CN107508323A - A kind of low-voltage platform area distributed photovoltaic access capability appraisal procedure and assessment system - Google Patents

A kind of low-voltage platform area distributed photovoltaic access capability appraisal procedure and assessment system Download PDF

Info

Publication number
CN107508323A
CN107508323A CN201710874616.5A CN201710874616A CN107508323A CN 107508323 A CN107508323 A CN 107508323A CN 201710874616 A CN201710874616 A CN 201710874616A CN 107508323 A CN107508323 A CN 107508323A
Authority
CN
China
Prior art keywords
voltage
current
low
platform area
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710874616.5A
Other languages
Chinese (zh)
Other versions
CN107508323B (en
Inventor
胡列翔
郑伟民
张全明
沈梁
傅旭华
王蕾
王坤
张西竹
王强强
谈历
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710874616.5A priority Critical patent/CN107508323B/en
Publication of CN107508323A publication Critical patent/CN107508323A/en
Application granted granted Critical
Publication of CN107508323B publication Critical patent/CN107508323B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/383
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of low-voltage platform area distributed photovoltaic access capability appraisal procedure and assessment system.The problem of evaluation of power supply capability difficulty after access a large amount of middle-size and small-size distributed photovoltaic, particularly families are accessed with photovoltaic be present in existing low-voltage network.The present invention is equivalent to the two-port network of endpoint node by first section, equivalent network parameters are calculated using input/output state at different moments, influence of the distributed photovoltaic to this node and first section voltage can be calculated in low-voltage platform area in the case of distribution network line parameter circuit value not obtaining, change simultaneously increases more parallel operation of transformers or the simple planning and designing mode using the parallel newly-built special power distribution network of distributed photovoltaic in the past, and power distribution network overall investment is reduced by the current capacity of accurate evaluation low-voltage network.

