CN107507099A - Power distribution network based on load transfer Information Matrix turns for training evaluation method - Google Patents

Power distribution network based on load transfer Information Matrix turns for training evaluation method Download PDF

Info

Publication number
CN107507099A
CN107507099A CN201710551010.8A CN201710551010A CN107507099A CN 107507099 A CN107507099 A CN 107507099A CN 201710551010 A CN201710551010 A CN 201710551010A CN 107507099 A CN107507099 A CN 107507099A
Authority
CN
China
Prior art keywords
mtd
mrow
load transfer
msub
mtr
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710551010.8A
Other languages
Chinese (zh)
Other versions
CN107507099B (en
Inventor
张伟
张珠玉
段渴望
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Integrated Electronic Systems Lab Co Ltd
Original Assignee
Integrated Electronic Systems Lab Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Integrated Electronic Systems Lab Co Ltd filed Critical Integrated Electronic Systems Lab Co Ltd
Priority to CN201710551010.8A priority Critical patent/CN107507099B/en
Publication of CN107507099A publication Critical patent/CN107507099A/en
Application granted granted Critical
Publication of CN107507099B publication Critical patent/CN107507099B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes

Abstract

Turn to include for training evaluation method, this method the invention discloses a kind of power distribution network based on load transfer Information Matrix:All switches and disconnecting link information that load transfer critical field collection LTSR and load transfer actual range collection LTPR are established to be included in the range of single turn of confession after record standard operation and practical operation.Establish load transfer standard information battle array LTSI and load transfer actual information battle array LTPI with the action number of devices of all load transfers, load transfer removal of load number, responsible consumer after record standard operation and practical operation restore electricity number, turn load transfer range set associated by supplying.Turn to give based on the dispatcher's load transfer training evaluation method turned for Information Matrix for actual information battle array LTPI comparison by load transfer standard information battle array LTSI and load transfer.The evaluation method can preferably reflect the operating process of dispatcher's load transfer, have preferable practical training evaluative meaning.

