CN107489150A - A kind of water construction equipment - Google Patents

A kind of water construction equipment Download PDF

Info

Publication number
CN107489150A
CN107489150A CN201710931810.2A CN201710931810A CN107489150A CN 107489150 A CN107489150 A CN 107489150A CN 201710931810 A CN201710931810 A CN 201710931810A CN 107489150 A CN107489150 A CN 107489150A
Authority
CN
China
Prior art keywords
end pin
elongation
horizontally set
cavity volume
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710931810.2A
Other languages
Chinese (zh)
Other versions
CN107489150B (en
Inventor
廖广强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Market supervision and Administration Bureau of Babu District, Hezhou City
Original Assignee
Ningde Yisheng Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningde Yisheng Intelligent Technology Co Ltd filed Critical Ningde Yisheng Intelligent Technology Co Ltd
Priority to CN201710931810.2A priority Critical patent/CN107489150B/en
Publication of CN107489150A publication Critical patent/CN107489150A/en
Application granted granted Critical
Publication of CN107489150B publication Critical patent/CN107489150B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a kind of water construction equipment, including pedestal and the main frame being fixedly mounted at the top of pedestal, the logical cavity volume for passing through main frame bottom surface is provided with main frame, be correspondingly provided with that left and right elongation is set inside cavity volume up and down first is horizontally set with beam and second and is horizontally set with beam, first, which is horizontally set with beam and second, is horizontally set with elongation end pin at left and right sides of beam and is fixedly connected respectively with inwall at left and right sides of cavity volume, the pedestal top surface of cavity volume bottom is installed with the first engine probeed into cavity volume, the first swing arm that elongation is set upwards is connected with the top of first engine, extension leads to pass through second and be horizontally set with beam and first from bottom to up at the top of first swing arm is horizontally set with beam and convolution is connected, elongation end pin probes into first and is horizontally set with the cavity volume of beam over top at the top of first swing arm, first the first swing arm outer surface for being horizontally set with beam over top is installed with deflecting wheel;The present invention is simple in construction, easy to operate, hammers efficiency high, and effectively pile body sinks and hits predeterminated position, reduces the time of work.

Description

A kind of water construction equipment
Technical field
The present invention relates to water construction field, specifically a kind of water construction equipment.
Background technology
, it is necessary to which pile body is sunk into designed elevation in water construction work progress, now just need to utilize various pile monkeys Beat repeatedly impulsive force and pile body deadweight, overcome the side friction power of pile body and the resistance hammering of pile-end soil layer to realize.Mesh It is preceding using tubular diesel hammer as the most widely used one kind, it be using light diesel as fuel, to environment have pollution, Er Qiezhen Dynamic big, noise height, disturb residents seriously, and can not be hammered in tilted direction, it is impossible to adapt to diversified operating environment.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of water construction equipment, and it can solve the problem that above-mentioned present technology The problem of middle.
The present invention is achieved through the following technical solutions:The present invention a kind of water construction equipment, including pedestal with And the main frame at the top of the pedestal is fixedly mounted on, the logical cavity volume for passing through the main frame bottom surface, the cavity volume are provided with the main frame It is internal be correspondingly provided with that left and right elongation is set up and down first be horizontally set with beam and second and be horizontally set with beam, described first is horizontally set with beam and described second It is horizontally set with elongation end pin at left and right sides of beam to be fixedly connected with inwall at left and right sides of the cavity volume respectively, the seat of the cavity volume bottom Body top surface is installed with the first engine probeed into the cavity volume, and elongation upwards is connected with the top of first engine and is set The first swing arm put, extension leads to pass through described second and be horizontally set with beam and described first from bottom to up at the top of first swing arm is horizontally set with beam And convolution is connected, elongation end pin probes into the described first cavity volume for being horizontally set with beam over top at the top of first swing arm Interior, the described first the first swing arm outer surface for being horizontally set with beam over top is installed with deflecting wheel, the institute above the deflecting wheel State the sliding bar for being provided with that top surface is connected with the cavity volume inner roof wall neat fit and left and right elongation is set in cavity volume, the sliding bar Left side extension is logical to pass through outer wall and neat fit connection on the left of the main frame, and sliding bar right side extension is logical to pass through the main frame Outer right wall and neat fit connection, the sliding bar right side elongation end pin are leant out outside the main frame right flank, lean out the master Neat fit is connected with hammering device in the sliding bar outside machine right flank, and described first on the right side of first swing arm is horizontally set with It is provided with the hammering transmitting device to be connected with the deflecting wheel neat fit in beam, described second on the right side of first swing arm Be horizontally set with beam and be provided with clamping lock regulation device, described second on the upside of the clamping lock regulation device be horizontally set with top surface of the beam provided with to institute The clamping lock transmitting device that hammering transmitting device coordinates clamping lock connection is stated, two groups of walking rollings are symmetrically arranged with before and after the pedestal bottom surface Wheel, former and later two described walking rollers are connected centrally through wheel shaft.
Preferably technical scheme, the left and right sides bottom on the outside of the main frame and top at left and right sides of the pedestal Between be installed with the first axostylus axostyle, outer wall is installed with the handrail set to upper left side elongation on the left of the main frame.
Preferably technical scheme, at left and right sides of first engine outer wall respectively with left and right sides of the cavity volume in The second axostylus axostyle is correspondingly provided between wall, the left and right sides the second axostylus axostyle top is respectively between inwall at left and right sides of the cavity volume Corresponding 3rd axostylus axostyle.
Preferably technical scheme, the hammering device includes being connected with the sliding bar neat fit and elongation up and down The vertical rod of setting, the vertical rod top elongation end pin is leant out outside the sliding bar top surface and the fixed limited sliding block in outer surface, described Bottom of upright rod elongation end pin is leant out outside the sliding bar bottom surface and end pin is provided with hammering plate, the hammering plate and the sliding bar Between the vertical rod outer surface be installed with even block, the vertical rod outer surface even between block and the sliding bar is provided with bullet Property part.
Preferably technical scheme, the hammering transmitting device includes the first guide runner and neat fit is arranged on institute State in the first guide runner and extend the 3rd slide guide bar set up and down, put down in the 3rd slide guide bar in first guide runner Sliding fit is connected with the first slide guide bar that left and right elongation is set, and the first slide guide bar left side end pin and first guide runner are left Side inwall is fixedly connected, and end pin is fixedly connected with first guide runner right side inwall on the right side of the first slide guide bar, and described the Three slide guide bars top extension probes into the described first cavity volume being horizontally set with the upside of beam and top end pin and the sliding bar bottom Portion is fixedly connected, and the described first the 3rd slide guide bar for being horizontally set with the upside of beam in the cavity volume is located at the deflecting wheel right positions, institute The first the 3rd slide guide bar right flank being horizontally set with the cavity volume of beam upside is stated to be horizontally set with the upside of beam in the cavity volume with described first The first elastic component is provided between inwall on the right side of the relative cavity volume of 3rd slide guide bar right flank, the 3rd slide guide bar bottom is stretched Long end pin, which probes into described first and is horizontally set with beam and described second, to be horizontally set with the cavity volume between beam.
Preferably technical scheme, is provided with the second guide runner in the clamping lock transmitting device, in second guide runner The first screw rod set provided with left and right elongation, the first screw rod left side are extended on the left of end pin and second guide runner Wall convolution is connected, and elongation end pin coordinates with inwall convolution on the right side of second guide runner and connected on the right side of first screw rod Connect, be installed with the first cone runner on the left of first screw rod on section outer surface, described first bores described first on the right side of runner Spiral lamination is connected with the slider guide that elongation is set upwards on screw rod, and elongation end pin leans out the card at the top of the slider guide Lock transmitting device top surface is outer and end pin is installed with the connecting rod for extending setting to the left, and elongation end pin is installed with upwards on the left of the connecting rod The clamping lock bar set is extended, the clamping lock bar is located at the leftward position of the 3rd slide guide bar bottom extended end pin and set relatively Put, neat fit is connected with the second slide guide bar that left and right elongation is set, institute in the slider guide on the upside of the first cone runner Elongation end pin at left and right sides of the second slide guide bar is stated to be fixedly connected with inwall at left and right sides of second guide runner respectively.
Preferably technical scheme, the clamping lock regulation device includes the 3rd guide runner and neat fit is arranged on institute The regulation and control sliding block in the 3rd guide runner is stated, is set at the top of the 3rd guide runner with the second guide runner left bottom intercommunication, The regulation and control sliding block inside spin line is connected with the second screw rod that left and right elongation is set, and is extended on the left of second screw rod End pin is connected with the 3rd guide runner inner left wall convolution, elongation end pin and regulation and control power on the right side of second screw rod Machine is connected, and the regulation and control engine outer surface is arranged on the right side of the 3rd guide runner in inwall and is fixedly connected, described Convolution is connected with the second swing arm that elongation is set up and down, second rotation in the regulation and control sliding block on front side of second screw rod Elongation end pin is probeed into second guide runner at the top of bar and end pin is installed with to be connected with the described first cone runner wedging Second cone runner, the second swing arm bottom extended end pin probes into the described second cavity volume being horizontally set with the downside of beam and end pin is consolidated Provided with the first tooth runner.
Preferably technical scheme, described second is horizontally set with the first swing arm outer surface on the downside of beam and is installed with and institute State the second tooth runner that the first tooth runner left-hand end is oppositely arranged.
The beneficial effects of the invention are as follows:
1. by the first the first fixed deflecting wheel in swing arm outer surface for being horizontally set with beam over top, top is set in the cavity volume above deflecting wheel The sliding bar that face is connected with cavity volume inner roof wall neat fit and left and right elongation is set, sliding bar left side extension is logical to be passed through on the left of main frame Outer wall and neat fit connection, sliding bar right side extension is logical to pass through main frame outer right wall and neat fit connection, sliding bar right side Elongation end pin is leant out outside main frame right flank, is leant out in the sliding bar outside main frame right flank neat fit and is connected hammering device, and first First on the right side of swing arm is horizontally set with the hammering transmitting device set in beam to be connected with deflecting wheel neat fit, on the right side of the first swing arm Second is horizontally set with beam and sets clamping lock regulation device, second on the upside of clamping lock regulation device be horizontally set with top surface of the beam set to hammering transmission dress The clamping lock transmitting device for coordinating clamping lock connection is put, continues the reciprocal hammering work for carrying out pile body surface so as to realize to automatically control, Meanwhile the clamping lock work of auto-control control sliding bar, stability when improving transport or carrying can be realized.
2. the vertical rod for including being connected with sliding bar neat fit and elongation is set up and down by hammering device, vertical rod top is stretched Long end pin is leant out outside sliding bar top surface and the fixed limit sliding block in outer surface, and bottom of upright rod elongation end pin is leant out outside sliding bar bottom surface and tail Tip installation hammering plate, the fixed even block in vertical rod outer surface between plate and sliding bar is hammered, even outside the vertical rod between block and sliding bar Surface sets elastic component, and larger impact is produced when reducing hammering so as to realize, plays preferable cushioning effect, and raising uses the longevity Life.
3. the present invention is simple in construction, easy to operate, the hammering work for automatically controlling and continuing reciprocal progress pile body surface can be realized Make, meanwhile, the clamping lock work of auto-control control sliding bar, stability when improving transport or carrying, and time saving province can be realized Power, efficiency high is hammered, effectively pile body sinks and hits predeterminated position, reduces the time of work, reduces financial cost, shorten The duration of construction.
Brief description of the drawings
For ease of explanation, the present invention is described in detail by following specific embodiment and accompanying drawing.
Fig. 1 is a kind of water construction device external overall structure diagram of the present invention;
Fig. 2 is a kind of water construction device interior overall structure diagram of the present invention;
Structural representation when Fig. 3 is after a kind of water construction equipment clamping lock of the present invention;
Fig. 4 is a kind of water construction equipment bottom surface upward view of the present invention.
Embodiment
As shown in Fig. 1-Fig. 4, a kind of water construction equipment of the invention, including pedestal 5 and it is fixedly mounted on the seat The main frame 6 at the top of body 5, is provided with the logical cavity volume 61 for passing through the bottom surface of main frame 6 in the main frame 6, phase up and down inside the cavity volume 61 Should be set provided with left and right elongation first is horizontally set with beam 62 and second and is horizontally set with beam 63, and described first, which is horizontally set with beam 62 and described second, is horizontally set with Elongation end pin in the left and right sides of beam 63 is fixedly connected with the left and right sides inwall of cavity volume 61 respectively, the bottom of cavity volume 61 it is described The top surface of pedestal 5 is installed with the first engine 52 probeed into the cavity volume 61, and the top of the first engine 52 is connected with The first swing arm 55 that elongation is set upwards, the top extension of the first swing arm 55 leads to from bottom to up to be passed through described second and is horizontally set with beam 63 Beam 62 is horizontally set with described first and convolution is connected, and the top of the first swing arm 55 elongation end pin probes into described first and is horizontally set with beam In the cavity volume 61 of 62 over tops, the described first outer surface of the first swing arm 55 for being horizontally set with the over top of beam 62 is installed with Deflecting wheel 552, the interior top surface that is provided with of the cavity volume 61 of the top of deflecting wheel 552 connect with the inner roof wall neat fit of cavity volume 61 Connect and left and right extends the sliding bar 610 set, the left side extension of sliding bar 610 is logical to be passed through the left side outer wall of main frame 6 and put down Sliding fit connects, and the right side extension of sliding bar 610, which leads to, passes through the outer right wall of main frame 6 and neat fit connection, described to push away Elongation end pin in the right side of slide bar 610 is leant out outside the right flank of main frame 6, leans out the sliding bar 610 outside the right flank of main frame 6 Interior neat fit is connected with hammering device 7, described the first of the right side of the first swing arm 55 be horizontally set with beam 62 be provided with to institute The hammering transmitting device of the neat fit of deflecting wheel 552 connection is stated, described the second of the right side of the first swing arm 55 is horizontally set with beam 63 Provided with clamping lock regulation device, described second on the upside of the clamping lock regulation device be horizontally set with the top surface of beam 63 be provided with to the hammering Transmitting device coordinates the clamping lock transmitting device 64 of clamping lock connection, and two groups of walking rollers are symmetrically arranged with before and after the bottom surface of pedestal 5 501, former and later two described walking rollers 501 are connected centrally through wheel shaft 502.
Valuably, it is installed between the left and right sides bottom in the outside of main frame 6 and the left and right sides of the pedestal 5 top First axostylus axostyle 51, the left side outer wall of main frame 6 is installed with the handrail set to upper left side elongation, so as to improve main frame 6 and pedestal 5 Stable connection.
Valuably, the left and right sides outer wall of the first engine 52 phase between the left and right sides inwall of cavity volume 61 respectively The second axostylus axostyle 53 should be provided with, the left and right sides top of the second axostylus axostyle 53 phase between the left and right sides inwall of cavity volume 61 respectively The 3rd axostylus axostyle 54 is answered, so as to improve the stability when operation of the first engine 52, is produced when preventing the first engine 52 from running Rocking causes equipment fluctuation of service.
Valuably, the hammering device 7 includes being connected with the neat fit of sliding bar 610 and extends the vertical of setting up and down Bar 71, the top of the vertical rod 71 elongation end pin is leant out outside the top surface of sliding bar 610 and the fixed limited sliding block 73 in outer surface, described The bottom extended end pin of vertical rod 71 is leant out outside the bottom surface of sliding bar 610 and end pin be provided with hammering plate 74, it is described hammering plate 74 with The outer surface of the vertical rod 71 between the sliding bar 610 is installed with even block 72, described to connect between block 72 and the sliding bar 610 The outer surface of the vertical rod 71 be provided with elastic component 75, so as to realize reduce hammering when produce larger impact, play preferably Cushioning effect, improve service life.
Valuably, the hammering transmitting device includes the first guide runner 621 and neat fit is arranged on described first and led Chute 621 is interior and extends the 3rd slide guide bar 623 set up and down, the 3rd slide guide bar 623 in first guide runner 621 Interior neat fit is connected with the first slide guide bar 622 that left and right elongation is set, the left side end pin of the first slide guide bar 622 and described the The inner left wall of one guide runner 621 is fixedly connected, the right side end pin of the first slide guide bar 622 and the right side of the first guide runner 621 Inwall is fixedly connected, and the top extension of the 3rd slide guide bar 623 probes into the described first cavity volume 61 for being horizontally set with the upside of beam 62 Interior and top end pin is fixedly connected with the bottom of sliding bar 610, and described first is horizontally set with the in the cavity volume 61 of the upside of beam 62 Three slide guide bars 623 are located at the right positions of deflecting wheel 552, described first be horizontally set with the cavity volume 61 of the upside of beam 62 the 3rd lead The right flank of slide bar 623 institute relative with the right flank of the 3rd slide guide bar 623 that described first is horizontally set with the cavity volume 61 of the upside of beam 62 State and be provided with the first elastic component 624 between the right side inwall of cavity volume 61, the bottom extended end pin of the 3rd slide guide bar 623 probes into described One, which is horizontally set with beam 62 and described second, is horizontally set with the cavity volume 61 between beam 63, because the 3rd slide guide bar 623 is by the first elasticity The elastic top pressure active force of part 624, so as to realize reciprocal hammer by the lasting neat fit of the slide guide bar 623 of deflecting wheel 552 and the 3rd Hit work.
Valuably, the second guide runner 641 is provided with the clamping lock transmitting device 64, is provided with second guide runner 641 The first screw rod 642 that left and right elongation is set, the left side of the first screw rod 642 elongation end pin and second guide runner 641 Inner left wall convolution is connected, the right side of the first screw rod 642 elongation end pin and the right side inwall of the second guide runner 641 Convolution is connected, and the first cone runner 643 is installed with the left side section outer surface of the first screw rod 642, and first cone turns Spiral lamination is connected with the slider guide 644 that elongation is set upwards on first screw rod 642 on the right side of wheel 643, described to lead Elongation end pin in the top of sliding block 644 is leant out outside the top surface of clamping lock transmitting device 64 and end pin is installed with the connecting rod for extending setting to the left 646, the left side of the connecting rod 646 elongation end pin is installed with the clamping lock bar 647 that elongation is set upwards, and the clamping lock bar 647 is located at institute State the leftward position of the bottom extended end pin of the 3rd slide guide bar 623 and be oppositely arranged, the described of upside of the first cone runner 643 is led Neat fit is connected with the second slide guide bar 645 that left and right elongation is set, the left and right sides of the second slide guide bar 645 in sliding block 644 Elongation end pin is fixedly connected with the left and right sides inwall of the second guide runner 641 respectively, so as to by clamping lock regulation device and second The transmission of tooth runner 551 and clamping lock transmitting device 64 is connected, and realization automatically controls clamping lock transmitting device 64 and transmitted with hammering The automatic clamping lock mating connection work of device.
Valuably, the clamping lock regulation device includes the 3rd guide runner 631 and neat fit is arranged on the described 3rd and led Regulation and control sliding block 634 in chute 631, the top of the 3rd guide runner 631 are set with the left bottom intercommunication of the second guide runner 641 Put, the regulation and control inside spin line of sliding block 634 is connected with the second screw rod 632 that left and right elongation is set, second spiral The left side of bar 632 elongation end pin is connected with the inner left wall of the 3rd guide runner 631 convolution, and second screw rod 632 is right Side extends end pin and is connected with regulation and control engine 633, and regulation and control engine 633 outer surface is arranged on the 3rd guide runner In 631 right side inwalls and it is fixedly connected, convolution mating connection in the regulation and control sliding block 634 of the front side of the second screw rod 632 There is the second swing arm 635 that elongation is set up and down, the top of the second swing arm 635 elongation end pin probes into second guide runner 641 Interior and end pin is installed with the second cone runner 636 to be connected with the described first cone wedging of runner 643, second swing arm 635 Bottom extended end pin probes into the described second cavity volume 61 being horizontally set with the downside of beam 63 and end pin is installed with the first tooth runner 637, Regulation and control work is automatically controlled so as to realize, improves operating efficiency.
Valuably, described second it is horizontally set with the outer surface of the first swing arm 55 of the downside of beam 63 and is installed with and first tooth The second tooth runner 551 that the left-hand end of runner 637 is oppositely arranged.
During original state, regulation and control sliding block 634 is located at the right-most position in the 3rd guide runner 631, now, makes regulation and control sliding block 634 drive the first tooth runner 637 at utmost away from the second tooth runner 551, meanwhile, make regulation and control sliding block 634 drive the second cone to turn Wheel 636 is at utmost away from the first cone runner 643, and now, the right flank of clamping lock bar 647 and the first guide runner 621 are in same perpendicular Straight plan-position.
When needing to hammer work, pedestal 5 is moved to the opening position for needing to hammer first, then passes through the first engine 52 the first swing arms 55 of drive circle round, and then drive the second tooth runner 551 and deflecting wheel 552 to circle round by the first swing arm 55, now, Second tooth runner 551 is in idling conditions, simultaneously as the 3rd slide guide bar 623 is acted on by the top pressure of the first elastic component 624 Power, the left-hand end of the 3rd slide guide bar 623 is connected with the right side outer surface smoother of deflecting wheel 552, now, returned by deflecting wheel 552 Rotation drives the 3rd slide guide bar 623 to be slided toward the left and right directions of complex edge the first slide guide bar 622, meanwhile, driven and pushed away by the 3rd slide guide bar 623 Slide bar 610 continues back and forth to horizontally slip, and pile body table is carried out by the hammering device 7 on the right-hand end of the 3rd slide guide bar 623 so as to realize The hammering work in face;When hammering completion needs are packed up and are transported, now, the first engine 52 of control stops convolution, meanwhile, control System regulation and control engine 633 drives the second screw rod 632 to circle round, and regulation and control sliding block 634 is driven gradually along the 3rd by the second screw rod 63 Left direction in guide runner 631 slides, until when regulation and control sliding block 634 is moved to the left-most position in the 3rd guide runner 631, Now, the first tooth runner 637 of the bottom of regulation and control sliding block 634 is made to be connected with the wedging of the second tooth runner 551, meanwhile, turn the second cone Wheel 636 be connected with the first cone wedging of runner 643, now, controls the first engine 52 the first swing arm 55 of drive to circle round, and then by the Two tooth runners 551 drive the first tooth runner 637 and the second swing arm 635 to circle round, meanwhile, the second cone is driven by the second swing arm 635 Runner 636 circles round, and now, the first spiral shell on the first cone runner 643 and the first cone runner 643 is driven by the second cone runner 636 Swing arm 642 circles round, meanwhile, drive slider guide 644 gradually along the right direction in the second slide guide bar 645 by the first screw rod 642 Slide, now, by the clamping lock bar 647 of the drivening rod 646 of slider guide 644 and the left side end pin of connecting rod 646 towards the 3rd slide guide bar 623 Opposite side is moved, until the slide guide bar 623 of clamping lock bar 647 and the 3rd abuts against and drives the 3rd slide guide bar 623 to overcome the first elasticity The pressure on top surface of part 624 Slideslip to the right, when the 3rd slide guide bar 623 slides into the right-most position in the first guide runner 621, this When, right-most position that the slider guide 644 in the second guide runner 641 is slid into the second guide runner 641, then control first dynamic Power machine 52 stops convolution, now, completes the clamping lock connection of sliding bar 610, producing to rock when preventing from moving causes device damage, carries High service life.
The beneficial effects of the invention are as follows:
1. by the first the first fixed deflecting wheel in swing arm outer surface for being horizontally set with beam over top, top is set in the cavity volume above deflecting wheel The sliding bar that face is connected with cavity volume inner roof wall neat fit and left and right elongation is set, sliding bar left side extension is logical to be passed through on the left of main frame Outer wall and neat fit connection, sliding bar right side extension is logical to pass through main frame outer right wall and neat fit connection, sliding bar right side Elongation end pin is leant out outside main frame right flank, is leant out in the sliding bar outside main frame right flank neat fit and is connected hammering device, and first First on the right side of swing arm is horizontally set with the hammering transmitting device set in beam to be connected with deflecting wheel neat fit, on the right side of the first swing arm Second is horizontally set with beam and sets clamping lock regulation device, second on the upside of clamping lock regulation device be horizontally set with top surface of the beam set to hammering transmission dress The clamping lock transmitting device for coordinating clamping lock connection is put, continues the reciprocal hammering work for carrying out pile body surface so as to realize to automatically control, Meanwhile the clamping lock work of auto-control control sliding bar, stability when improving transport or carrying can be realized.
2. the vertical rod for including being connected with sliding bar neat fit and elongation is set up and down by hammering device, vertical rod top is stretched Long end pin is leant out outside sliding bar top surface and the fixed limit sliding block in outer surface, and bottom of upright rod elongation end pin is leant out outside sliding bar bottom surface and tail Tip installation hammering plate, the fixed even block in vertical rod outer surface between plate and sliding bar is hammered, even outside the vertical rod between block and sliding bar Surface sets elastic component, and larger impact is produced when reducing hammering so as to realize, plays preferable cushioning effect, and raising uses the longevity Life.
3. the present invention is simple in construction, easy to operate, the hammering work for automatically controlling and continuing reciprocal progress pile body surface can be realized Make, meanwhile, the clamping lock work of auto-control control sliding bar, stability when improving transport or carrying, and time saving province can be realized Power, efficiency high is hammered, effectively pile body sinks and hits predeterminated position, reduces the time of work, reduces financial cost, shorten The duration of construction.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any The change or replacement expected without creative work, it should all be included within the scope of the present invention.Therefore, it is of the invention Protection domain should be determined by the scope of protection defined in the claims.

Claims (8)

1. a kind of water construction equipment, including pedestal and the main frame that is fixedly mounted at the top of pedestal, it is characterised in that:In main frame Provided with the logical cavity volume for passing through main frame bottom surface, be correspondingly provided with that left and right elongation is set inside cavity volume up and down first is horizontally set with beam and second and is horizontally set with Beam, first, which is horizontally set with beam and second, is horizontally set with elongation end pin at left and right sides of beam and is fixedly connected respectively with inwall at left and right sides of cavity volume, cavity volume The pedestal top surface of bottom is installed with the first engine probeed into cavity volume, and elongation upwards is connected with the top of the first engine and is set The first swing arm put, extension leads to pass through second and be horizontally set with beam and first from bottom to up at the top of the first swing arm is horizontally set with beam and convolution coordinates and connected Connect, elongation end pin probes into first and is horizontally set with the cavity volume of beam over top at the top of the first swing arm, and first is horizontally set with the of beam over top One swing arm outer surface is installed with deflecting wheel, be connected in the cavity volume above deflecting wheel provided with top surface with cavity volume inner roof wall neat fit and Left and right extends the sliding bar of setting, and sliding bar left side extension is logical to pass through outer wall and neat fit connection, the sliding bar right side on the left of main frame Side extension is logical to pass through main frame outer right wall and neat fit connection, and elongation end pin is leant out outside main frame right flank on the right side of sliding bar, is visited Neat fit is connected with hammering device in the sliding bar gone out outside main frame right flank, and first on the right side of the first swing arm, which is horizontally set with beam, to be provided with To the hammering transmitting device being connected with deflecting wheel neat fit, second on the right side of the first swing arm is horizontally set with beam to regulate and control provided with clamping lock Device, second on the upside of clamping lock regulation device, which is horizontally set with top surface of the beam, is provided with clamping lock to coordinate clamping lock to be connected with hammering transmitting device Transmitting device, two groups of walking rollers is symmetrically arranged with before and after pedestal bottom surface, former and later two walking rollers interlock centrally through wheel shaft Connection.
A kind of 2. water construction equipment according to claim 1, it is characterised in that:Left and right sides bottom on the outside of the main frame The first axostylus axostyle is installed with left and right sides of portion and the pedestal between top, main frame left side outer wall, which is installed with to upper left side, to be stretched The long handrail set.
A kind of 3. water construction equipment according to claim 1, it is characterised in that:It is outer at left and right sides of first engine Wall is correspondingly provided with the second axostylus axostyle between inwall at left and right sides of the cavity volume respectively, and the left and right sides the second axostylus axostyle top is respectively Corresponding 3rd axostylus axostyle between inwall at left and right sides of the cavity volume.
A kind of 4. water construction equipment according to claim 1, it is characterised in that:The hammering device includes pushing away with described The vertical rod that slide bar neat fit is connected and elongation is set up and down, the vertical rod top elongation end pin are leant out outside the sliding bar top surface And the fixed limited sliding block in outer surface, the bottom of upright rod elongation end pin is leant out outside the sliding bar bottom surface and end pin is provided with hammering Plate, the vertical rod outer surface between the hammering plate and the sliding bar are installed with even block, the even block and the sliding bar Between the vertical rod outer surface be provided with elastic component.
A kind of 5. water construction equipment according to claim 1, it is characterised in that:The hammering transmitting device includes first Guide runner and neat fit are arranged on the 3rd slide guide bar that in first guide runner and elongation is set up and down, and described first leads Neat fit is connected with the first slide guide bar that left and right elongation is set, the first slide guide bar in the 3rd slide guide bar in chute Left side end pin is fixedly connected with the first guide runner inner left wall, end pin and first slide guide on the right side of the first slide guide bar Inwall is fixedly connected on the right side of groove, and extension is probeed into the described first cavity volume being horizontally set with the upside of beam at the top of the 3rd slide guide bar And top end pin is fixedly connected with sliding bar bottom, the described first the 3rd slide guide bar for being horizontally set with the upside of beam in the cavity volume is located at institute Deflecting wheel right positions are stated, the described first the 3rd slide guide bar right flank for being horizontally set with the upside of beam in the cavity volume is horizontally set with described first On the right side of the relative cavity volume of the 3rd slide guide bar right flank on the upside of beam in the cavity volume the first elastic component, institute are provided between inwall State the 3rd slide guide bar bottom extended end pin and probe into described first and be horizontally set with beam and described second and be horizontally set with the cavity volume between beam.
A kind of 6. water construction equipment according to claim 5, it is characterised in that:The is provided with the clamping lock transmitting device Two guide runners, interior the first screw rod for being provided with left and right elongation and setting of second guide runner, the first screw rod left side extends End pin is connected with the second guide runner inner left wall convolution, elongation end pin and described second on the right side of first screw rod Inwall convolution is connected on the right side of guide runner, and the first cone runner is installed with section outer surface on the left of first screw rod, described Spiral lamination is connected with the slider guide that elongation is set upwards, the slide guide on first screw rod on the right side of first cone runner Elongation end pin is leant out outside the clamping lock transmitting device top surface at the top of block and end pin is installed with the connecting rod for extending setting to the left, the company Elongation end pin is installed with the clamping lock bar that elongation is set upwards on the left of bar, and the clamping lock bar is located at the 3rd slide guide bar bottom extended The leftward position of end pin and it is oppositely arranged, neat fit is connected with left and right and stretched in the slider guide on the upside of the first cone runner Long the second slide guide bar set, at left and right sides of the second slide guide bar elongation end pin respectively with left and right sides of second guide runner Inwall is fixedly connected.
A kind of 7. water construction equipment according to claim 6, it is characterised in that:The clamping lock regulation device includes the 3rd Guide runner and neat fit are arranged on the regulation and control sliding block in the 3rd guide runner, with described the at the top of the 3rd guide runner Two guide runner left bottom intercommunications are set, and the regulation and control sliding block inside spin line is connected with the second spiral that left and right elongation is set Bar, the second screw rod left side elongation end pin are connected with the 3rd guide runner inner left wall convolution, second spiral shell Elongation end pin is connected with regulation and control engine on the right side of swing arm, and the regulation and control engine outer surface is arranged on the 3rd guide runner In the inwall of right side and it is fixedly connected, convolution is connected with the regulation and control sliding block on front side of second screw rod extends up and down The second swing arm set, at the top of second swing arm elongation end pin probe into second guide runner and end pin be installed with to Second cone runner of the first cone runner wedging connection, the second swing arm bottom extended end pin probe into described second and are horizontally set with beam In the cavity volume of downside and end pin is installed with the first tooth runner.
A kind of 8. water construction equipment according to claim 7, it is characterised in that:Described second be horizontally set with it is described on the downside of beam The second tooth runner being oppositely arranged with the first tooth runner left-hand end is installed with first swing arm outer surface.
CN201710931810.2A 2017-10-09 2017-10-09 A kind of water construction equipment Active CN107489150B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710931810.2A CN107489150B (en) 2017-10-09 2017-10-09 A kind of water construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710931810.2A CN107489150B (en) 2017-10-09 2017-10-09 A kind of water construction equipment

Publications (2)

Publication Number Publication Date
CN107489150A true CN107489150A (en) 2017-12-19
CN107489150B CN107489150B (en) 2018-11-16

Family

ID=60654134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710931810.2A Active CN107489150B (en) 2017-10-09 2017-10-09 A kind of water construction equipment

Country Status (1)

Country Link
CN (1) CN107489150B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2194926Y (en) * 1994-03-30 1995-04-19 中国矿业大学 Vibration plate compactor
CN2354995Y (en) * 1999-01-06 1999-12-22 王继忠 Hammer for piling process
CN2841768Y (en) * 2005-07-22 2006-11-29 张德明 Impact tamping machine
CN102465530A (en) * 2010-11-02 2012-05-23 陕西龙海工程建设有限公司 Hammer hitting device
CN204418085U (en) * 2015-01-28 2015-06-24 黑龙江科技大学 A kind of classification descaling machine for formation of land
US9695566B2 (en) * 2014-07-31 2017-07-04 Wacker Neuson Produktion GmbH & Co. KG Soil compacting device having spring suspension and guiding

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2194926Y (en) * 1994-03-30 1995-04-19 中国矿业大学 Vibration plate compactor
CN2354995Y (en) * 1999-01-06 1999-12-22 王继忠 Hammer for piling process
CN2841768Y (en) * 2005-07-22 2006-11-29 张德明 Impact tamping machine
CN102465530A (en) * 2010-11-02 2012-05-23 陕西龙海工程建设有限公司 Hammer hitting device
US9695566B2 (en) * 2014-07-31 2017-07-04 Wacker Neuson Produktion GmbH & Co. KG Soil compacting device having spring suspension and guiding
CN204418085U (en) * 2015-01-28 2015-06-24 黑龙江科技大学 A kind of classification descaling machine for formation of land

Also Published As

Publication number Publication date
CN107489150B (en) 2018-11-16

Similar Documents

Publication Publication Date Title
CN107630455B (en) A kind of free of contamination equipment for building
CN106761453B (en) Drilling rod and multifunctional drill based on the design of Lay Lip river Triangle Principle
CN104081033B (en) Check valve driving device for injecting gas
CN103952850A (en) Single-system computerized flat knitting machine with double-system functions
CN107489150A (en) A kind of water construction equipment
CN206750105U (en) A kind of rhombus wing underwater glider with the on-fixed wing
CN108005069A (en) A kind of Novel water conservancy Architectural Equipment
CN107558527A (en) A kind of bridge construction, which carries on construction work at night, uses dust arrester
CN204001864U (en) The combined guided elevator stage of a kind of line slideway and bridging
CN108005070A (en) A kind of practical water construction equipment
CN103952851A (en) Single-system flat knitting machine base plate with double-system functions
CN107740401B (en) A kind of electric power cable stringer
CN107700465A (en) A kind of communication network development device
CN107700464A (en) A kind of Novel Communication networking device
CN107675695A (en) A kind of communication network connecting device
CN107574810B (en) A kind of power line network laying apparatus
CN107604914A (en) A kind of environmentally friendly water conservancy projects
CN107761726B (en) A kind of irrigating apparatus
CN107761727B (en) It is a kind of to pollute small water construction device
CN107806082B (en) A kind of cable stringer
CN107620307B (en) A kind of pollution-free equipment for building
CN209243318U (en) A kind of High Precision Automatic margin to seam left water chestnut density domination mechanism
CN108413333A (en) A kind of building construction lighting device
CN107724372A (en) A kind of cable equipment of stabilization
CN107724369B (en) A kind of cable system stringer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181011

Address after: 317100 No. 80-3, Hai Yang Road, Hai You street, three gate County, Taizhou, Zhejiang.

Applicant after: Three door truth Environmental Protection Technology Co., Ltd.

Address before: 352000 17, 2401, Wanda Plaza, 1 Tian Hu East Road, Jiaocheng District, Ningde, Fujian.

Applicant before: Ningde Yisheng Intelligent Technology Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201125

Address after: 9 Jianshe East Road, Babu District, Hezhou City, Guangxi Zhuang Autonomous Region

Patentee after: Market supervision and Administration Bureau of Babu District, Hezhou City

Address before: 317100 No. 80-3, Hai Yang Road, Hai You street, three gate County, Taizhou, Zhejiang.

Patentee before: SANMEN HUIZHEN ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right