Description

A kind of low-voltage platform area distributed photovoltaic access capability appraisal procedure and assessment system
Technical field
It is specifically a kind of based on port etc. the invention belongs to the planning field of distributed photovoltaic access low-voltage network The low-voltage platform area distributed photovoltaic access capability appraisal procedure and assessment system of effect.
Background technology
China's poverty alleviation develops rapidly with family distributed photovoltaic, and State Grid Corporation of China decontrols according to national policy to this and connect Enter, but have in Practical Project that access capacity is excessive, add the intermittent fluctuation that distributed photovoltaic accesses regional voltage, portion Divide there occurs voltage out-of-limit, so as to have impact on the common electric voltage quality in low-voltage platform area.
Therefore, it is domestic about scholar from the control mode of distributed photovoltaic body, medium voltage side space truss project or disappear on the spot Receive etc. conducts a research, but have ignored the planning of power distribution network in low-voltage platform area, still lacks and receives distribution to low-voltage platform area The assessment of photovoltaic ability, so as to cause excess investment in engineering, such as increase more parallel operation of transformers or using parallel new The special power distribution network of distributed photovoltaic is built, reflects in the investment of photovoltaic access low-voltage network and lacks asking for effective assessment tool Topic.
The content of the invention
Confession after being accessed for existing low-voltage network at access a large amount of middle-size and small-size distributed photovoltaic, particularly families with photovoltaic The problem of electric energy force estimation difficulty, the present invention provide a kind of low-voltage platform area distributed photovoltaic access capability equivalent based on port and assessed Method, with the current capacity of accurate evaluation low-voltage network, reduce the overall investment of low-voltage network.
Therefore, the present invention adopts the following technical scheme that:A kind of low-voltage platform area distributed photovoltaic access capability appraisal procedure, It comprises the following steps:
1) low-voltage platform area with photovoltaic generation access is chosen, family electric energy meter is read by the collector of low-voltage platform area Customs Assigned Number, watt current, reactive current and voltage data, the active electricity of step down side is read by Distribution transformer Stream, reactive current and voltage data, it is desirable to which total data is once called, and is ensured data while property, is ignored communication delay;
2) all single-phase or three-phase electric energy meter watt current, reactive current, electricity in the low-voltage platform area that storage is called every time Data, Customs Assigned Number and markers are pressed, is accurate to minute;
3) read and store all single-phase or three-phase electric energy meter current transformer ratio in low-voltage platform area, a sub-value is made Allow the maximum current I of access for node ii_max
4) files on each of customers is inquired about by all single-phase or three-phase electric energy meter Customs Assigned Number in low-voltage platform area, determines the node i The type of user, including without generating electricity, generate power for their own use and fully surf the Net;
5) using low-voltage platform area transformer outlet as head end, the first section and node i at 2 moment are obtained in data storage Watt current, reactive current, voltage data, Customs Assigned Number and markers, it is desirable to two groups of data differ, calculate i-th of node Equivalent two port parameter between head end;
6) watt current, reactive current and the voltage data of the first section at moment at high noon day in the Spring Equinox are chosen, by the maximum of node i Current value Ii_maxAs watt current, reactive current is set to zero, passes through the equivalent two port parameter calculate node i's of acquisition Whether voltage meets within 220V 10% deviation up and down, the electric current maximum access capability if meeting as the node, is discontented with It is sufficient then with 5% be step-length reduce watt current, until meet;
7) user type as associated by Customs Assigned Number in low-voltage platform area, statistic of classification without photovoltaic generation, online in full and The latching current sum generated power for their own use, as the access capability index of all types of user.
As the supplement of above-mentioned technical proposal, in described step 5), equivalent two port uses T-shaped network.
As the supplement of above-mentioned technical proposal, the solution formula of the equivalent two port parameter is as follows:
In formula,Respectively first moment two ports voltage and current value, Respectively second moment two ports voltage and current value, symbol first subscript numbering be end Mouth numbering, second subscript numbering of symbol is to number constantly;
Z1, Z2, Z3Three equiva lent impedances of respectively T-shaped network.
As the supplement of above-mentioned technical proposal, in described step 6), the voltage of node i is calculated by following formula:
In formula,The electric current flowed into for first port,It is the electric current that output port flows into for second port,For The voltage of Two-port netwerk.
As the supplement of above-mentioned technical proposal, in described step 5), it is desirable to which the particular content that two groups of data differ is: Judge that the watt currents of two groups of data, the relative difference of reactive current whether within 10%, if it is delete one of which, New one group is read, until the watt current of two groups of data, relative difference >=10% of reactive current.
It is a further object of the present invention to provide a kind of low-voltage platform area distributed photovoltaic access capability assessment system, it includes:
Data read module:The low-voltage platform area with photovoltaic generation access is chosen, is read by the collector of low-voltage platform area Customs Assigned Number, watt current, reactive current and the voltage data of family electric energy meter, it is low that transformer is read by Distribution transformer Press side watt current, reactive current and voltage data, it is desirable to which total data is once called, and is ensured data while property, is ignored logical Letter delay;
Data memory module:Store all single-phase or three-phase electric energy meter watt current in the low-voltage platform area called every time, Reactive current, voltage data, Customs Assigned Number and markers, are accurate to minute;
Node accesses maximum current chosen module:Read and store all single-phase or three-phase electric energy meter electricity in low-voltage platform area Current transformer no-load voltage ratio, the maximum current I of access is allowed using a sub-value as node ii_max
Node users determination type module:Used by all single-phase or three-phase electric energy meter Customs Assigned Number inquiry in low-voltage platform area Family archives, determine the type of node i user, including without generating electricity, generate power for their own use and fully surf the Net;
Equivalent two port parameter calculating module:Using low-voltage platform area transformer outlet as head end, in data storage Watt current, reactive current, voltage data, Customs Assigned Number and the markers of the middle first section and node i for obtaining 2 moment, it is desirable to two Group data differ, and calculate the equivalent two port parameter between i-th of node and head end;
Electric current maximum access capability determining module:Choose watt current, the reactive current of the first section at moment at high noon day in the Spring Equinox And voltage data, by the maximum current value I of node ii_maxAs watt current, reactive current is set to zero, passes through the equivalent of acquisition Whether Two-port Network Parameters calculate node i voltage meets within 220V 10% deviation up and down, and the section is used as if meeting The electric current maximum access capability of point, it is unsatisfactory for being then that step-length reduces watt current with 5%, until meeting;
Access capability index computing module:User type as associated by Customs Assigned Number in low-voltage platform area, statistic of classification without Photovoltaic generation, the latching current sum in full surfed the Net and generated power for their own use, as the access capability index of all types of user.
It is the device have the advantages that as follows:The present invention is equivalent to the two-port network of endpoint node by first section, profit Equivalent network parameters are calculated with input/output state at different moments, are not obtaining distribution network line parameter circuit value in low-voltage platform area In the case of can calculate influence of the distributed photovoltaic to this node and first section voltage, while change and increase more transformers in the past simultaneously Row operation or the simple planning and designing mode using the parallel newly-built special power distribution network of distributed photovoltaic, are matched somebody with somebody by accurate evaluation low pressure The current capacity of power network reduces power distribution network overall investment.
Brief description of the drawings
Fig. 1 is the structural representation of T-shaped network in the embodiment of the present invention 1;
Fig. 2 is the schematic flow sheet of the embodiment of the present invention 1.
Embodiment
Embodiment 1
The present embodiment is a kind of low-voltage platform area distributed photovoltaic access capability appraisal procedure, and it comprises the following steps:
1) low-voltage platform area with photovoltaic generation access is chosen, family electric energy meter is read by the collector of low-voltage platform area Customs Assigned Number, watt current, reactive current and voltage data, the active electricity of step down side is read by Distribution transformer Stream, reactive current and voltage data, it is desirable to which total data is once called, and is ensured data while property, is ignored communication delay.
2) all single-phase or three-phase electric energy meter watt current, reactive current, electricity in the low-voltage platform area that storage is called every time Data, Customs Assigned Number and markers are pressed, is accurate to minute.
3) read and store all single-phase or three-phase electric energy meter current transformer ratio in low-voltage platform area, a sub-value is made Allow the maximum current I of access for node ii_max