Description

Power distribution network based on load transfer Information Matrix turns for training evaluation method
Technical field
It is specifically a kind of to be based on load transfer information the present invention relates to power distribution network dispatcher's load transfer training field The power distribution network of battle array turns for training evaluation method.
Background technology
With the development of intelligent grid, the construction scale of power distribution network expands increasingly, and monitoring device increases increasingly, operational process It is increasingly sophisticated.To ensure the security of power supply quality, economy and reliability, the professional standards of dispatching of power netwoks operations staff are carried Higher requirement is gone out.
Dispatcher training system system is extensive as the important means of the daily training of management and running personnel and accident inversion Using.And the difficult point that rational evaluation is always dispatcher training system is provided to the level and training process of scheduling student.Mesh Preceding dispatcher training system system mainly includes two classes, and one kind is Substation Training Simulation System, and another kind is that power network training is imitated True system.Its methods of marking mainly includes manual intervention point system, tradition plus-minus point-score, artificial intelligence matching method etc..
The characteristics of distribution scheduling person's Training Simulation System has its own, it is only that it had both been different from the protection of Substation Training emulation Vertical property, also different from the protection complexity of major network dispatcher training system.When fault recovery and when of falling load under normal circumstances, need Carry out frequently load transfer operation.The load transfer training evaluation method of power distribution network dispatcher is imitative in training to dispatcher The automatic evaluation method that load transfer operation in very is carried out, has important reality to the practical application of dispatcher training system Meaning.
The content of the invention
It is special with reference to power distribution network it is an object of the invention to solve the evaluation problem of power distribution network dispatcher's load transfer training Point, provide a kind of power distribution network based on load transfer Information Matrix and turn for training evaluation method.
For realizing that the technical scheme of above-mentioned purpose is as follows:
A kind of power distribution network based on load transfer Information Matrix turns to comprise the following steps for training evaluation method, this method:
(1) establish load transfer critical field collection LTSR and load transfer actual range collection LTPR with record standard operation and All switches included after practical operation in the range of single turn of confession and disconnecting link information;
(2) establish load transfer standard information battle array LTSI and load transfer actual information battle array LTPI with record standard operation and The action number of devices of all load transfers, load transfer removal of load number, responsible consumer, which restore electricity, after practical operation counts, turns to supply institute The load transfer range set of association;
(3) turn to give for actual information battle array LTPI comparison with load transfer by load transfer standard information battle array LTSI Based on the dispatcher's load transfer training evaluation method turned for Information Matrix;
Service area to be restored impacted after a certain standard failure is isolated is described with load transfer critical field collection LTSR The set of xegregating unit contained by domain (switch, disconnecting link), it is specially:
LTSR={ ls1,ls2,ls3,…,lsi,…lst}
Wherein, lsiFor the xegregating unit included in load transfer critical field collection, t is load transfer critical field collection institute Number containing xegregating unit.
Service area to be restored impacted after a certain physical fault is isolated is described with load transfer actual range collection LTPR The set of xegregating unit contained by domain (switch, disconnecting link), it is specially:
LTPR={ lp1,lp2,lp3,…,lpi,…lpw}
Wherein, lpiFor the xegregating unit included in load transfer actual range collection, w is load transfer actual range collection institute Number containing xegregating unit.
Establish the letter of the load transfer result after load transfer standard information battle array LTSI comprehensive description Fault Isolation standard operations Breath, it is specially:
Wherein, the load transfer operation information after each one failure of behavior, n is number of faults;1st is classified as load transfer Number of devices is acted, the 2nd is classified as load transfer removal of load number, and the 3rd, which is classified as responsible consumer, restores electricity number, and the 4th is classified as and turns for being closed The load transfer range set of connection.
With the object information of load transfer actual information battle array LTPI recording dispatching person's load transfer practical operations, specifically For:
Wherein, each argument structures of load transfer actual information battle array LTPI and the complete phases of load transfer standard information battle array LTSI Together, repeat no more.
Load transfer actual range collection is with load transfer critical field without common factor, and part is occured simultaneously or the actual model of load transfer Enclose collection and realize that load transfer operation can all cause power failure range to expand in the case of these three comprising load transfer critical field collection, recognize To be faulty operation.When load transfer critical field collection includes load transfer actual range collection, although can be got rid of after restoring electricity Fall sub-load, but not cause the further expansion of power failure range, it is believed that be feasible.Load is described based on above-mentioned thought to turn It is as follows for scale scores LTRS:
The level of dispatcher's load transfer operation is not only relevant with the scope of load transfer, with turning for the removal of load in operation Number, it is ensured that the power supply number of responsible consumer, operation equipment number all have much relations, so in summary factor describes load transfer letter It is as follows to cease battle array scoring LTIS:
Wherein, LTRS (lpi4) represent with lpi4For the load transfer scale scores of load transfer range set;SLTISiFor i-th The load transfer information scoring of individual failure, SLSijFor load transfer operation information battle array the i-th row jth item rating;
For LTRS (lpi4) for 1 situation, it is specified that working as lpijAnd lsijSLS when (j=1~3) are all 0ijFor 1, work as lpij And lsij(j=1~3) only have one be 0 when SLSijFor 0.
Advantageous effects of the present invention:Establish load transfer critical field collection LTSR and load transfer actual range collection LTPR With all switches and disconnecting link information included in the range of single turn of confession after record standard operation and practical operation.Establish load transfer Standard information battle array LTSI and load transfer actual information battle array LTPI is with all load transfers after record standard operation and practical operation Action number of devices, load transfer removal of load number, responsible consumer restore electricity number, turn to supply associated load transfer range set. Turn to give for actual information battle array LTPI comparison by load transfer standard information battle array LTSI and load transfer and be based on turning for letter Cease dispatcher's load transfer training evaluation method of battle array.The evaluation method can preferably reflect the operation of dispatcher's load transfer Journey, there is preferable practical training evaluative meaning.
Brief description of the drawings
Fig. 1 is typical power distribution network figure.
Embodiment
The present invention will be described in detail below:A kind of power distribution network based on load transfer Information Matrix turns for training evaluation Method, this method comprise the following steps:
(1) after establishing Fault Isolation critical field collection FISR and Fault Isolation actual range collection FIPR to describe single failure All switches for being included in standard operation and practical operation isolation range, disconnecting link information;
Service area to be restored impacted after a certain standard failure is isolated is described with load transfer critical field collection LTSR The set of xegregating unit contained by domain (switch, disconnecting link), it is specially:
LTSR={ ls1,ls2,ls3,…,lsi,…lst}
Wherein, lsiFor the xegregating unit included in load transfer critical field collection, t is load transfer critical field collection institute Number containing xegregating unit.
Service area to be restored impacted after a certain physical fault is isolated is described with load transfer actual range collection LTPR The set of xegregating unit contained by domain (switch, disconnecting link), it is specially:
LTPR={ lp1,lp2,lp3,…,lpi,…lpw}
Wherein, lpiFor the xegregating unit included in load transfer actual range collection, w is load transfer actual range collection institute Number containing xegregating unit.
(2) establish Fault Isolation standard information battle array FISI and Fault Isolation actual information battle array FIPI with record standard operation and The action number of devices of all Fault Isolations after practical operation, the contained isolation of responsible consumer number, area of isolation contained by area of isolation are set Fault Isolation range set associated by standby number, failure;
Establish the letter of the load transfer result after load transfer standard information battle array LTSI comprehensive description Fault Isolation standard operations Breath, it is specially:
Wherein, the load transfer operation information after each one failure of behavior, n is number of faults;1st is classified as load transfer Number of devices is acted, the 2nd is classified as load transfer removal of load number, and the 3rd, which is classified as responsible consumer, restores electricity number, and the 4th is classified as and turns for being closed The load transfer range set of connection.
With the object information of load transfer actual information battle array LTPI recording dispatching person's load transfer practical operations, specifically For:
Wherein, each argument structures of load transfer actual information battle array LTPI and the complete phases of load transfer standard information battle array LTSI Together, repeat no more.
(3) provided by standard failure Information Matrix FISI and physical fault Information Matrix FIPI contrast computing a kind of based on event Hinder the Fault Isolation evaluation method of Information Matrix;
Load transfer actual range collection is with load transfer critical field without common factor, and part is occured simultaneously or the actual model of load transfer Enclose collection and realize that load transfer operation can all cause power failure range to expand in the case of these three comprising load transfer critical field collection, recognize To be faulty operation.When load transfer critical field collection includes load transfer actual range collection, although can be got rid of after restoring electricity Fall sub-load, but not cause the further expansion of power failure range, it is believed that be feasible.Load is described based on above-mentioned thought to turn It is as follows for scale scores LTRS:
The level of dispatcher's load transfer operation is not only relevant with the scope of load transfer, with turning for the removal of load in operation Number, it is ensured that the power supply number of responsible consumer, operation equipment number all have much relations, so in summary factor describes load transfer letter It is as follows to cease battle array scoring LTIS:
Wherein, LTRS (lpi4) represent with lpi4For the load transfer scale scores of load transfer range set;SLTISiFor i-th The load transfer information scoring of individual failure, SLSijFor load transfer operation information battle array the i-th row jth item rating;
For LTRS (lpi4) for 1 situation, it is specified that working as lpijAnd lsijSLS when (j=1~3) are all 0ijFor 1, work as lpij And lsij(j=1~3) only have one be 0 when SLSijFor 0.
It is as shown in Figure 1 certain area's distribution network, is made up of two feeder lines, STA1, STA2 is transformer station;DS1, DS2 be with Power station;SP1~SP3 is switching station;#1~#7 is each transformer station, power distribution station and switching station's bus;S1, S9 are that transformer station's outlet is broken Road device switch;S2~S8, S10~S18 are switchgear house and switching station's on-load switch, and S19 is that circuit high-voltage switch gear makees interconnection switch With, on each switch install two distant FTU can on send fault-signal;T1~T12 is distribution transformer;D1~D12 is overhead line Road high-voltage switch, each distribution transforming and transformer station's outlet switch electric current are as schemed, and each rated capacity that switchs is 630A, and T7, T4 are important use Family load.
When high-voltage switch D1, D2 enclose region, and permanent fault occurs, standard operation is to need to divide high-voltage switch D1, D2 Lock can isolated fault, after isolated fault, due to needed for fault down stream turn for load be 400A and, charged S9 can be turned and only had 270A residual capacity, so needing to get rid of 130A load, according to load importance and load, the load that need to be got rid of is The common 130A of T3, T5, T6, T8, and fault down stream block supply can be recovered to interconnection switch S19.Failure upstream load is to power supply Point switch S1 closes a floodgate and can restored electricity.
If dispatcher expands Fault Isolation scope in Fault Isolation operation, it is believed that failure occurs in S2, S6 section.It is negative Lotus turns to have got rid of T4, T8 load in supplying, then load transfer critical field collection LTSR and load transfer actual range collection LTPR, load Turn as shown in table 1 for standard information battle array LTSI and load transfer actual information battle array LTPI:
The load transfer standard of table 1 and actual turn of load transfer supply table
According to step (3) methods described, its load transfer scale scores LTRS=1, load transfer Information Matrix scoring LTIS =25 (2/3+1/2+1/2+1)=66.667 point.

Claims (4)

1. the power distribution network based on load transfer Information Matrix turns for training evaluation method, it is characterised in that:This method includes following step Suddenly:
Step 1: establish load transfer critical field collection LTSR and load transfer actual range collection LTPR with record standard operation and All switches included after practical operation in the range of single turn of confession and disconnecting link information;
Step 2: establish load transfer standard information battle array LTSI and load transfer actual information battle array LTPI with record standard operation and The action number of devices of all load transfers, load transfer removal of load number, responsible consumer, which restore electricity, after practical operation counts, turns to supply institute The load transfer range set of association;
Step 3: turn to give for actual information battle array LTPI comparison with load transfer by load transfer standard information battle array LTSI Based on the dispatcher's load transfer training evaluation method turned for Information Matrix.
2. the power distribution network according to claim 1 based on load transfer Information Matrix turns to exist for training evaluation method, its feature In:
Load transfer critical field collection LTSR described in step 1 with describe after a certain standard failure isolation it is impacted treat it is extensive The set of xegregating unit, xegregating unit therein include switch and disconnecting link contained by multiple power supply area, are specially:
LTSR={ ls1,ls2,ls3,…,lsi,…lst}
Wherein, lsiFor the xegregating unit included in load transfer critical field collection, t is contained by load transfer critical field collection LTSR Xegregating unit number;
Load transfer actual range collection LTPR described in step 1 with describe after a certain physical fault isolation it is impacted treat it is extensive The set of xegregating unit, xegregating unit therein include switch and disconnecting link contained by multiple power supply area, are specially:
LTPR={ lp1,lp2,lp3,…,lpi,…lpw}
Wherein, lpiFor the xegregating unit included in load transfer actual range collection, w, which is that load transfer actual range collection is contained, to be isolated Number of devices.
3. the power distribution network according to claim 2 based on load transfer Information Matrix turns to exist for training evaluation method, its feature In:
The load transfer knot established in step 2 after load transfer standard information battle array LTSI comprehensive description Fault Isolation standard operations Fruit information, it is specially:
<mrow> <mi>L</mi> <mi>T</mi> <mi>S</mi> <mi>I</mi> <mo>=</mo> <mfenced open = "[" close = "]"> <mtable> <mtr> <mtd> <mrow> <msub> <mi>ls</mi> <mn>11</mn> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>ls</mi> <mn>12</mn> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>ls</mi> <mn>13</mn> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>ls</mi> <mn>14</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>ls</mi> <mn>21</mn> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>ls</mi> <mn>22</mn> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>ls</mi> <mn>23</mn> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>ls</mi> <mn>24</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> </mtr> <mtr> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> </mtr> <mtr> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>ls</mi> <mrow> <mi>n</mi> <mn>1</mn> </mrow> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>ls</mi> <mrow> <mi>n</mi> <mn>2</mn> </mrow> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>ls</mi> <mrow> <mi>n</mi> <mn>3</mn> </mrow> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>ls</mi> <mrow> <mi>n</mi> <mn>4</mn> </mrow> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced> </mrow>
Wherein, the load transfer operation information after each one failure of behavior, n is number of faults;1st is classified as the action of load transfer Number of devices, the 2nd is classified as load transfer removal of load number, and the 3rd, which is classified as responsible consumer, restores electricity number, the 4th be classified as turn to supply it is associated Load transfer range set;
With the object information after load transfer actual information battle array LTPI recording dispatching person's load transfer practical operations, it is specially:
<mrow> <mi>L</mi> <mi>T</mi> <mi>P</mi> <mi>I</mi> <mo>=</mo> <mfenced open = "[" close = "]"> <mtable> <mtr> <mtd> <mrow> <msub> <mi>lp</mi> <mn>11</mn> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>lp</mi> <mn>12</mn> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>lp</mi> <mn>13</mn> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>lp</mi> <mn>14</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>lp</mi> <mn>21</mn> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>lp</mi> <mn>22</mn> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>lp</mi> <mn>23</mn> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>lp</mi> <mn>24</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> </mtr> <mtr> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> </mtr> <mtr> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> <mtd> <mo>.</mo> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>lp</mi> <mrow> <mi>n</mi> <mn>1</mn> </mrow> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>lp</mi> <mrow> <mi>n</mi> <mn>2</mn> </mrow> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>lp</mi> <mrow> <mi>n</mi> <mn>3</mn> </mrow> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>lp</mi> <mrow> <mi>n</mi> <mn>4</mn> </mrow> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced> </mrow>
Load transfer each argument structures of actual information battle array LTPI are identical with load transfer standard information battle array LTSI, no longer superfluous State.
4. the power distribution network according to claim 3 based on load transfer Information Matrix turns to exist for training evaluation method, its feature In:
In step 3, load transfer actual range collection is with load transfer critical field without common factor, and part is occured simultaneously or load transfer Comprising load transfer critical field collection, these three situations are considered faulty operation to actual range collection;When load transfer critical field collection During comprising load transfer actual range collection, it is believed that be feasible;Load transfer scale scores LTRS is described such as based on above-mentioned thought Under:
The level of dispatcher's load transfer operation is not only relevant with the scope of load transfer, with turning for the removal of load number in operation, Ensuring the power supply number of responsible consumer, operation equipment number all has much relations, so in summary factor describes load transfer information Battle array scoring LTIS is as follows:
<mrow> <mi>L</mi> <mi>T</mi> <mi>I</mi> <mi>S</mi> <mo>=</mo> <mfrac> <mn>100</mn> <mi>n</mi> </mfrac> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mi>SLTIS</mi> <mi>i</mi> </msub> </mrow>
<mrow> <msub> <mi>SLTIS</mi> <mi>i</mi> </msub> <mo>=</mo> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <mfrac> <mn>1</mn> <mn>4</mn> </mfrac> <mrow> <mo>(</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>j</mi> <mo>=</mo> <mn>1</mn> </mrow> <mrow> <mi>j</mi> <mo>=</mo> <mn>3</mn> </mrow> </munderover> <msub> <mi>SLS</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>+</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow> </mtd> <mtd> <mrow> <mi>L</mi> <mi>T</mi> <mi>R</mi> <mi>S</mi> <mrow> <mo>(</mo> <msub> <mi>lp</mi> <mrow> <mi>i</mi> <mn>4</mn> </mrow> </msub> <mo>)</mo> </mrow> <mo>=</mo> <mn>1</mn> </mrow> </mtd> </mtr> <mtr> <mtd> <mn>0</mn> </mtd> <mtd> <mrow> <mi>L</mi> <mi>T</mi> <mi>R</mi> <mi>S</mi> <mrow> <mo>(</mo> <msub> <mi>lp</mi> <mrow> <mi>i</mi> <mn>4</mn> </mrow> </msub> <mo>)</mo> </mrow> <mo>=</mo> <mn>0</mn> </mrow> </mtd> </mtr> </mtable> </mfenced> </mrow>
Wherein, LTRS (lpi4) represent with lpi4For the load transfer scale scores of load transfer range set;SLTISiFor i-th of event The load transfer information scoring of barrier, SLSijFor load transfer operation information battle array the i-th row jth item rating;
For LTRS (lpi4) for 1 situation, it is specified that working as lpijAnd lsijSLS when (j=1~3) are all 0ijFor 1, work as lpijAnd lsij (j=1~3) only have one be 0 when SLSijFor 0.
CN201710551010.8A 2017-07-07 2017-07-07 Power distribution network transfer training evaluation method based on load transfer information array Active CN107507099B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710551010.8A CN107507099B (en) 2017-07-07 2017-07-07 Power distribution network transfer training evaluation method based on load transfer information array

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710551010.8A CN107507099B (en) 2017-07-07 2017-07-07 Power distribution network transfer training evaluation method based on load transfer information array

Publications (2)

Publication Number Publication Date
CN107507099A true CN107507099A (en) 2017-12-22
CN107507099B CN107507099B (en) 2020-06-09

Family

ID=60679665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710551010.8A Active CN107507099B (en) 2017-07-07 2017-07-07 Power distribution network transfer training evaluation method based on load transfer information array

Country Status (1)

Country Link
CN (1) CN107507099B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110211445A (en) * 2019-04-30 2019-09-06 国家电网有限公司 A kind of distribution network load turns to apply training system for control

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006002527A1 (en) * 2004-07-01 2006-01-12 Cae Inc. Method and system for simulation-based troubleshooting and fault verification in operator-controlled complex systems
CN101958536A (en) * 2010-09-20 2011-01-26 中国电力科学研究院 Distribution network failure isolation and quick power service restoration decision support system
CN102013085A (en) * 2010-12-14 2011-04-13 天津市电力公司 Evaluation method for distribution network reliability
CN105678634A (en) * 2015-11-05 2016-06-15 贵州电网有限责任公司培训与评价中心 Power distribution network dispatcher training simulation scoring method
CN106451422A (en) * 2016-09-30 2017-02-22 国网江西省电力公司电力科学研究院 Simple 10kV distribution line load transfer risk assessment platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006002527A1 (en) * 2004-07-01 2006-01-12 Cae Inc. Method and system for simulation-based troubleshooting and fault verification in operator-controlled complex systems
CN101958536A (en) * 2010-09-20 2011-01-26 中国电力科学研究院 Distribution network failure isolation and quick power service restoration decision support system
CN102013085A (en) * 2010-12-14 2011-04-13 天津市电力公司 Evaluation method for distribution network reliability
CN105678634A (en) * 2015-11-05 2016-06-15 贵州电网有限责任公司培训与评价中心 Power distribution network dispatcher training simulation scoring method
CN106451422A (en) * 2016-09-30 2017-02-22 国网江西省电力公司电力科学研究院 Simple 10kV distribution line load transfer risk assessment platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110211445A (en) * 2019-04-30 2019-09-06 国家电网有限公司 A kind of distribution network load turns to apply training system for control
CN110211445B (en) * 2019-04-30 2021-06-08 国家电网有限公司 Power distribution network load transfer control application training system

Also Published As

Publication number Publication date
CN107507099B (en) 2020-06-09

Similar Documents

Publication Publication Date Title
CN104091482B (en) Operation and maintenance simulating training system of smart distribution grid
CN107293174A (en) Distribution network failure based on track battle array judges training evaluation method
WO2017166735A1 (en) Power-grid self-healing system and self-healing logic thereof in 110kv chain power-supply mode
WO2022037234A1 (en) Transmission-distribution integrated load transfer method facing high-quality power supply service
CN101917064B (en) Back-up protection processing method of digital substation transformer based on GOOSE mode
CN105379135B (en) The system and method diagnosed automatically in real time in power network
CN106451384B (en) Power grid self-healing DSS based on scheduling emergency preplan
CN107221218A (en) Distribution network failure emulation training evaluation method based on isolation information battle array similarity
CN103529708A (en) Pre-operation simulation system for power distribution network and simulation analysis method
CN104331777A (en) Error-preventing management system for county level power grid dispatching operation
CN105337314B (en) A kind of multi-source based on distributed power source black starting-up technology coordinates control fault handling method
CN107293173B (en) Distribution network failure emulation training modeling method based on isolation information battle array
Agrawal et al. Deployment of System Protection Schemes for enhancing reliability of power system: Operational experience of wide area SPS in Northern Regional Power System in India
CN107507099A (en) Power distribution network based on load transfer Information Matrix turns for training evaluation method
CN103647279B (en) A kind of forecast failure set creation method based on plant stand wiring information
CN107316527B (en) Distribution network failure training evaluation method based on Fault Isolation Information Matrix
CN107976598A (en) The test method of SOE signals is lost after intelligent substation line fault
Gupta et al. Protection coordination in multi-terminal HVDC networks for DC fault clearance
Teo et al. Restoration of electrical power supply through an algorithm and knowledge based system
CN107944670A (en) Distribution network failure emulation training evaluation method based on radar map
CN107393365B (en) Power distribution network fault simulation training evaluation method based on feasibility
CN107507098A (en) Distribution network load based on track battle array turns for training evaluation method
CN113380102A (en) Distribution network dispatcher training simulation system and method
Teo et al. Artificial intelligence in diagnosis and supply restoration for a distribution network
CN105119367A (en) Digital spare power automatic switching simulation method based on dynamic topology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant