CN107483307A - It is a kind of that table method is searched based on the stipulations standards of DL/T 645 - Google Patents

It is a kind of that table method is searched based on the stipulations standards of DL/T 645 Download PDF

Info

Publication number
CN107483307A
CN107483307A CN201710548877.8A CN201710548877A CN107483307A CN 107483307 A CN107483307 A CN 107483307A CN 201710548877 A CN201710548877 A CN 201710548877A CN 107483307 A CN107483307 A CN 107483307A
Authority
CN
China
Prior art keywords
electric energy
energy meter
concentrator
intelligent electric
address
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710548877.8A
Other languages
Chinese (zh)
Inventor
王伟峰
陆春光
张宏达
李波
张国成
陶晖
魏明林
周淦林
蒋立志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Huayun Information Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Huayun Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Zhejiang Huayun Information Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710548877.8A priority Critical patent/CN107483307A/en
Publication of CN107483307A publication Critical patent/CN107483307A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • H04L12/40Bus networks
    • H04L12/403Bus networks with centralised control, e.g. polling
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C19/00Electric signal transmission systems
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L61/00Network arrangements, protocols or services for addressing or naming
    • H04L61/45Network directories; Name-to-address mapping
    • H04L61/4552Lookup mechanisms between a plurality of directories; Synchronisation of directories, e.g. metadirectories
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Abstract

It is a kind of that table method is searched based on the stipulations standards of DL/T 645, it is related to a kind of acquisition method.At present, when the situation for newly-increased electric energy meter occur, when execution searches table automatically, then the efficiency for searching table can be largely effected on because of the presence of original electric energy meter.The present invention comprises the following steps:1)Concentrator communicates with intelligent electric energy meter;2)After intelligent electric energy meter receives the abbreviated addressing message of concentrator, judge whether to receive any message for its address of concentrator transmission in setting time, if being then not responding to the abbreviated addressing message, otherwise respond abbreviated addressing message, send its address information;3)The address information for each intelligent electric energy meter that concentrator storage receives, after generating the electric energy meter address history on its line of RS 485, active reporting is to acquisition system main website.This skill scheme greatly improves and searches table efficiency in the case of increment electric energy meter.

Description

It is a kind of that table method is searched based on the stipulations standards of DL/T 645
Technical field
The present invention relates to a kind of acquisition method, more particularly to a kind of table method is searched based on the stipulations standards of DL/T 645.
Background technology
In the power information acquisition system of Utilities Electric Co., concentrator passes through the stipulations standards of DL/T 645 and intelligent electric energy meter Communication, according to the content in the stipulations standards systems of DL/T 645, physical electrical interface uses semiduplex RS-485 standard serials Bus electric interfaces, and the half-duplex operation mode of main-slave structure is defined as on data link level, wherein based on concentrator Stand, intelligent electric energy meter is slave station, and each intelligent electric energy meter has each unique mailing address coding, according to field application situation Difference, the electric energy meter quantity that can access in every RS-485 bus can at most reach 100, show in the application of Utilities Electric Co. , install and safeguard for convenience, typically require that concentrator has and search table function automatically, be i.e. concentrator searches for its RS-485 automatically Electric energy table address on line, for active reporting to acquisition system main website, this method is installed for the first time in equipment searches table after forming archives When it is still relatively efficient, but in the event of the situation of newly-increased electric energy meter, perform it is automatic search table when, then can The efficiency for searching table is largely effected on because of the presence of original electric energy meter, needs to improve this increment electricity using a kind of method Table efficiency is searched in the case of energy table.
The content of the invention
The technical problem to be solved in the present invention and the technical assignment proposed are prior art to be improved with being improved, There is provided it is a kind of table method is searched based on the stipulations standards of DL/T 645, to put forward efficient purpose.Therefore, the present invention takes following skill Art scheme.
A kind of table method of searching based on the stipulations standards of DL/T 645 comprises the following steps:
1)Concentrator is communicated by the stipulations marks of DL/T 645 with intelligent electric energy meter;Concentrator is main website, and intelligent electric energy meter is slave station; Concentrator sends abbreviated addressing message to electric energy meter;
2)After intelligent electric energy meter receives the abbreviated addressing message of concentrator, judge whether intelligent electric energy meter receives in setting time Cross any message for its address of concentrator transmission, if being then not responding to the abbreviated addressing message, otherwise intelligent electric energy meter The abbreviated addressing message of concentrator is responded, sends its address information;
3)The address information for each intelligent electric energy meter that concentrator storage receives, generate the electric energy meter address history on its RS-485 line Afterwards, active reporting is to acquisition system main website.
Intelligent electric energy meter is within a certain period of time(Time value can be set according to actual conditions)If received concentrator Any message for its address sent, then any message that address field is abbreviated addressing is not responding to, can so be carried significantly Table efficiency is searched in the case of high increment electric energy meter.
As further improving and supplementing to above-mentioned technical proposal, present invention additionally comprises following additional technical feature.
Further, in step 2)In, when intelligent electric energy meter is not receive appointing for concentrator transmission in setting time When what is directed to the message of its address, acknowledgement frame is sent after intelligent electric energy meter random delay, the address field of acknowledgement frame returns to intelligence electricity Can table address.
Further, after intelligent electric energy meter accesses RS-485, actively its address information is sent to concentrator.
Further, concentrator judges whether do not have in reception time-out time according to the electric energy meter address history of preservation The information that all intelligent electric energy meters are replied is received, if not receiving all intelligent electric energy meters time receiving concentrator in time-out time Multiple information, then abbreviated addressing message is sent again.
Further, if after concentrator repeatedly sends abbreviated addressing message, all intelligent electric energy meters are not received still and are returned Multiple information, then roll-call copy reading is carried out to not successful intelligent electric energy meter.
Further, after the most three times transmissions abbreviated addressing messages of concentrator, if all intelligent electric energy still can not be received The information that table is replied, then carry out roll-call copy reading to not successful intelligent electric energy meter.
Further, the frame format of acknowledgement frame includes start-of-frame, address field, start-of-frame, control code, data field length Degree, data field, check code and end mark.
Further, concentrator is in abbreviated addressing, and from low level, the remaining high-order AAH that mends carries out meter reading as asterisk wildcard Operation, the address field of electric energy meter acknowledgement frame return to actual mailing address.The number of transmission abbreviated addressing to concentrator is carried out Limitation, after the address information of most of intelligent electric energy meter is obtained, the intelligent electric energy meter of fraction is polled, effectively improved Efficiency, while communication pressure is also reduced, reduce influences on other business data transmissions.
Beneficial effect:
1st, intelligent electric energy meter does not ring then within a certain period of time if receiving any message for its address of concentrator transmission Any message for answering address field to be abbreviated addressing, it can so greatly improve and search table efficiency in the case of increment electric energy meter.
2nd, after for abbreviated addressing is employed many times, roll-call copy reading still is carried out without successful intelligent electric energy meter, improves effect While rate, ensure the acquisition of the address information of intelligent electric energy meter.
3rd, information is sent after each intelligent electric energy meter random delay, avoids congestion, improve the reliability of work.
4th, the number of the abbreviated addressing of concentrator is limited, it is right after the address of most of intelligent electric energy meter is obtained The intelligent electric energy meter of fraction is polled, and effectively improves efficiency, while also reduces communication pressure, is reduced to other business datums Transmission influences.
5th, avoid intelligent electric energy meter from uploading the address information repeated to concentrator, reduce communication pressure, reduce to other industry Data transfer of being engaged in influences.
Brief description of the drawings
Fig. 1 is the electric energy meter flow chart of the present invention.
Embodiment
Technical scheme is described in further detail below in conjunction with Figure of description.
Embodiment one:
As shown in figure 1, the present invention comprises the following steps:
1)Concentrator is communicated by the stipulations marks of DL/T 645 with intelligent electric energy meter;Concentrator is main website, and intelligent electric energy meter is slave station; Concentrator sends abbreviated addressing message to electric energy meter;
2)After intelligent electric energy meter receives the abbreviated addressing message of concentrator, judge whether intelligent electric energy meter receives in setting time Cross any message for its address of concentrator transmission, if being then not responding to the abbreviated addressing message, otherwise intelligent electric energy meter The abbreviated addressing message of concentrator is responded, sends its address information;
3)The address information for each intelligent electric energy meter that concentrator storage receives, generate the electric energy meter address history on its RS-485 line Afterwards, active reporting is to acquisition system main website.
Intelligent electric energy meter was within a certain period of time if received any message for its address of concentrator transmission, then not Response address domain is any message of abbreviated addressing, can so greatly improve and search table efficiency in the case of increment electric energy meter.Together When, avoid intelligent electric energy meter from uploading the useless address information repeated to concentrator, reduce communication pressure, reduce to other business Data transfer influences.
The frame format of acknowledgement frame include start-of-frame, address field, start-of-frame, control code, data field length, data field, Check code and end mark.Frame format is as shown in table 1:
Table 1
The abbreviated addressing of address field, from some low levels, the remaining high-order AAH that mends carries out meter reading operation, electric energy meter as asterisk wildcard The address field of acknowledgement frame returns to actual mailing address.
In order to avoid congestion, the reliability of work is improved.In step 2)In, when intelligent electric energy meter be in setting time not When receiving any message for its address of concentrator transmission, acknowledgement frame, response are sent after intelligent electric energy meter random delay The address field of frame returns to intelligent electric energy meter address.Information is sent after each intelligent electric energy meter random delay, avoids congestion, improves work The reliability of work.
In order to improve efficiency, after intelligent electric energy meter accesses RS-485, actively its address information is sent to concentrator.
To improve the reliability of work, while efficiency is improved, ensure the acquisition of the address information of intelligent electric energy meter, collect Middle device judges whether that not receiving all intelligent electric energy meters in reception time-out time returns according to the electric energy meter address history of preservation Multiple information, if not receiving the information that all intelligent electric energy meters are replied receiving concentrator in time-out time, send again Abbreviated addressing message.After if concentrator repeatedly sends abbreviated addressing message, do not receive what all intelligent electric energy meters were replied still Information, then roll-call copy reading is carried out to not successful intelligent electric energy meter.In the present embodiment, the most three times transmissions of concentrator are condensed Message is addressed, if can not still receive the information that all intelligent electric energy meters are replied, not successful intelligent electric energy meter is carried out Roll-call copy reading.
A kind of specific embodiment that table method is the present invention of searching based on the stipulations standards of DL/T 645 shown in figure 1 above, Substantive distinguishing features of the present invention and progress have been embodied, under the enlightenment of the present invention, it can have been entered according to the use needs of reality The equivalent modifications of row shape, structure etc., this programme protection domain row.

Claims (8)

1. a kind of search table method based on the stipulations standards of DL/T 645, it is characterised in that comprises the following steps:
1)Concentrator is communicated by the stipulations marks of DL/T 645 with intelligent electric energy meter;Concentrator is main website, and intelligent electric energy meter is slave station; Concentrator sends abbreviated addressing message to electric energy meter;
2)After intelligent electric energy meter receives the abbreviated addressing message of concentrator, judge whether intelligent electric energy meter receives in setting time Cross any message for its address of concentrator transmission, if being then not responding to the abbreviated addressing message, otherwise intelligent electric energy meter The abbreviated addressing message of concentrator is responded, sends its address information;
3)The address information for each intelligent electric energy meter that concentrator storage receives, generate the electric energy meter address history on its RS-485 line Afterwards, active reporting is to acquisition system main website.
A kind of table method is searched based on the stipulations standards of DL/T 645 2. according to claim 1, it is characterised in that:In step 2)In, when intelligent electric energy meter is any message for its address for not receiving concentrator transmission in setting time, intelligence Acknowledgement frame can be sent after electric energy meter random delay, the address field of acknowledgement frame returns to intelligent electric energy meter address.
A kind of table method is searched based on the stipulations standards of DL/T 645 3. according to claim 1, it is characterised in that:Work as intelligence After electric energy meter access RS-485, actively its address information is sent to concentrator.
A kind of table method is searched based on the stipulations standards of DL/T 645 4. according to claim 1, it is characterised in that:Concentrator According to the electric energy meter address history of preservation, judge whether not receiving what all intelligent electric energy meters were replied in reception time-out time Information, if not receiving the information that all intelligent electric energy meters are replied receiving concentrator in time-out time, send condense again Address message.
A kind of table method is searched based on the stipulations standards of DL/T 645 5. according to claim 4, it is characterised in that:If concentrate After device repeatedly sends abbreviated addressing message, the information that all intelligent electric energy meters are replied is not received still, then to not successful Intelligent electric energy meter carries out roll-call copy reading.
A kind of table method is searched based on the stipulations standards of DL/T 645 6. according to claim 5, it is characterised in that:Concentrator After most three times send abbreviated addressing messages, if can not still receive the information that all intelligent electric energy meters are replied, to not into The intelligent electric energy meter of work(carries out roll-call copy reading.
A kind of table method is searched based on the stipulations standards of DL/T 645 7. according to claim 1, it is characterised in that:Acknowledgement frame Frame format include start-of-frame, address field, start-of-frame, control code, data field length, data field, check code and end mark.
A kind of table method is searched based on the stipulations standards of DL/T 645 8. according to claim 1, it is characterised in that:Concentrator In abbreviated addressing, from low level, the remaining high-order AAH that mends carries out meter reading operation, the address of electric energy meter acknowledgement frame as asterisk wildcard Domain returns to actual mailing address.
CN201710548877.8A 2017-07-07 2017-07-07 It is a kind of that table method is searched based on the stipulations standards of DL/T 645 Pending CN107483307A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710548877.8A CN107483307A (en) 2017-07-07 2017-07-07 It is a kind of that table method is searched based on the stipulations standards of DL/T 645

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710548877.8A CN107483307A (en) 2017-07-07 2017-07-07 It is a kind of that table method is searched based on the stipulations standards of DL/T 645

Publications (1)

Publication Number Publication Date
CN107483307A true CN107483307A (en) 2017-12-15

Family

ID=60596199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710548877.8A Pending CN107483307A (en) 2017-07-07 2017-07-07 It is a kind of that table method is searched based on the stipulations standards of DL/T 645

Country Status (1)

Country Link
CN (1) CN107483307A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111009110A (en) * 2019-11-28 2020-04-14 江苏智臻能源科技有限公司 Method and hardware equipment for collecting load identification data of user electric meter
CN111212104A (en) * 2019-12-05 2020-05-29 宁波三星智能电气有限公司 Automatic meter searching method for electric meter acquisition terminal
CN112114192A (en) * 2020-07-29 2020-12-22 宁波三星医疗电气股份有限公司 Electric power acquisition terminal meter searching method, electronic equipment and meter searching system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1547366A (en) * 2003-12-03 2004-11-17 何世刚 Automatic addressing method for electronic instruments and application
WO2006021963A2 (en) * 2004-08-26 2006-03-02 Aquate Industries Ltd. Meter readout system
CN101324989A (en) * 2007-06-12 2008-12-17 上海协霖电子有限公司 Automatic recognition technique of electrical energy meter in centralized meter reading system
CN102176726A (en) * 2010-12-16 2011-09-07 中国电力科学研究院 Address self-adaption method in electric energy meter information acquisition system
CN102299977A (en) * 2011-08-08 2011-12-28 深圳市金正方科技有限公司 Method for automatic register of electric energy meter by collector and collector
CN102779403A (en) * 2012-07-30 2012-11-14 天津万华股份有限公司 Ultrasonic heat meter with plug-and-play M-BUS interface
CN103731193A (en) * 2014-01-02 2014-04-16 瑞斯康微电子(深圳)有限公司 Wireless automatic relay networking method and meter reading system
CN104217566A (en) * 2014-09-16 2014-12-17 北京天公瑞丰科技有限公司 Intelligent meter searching method and system for type II collector

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1547366A (en) * 2003-12-03 2004-11-17 何世刚 Automatic addressing method for electronic instruments and application
WO2006021963A2 (en) * 2004-08-26 2006-03-02 Aquate Industries Ltd. Meter readout system
CN101324989A (en) * 2007-06-12 2008-12-17 上海协霖电子有限公司 Automatic recognition technique of electrical energy meter in centralized meter reading system
CN102176726A (en) * 2010-12-16 2011-09-07 中国电力科学研究院 Address self-adaption method in electric energy meter information acquisition system
CN102299977A (en) * 2011-08-08 2011-12-28 深圳市金正方科技有限公司 Method for automatic register of electric energy meter by collector and collector
CN102779403A (en) * 2012-07-30 2012-11-14 天津万华股份有限公司 Ultrasonic heat meter with plug-and-play M-BUS interface
CN103731193A (en) * 2014-01-02 2014-04-16 瑞斯康微电子(深圳)有限公司 Wireless automatic relay networking method and meter reading system
CN104217566A (en) * 2014-09-16 2014-12-17 北京天公瑞丰科技有限公司 Intelligent meter searching method and system for type II collector

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111009110A (en) * 2019-11-28 2020-04-14 江苏智臻能源科技有限公司 Method and hardware equipment for collecting load identification data of user electric meter
CN111212104A (en) * 2019-12-05 2020-05-29 宁波三星智能电气有限公司 Automatic meter searching method for electric meter acquisition terminal
CN111212104B (en) * 2019-12-05 2022-07-29 宁波三星智能电气有限公司 Automatic meter searching method for electricity meter acquisition terminal
CN112114192A (en) * 2020-07-29 2020-12-22 宁波三星医疗电气股份有限公司 Electric power acquisition terminal meter searching method, electronic equipment and meter searching system

Similar Documents

Publication Publication Date Title
CN105450489B (en) The preferential efficient field bus systems of HEBus and communication means for realizing most short message of output
CN107464412A (en) A kind of electric energy meter event information copy reading method
CN107483307A (en) It is a kind of that table method is searched based on the stipulations standards of DL/T 645
CN102608962B (en) A kind of power information collecting device automatic maintenance method from bottom to top
CN107516409A (en) Power information acquisition system electric energy meter cognitive method based on narrow-band power line carrier
CN101281214B (en) Remote meter reading system heart-throb frame real-time detection method
CN101964739B (en) Data transmission method, device and system
CN102752227B (en) A kind of network-building method of power user power consumption information acquisition system, website and system
CN102737065A (en) Method and device for acquiring data
CN103778772B (en) Framing and interconnection transmitting method in electricity utilization information collecting system
CN102053935A (en) MODBUS serial communication protocol-based communication method
CN102637352A (en) Remote meter reading method and system, primary electric energy meter and secondary electric energy meter
CN103247157A (en) Electric quantity data wireless acquisition device and electric quantity data acquisition system
CN103996276A (en) Remote transmission system and method for data of power plant
CN104301244A (en) Cluster communication system and method of large-scale power distribution network system
CN103442003B (en) Data acquisition towards SCADA system backfills system and method
CN103543326A (en) System of measuring generating power of photovoltaic modules
CN103578251A (en) Micropower wireless networking method based on flooding
CN105307282B (en) A kind of method and device preventing multiple users access interference
CN103577485A (en) Master and slave mode inquiry system and method
CN103248547A (en) Fast data capture method for slave station in Modbus RTU (remote terminal unit) and slave station
CN110932393B (en) Substation information protection master station system and data initialization method thereof
CN103428677B (en) The sending method and signaling channel of grouping busihess data send the method for reseptance of information
CN102523580A (en) M2M (Machine-to-Machine/Man) service terminal data processing method and M2M service card as well as M2M terminal data processing card
CN109632842A (en) A kind of the CT detector and its application method of module serial structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171215

RJ01 Rejection of invention patent application after publication