4) files on each of customers is inquired about by all single-phase or three-phase electric energy meter Customs Assigned Number in low-voltage platform area, determines the node i The type of user, including without generating electricity, generate power for their own use and fully surf the Net.
5) using low-voltage platform area transformer outlet as head end, the first section and node i at 2 moment are obtained in data storage Watt current, reactive current, voltage data, Customs Assigned Number and markers, judge the watt currents of two groups of data, reactive current Relative difference if it is deletes one of which whether within 10%, reads new one group, until the active electricity of two groups of data Stream, relative difference >=10% of reactive current, calculate the equivalent two port parameter between i-th of node and head end;It is equivalent Two-port network uses T-shaped network, and the solution formula of the equivalent two port parameter is as follows:
In formula,Respectively first moment two ports voltage and current value, Respectively second moment two ports voltage and current value, symbol first subscript numbering be end Mouth numbering, second subscript numbering of symbol is to number constantly;
Z1, Z2, Z3Three equiva lent impedances of respectively T-shaped network.
6) watt current, reactive current and the voltage data of the first section at moment at high noon day in the Spring Equinox are chosen, by the maximum of node i Current value Ii_maxAs watt current, reactive current is set to zero, passes through the equivalent two port parameter calculate node i's of acquisition Whether voltage meets within 220V 10% deviation up and down, the electric current maximum access capability if meeting as the node, is discontented with It is sufficient then with 5% be step-length reduce watt current, until meet;The voltage of node i is calculated by following formula:
In formula,The electric current flowed into for first port,It is the electric current that output port flows into for second port,For The voltage of Two-port netwerk.
7) user type as associated by Customs Assigned Number in low-voltage platform area, statistic of classification without photovoltaic generation, online in full and The latching current sum generated power for their own use, as the access capability index of all types of user.
Embodiment 2
The present embodiment is a kind of low-voltage platform area distributed photovoltaic access capability assessment system, and it includes:
Data read module:The low-voltage platform area with photovoltaic generation access is chosen, is read by the collector of low-voltage platform area Customs Assigned Number, watt current, reactive current and the voltage data of family electric energy meter, it is low that transformer is read by Distribution transformer Press side watt current, reactive current and voltage data, it is desirable to which total data is once called, and is ensured data while property, is ignored logical Letter delay;
Data memory module:Store all single-phase or three-phase electric energy meter watt current in the low-voltage platform area called every time, Reactive current, voltage data, Customs Assigned Number and markers, are accurate to minute;
Node accesses maximum current chosen module:Read and store all single-phase or three-phase electric energy meter electricity in low-voltage platform area Current transformer no-load voltage ratio, the maximum current I of access is allowed using a sub-value as node ii_max
Node users determination type module:Used by all single-phase or three-phase electric energy meter Customs Assigned Number inquiry in low-voltage platform area Family archives, determine the type of node i user, including without generating electricity, generate power for their own use and fully surf the Net;
Equivalent two port parameter calculating module:Using low-voltage platform area transformer outlet as head end, in data storage Watt current, reactive current, voltage data, Customs Assigned Number and the markers of the middle first section and node i for obtaining 2 moment, it is desirable to two Group data differ, and calculate the equivalent two port parameter between i-th of node and head end;
Electric current maximum access capability determining module:Choose watt current, the reactive current of the first section at moment at high noon day in the Spring Equinox And voltage data, by the maximum current value I of node ii_maxAs watt current, reactive current is set to zero, passes through the equivalent of acquisition Whether Two-port Network Parameters calculate node i voltage meets within 220V 10% deviation up and down, and the section is used as if meeting The electric current maximum access capability of point, it is unsatisfactory for being then that step-length reduces watt current with 5%, until meeting;
Access capability index computing module:User type as associated by Customs Assigned Number in low-voltage platform area, statistic of classification without Photovoltaic generation, the latching current sum in full surfed the Net and generated power for their own use, as the access capability index of all types of user.
Above-described embodiment is the description of the invention, is not limitation of the invention, it is any to simple transformation of the present invention after Scheme belong to protection scope of the present invention.

