel 5 is less than lower flange width;
Superimposed sheet 1 is arranged on the lower flange of main girder steel 5
Crouched under superimposed sheet 1 to the main lower flange of girder steel 5;
Superimposed sheet 1 reserves gap 7 along main body girder steel direction;
Gap 9 is left between superimposed sheet.
After superimposed sheet 1 installs, in the main lower flange direction formwork of girder steel 1, casting concrete, concrete grout is along gap Flow into girder steel lower flange;
Superimposed sheet last layer 8 has been poured, and after ground surface finishing layer has been constructed, girder steel has all been rolled in floor.
It is 1000mm, spacing 500mm, gap width 50mm that the superimposed sheet reserves gap length along main body girder steel direction.
The superimposed sheet is tapped to lower flange of girder edge 20mm.
Assembling type steel structure girder steel laminated floor slab connection method of the present invention, avoid girder steel exposure in atmosphere, avoid steel Beam brush antirust fireproof paint in use, furred ceiling expense is reduced, save truss bars, reduce the height of floor, reduce construction Cost, efficiency of construction is improved, ensure construction quality.
The above described is only a preferred embodiment of the present invention, not the structure of the present invention is made any formal Limitation.Any simple modification, equivalent change and modification that every technical spirit according to the present invention is made to above example, Belong in the range of technical scheme.

Claims (5)

  1. A kind of 1. assembling type steel structure girder steel laminated floor slab connection method, it is characterised in that
    Laminated floor slab time girder steel lower flange is prefabricated in laminated floor slab, and lower flange meets that fire prevention will away from the following edge thickness of superimposed sheet Ask;
    The connecting node position concrete of time girder steel and the main girder steel of structure reserves the connection gap of installation in superimposed sheet;
    Superimposed sheet is being tapped to the pre- retained tongue and groove in the main girder steel position of structure;
    The main girder steel top flange width of structure is less than lower flange width;Superimposed sheet is arranged on the lower flange of the main girder steel of structure;Superimposed sheet Under crouch to the main girder steel lower flange of structure;
    Superimposed sheet reserves gap along the main girder steel direction of structure;
    After component installs, in structure main girder steel lower flange direction formwork, casting concrete, concrete grout flows into along gap Girder steel lower flange;
    Superimposed sheet last layer has been poured, and after ground surface finishing layer has been constructed, girder steel has all been rolled in floor.
  2. 2. assembling type steel structure girder steel laminated floor slab connection method according to claim 1, it is characterised in that:The superimposed sheet It is 1000mm, spacing 500mm, gap width 50mm to reserve gap length along main girder steel direction.
  3. 3. assembling type steel structure girder steel laminated floor slab connection method according to claim 1, it is characterised in that:The superimposed sheet The pre- retained tongue and groove in the main girder steel position of structure is tapped to, superimposed sheet is tapped to 20 millimeters of lower flange.
  4. 4. assembling type steel structure girder steel laminated floor slab connection method according to claim 1, it is characterised in that:Secondary girder steel is prefabricated In laminated floor slab.
  5. 5. assembling type steel structure girder steel laminated floor slab connection method according to claim 1, it is characterised in that:It is secondary in superimposed sheet The connecting node position concrete of girder steel and the main girder steel of structure reserves the connection gap of installation.
CN201710809155.3A 2017-09-10 2017-09-10 Assembling type steel structure girder steel laminated floor slab connection method Pending CN107524255A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710809155.3A CN107524255A (en) 2017-09-10 2017-09-10 Assembling type steel structure girder steel laminated floor slab connection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710809155.3A CN107524255A (en) 2017-09-10 2017-09-10 Assembling type steel structure girder steel laminated floor slab connection method

Publications (1)

Publication Number Publication Date
CN107524255A true CN107524255A (en) 2017-12-29

Family

ID=60736616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710809155.3A Pending CN107524255A (en) 2017-09-10 2017-09-10 Assembling type steel structure girder steel laminated floor slab connection method

Country Status (1)

Country Link
CN (1) CN107524255A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894421A (en) * 2018-06-29 2018-11-27 宁波普利凯建筑科技有限公司 A kind of general laminated floor slab and its construction method
CN110258878A (en) * 2019-07-08 2019-09-20 江苏广兴集团有限公司 Stealthy beam assembled disassembly-free heat-insulation floor construction
CN110306666A (en) * 2019-06-28 2019-10-08 中国二十二冶集团有限公司 Assembling type steel structure Indoor Residential Ecological girder steel is without exposed structure and its construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10102659A (en) * 1996-10-01 1998-04-21 Nkk Corp Concrete casting method in steel framed concrete composite beam
CN202577704U (en) * 2012-01-13 2012-12-05 湖北弘毅建筑装饰工程有限公司 Composite floor slab for steel structure building
CN104895231A (en) * 2015-04-30 2015-09-09 宁波大学 Assembled composite floor slab and manufacturing method thereof
CN106522441A (en) * 2016-10-26 2017-03-22 中国二十二冶集团有限公司 Connecting method of prefabricated composite multi-ribbed floor slabs and steel beams of assembly type steel structure house

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10102659A (en) * 1996-10-01 1998-04-21 Nkk Corp Concrete casting method in steel framed concrete composite beam
CN202577704U (en) * 2012-01-13 2012-12-05 湖北弘毅建筑装饰工程有限公司 Composite floor slab for steel structure building
CN104895231A (en) * 2015-04-30 2015-09-09 宁波大学 Assembled composite floor slab and manufacturing method thereof
CN106522441A (en) * 2016-10-26 2017-03-22 中国二十二冶集团有限公司 Connecting method of prefabricated composite multi-ribbed floor slabs and steel beams of assembly type steel structure house

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894421A (en) * 2018-06-29 2018-11-27 宁波普利凯建筑科技有限公司 A kind of general laminated floor slab and its construction method
CN108894421B (en) * 2018-06-29 2023-12-26 宁波普利凯建筑科技有限公司 Universal composite floor slab and construction method thereof
CN110306666A (en) * 2019-06-28 2019-10-08 中国二十二冶集团有限公司 Assembling type steel structure Indoor Residential Ecological girder steel is without exposed structure and its construction method
CN110258878A (en) * 2019-07-08 2019-09-20 江苏广兴集团有限公司 Stealthy beam assembled disassembly-free heat-insulation floor construction
CN110258878B (en) * 2019-07-08 2024-04-05 江苏广兴集团有限公司 Hidden beam assembled disassembly-free heat preservation floor structure

Similar Documents

Publication Publication Date Title
CN107524255A (en) Assembling type steel structure girder steel laminated floor slab connection method
CN101265748B (en) Tools type section steel fastener steel tube outer scaffold
CN102134907A (en) Construction method of steel bar truss floor support plate
CN204266583U (en) Side, the ater-casting formwork system of shear wall or floor
CN103603491B (en) A kind of erection method of beam slab alter-pouring strips mould plate bracing frame
CN207582950U (en) Steel structural plant roof concrete parapet external mold formwork erecting structure
CN103306463A (en) Metal liner concrete air channel construction method
CN204098314U (en) Steel plate combination floor
EP3529426B1 (en) Wall construction system comprising drywall construction combination profiled sections, and method for constructing a wall
CN107190897A (en) Assembling type steel structure zigzag laminated floor slab connection method
CN204401802U (en) The connected node of concrete column and girder steel
CN204081182U (en) A kind of two-way mixing cross wise reinforcement truss self-supporting floor support plate
CN109736514A (en) A kind of connecting structure and preparation method thereof of prefabricated daughter's wallboard
CN103276848B (en) Open-web flat beam, steel concrete flitch girder and construction method thereof
CN106759950B (en) Construction process for prefabricated plate wall I-shaped steel welding joint
CN205088947U (en) Thin metal connecting plate and built -up plate
CN211499410U (en) Hoisting hole
CN204435427U (en) The vertical alter-pouring strips mould plate of basement shear wall
CN211369529U (en) A template for expansion joint department
CN202187455U (en) Suspended-ceiling suspension device below a floor support plate in a steel structure
CN204626653U (en) A kind of with the precast beam of liner plate and the connected node of precast plate
CN104847111A (en) Construction method, mounting structure and combined structure for coupling beam between shear wall limbs
CN202689319U (en) Novel building material
DE102019105735A1 (en) Semi-prefabricated construction wall
CN211874020U (en) Parking and charging intensive complex structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171229