CN107504324A - A kind of construction technology of the insulation heat preservation layer of deep cooling pipeline connecting device - Google Patents

A kind of construction technology of the insulation heat preservation layer of deep cooling pipeline connecting device Download PDF

Info

Publication number
CN107504324A
CN107504324A CN201710649367.XA CN201710649367A CN107504324A CN 107504324 A CN107504324 A CN 107504324A CN 201710649367 A CN201710649367 A CN 201710649367A CN 107504324 A CN107504324 A CN 107504324A
Authority
CN
China
Prior art keywords
foam
outer jacket
insulation
deep cooling
connecting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710649367.XA
Other languages
Chinese (zh)
Other versions
CN107504324B (en
Inventor
司飞
冀怀岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cool Tech Insulation Jiangsu Co ltd
Original Assignee
Cool Tech Insulation Technology Jiangsu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cool Tech Insulation Technology Jiangsu Co Ltd filed Critical Cool Tech Insulation Technology Jiangsu Co Ltd
Priority to CN201710649367.XA priority Critical patent/CN107504324B/en
Publication of CN107504324A publication Critical patent/CN107504324A/en
Application granted granted Critical
Publication of CN107504324B publication Critical patent/CN107504324B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L59/00Thermal insulation in general
    • F16L59/02Shape or form of insulating materials, with or without coverings integral with the insulating materials
    • F16L59/028Composition or method of fixing a thermally insulating material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L59/00Thermal insulation in general
    • F16L59/02Shape or form of insulating materials, with or without coverings integral with the insulating materials
    • F16L59/029Shape or form of insulating materials, with or without coverings integral with the insulating materials layered

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Insulation (AREA)

Abstract

Present invention is disclosed a kind of construction technology of the insulation heat preservation layer of deep cooling pipeline connecting device; first required to carry out the prefabricated of heat insulating block according to equipment size; then in the longitudinally spaced paste heat-preserving block of equipment surface; equipment surface spray foam bottoming between heat insulating block; when bottoming thickness reaches gross thickness 50%; metal outer jacket is installed in device external successively from the bottom to top; and one layer of just internally space injection-molded foam is often installed; until being installed at apparatus closing end, foam spraying is finally carried out to end socket and then installation coat of metal realizes that integral installation is completed.The present invention provides a kind of construction technology of the insulation heat preservation layer of deep cooling pipeline connecting device, realizes the isothermal holding to connecting equipment, it is ensured that integral heat insulation performance.

Description

A kind of construction technology of the insulation heat preservation layer of deep cooling pipeline connecting device
Technical field
The present invention relates to the heat-insulation system of deep cooling pipeline connecting device, more particularly to a kind of deep cooling pipeline connecting device is exhausted The construction technology of edge heat-insulation layer.
Background technology
With advances in technology with the raising of human living standard, liquefied natural gas (LNG), liquid nitrogen (LN2), liquid oxygen (LO2), the cryogenic liquefying material application such as liquid CO 2 (LCO2), liquefied petroleum gas (LPG) progressively expands, especially LNG, main component are made up of methane.LNG is to be cooled to -162 DEG C by gaseous natural gas at ambient pressure, is allowed to condense into Liquid.Storage and transportation space can be greatlyd save after natural gas liquefaction, volume is about the 1/600 of gaseous volume after liquefaction, and is had The features such as calorific value is big, performance is high.LNG is a kind of cleaning, the efficient energy, is increasingly favored as clean energy resource, a lot LNG is all classified as preferred fuels by country, and ratio of the natural gas in energy supply increases sharply, and it is most swift and violent to turn into whole world growth One of energy industry.LNG is by as the popular energy commodity of next whole world contention after oil.
But domestic LNG is that the deep cooling medium transport of representative still relies on groove tank car or gaseous state pipeline transportation at present, Wherein pipeline is more typical types of transportation, in order to ensure the insulation of pipeline, all can carry out isothermal holding in pipe surface, it is ensured that Its heat-insulating property, some auxiliary equipments can be also then connected between general pipeline, due to being auxiliary equipment, so its thermal requirements Many producers do not do excessive emphasis, but actual proof, the heat-insulating property of equipment have very big shadow to overall conveying insulation Ring.
The content of the invention
A kind of the defects of it is an object of the invention to overcome prior art, there is provided thermal insulating of deep cooling pipeline connecting device The construction technology of layer, realize the isothermal holding to connecting equipment, it is ensured that integral heat insulation performance.
To achieve the above object, the present invention proposes following technical scheme:
A kind of construction technology of the insulation heat preservation layer of deep cooling pipeline connecting device, comprises the following steps:
A, required to determine the size of prefabricated thermal insulation block according to the size of equipment and insulation thickness;
B, cleaning treatment is carried out to equipment surface, it is ensured that equipment surface is without greasy dirt, floating dust and water stain, then using diaphragm by valve Door, pressure gauge, console, which protects, prevents foam splashes from producing pollution;
C, prefabricated section hookup wire is drawn according to 60 ° of deciles of circumference in equipment surface, the hookup wire longitudinal arrangement is in equipment surface, so Deep cooling glue is coated in setting-out position afterwards, and prefabricated section is longitudinally sticked, stands in 60min and treats its solidification;
D, the equipment surface between prefabricated section carries out spray foam bottoming, and bottoming thickness is 4 ~ 5mm, after prime coat solidification, Continue spray foam until depth of foam reaches the 50% of gross thickness;
E, slave unit bottom starts to install first metal outer jacket, and its height is 1m, and transverse lap width is 50mm, outside metal The just injection-molded foam in the space of outer jacket parcel after sheath installation, gun traffic and speed is controlled during injection, it is ensured that injection sky Interior no cavity, and external protection is indeformable;
F, and then on first metal outer jacket continue that second layer metal outer jacket is installed, longitudinal lap joint width is 30mm, horizontal It is 50mm to lap width, same internally space injection-molded foam repeats the above steps until apparatus closing end position;
G, insulation thickness requirement is sprayed into for the carry out foam at end socket, then stainless steel outer jacket is installed at end socket, really Gap between outer jacket and foam is protected to fix by rivet between being less than 2mm metal outer jackets;
H, equipment integral insulation heat-insulation layer is checked, it is ensured that indeformable without bulge, seam.
The prefabricated thermal insulation block is polyurethane material, and its density is 35 ~ 50kg/m3.
The metal outer jacket realizes that overlap joint is fixed using rivet or metal sealing glue.
The metal outer jacket is stainless steel, aluminium skin or galvanized iron sheet.
The construction of disclosed insulation heat preservation layer, is constructed in the form of injection-molded foam, by first spraying Foam bottoming, then coated metal outer jacket, then in metal outer jacket inner space injection-molded foam so that the foam of injection is with beating Bottom foam and metal outer jacket are preferably bonded, and compared to traditional first injection, polishing is wrapped up the form of outer jacket, not only dropped again Low cumbersome property, also improves adhesive property.
Compared with prior art, the construction work of the insulation heat preservation layer for a kind of deep cooling pipeline connecting device that the present invention discloses Skill, there is following usefulness:Constructed using injection-molded foam form, whole work progress is quick and easy, and injection-molded foam is certainly The cementability of body can realize the good bonding with metal outer jacket, improve service life, while ensure that the insulation of equipment Performance.
Embodiment
Below in conjunction with the specific embodiment of the present invention, the technical scheme of the embodiment of the present invention is carried out clear, complete Description.
A kind of construction technology of the insulation heat preservation layer of disclosed deep cooling pipeline connecting device, including following step Suddenly:
A, required to determine the size of prefabricated thermal insulation block according to the size of equipment and insulation thickness;
B, cleaning treatment is carried out to equipment surface, it is ensured that equipment surface is without greasy dirt, floating dust and water stain, then using diaphragm by valve Door, pressure gauge, console, which protects, prevents foam splashes from producing pollution;
C, prefabricated section hookup wire is drawn according to 60 ° of deciles of circumference in equipment surface, the hookup wire longitudinal arrangement is in equipment surface, so Deep cooling glue is coated in setting-out position afterwards, and prefabricated section is longitudinally sticked, stands in 60min and treats its solidification;
D, the equipment surface between prefabricated section carries out spray foam bottoming, and bottoming thickness is 4 ~ 5mm, after prime coat solidification, Continue spray foam until depth of foam reaches the 50% of gross thickness;
E, slave unit bottom starts to install first metal outer jacket, and its height is 1m, and transverse lap width is 50mm, outside metal The just injection-molded foam in the space of outer jacket parcel after sheath installation, gun traffic and speed is controlled during injection, it is ensured that injection sky Interior no cavity, and external protection is indeformable;
F, and then on first metal outer jacket continue that second layer metal outer jacket is installed, longitudinal lap joint width is 30mm, horizontal It is 50mm to lap width, same internally space injection-molded foam repeats the above steps until apparatus closing end position;
G, insulation thickness requirement is sprayed into for the carry out foam at end socket, then stainless steel outer jacket is installed at end socket, really Gap between outer jacket and foam is protected to fix by rivet between being less than 2mm metal outer jackets;
H, equipment integral insulation heat-insulation layer is checked, it is ensured that indeformable without bulge, seam.
The metal outer jacket can use rivet or metal sealing glue to realize that overlap joint is fixed according to field demand, enter Row fluid sealant is fixed to be bonded by glue rifle extrusion at least 4mm adhesive tape in metal level lap-joint, realization.
The metal outer jacket as needed can be according to stainless steel, aluminium skin or galvanized iron sheet.
The prefabricated thermal insulation block is polyurethane hard foam, has good mechanical strength, its performance parameter is referring to table 1
The technology contents and technical characteristic of the present invention have revealed that as above, but those skilled in the art are still potentially based on this Teaching and the announcement of invention and make a variety of replacements and modification without departing substantially from spirit of the present invention, therefore, the scope of the present invention should not It is limited to the content disclosed in embodiment, and various replacements and modification without departing substantially from the present invention should be included, and is weighed for present patent application Profit requires to be covered.

Claims (4)

  1. A kind of 1. construction technology of the insulation heat preservation layer of deep cooling pipeline connecting device, it is characterised in that:Comprise the following steps:
    A, required to determine the size of prefabricated thermal insulation block according to the size of equipment and insulation thickness;
    B, cleaning treatment is carried out to equipment surface, it is ensured that equipment surface is without greasy dirt, floating dust and water stain, then using diaphragm by valve Door, pressure gauge, console, which protects, prevents foam splashes from producing pollution;
    C, prefabricated section hookup wire is drawn according to 60 ° of deciles of circumference in equipment surface, the hookup wire longitudinal arrangement is in equipment surface, so Deep cooling glue is coated in setting-out position afterwards, and prefabricated section is longitudinally sticked, stands in 60min and treats its solidification;
    D, the equipment surface between prefabricated section carries out spray foam bottoming, and bottoming thickness is 4 ~ 5mm, after prime coat solidification, Continue spray foam until depth of foam reaches the 50% of gross thickness;
    E, slave unit bottom starts to install first metal outer jacket, and its height is 1m, and transverse lap width is 50mm, outside metal The just injection-molded foam in the space of outer jacket parcel after sheath installation, gun traffic and speed is controlled during injection, it is ensured that injection sky Interior no cavity, and external protection is indeformable;
    F, and then on first metal outer jacket continue that second layer metal outer jacket is installed, longitudinal lap joint width is 30mm, horizontal It is 50mm to lap width, same internally space injection-molded foam repeats the above steps until apparatus closing end position;
    G, insulation thickness requirement is sprayed into for the carry out foam at end socket, then stainless steel outer jacket is installed at end socket, really Gap between outer jacket and foam is protected to fix by rivet between being less than 2mm metal outer jackets;
    H, equipment integral insulation heat-insulation layer is checked, it is ensured that indeformable without bulge, seam.
  2. 2. the construction technology of the insulation heat preservation layer of deep cooling pipeline connecting device according to claim 1, it is characterised in that:Institute It is polyurethane material to state prefabricated thermal insulation block, and its density is 35 ~ 50kg/m3.
  3. 3. the construction technology of the insulation heat preservation layer of deep cooling pipeline connecting device according to claim 1, it is characterised in that:Institute State metal outer jacket and realize that overlap joint is fixed using rivet or metal sealing glue.
  4. 4. the construction technology of the insulation heat preservation layer of deep cooling pipeline connecting device according to claim 1, it is characterised in that:Institute It is stainless steel, aluminium skin or galvanized iron sheet to state metal outer jacket.
CN201710649367.XA 2017-08-02 2017-08-02 Construction process of insulating layer of cryogenic pipeline connecting equipment Active CN107504324B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710649367.XA CN107504324B (en) 2017-08-02 2017-08-02 Construction process of insulating layer of cryogenic pipeline connecting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710649367.XA CN107504324B (en) 2017-08-02 2017-08-02 Construction process of insulating layer of cryogenic pipeline connecting equipment

Publications (2)

Publication Number Publication Date
CN107504324A true CN107504324A (en) 2017-12-22
CN107504324B CN107504324B (en) 2020-01-31

Family

ID=60690232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710649367.XA Active CN107504324B (en) 2017-08-02 2017-08-02 Construction process of insulating layer of cryogenic pipeline connecting equipment

Country Status (1)

Country Link
CN (1) CN107504324B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109000146A (en) * 2018-07-16 2018-12-14 酷泰克保温科技江苏有限公司 A kind of mobile construction method in bank storage tank thermal insulation layer
CN110861250A (en) * 2019-11-21 2020-03-06 上海宝冶集团有限公司 Foaming and heat-insulating method for low-temperature working condition refrigeration pipeline
CN112524478A (en) * 2020-12-11 2021-03-19 酷泰克保温科技江苏有限公司 Construction process for ultra-large low-temperature liquid-filled insulating layer
CN112555672A (en) * 2020-12-11 2021-03-26 酷泰克保温科技江苏有限公司 Manufacturing process of ultra-large low-temperature liquid-filled insulating layer
CN112594542A (en) * 2020-12-11 2021-04-02 酷泰克保温科技江苏有限公司 Preparation process of ultra-large low-temperature liquid-filled insulating layer

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5699638A (en) * 1980-01-10 1981-08-11 Kubota Ltd Manufacture of heat insulating tube
CN101004238A (en) * 2006-12-03 2007-07-25 岑保卫 Metal insulation layer for equipment and pipe
CN203099220U (en) * 2013-01-15 2013-07-31 中国寰球工程公司 Cryogenic-valve cold insulation structure
CN203907094U (en) * 2014-06-30 2014-10-29 佰焰(天津)燃气科技发展有限公司 Heat preservation coupling that liquefied natural gas filling station used

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5699638A (en) * 1980-01-10 1981-08-11 Kubota Ltd Manufacture of heat insulating tube
CN101004238A (en) * 2006-12-03 2007-07-25 岑保卫 Metal insulation layer for equipment and pipe
CN203099220U (en) * 2013-01-15 2013-07-31 中国寰球工程公司 Cryogenic-valve cold insulation structure
CN203907094U (en) * 2014-06-30 2014-10-29 佰焰(天津)燃气科技发展有限公司 Heat preservation coupling that liquefied natural gas filling station used

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李宪光: "设备和管道采用聚氨酯保温的工程施工", 《冷藏技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109000146A (en) * 2018-07-16 2018-12-14 酷泰克保温科技江苏有限公司 A kind of mobile construction method in bank storage tank thermal insulation layer
CN110861250A (en) * 2019-11-21 2020-03-06 上海宝冶集团有限公司 Foaming and heat-insulating method for low-temperature working condition refrigeration pipeline
CN112524478A (en) * 2020-12-11 2021-03-19 酷泰克保温科技江苏有限公司 Construction process for ultra-large low-temperature liquid-filled insulating layer
CN112555672A (en) * 2020-12-11 2021-03-26 酷泰克保温科技江苏有限公司 Manufacturing process of ultra-large low-temperature liquid-filled insulating layer
CN112594542A (en) * 2020-12-11 2021-04-02 酷泰克保温科技江苏有限公司 Preparation process of ultra-large low-temperature liquid-filled insulating layer

Also Published As

Publication number Publication date
CN107504324B (en) 2020-01-31

Similar Documents

Publication Publication Date Title
CN107504324A (en) A kind of construction technology of the insulation heat preservation layer of deep cooling pipeline connecting device
JP6101826B2 (en) Tank wall with penetrating elements
CN106969257A (en) A kind of construction technology of LNG storage tank heat-insulation system
EG23700A (en) thermally insulated pipeline
US10197220B2 (en) Integrated storage/offloading facility for an LNG production plant
CN103998852A (en) Vessel wall comprising a pipe
CN107420736A (en) A kind of cryogenic storage tank fire lagging
CN204534125U (en) The insulating structure of band gas leakage measuring ability
CN204226958U (en) Lng vacuum tube
KR20150058645A (en) Cargo containment
KR20200093819A (en) Dome barrier structure of independence type storage tank
CN206802745U (en) A kind of self-adhering-type LNG storage tank heat-insulation layer
KR101350804B1 (en) Structure of storing container for liquefied natural gas
CN205664010U (en) Prefabricated cryrogenic spraying winding hot oil line
CN106015765A (en) Prefabricated cryogenic heat-preservation pipeline
CN107013802A (en) A kind of LNG storage tank heat-insulation system
CN206802640U (en) A kind of deep cooling pipeline heat-insulating system
CN107631130A (en) A kind of deep cooling pipeline cold insulation pipe carrier and conduit saddle construction technology
KR102077912B1 (en) Liquefied Gas Storage Tank and Marine Structure having the same
KR101403621B1 (en) Structure and manufacturing method of storing container for liquefied natural gas
KR20150095383A (en) Manufacturing Method Of Insulation Box For Cargo Tank And Structure Of The Same
CN221188987U (en) Rhombic liquid ammonia low-temperature cargo hold insulation structure
CN217713937U (en) Low-temperature liquid pipeline leading-out sealing and heat-insulating structure
KR20220108254A (en) Insulation structure for liquified gas storage tank and method for forming the insulation structure
CN207584366U (en) A kind of LNG storage tank fireproof thermal-insulation layer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221118

Address after: 226,007 Room 1028, No. 188, Jiangguang Road, Suxitong Science and Technology Industrial Park, Nantong City, Jiangsu Province

Patentee after: Nantong Fanhao Thermal Insulation Technology Co.,Ltd.

Address before: No.999, Guangzhou road, Haimen Economic and Technological Development Zone, Haimen City, Nantong City, Jiangsu Province, 226000

Patentee before: COOL TECH INSULATION JIANGSU CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230802

Address after: No.999, Guangzhou road, Haimen Economic and Technological Development Zone, Haimen City, Nantong City, Jiangsu Province, 226000

Patentee after: COOL TECH INSULATION JIANGSU CO.,LTD.

Address before: 226,007 Room 1028, No. 188, Jiangguang Road, Suxitong Science and Technology Industrial Park, Nantong City, Jiangsu Province

Patentee before: Nantong Fanhao Thermal Insulation Technology Co.,Ltd.