Claims (10)

1. a kind of low-voltage platform area distributed photovoltaic access capability appraisal procedure, it is characterised in that comprise the following steps:
1) low-voltage platform area with photovoltaic generation access is chosen, the user of family electric energy meter is read by the collector of low-voltage platform area Numbering, watt current, reactive current and voltage data, step down side watt current, nothing are read by Distribution transformer Work(electric current and voltage data, it is desirable to which total data is once called, and is ensured data while property, is ignored communication delay;
2) all single-phase or three-phase electric energy meter watt current, reactive current, voltage number in the low-voltage platform area that storage is called every time According to, Customs Assigned Number and markers, minute is accurate to;
3) read and store all single-phase or three-phase electric energy meter current transformer ratio in low-voltage platform area, using a sub-value as section Point i allows the maximum current I of accessi_max
4) files on each of customers is inquired about by all single-phase or three-phase electric energy meter Customs Assigned Number in low-voltage platform area, determines node i user Type, including without generating electricity, generate power for their own use and fully surf the Net;
5) using low-voltage platform area transformer outlet as head end, 2 first sections at moment and having for node i are obtained in data storage Work(electric current, reactive current, voltage data, Customs Assigned Number and markers, it is desirable to which two groups of data differ, and calculate i-th of node and head Equivalent two port parameter between end;
6) watt current, reactive current and the voltage data of the first section at moment at high noon day in the Spring Equinox are chosen, by the maximum current of node i Value Ii_maxAs watt current, reactive current is set to zero, passes through the equivalent two port parameter calculate node i of acquisition voltage Whether meet within 220V 10% deviation up and down, the electric current maximum access capability if meeting as the node, be unsatisfactory for then It is that step-length reduces watt current with 5%, until meeting;
7) user type as associated by Customs Assigned Number in low-voltage platform area, statistic of classification is without photovoltaic generation, online in full and spontaneous Personal latching current sum, as the access capability index of all types of user.
2. distributed photovoltaic access capability appraisal procedure in low-voltage platform area according to claim 1, it is characterised in that described In step 5), equivalent two port uses T-shaped network.
3. distributed photovoltaic access capability appraisal procedure in low-voltage platform area according to claim 2, it is characterised in that described etc. The solution formula for imitating Two-port Network Parameters is as follows:
In formula,Respectively first moment two ports voltage and current value, Respectively second moment two ports voltage and current value, symbol first subscript numbering be port numbering, symbol Second subscript numbering is to number constantly;
Z1, Z2, Z3Three equiva lent impedances of respectively T-shaped network.
4. distributed photovoltaic access capability appraisal procedure in low-voltage platform area according to claim 3, it is characterised in that described In step 6), the voltage of node i is calculated by following formula:
In formula,The electric current flowed into for first port,The electric current flowed into for second port,It is output port for second port Voltage.
5. distributed photovoltaic access capability appraisal procedure in low-voltage platform area according to claim 1, it is characterised in that described In step 5), it is desirable to which the particular content that two groups of data differ is:Judge the watt currents of two groups of data, reactive current it is relative Difference if it is deletes one of which whether within 10%, reads new one group, until the watt current of two groups of data, Relative difference >=10% of reactive current.
A kind of 6. low-voltage platform area distributed photovoltaic access capability assessment system, it is characterised in that including:
Data read module:The low-voltage platform area with photovoltaic generation access is chosen, family is read by the collector of low-voltage platform area and used Customs Assigned Number, watt current, reactive current and the voltage data of electric energy meter, step down side is read by Distribution transformer Watt current, reactive current and voltage data, it is desirable to which total data is once called, and is ensured data while property, is ignored communication and prolong Late;
Data memory module:Store all single-phase or three-phase electric energy meter watt current in the low-voltage platform area called every time, idle Electric current, voltage data, Customs Assigned Number and markers, are accurate to minute;
Node accesses maximum current chosen module:Read and to store all single-phase or three-phase electric energy meter electric current in low-voltage platform area mutual Sensor no-load voltage ratio, the maximum current I of access is allowed using a sub-value as node ii_max
Node users determination type module:By all single-phase or three-phase electric energy meter Customs Assigned Number inquiry user's shelves in low-voltage platform area Case, determines the type of node i user, including without generating electricity, generate power for their own use and fully surf the Net;
Equivalent two port parameter calculating module:Using low-voltage platform area transformer outlet as head end, obtained in data storage Take the first section at 2 moment and watt current, reactive current, voltage data, Customs Assigned Number and the markers of node i, it is desirable to two groups of numbers According to differing, the equivalent two port parameter between i-th of node and head end is calculated;
Electric current maximum access capability determining module:Choose watt current, reactive current and the electricity of the first section at moment at high noon day in the Spring Equinox Data are pressed, by the maximum current value I of node ii_maxAs watt current, reactive current is set to zero, passes through equivalent two end of acquisition Whether mouthful network parameter calculate node i voltage meet within 220V 10% deviation up and down, as satisfaction then as the node Electric current maximum access capability, it is unsatisfactory for being then that step-length reduces watt current with 5%, until meeting;
Access capability index computing module:User type as associated by Customs Assigned Number in low-voltage platform area, statistic of classification is without photovoltaic Generate electricity, the latching current sum in full surfed the Net and generated power for their own use, as the access capability index of all types of user.
7. distributed photovoltaic access capability assessment system in low-voltage platform area according to claim 6, it is characterised in that described In equivalent two port parameter calculating module, equivalent two port uses T-shaped network.
8. distributed photovoltaic access capability assessment system in low-voltage platform area according to claim 7, it is characterised in that described etc. The solution formula for imitating Two-port Network Parameters is as follows:
In formula,Respectively first moment two ports voltage and current value, Respectively second moment two ports voltage and current value, symbol first subscript numbering be end Mouth numbering, second subscript numbering of symbol is to number constantly;
Z1, Z2, Z3Three equiva lent impedances of respectively T-shaped network.
9. distributed photovoltaic access capability assessment system in low-voltage platform area according to claim 3, it is characterised in that described In electric current maximum access capability determining module, the voltage of node i is calculated by following formula:
In formula,The electric current flowed into for first port,It is the electric current that output port flows into for second port,For second port Voltage.
10. distributed photovoltaic access capability assessment system in low-voltage platform area according to claim 1, it is characterised in that described Equivalent two port parameter calculating module in, it is desirable to the particular content that two groups of data differ is:Judge two groups of data Watt current, the relative difference of reactive current if it is delete one of which whether within 10%, read new one group, Until the watt current of two groups of data, relative difference >=10% of reactive current.
CN201710874616.5A 2017-09-25 2017-09-25 Low-voltage distribution room distributed photovoltaic access capability assessment method and system Active CN107508323B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710874616.5A CN107508323B (en) 2017-09-25 2017-09-25 Low-voltage distribution room distributed photovoltaic access capability assessment method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710874616.5A CN107508323B (en) 2017-09-25 2017-09-25 Low-voltage distribution room distributed photovoltaic access capability assessment method and system

Publications (2)

Publication Number Publication Date
CN107508323A true CN107508323A (en) 2017-12-22
CN107508323B CN107508323B (en) 2020-04-21

Family

ID=60698550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710874616.5A Active CN107508323B (en) 2017-09-25 2017-09-25 Low-voltage distribution room distributed photovoltaic access capability assessment method and system

Country Status (1)

Country Link
CN (1) CN107508323B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012080482A1 (en) * 2010-12-17 2012-06-21 Belenos Clean Power Holding Ag Micro-inverter
CN203859535U (en) * 2014-01-27 2014-10-01 阳光电源(上海)有限公司 Switch circuit and energy storage system
CN106549376A (en) * 2016-12-08 2017-03-29 东北大学 The branch road comprehensive stability appraisal procedure of power distribution network containing DG based on equivalent node method
CN106849154A (en) * 2016-11-29 2017-06-13 国网冀北电力有限公司承德供电公司 A kind of photovoltaic plant node harmonic voltage and harmonic source sensitivity relation analysis method
CN107039995A (en) * 2016-11-28 2017-08-11 国网湖北省电力公司宜昌供电公司 A kind of distributed photovoltaic power access planing method for considering power quality problem

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012080482A1 (en) * 2010-12-17 2012-06-21 Belenos Clean Power Holding Ag Micro-inverter
CN203859535U (en) * 2014-01-27 2014-10-01 阳光电源(上海)有限公司 Switch circuit and energy storage system
CN107039995A (en) * 2016-11-28 2017-08-11 国网湖北省电力公司宜昌供电公司 A kind of distributed photovoltaic power access planing method for considering power quality problem
CN106849154A (en) * 2016-11-29 2017-06-13 国网冀北电力有限公司承德供电公司 A kind of photovoltaic plant node harmonic voltage and harmonic source sensitivity relation analysis method
CN106549376A (en) * 2016-12-08 2017-03-29 东北大学 The branch road comprehensive stability appraisal procedure of power distribution network containing DG based on equivalent node method

Also Published As

Publication number Publication date
CN107508323B (en) 2020-04-21

Similar Documents

Publication Publication Date Title
CN108418255A (en) A kind of extra-high voltage direct-current suitable for the new energy containing high permeability sends Electric power network planning method and system outside
CN105761161A (en) AC and DC power distribution network power supply mode evaluation method
CN109492824B (en) Distributed wind storage system optimization method considering source-network-load multi-party benefits
CN109711706A (en) Consider the active distribution network substation planning method of distributed generation resource and demand response
CN107016496A (en) Hydropower Stations water level control carries the measuring method and system of efficiency
CN102055191A (en) Wide area load shedding control method for quiescent voltage stabilization considering external power grid equivalence
CN108493985B (en) Identification method for out-of-limit weak link of voltage of power distribution network containing distributed power supply
CN105006819B (en) A kind of black-start scheme evaluation method
CN111507529A (en) Economic-environment and energy dynamic pricing based double-layer game micro-energy network capacity optimization planning method
CN106026169A (en) Decomposition-coordination optimization method based on multi-microgrid merging into power distribution network
CN109217297A (en) Alternating current-direct current active distribution network dispatches second order Based On The Conic Model a few days ago
CN113240350B (en) Comprehensive utility evaluation method and system based on energy storage grid connection
CN108512221A (en) A kind of loss computing method containing distributed generation resource and net platform region
CN101882785A (en) Flow analysis system and method for intelligent power distribution networks containing distributed generation
CN105550792A (en) Design method of dynamic peak electricity pricing mechanism
CN110245819A (en) A kind of energy efficiency evaluating method of multiple-energy-source interacted system
CN106655268A (en) Comprehensive benefit analysis method and device for distributed photovoltaic access
CN115796611A (en) Building power distribution system energy efficiency assessment and promotion method, system and storage medium
CN109615246B (en) Method for determining economic operation state of active power distribution network
CN104376205B (en) Access power distribution network distributed generation resource Benefit Evaluation Method based on information content flexible strategy method
CN107274054B (en) Power distribution network operation efficiency evaluation method based on maximum available capacity of same-layer equipment
CN113807658A (en) Resource aggregation potential evaluation method and device based on source network load storage collaborative interaction scheme
CN107508323A (en) A kind of low-voltage platform area distributed photovoltaic access capability appraisal procedure and assessment system
CN110323779B (en) Method and system for dynamically aggregating power of distributed power generation and energy storage device
CN106384323A (en) Energy scheme evaluating method and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant