CN107522027A - wiring binding wire coiling device - Google Patents
wiring binding wire coiling device Download PDFInfo
- Publication number
- CN107522027A CN107522027A CN201710637022.2A CN201710637022A CN107522027A CN 107522027 A CN107522027 A CN 107522027A CN 201710637022 A CN201710637022 A CN 201710637022A CN 107522027 A CN107522027 A CN 107522027A
- Authority
- CN
- China
- Prior art keywords
- balancing frame
- vertical rod
- binding wire
- arc
- contact pin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H75/00—Storing webs, tapes, or filamentary material, e.g. on reels
- B65H75/02—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
- B65H75/04—Kinds or types
- B65H75/08—Kinds or types of circular or polygonal cross-section
- B65H75/14—Kinds or types of circular or polygonal cross-section with two end flanges
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H75/00—Storing webs, tapes, or filamentary material, e.g. on reels
- B65H75/02—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
- B65H75/18—Constructional details
Abstract
The invention discloses a kind of wiring binding wire coiling device, including reel and fixed equipment, the reel is fixed in fixed equipment, and the fixed equipment includes vertical rod, and the lower end of vertical rod is provided with top;Also include the balancing frame being fixed in vertical rod, the bottom surface of the balancing frame is vertical with the axis of vertical rod, and balancing frame and the tie point of vertical rod are located within the edge of balancing frame on balancing frame;Also include multiple sled holes being connected with balance plate edge, and the sled hole is around the edge annular arrangement of balancing frame.This wiring binding wire coiling device can use in the erecting bed of wire terminal, can be directed to specific needs, make wire terminal, meanwhile, the equipment sets up and separated quick and easy.
Description
Technical field
The present invention relates to power system annex making apparatus technical field, is filled more particularly to a kind of wiring binding wire coiling
Put.
Background technology
In existing power network, spiral binding wire connects equipment for conventional wire terminal, such as in order to prevent power system
Middle overhead transmission line shaft tower is toppled, shaft tower bears excessive moment of flexure and cross-arm is crooked etc., it is necessary to be set up at the position such as shaft tower or cross-arm
Bracing wire.Extension of rural power grids engineering project needs to make a large amount of bracing wires, and a project at least more than 100 covers bracing wire, more up to more than 200
Set, the producing efficiency of bracing wire will directly influence the project process and operating efficiency of whole extension of rural power grids engineering.In the system of bracing wire
During work, it is time-consuming it is most long be to make drawing wire binding line:First is that required binding wire quantity itself is more, and second is nothing
By being by manual coiling or by special equipment making, the problem of less efficient be present.
In the prior art, as described in the invention of Application No. CN201620911029.X, CN201521018876.5, for profit
In the labor intensity for reducing coiling and winding efficiency is improved, those skilled in the art have produced one kind and have been exclusively used in helical form colligation
The equipment of line coiling, then above equipment is not easy to use at the construction field (site), therefore is needed for specific wire terminal, exists motor-driven
The problem of property is not strong.
The content of the invention
For the equipment for being currently used for helical form binding wire coiling set forth above, due to being not easy to make at the construction field (site)
With, for specific wire terminal need, the problem of mobility is not strong be present, the invention provides a kind of wiring binding wire coiling dress
Put, this wiring binding wire coiling device can use in the erecting bed of wire terminal, can be directed to specific needs, and field fabrication line connects
Head, meanwhile, the equipment sets up and separated quick and easy.
Wiring binding wire coiling device provided by the invention solves problem by following technical essential:Wiring binding wire around
Device processed, including reel and fixed equipment, the reel are fixed in fixed equipment, and the fixed equipment includes vertical rod,
The lower end of vertical rod is provided with top;
Also include the balancing frame being fixed in vertical rod, the bottom surface of the balancing frame is vertical with the axis of vertical rod, and balancing frame
Upper balancing frame and the tie point of vertical rod are located within the edge of balancing frame;
Also include multiple sled holes being connected with balance plate edge, and the sled hole is around the edge annular arrangement of balancing frame.
Specifically, above reel is the winding part in this equipment, above fixed equipment is that this equipment is connected with ground
Fixed part:It is arranged on the top of vertical rod lower end to facilitate in vertical rod insertion soil, after the fixation of this equipment, operating personnel can be convenient
Completion coiling binding wire on a bobbin.
In the prior art, the material as binding wire includes iron wire, copper cash, aluminum steel etc., while line footpath thickness differs, for
The big material of some bending difficulty can complete binding wire coiling, it is necessary to apply larger moment of flexure, in this case, fixed equipment
Fixed stability has large effect to coiling efficiency and coiling quality, different for the soil property of specific embedded location, stands
Bar can not be embedded it is infinitely deep to ensure reliability that earth's surface is fixed to fixed equipment.In this programme, by setting balancing frame,
Completed in this equipment into soil after insertion, the lower surface of balancing frame contacts with earth's surface, due to balancing frame and vertical rod on balancing frame
Tie point be located within the edge of balancing frame, then in coiling binding wire, no matter vertical rod is toppled over to which side, in each radial direction of vertical rod
On there is balancing frame mutually to be extruded with soil to avoid this equipment from toppling over, therefore above balancing frame can effectively improve fixed equipment
The stability being installed on soil.
Meanwhile above balancing frame can also be embedded in the force application part of underground as vertical rod:Operator can by trampling balancing frame,
Conveniently realize fixation of this equipment in earth's surface.
By above-mentioned, this equipment it is stable be fixed on ground dependent on the normal pressure between balancing frame and earth's surface with
And the depth of vertical rod insertion underground, and the excessively shallow lower end for being also easily caused vertical rod of above depth pries open soil and makes capital equipment and topples over.
The sled hole of arrangement above is used for vertical rod easily by being taken out in soil:Such as crowbar lever can be used to pass through sled hole for operator,
After the front end of lever is ridden upon on fulcrum simultaneously, upward tilting power is provided for vertical rod using lever principle.Arrangement above is
Edge annular arrangement of the hole around balancing frame is prized, for realizing each side by balancing frame, vertical rod is sequentially or simultaneously tilted, avoids vertical rod
Normal pressure between unilateral and soil is excessive and causes vertical rod to be not easy to be pulled out.
To sum up, this wiring binding wire coiling device can use in the erecting bed of wire terminal, can be directed to specific needs, scene
Wire terminal is made, meanwhile, the equipment sets up and separated quick and easy.
Preferably, for ease of by extracting vertical rod in soil, being preferably arranged to be additionally provided with balancing frame on connection balancing frame
The through hole of downside, and water irrigating hole of the above through hole as this equipment when being extracted in by soil.I.e. during this equipment is separated,
Poured water by the water irrigating hole into the gap between vertical rod and soil, balancing frame and soil, vertical rod can be greatly reduced and extract institute
The power needed, the function of above through hole, which seems, particularly when soil is clay becomes apparent.Further, it is preferably arranged to institute
Through hole is stated close to balancing frame and the tie point of vertical rod.
Further technical scheme is:
Make it that balancing frame can play good overturning-preventing to vertical rod and constrain, described to when arbitrarily rolling for vertical rod
Balancing frame is circular slab, the axis of balancing frame and the axis collinear of vertical rod.
Also include the reinforcement that both ends are connected with balancing frame and vertical rod respectively, the quantity and the quantity in sled hole of the reinforcement
Equal, annularly uniform relative to the axis of vertical rod between reinforcement, the reinforcement is arranged at balancing frame away from top one
Side, the lower end of reinforcement are connected with balancing frame, and the upper end of reinforcement is connected with vertical rod, and a sled is respectively arranged with each reinforcement
Hole.In this programme, the reinforcement can effectively improve balancing frame in stress as the connector between balancing frame and vertical rod
Non-deformability, reach improve reel positional stability purpose, and then ensure spiral wire terminal coiling efficiency and around
The purpose of quality processed.In this programme, due to easily obtaining larger contact area between balancing frame and earth's surface, to cause this equipment more
To be light, preferably balancing frame is made to it is relatively thin, for avoid vertical rod tilt during cause balancing frame local pressure excessive and
It is deformed or destroys, is arranged to the sled hole position on each reinforcement, so, reinforcement can be made full use of as sled Kong Yuli
The transferring element of power between bar, reach the purpose of protection balancing frame.Sled hole can use the full circle being welded on balancing frame above
Ring or semicircular ring, the hole on above full circle ring or semicircular ring is the sled hole.Preferably, above full circle ring or semicircular ring can adopt
With discarded nut, by short sections for being cut down on pipe etc..
To enable the best performance of reinforcement to constrain the anti-deformation of balancing frame, balancing frame and reinforcement on balancing frame
Tie point be located at the edge of balancing frame.
Because the soil property according to specifically used position is different, to cause balancing frame to can adapt to a variety of soil properties or vertical
Bar insert depth, position of the balancing frame on vertical rod axis is adjustable.Preferably, balancing frame can be directly threadedly coupled with vertical rod
Or puller bolt is set on balancing frame;When reinforcement is provided between balancing frame and vertical rod, it may be configured as reinforcement and be located at
The upside of balancing frame, while the collar coordinated with vertical rod gap is set, the collar coordinates with vertical rod gap, reinforcement
Lower end is fixedly connected with balancing frame, and the upper end of reinforcement is fixedly connected with the collar.
Also include pedestal, flexible joint and contact pin, the reel includes multiple arcs plate, and one end of each arc is logical
Flexible joint is crossed with pedestal to be connected;
Arc is annularly distributed on a circle, and a jack for being used to wear contact pin is surrounded between arc;
The axis connecting hole conllinear with the receptacle axis is additionally provided with the pedestal;
In contact pin may pass through jack insertion connecting hole, and the outside of arc is by the tightening force of cable, arc it is interior
After side contacts with contact pin, there is gap between two arcs of arbitrary neighborhood;
After in one end of contact pin insertion connecting hole, the other end of the contact pin is located at the outside of arc;
The pedestal is threadedly coupled with vertical rod.
Specifically, above flexible joint can use flexible fabric, such as kernmantle, woven cloth, as forming metal wire knitted
Flexible metal net etc., flexible joint can be according to specific materials, from viscous with arc, flexible joint and the specific connected mode of pedestal
Connect, weld.So, for each arc, in the case that body position of being present is fixed, each arc can pass through flexible joint
Plastic deformation, in space occur as angle, position change.
This programme when in use, inserts contact pin, after contact pin is inserted in connecting hole, in arc by the openend of jack first
The outside coiling cable of plate obtains spiral helicine binding wire, and now, each arc is by the tightening force of cable, the inner side of each arc
After being contacted with contact pin side wall, contact pin plays the role of positioning to each arc, i.e., now multiple arcs plate forms a geometry
Certain reel.After binding wire coiling is completed, by contact pin by being extracted out in connecting hole and jack, because contact pin is in extraction
In do not influence gained helical form binding wire shape, and detach rear each arc can be to a lateral movement of jack, so, the above
The reel external diameter being made up of multiple arcs plate diminishes, and gained helical form binding wire can be easily by removing in this equipment.To sum up,
This equipment has that simple in construction, easy to operate, helical form binding wire Forming Quality is good, helical form binding wire in this equipment by detaching
The characteristics of facilitating.
In this programme, reel includes multiple arcs plate, and arc is annularly distributed on a circle, is equivalent to the reel
Tangerine flap-type structure, i.e., by a complete reel, cut along axis direction, the part cut is as above-described
Source caused by gap.Such as cut using a steel pipe or plastic barrel, each of gained is described arc, flexible
Joint and the tie point of each are located at the end of each.
It is threadedly coupled with upper pedestal with vertical rod, it is intended to realize:The reel of the specific size used for specific binding wire,
Can be as needed, in vertical rod with change reel with adapt to process needs.
Make it that the arc annular is distributed on a circle gained helical form binding wire closer to cylindrical.
For ease of the operation of this equipment, internal thread segment is additionally provided with the connecting hole, the contact pin insertion connecting hole
One end is threadedly coupled with the internal thread segment.In this programme, both can be threadedly coupled with pedestal by contact pin and be connected as one
Body, so, operating personnel are after fixed base frame, it is only necessary to wind cable in the outside of arc, you can obtain helical form binding wire.
, to extract contact pin, it is additionally provided with for convenience of to application pressure on contact pin on the other end of the contact pin relative to slotting
The needle handle of pin side evagination.
Each arc is provided with flange, lateral surface of each flange both with respect to corresponding arc on one end of pedestal
Evagination.In this programme, when the flange can be used as coiling helical form binding wire, the cable baffle plate on reel, so, winding
During cable, the stable coiling starting point in position can be obtained.Further, the flange being arranged on each arc is located at same annulus
On, the axis of above annulus and the axis collinear of jack, so, equivalent to an available baffle ring.
The invention has the advantages that:
This wiring binding wire coiling device can use in the erecting bed of wire terminal, can be directed to specific needs, field fabrication
Wire terminal, meanwhile, the equipment sets up and separated quick and easy.
Brief description of the drawings
Fig. 1 is the front sectional view of one specific embodiment of wiring binding wire coiling device of the present invention, meanwhile, should
Sectional view is partial sectional view;
Fig. 2 is along the sectional view in A-A directions shown in Fig. 1.
Reference in figure is followed successively by:1st, arc, 2, contact pin, 3, needle handle, 4, flexible joint, 5, pedestal, 6, flange,
7th, connecting hole, 8, jack, 9, vertical rod, 10, balancing frame, 11, reinforcement, 12, top, 13, sled hole.
Embodiment
With reference to embodiment, the present invention is described in further detail, but the present invention structure be not limited only to it is following
Embodiment.
Embodiment 1:
As depicted in figs. 1 and 2, wiring binding wire coiling device, including reel and fixed equipment, the reel are fixed
In in fixed equipment, the fixed equipment includes vertical rod 9, and the lower end of vertical rod 9 is provided with top 12;
Also including the balancing frame 10 being fixed in vertical rod 9, the bottom surface of the balancing frame 10 is vertical with the axis of vertical rod 9, and
Balancing frame 10 and the tie point of vertical rod 9 are located within the edge of balancing frame 10 on balancing frame 10;
Also include multiple sled holes 13 being connected with the edge of balancing frame 10, and the sled hole 13 is around the edge of balancing frame 10 annular
Arrangement.
Specifically, above reel is the winding part in this equipment, above fixed equipment is that this equipment is connected with ground
Fixed part:Being arranged on top the 12 of the lower end of vertical rod 9 facilitates vertical rod 9 to be embedded in soil, and after the fixation of this equipment, operating personnel can
Easily complete coiling binding wire on a bobbin.
In the prior art, the material as binding wire includes iron wire, copper cash, aluminum steel etc., while line footpath thickness differs, for
The big material of some bending difficulty can complete binding wire coiling, it is necessary to apply larger moment of flexure, in this case, fixed equipment
Fixed stability has large effect to coiling efficiency and coiling quality, different for the soil property of specific embedded location, stands
Bar 9 can not be embedded it is infinitely deep to ensure reliability that earth's surface is fixed to fixed equipment.In this programme, by setting balancing frame
10, completed in this equipment into soil after insertion, the lower surface of balancing frame 10 contacts with earth's surface, due to balancing frame on balancing frame 10
10 are located within the edge of balancing frame 10 with the tie point of vertical rod 9, then in coiling binding wire, no matter vertical rod 9 is toppled over to which side,
Respectively radially there is balancing frame 10 mutually to be extruded with soil to avoid this equipment from toppling in vertical rod 9, therefore above balancing frame 10 can
The effective stability for improving fixed equipment and being installed on soil.
Meanwhile above balancing frame 10 can also be embedded in the force application part of underground as vertical rod 9:Operator can be by trampling balance
Disk 10, conveniently realize fixation of this equipment in earth's surface.
By above-mentioned, this equipment is stable to be fixed on ground dependent on the normal pressure between balancing frame 10 and earth's surface
And vertical rod 9 is embedded in the depth of underground, and the excessively shallow lower end for being also easily caused vertical rod 9 of above depth pries open soil and makes capital equipment and inclines
.The sled hole 13 of arrangement above is used for vertical rod 9 easily by being taken out in soil:Such as crowbar lever can be used to pass through for operator
Hole 13 is prized, while is that vertical rod 9 provides upward tilting power using lever principle after the front end of lever is ridden upon on fulcrum.With
On be arranged to prize hole 13 around balancing frame 10 edge annular arrangement, for realize by balancing frame 10 each side, sequentially or simultaneously stick up
Vertical rod 9 is played, avoids the unilateral normal pressure between soil of vertical rod 9 excessive and causes vertical rod 9 to be not easy to be pulled out.
To sum up, this wiring binding wire coiling device can use in the erecting bed of wire terminal, can be directed to specific needs, scene
Wire terminal is made, meanwhile, the equipment sets up and separated quick and easy.
In the present embodiment, for ease of by extracting vertical rod 9 in soil, being preferably arranged to be additionally provided with balancing frame 10 to connect and putting down
The through hole of the weighing apparatus upper and lower sides of disk 10, and water irrigating hole of the above through hole as this equipment when being extracted in by soil.Torn open in this equipment
From during, poured water, can subtracted significantly into the gap between vertical rod 9 and soil, balancing frame 10 and soil by the water irrigating hole
Required power is extracted in small vertical rod 9, and the function of above through hole, which seems, particularly when soil is clay becomes apparent.Further
, the through hole is preferably arranged to close to balancing frame 10 and the tie point of vertical rod 9.
Embodiment 2:
As depicted in figs. 1 and 2, the present embodiment is further qualified on the basis of embodiment 1:For cause vertical rod 9 to appoint
When meaning rolls, balancing frame 10 can play vertical rod 9 good overturning-preventing constraint, and the balancing frame 10 is circular slab, is put down
Weigh the axis of disk 10 and the axis collinear of vertical rod 9.
Also include the reinforcement 11 that both ends are connected with balancing frame 10 and vertical rod 9 respectively, the quantity and sled of the reinforcement 11
The quantity in hole 13 is equal, annularly uniform relative to the axis of vertical rod 9 between reinforcement 11, and the reinforcement 11 is arranged at balance
Disk 10 is connected away from top 12 side, the lower end of reinforcement 11 with balancing frame 10, and the upper end of reinforcement 11 is connected with vertical rod 9,
A sled hole 13 is respectively arranged with each reinforcement 11.In this programme, the reinforcement 11 is as between balancing frame 10 and vertical rod 9
Connector, non-deformability of the balancing frame 10 in stress can be effectively improved, reach improve reel positional stability mesh
, and then ensure the purpose of spiral wire terminal coiling efficiency and coiling quality.In this programme, due to balancing frame 10 and earth's surface
Between easily obtain larger contact area, make it that this equipment is more light, preferably balancing frame 10 is made to it is relatively thin, to avoid
Vertical rod 9 causes the local pressure of balancing frame 10 excessive and is deformed or destroys during tilting, and is arranged to 13, the hole of sled
In on each reinforcement 11, so, transferring element of the reinforcement 11 as the power between sled hole 13 and vertical rod 9 can be made full use of, is reached
To the purpose of protection balancing frame 10.Sled hole 13 can be whole using full circle ring or the semicircular ring being welded on balancing frame 10, the above above
Hole on annulus or semicircular ring is the sled hole 13.Preferably, above full circle ring or semicircular ring can use discarded nut, by
Short sections cut down on pipe etc..
To enable the best performance of reinforcement 11 to constrain the anti-deformation of balancing frame 10, balancing frame 10 on balancing frame 10
It is located at the edge of balancing frame 10 with the tie point of reinforcement 11.
Because the soil property according to specifically used position is different, for cause balancing frame 10 can adapt to a variety of soil properties or
The insert depth of vertical rod 9, position of the balancing frame 10 on the axis of vertical rod 9 is adjustable.Preferably, balancing frame 10 can be straight with vertical rod 9
Connect threaded connection or puller bolt is set on balancing frame 10;, can when being provided with reinforcement 11 between balancing frame 10 and vertical rod 9
Be arranged to the upside that reinforcement 11 is located at balancing frame 10, while the collar coordinated with the gap of vertical rod 9 be set, the collar and
The gap of vertical rod 9 coordinates, and the lower end of reinforcement 11 is fixedly connected with balancing frame 10, and the upper end of reinforcement 11 is fixedly connected with the collar.
Embodiment 3:
The present embodiment is further qualified on the basis of embodiment 1:Also include pedestal 5, flexible joint 4 and contact pin 2, institute
Stating reel includes multiple arcs plate 1, and one end of each arc 1 is connected by flexible joint 4 with pedestal 5;
Arc 1 is annularly distributed on a circle, and a jack 8 for being used to wear contact pin 2 is surrounded between arc 1;
The connecting hole 7 of axis and the axis collinear of jack 8 is additionally provided with the pedestal 5;
Jack 8 is may pass through in contact pin 2 to insert in connecting hole 7, and the outside of arc 1 is by the tightening force of cable, arc 1
Inner side contacted with contact pin 2 after, there is gap between two arcs 1 of arbitrary neighborhood;
After in one end of contact pin 2 insertion connecting hole 7, the other end of the contact pin 2 is located at the outside of arc 1;
The pedestal 5 is threadedly coupled with vertical rod 9.
Specifically, above flexible joint 4 can use flexible fabric, such as kernmantle, woven cloth, as forming metal wire knitted
Flexible metal net etc., flexible joint 4 can be selected with arc 1, flexible joint 4 and 5 specific connected mode of pedestal according to specific material
With bonding, welding etc..So, for each arc 1, in the case of being fixed in the position of pedestal 5, each arc 1 can pass through
The plastic deformation of flexible joint 4, the change such as angle, position occurs in space.
This programme when in use, inserts contact pin 2 by the openend of jack 8 first, after contact pin 2 is inserted in connecting hole 7,
The outside coiling cable of arc 1 obtains spiral helicine binding wire, and now, each arc 1 is by the tightening force of cable, each arc
After 1 inner side contacts with the side wall of contact pin 2, contact pin 2 plays the role of positioning to each arc 1, i.e., now multiple arcs plate 1 forms one
The certain reel of individual geometry.After binding wire coiling is completed, by contact pin 2 by being extracted out in connecting hole 7 and jack 8, due to
Contact pin 2 do not influenceed in extraction gained helical form binding wire shape, and detach rear each arc 1 can be to jack 8
One lateral movement, so, the reel external diameter that the above is made up of multiple arcs plate 1 diminish, and gained helical form binding wire can be easily
By being removed in this equipment.To sum up, this equipment has that simple in construction, easy to operate, helical form binding wire Forming Quality is good, helical form
Binding wire is by detaching the characteristics of facilitating in this equipment.
In this programme, reel includes multiple arcs plate 1, and arc 1 is annularly distributed on a circle, equivalent to the reel
For tangerine flap-type structure, i.e., by a complete reel, cut along axis direction, the part cut is as described above
Gap caused by source.Such as being cut using a steel pipe or plastic barrel, each of gained is described arc 1,
Flexible joint 4 and the tie point of each are located at the end of each.
It is threadedly coupled with upper pedestal 5 with vertical rod 9, it is intended to realize:The coiling of the specific size used for specific binding wire
Cylinder, can be as needed, in vertical rod 9 with change reel with adapt to process needs.
Make it that the annular of arc 1 is distributed on a circle gained helical form binding wire closer to cylindrical.
For ease of the operation of this equipment, internal thread segment is additionally provided with the connecting hole 7, the contact pin 2 inserts connecting hole 7
One end be threadedly coupled with the internal thread segment.In this programme, both it can be connected by contact pin 2 and the threaded connection of pedestal 5
It is integrated, so, operating personnel are after fixed base frame 5, it is only necessary to wind cable in the outside of arc 1, you can obtain helical form
Binding wire.
, to extract contact pin 2, it is additionally provided with for convenience of to application pressure on contact pin 2 on the other end of the contact pin 2 relative
In the needle handle 3 of the side evagination of contact pin 2.
Each arc 1 is provided with flange 6 on one end of pedestal 5, and each flange 6 is both with respect to corresponding arc 1
Lateral surface evagination.In this programme, when the flange 6 can be used as coiling helical form binding wire, the cable baffle plate on reel, this
Sample, when winding cable, the stable coiling starting point in position can be obtained.Further, the flange 6 being arranged on each arc 1
In on same annulus, the axis of above annulus and the axis collinear of jack 8, so, equivalent to an available baffle ring.
Above content is to combine the further description that specific preferred embodiment is made to the present invention, it is impossible to assert this
The embodiment of invention is confined to these explanations.For general technical staff of the technical field of the invention,
The other embodiment drawn in the case where not departing from technical scheme, should be included within the scope of the present invention.
Claims (10)
1. wiring binding wire coiling device, including reel and fixed equipment, the reel are fixed in fixed equipment, it is special
Sign is that the fixed equipment includes vertical rod (9), and the lower end of vertical rod (9) is provided with top (12);
Also include the balancing frame (10) being fixed in vertical rod (9), the bottom surface of the balancing frame (10) and the axis of vertical rod (9) hang down
Directly, and balancing frame (10) and the tie point of vertical rod (9) are located within the edge of balancing frame (10) on balancing frame (10);
Also include multiple sled holes (13) being connected with balancing frame (10) edge, and sled hole (13) is around the edge of balancing frame (10)
Annular arrangement.
2. wiring binding wire coiling device according to claim 1, it is characterised in that the balancing frame (10) is circle
Plate, the axis of balancing frame (10) and the axis collinear of vertical rod (9).
3. wiring binding wire coiling device according to claim 2, it is characterised in that also including both ends respectively with balancing frame
(10) and the connected reinforcement (11) of vertical rod (9), the quantity of the reinforcement (11) is equal with the quantity of sled hole (13), reinforcement
(11) axis between relative to vertical rod (9) is annularly uniform, and the reinforcement (11) is arranged at balancing frame (10) away from top
(12) side, the lower end of reinforcement (11) are connected with balancing frame (10), and the upper end of reinforcement (11) is connected with vertical rod (9), respectively
Sled hole (13) is respectively arranged with reinforcement (11).
4. wiring binding wire coiling device according to claim 3, it is characterised in that balancing frame (10) on balancing frame (10)
It is located at the edge of balancing frame (10) with the tie point of reinforcement (11).
5. wiring binding wire coiling device according to claim 1, it is characterised in that the balancing frame (10) is in vertical rod
(9) position on axis is adjustable.
6. wiring binding wire coiling device according to claim 1, it is characterised in that also including pedestal (5), flexible joint
(4) and contact pin (2), the reel includes multiple arcs plate (1), one end of each arc (1) by flexible joint (4) with
Pedestal (5) is connected;
Arc (1) is annularly distributed on a circle, and a jack (8) for being used to wear contact pin (2) is surrounded between arc (1);
The connecting hole (7) of axis and the jack (8) axis collinear is additionally provided with the pedestal (5);
In contact pin (2) may pass through jack (8) insertion connecting hole (7), and the outside of arc (1) is by the tightening force of cable, arc
After the inner side of shape plate (1) contacts with contact pin (2), there is gap between two arcs (1) of arbitrary neighborhood;
After in one end of contact pin (2) insertion connecting hole (7), the other end of the contact pin (2) is located at the outside of arc (1);
The pedestal (5) is threadedly coupled with vertical rod (9).
7. wiring binding wire coiling device according to claim 6, it is characterised in that arc (1) annular is uniform
On Yu Yiyuan.
8. wiring binding wire coiling device according to claim 6, it is characterised in that also set up on the connecting hole (7)
There is internal thread segment, one end of contact pin (2) the insertion connecting hole (7) is threadedly coupled with the internal thread segment.
9. wiring binding wire coiling device according to claim 6, it is characterised in that on the other end of the contact pin (2)
It is additionally provided with the needle handle (3) relative to contact pin (2) side evagination.
10. wiring binding wire coiling device according to claim 6, it is characterised in that each arc (1) is close to pedestal
(5) flange (6), lateral surface evagination of each flange (6) both with respect to corresponding arc (1) are provided with one end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710637022.2A CN107522027A (en) | 2017-07-31 | 2017-07-31 | wiring binding wire coiling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710637022.2A CN107522027A (en) | 2017-07-31 | 2017-07-31 | wiring binding wire coiling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107522027A true CN107522027A (en) | 2017-12-29 |
Family
ID=60680109
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710637022.2A Pending CN107522027A (en) | 2017-07-31 | 2017-07-31 | wiring binding wire coiling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107522027A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108687265A (en) * | 2018-05-18 | 2018-10-23 | 国网辽宁省电力有限公司阜新供电公司 | Standard bracing wire wedge shape buttock line binding machine |
CN114772380A (en) * | 2022-05-24 | 2022-07-22 | 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 | Novel iron wire coil winder |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5205521A (en) * | 1992-02-03 | 1993-04-27 | David E. Kafka | Hose reel stand with pivot means |
CN101687240A (en) * | 2007-06-29 | 2010-03-31 | Sms西马格股份公司 | Spreadable coiler drum |
CN201943430U (en) * | 2011-03-21 | 2011-08-24 | 辽宁省电力有限公司鞍山超高压分公司 | Fence net winder |
CN202808087U (en) * | 2012-09-07 | 2013-03-20 | 嘉兴电力局 | Lead disk for power transmission line grounding resistance measuring megohm meter |
CN203319406U (en) * | 2013-06-05 | 2013-12-04 | 江苏省农业科学院 | Manual recoverer of drip irrigation belt |
CN204675523U (en) * | 2015-04-02 | 2015-09-30 | 垫江县龙洋纸管厂 | A kind of adjustable type for industrial large-sized paper roll easily extracts refill |
CN106223707A (en) * | 2016-07-18 | 2016-12-14 | 安徽状元郎电子科技有限公司 | A kind of electric pole of the convenient Anti-inclining installed |
CN207004149U (en) * | 2017-07-31 | 2018-02-13 | 绵阳行之智汇知识产权服务有限公司 | Power system binding wire making apparatus |
-
2017
- 2017-07-31 CN CN201710637022.2A patent/CN107522027A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5205521A (en) * | 1992-02-03 | 1993-04-27 | David E. Kafka | Hose reel stand with pivot means |
CN101687240A (en) * | 2007-06-29 | 2010-03-31 | Sms西马格股份公司 | Spreadable coiler drum |
CN201943430U (en) * | 2011-03-21 | 2011-08-24 | 辽宁省电力有限公司鞍山超高压分公司 | Fence net winder |
CN202808087U (en) * | 2012-09-07 | 2013-03-20 | 嘉兴电力局 | Lead disk for power transmission line grounding resistance measuring megohm meter |
CN203319406U (en) * | 2013-06-05 | 2013-12-04 | 江苏省农业科学院 | Manual recoverer of drip irrigation belt |
CN204675523U (en) * | 2015-04-02 | 2015-09-30 | 垫江县龙洋纸管厂 | A kind of adjustable type for industrial large-sized paper roll easily extracts refill |
CN106223707A (en) * | 2016-07-18 | 2016-12-14 | 安徽状元郎电子科技有限公司 | A kind of electric pole of the convenient Anti-inclining installed |
CN207004149U (en) * | 2017-07-31 | 2018-02-13 | 绵阳行之智汇知识产权服务有限公司 | Power system binding wire making apparatus |
Non-Patent Citations (1)
Title |
---|
雷源铁: "《建筑施工实例应用手册 3》", 31 January 1998, 中国建筑工业出版社 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108687265A (en) * | 2018-05-18 | 2018-10-23 | 国网辽宁省电力有限公司阜新供电公司 | Standard bracing wire wedge shape buttock line binding machine |
CN108687265B (en) * | 2018-05-18 | 2023-08-15 | 国网辽宁省电力有限公司阜新供电公司 | Standard stay wire wedge tail wire binding machine |
CN114772380A (en) * | 2022-05-24 | 2022-07-22 | 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 | Novel iron wire coil winder |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108301568B (en) | A kind of assembling structure of assembly concrete component | |
CN105442434B (en) | The assembling method of bridge prefabrication column and prefabricated bent cap | |
CN107522027A (en) | wiring binding wire coiling device | |
CN204277316U (en) | The on-the-spot processing mold of a kind of circular steel reinforcement cage | |
CN107816170A (en) | A kind of great diameter and long steel reinforcement cage and its construction method | |
CN207004149U (en) | Power system binding wire making apparatus | |
CN102433989B (en) | Equipment base pre-reservation round anchor bolt hole die | |
CN102493479B (en) | Construction method for circular foundation bolt hole reserved for equipment foundation | |
CN107740440A (en) | A kind of pipe gallery aluminum alloy mould plate support system and its construction method | |
CN104741486A (en) | Stay wire production machine tool | |
CN207001891U (en) | Spiral wire terminal Winder | |
CN107522028A (en) | Wire terminal Winder | |
CN104213728B (en) | Oblique beam for grandstand of stadium and construction process for oblique beam | |
CN105089327A (en) | Sectional type electric pole assembling device, processing process and using method | |
CN104878775B (en) | A kind of contrary sequence method steel pipe column vertical adjustment guider having enough to meet the need and its construction method | |
CN107044204A (en) | The pre-buried ring of convenient cutting | |
CN105234916A (en) | Mobile type comprehensive storage device for safety tools and instruments | |
CN106345945B (en) | A kind of reinforcing bar cutter device stable with holding function | |
CN106099412B (en) | A kind of Portable power construction grounding device and its application method | |
CN105821879B (en) | A kind of spud pile and its extracting apparatus | |
CN103758025A (en) | Road crossing device for power grid construction | |
CN107504036A (en) | Sleeve pipe inner supporting device and its construction method | |
CN201695742U (en) | Conical cross arm | |
CN104234210B (en) | The reinforcing steel bar connecting device of a kind of precast beam Column border node and construction method thereof | |
CN206922338U (en) | Winding tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171229 |
|
RJ01 | Rejection of invention patent application after publication |