CN107483165A - Merge method, apparatus, base station and the user equipment of feedback - Google Patents
Merge method, apparatus, base station and the user equipment of feedback Download PDFInfo
- Publication number
- CN107483165A CN107483165A CN201610405714.XA CN201610405714A CN107483165A CN 107483165 A CN107483165 A CN 107483165A CN 201610405714 A CN201610405714 A CN 201610405714A CN 107483165 A CN107483165 A CN 107483165A
- Authority
- CN
- China
- Prior art keywords
- subframes
- phich
- offset
- pusch
- feedback
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0053—Allocation of signaling, i.e. of overhead other than pilot signals
- H04L5/0055—Physical resource allocation for ACK/NACK
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
A kind of method, apparatus, base station and user equipment for merging feedback, the described method comprises the following steps:The user equipment offset-lists of all feedbacks to be received are informed, the offset-lists are used to indicate the corresponding relation of difference PUSCH subframes and offset when calculating PHICH resource;For all PUSCH subframes to be feedback, according to offset corresponding to every PUSCH subframes, the PHICH resource used for the HARQ feedback of each PUSCH subframes in PHICH subframes is calculated;PHICH is sent to the user equipment of all feedbacks to be received in the PHICH subframes.The present invention program can make HARQ feedback that user equipment determines to merge different PUSCH subframes in the feedback corresponding PHICH resource in same PHICH subframes, so as to correctly obtaining information.
Description
Technical field
The present invention relates to wireless communication technology, more particularly to a kind of method, apparatus, base station and user for merging feedback to set
It is standby.
Background technology
Long Term Evolution (Long Term Evolution, LTE) system is by third generation partner program (The 3rd
Generation Partnership Project, 3GPP) UMTS (Universal that organizes to set up
Mobile Telecommunications System, UMTS) technical standard, in December, 2004 in the meeting of 3GPP Toronto
Formally set up the project and start.LTE system introduces OFDM (Orthogonal Frequency Division
Multiplexing, OFDM) and the key technology such as multiple-input and multiple-output (Multi-Input&Multi-Output, MIMO), show
Work adds spectrum efficiency and message transmission rate, and supports various bandwidth to distribute:1.4MHz, 3MHz, 5MHz, 10MHz,
15MHz and 20MHz etc., and global main flow 2G/3G frequency ranges and some newly-increased frequency ranges are supported, thus frequency spectrum distribution is more flexible, is
System capacity and covering are also obviously improved.The more flattening of the LTE system network architecture is simplified, and reduces network node and system is answered
Miscellaneous degree, so as to reduce Time Delay of Systems, also reduce network design and maintenance cost.LTE system is supported and other 3GPP systems
Interoperability.Different according to duplex mode, LTE system is divided into FDD (Frequency Division Duplex, FDD) LTE
With time division duplex (Time Division Duplex, TDD) LTE.FDD LTE up-downgoings use paired UHF band reception and transmission
Data, and TDD LTE up-downgoings are then transmitted using identical frequency range on different time slots.
In FDD LTE, user equipment (User Equipment, UE) uses the physics of designated spectrum resource in subframe n
Uplink Shared Channel (Physical Uplink Shared Channel, PUSCH) carries out transmitting uplink data, and base station parsing is used
The upstream data that family equipment is sent, and physical mixed automatic re-transmission indicating channel (Physical is sent on subframe n+4
Hybrid ARQ Indicator Channel, PHICH), instruction hybrid automatic repeat-request (Hybrid Automatic
Repeat Request, HARQ) feedback information, that is, confirm (Acknowledgement, ACK) or negative acknowledge (Negative
Acknowledgment, NACK).Specifically, if it is possible to accurately receive upstream data, then base station is on subframe n+4 PHICH
Instruction confirms;If can not accurately receive upstream data or be not received by upstream data, PHICH of the base station in subframe n+4
Upper instruction negative acknowledge.
In TDD LTE, user equipment carries out transmitting uplink data in subframe n, and base station is needed in subframe n+k (k>=4)
PHICH on indicate ACK or NACK, it should be pointed out that there are unique k values to correspond to therewith for specified n values.
PHICH transmission can carry out tissue in the form of PHICH groups, and multiple PHICH channels in 1 PHICH group use
The multiplex mode of orthogonal spreading sequence takes identical time-frequency domain physical resource.For example, in normal cyclic prefix (Cyclic
Prefix, CP) when, a PHICH group is multiplexed 8 PHICH channels, there is provided 8 PHICH resources, i.e. base station can be to 8 users
Equipment indicates the ACK or NACK (it is assumed that a user equipment only transmits a transmission block) of its uplink.PHICH resource by
PHICH groups identify and the interior mark of group together decides on.User equipment is by transmitting the Physical Resource Block shared by upstream data
Position (the minimum thing of the user equipment in first slot transmission upstream data of (Physical Resource Block, PRB)
Manage resource block index) and demodulation reference signal (De-Modulation Reference Signal, DMRS) circulation
Displacement (Cyclic Shift, CS) determines to identify in the PHICH groups mark and group of a PHICH resource.
Usual LTE is always deployed in mandate (licensed) frequency spectrum resource that operator possesses, but authorizes frequency spectrum resource non-
It is often rare, therefore operator starts consideration and makes full use of unauthorized (unlicensed) frequency spectrum resource, such as 5GHz frequency spectrum resource
Carry out data transmission., it is necessary to say (Listen Before afterwards using first listening before base station is using unlicensed spectrum resource
Talk, LBT) mechanism, monitoring whether have other users such as WLAN (Wireless Local Area Networks,
WLAN the unlicensed spectrum resource) is used, if it is determined that the channel of unlicensed spectrum is in busy condition, then needs
Treat;When it is determined that the channel of unlicensed spectrum is in idle condition, then the unlicensed spectrum resource of a period of time can be used.Example
Such as, when Japan can at most be used continuously up to 4ms unlicensed spectrum resource, when other countries allow continuous use
Between can be with longer.When this unlicensed spectrum resource is using completing, base station needs to discharge the unlicensed spectrum resource, so
Monitor the right to use for obtaining unlicensed frequencies resource next time again afterwards.
When base station sends PHICH in the channel of unlicensed spectrum, if the channel of unlicensed spectrum is in busy condition,
Then base station needs to wait and sends PHICH after postponing several subframes, it is possible to it is anti-HARQ corresponding to multiple PUSCH subframes occur
The situation waiting for transmission such as feedforward information.The base station sends HARQ feedback corresponding to multiple PUSCH subframes in same PHICH subframes
Situation is referred to as merging feedback.
In the prior art, when base station is closed in same PHICH subframes to HARQ feedback corresponding to multiple PUSCH subframes
And when feeding back, the HARQ feedback of different PUSCH subframes is possible to correspond to same PHICH resource simultaneously, causes user equipment
Every PUSCH subframes corresponding PHICH resource in the PHICH subframes can not be determined, also can not be just correctly received anti-
Feedforward information.
The content of the invention
Present invention solves the technical problem that it is to provide a kind of method, apparatus, base station and user equipment for merging feedback, can
Make HARQ feedback that user equipment determines to merge different PUSCH subframes in the feedback corresponding PHICH money in same PHICH subframes
Source, so as to correctly obtain information.
In order to solve the above technical problems, the embodiment of the present invention provide it is a kind of merge feedback method, methods described include with
Lower step:The user equipment offset-lists of all feedbacks to be received are informed, the offset-lists are used to indicate calculating PHICH moneys
The corresponding relation of difference PUSCH subframes and offset during source;For all PUSCH subframes to be feedback, according to every PUSCH
Offset corresponding to frame, calculate the PHICH resource used for the HARQ feedback of each PUSCH subframes in PHICH subframes;
The PHICH subframes send PHICH to the user equipment of all feedbacks to be received.
Alternatively, it is corresponding with offset to include the PUSCH subframes with different first time differences for the offset-lists
Relation, the first time difference are that the time of PHICH subframes and the PHICH subframes is preset corresponding to the PUSCH subframes
Difference, wherein, the default PHICH subframes have default sequential corresponding relation with the PUSCH subframes.
Alternatively, it is corresponding with offset to include the PUSCH subframes with different second time differences for the offset-lists
Relation, second time difference are the time difference of the PUSCH subframes and the PHICH subframes.
Alternatively, the offset according to corresponding to every PUSCH subframes, the HARQ for each PUSCH subframes is calculated
Feeding back the PHICH resource used in PHICH subframes includes:According to the user equipment on first time slot of PUSCH subframes
Minimum PRB indexes, DMRS cyclic shift and offset corresponding to the PUSCH subframes used in row transmission, described in calculating
The PHICH resource of HARQ feedback identifies in the group mark and group in the PHICH subframes.
Alternatively, the offset-lists are to inform the user equipment by RRC signaling.
Alternatively, the offset-lists include the maximum number of PUSCH subframes to be feedback corresponding to single PHICH subframes
Amount.
In order to solve the above technical problems, the embodiment of the present invention also provides a kind of method for merging feedback, methods described includes
Following steps:Offset-lists are received from base station, the offset-lists are used to indicate difference PUSCH when calculating PHICH resource
The corresponding relation of frame and offset;The PHICH in PHICH sub-frame transmissions is received from base station, the PHICH subframes are for being needed
The PUSCH subframes of feedback;According to offset corresponding to user equipment itself every PUSCH subframes to be feedback, it is determined that for each
The PHICH resource that the HARQ feedback of individual PUSCH subframes uses in the PHICH subframes.
Alternatively, it is corresponding with offset to include the PUSCH subframes with different first time differences for the offset-lists
Relation, the first time difference are that the time of PHICH subframes and the PHICH subframes is preset corresponding to the PUSCH subframes
Difference, wherein, the default PHICH subframes have default sequential corresponding relation with the PUSCH subframes.
Alternatively, it is corresponding with offset to include the PUSCH subframes with different second time differences for the offset-lists
Relation, second time difference are the time difference of the PUSCH subframes and the PHICH subframes.
Alternatively, the offset according to corresponding to every PUSCH subframes, it is determined that the HARQ feedback for each PUSCH subframes
The PHICH resource used in the PHICH subframes includes:Used according in the first time slot uplink of PUSCH subframes
Minimum PRB indexes, DMRS cyclic shift and the PUSCH subframes corresponding to offset, calculate the HARQ feedback
PHICH resource identifies in the group mark and group in the PHICH subframes.
Alternatively, the offset-lists are received by RRC signaling.
Alternatively, the offset-lists include the maximum number of PUSCH subframes to be feedback corresponding to single PHICH subframes
Amount.
In order to solve the above technical problems, the embodiment of the present invention also provides a kind of device for merging feedback, described device includes:
Informing unit, suitable for informing the user equipment offset-lists of all feedbacks to be received, the offset-lists are used to indicate calculating
The corresponding relation of difference PUSCH subframes and offset during PHICH resource;Computing unit, suitable for for all PUSCH to be feedback
Subframe, according to offset corresponding to every PUSCH subframes, the HARQ feedback for each PUSCH subframes is calculated in PHICH subframes
The PHICH resource inside used;Transmitting element, suitable for sending PHICH to the use of all feedbacks to be received in the PHICH subframes
Family equipment.
Alternatively, it is corresponding with offset to include the PUSCH subframes with different first time differences for the offset-lists
Relation, the first time difference are that the time of PHICH subframes and the PHICH subframes is preset corresponding to the PUSCH subframes
Difference, wherein, the default PHICH subframes have default sequential corresponding relation with the PUSCH subframes.
Alternatively, it is corresponding with offset to include the PUSCH subframes with different second time differences for the offset-lists
Relation, second time difference are the time difference of the PUSCH subframes and the PHICH subframes.
Alternatively, the computing unit includes:Computation subunit, suitable for according to the user equipment in PUSCH subframes
Offset corresponding to minimum PRB indexes, DMRS cyclic shift and the PUSCH subframes used in one time slot uplink
Amount, calculate the PHICH resource of the HARQ feedback and identified in the group mark and group in the PHICH subframes.
Alternatively, the informing unit informs offset-lists described in the user equipment by RRC signaling.
Alternatively, the offset-lists include the maximum number of PUSCH subframes to be feedback corresponding to single PHICH subframes
Amount.
In order to solve the above technical problems, the embodiment of the present invention also provides a kind of base station, the base station includes above-mentioned merging
Feedback device.
In order to solve the above technical problems, the embodiment of the present invention also provides a kind of device for merging feedback, described device includes:
First receiving unit, suitable for receiving offset-lists from base station, the offset-lists are used to indicate different when calculating PHICH resource
The corresponding relation of PUSCH subframes and offset;Second receiving unit, suitable for being received from base station in PHICH sub-frame transmissions
PHICH, the PHICH subframes are directed to all PUSCH subframes to be feedback;Determining unit, suitable for being treated according to user equipment itself
Offset corresponding to every PUSCH subframes of feedback, it is determined that sub in the PHICH for the HARQ feedback of each PUSCH subframes
The PHICH resource used in frame.
Alternatively, it is corresponding with offset to include the PUSCH subframes with different first time differences for the offset-lists
Relation, the first time difference are that the time of PHICH subframes and the PHICH subframes is preset corresponding to the PUSCH subframes
Difference, wherein, the default PHICH subframes have default sequential corresponding relation with the PUSCH subframes.
Alternatively, it is corresponding with offset to include the PUSCH subframes with different second time differences for the offset-lists
Relation, second time difference are the time difference of the PUSCH subframes and the PHICH subframes.
Alternatively, the determining unit includes:Determination subelement, suitable for according to up in first time slot of PUSCH subframes
Minimum PRB indexes, DMRS cyclic shift and offset corresponding to the PUSCH subframes used in transmission, described in calculating
The PHICH resource of HARQ feedback identifies in the group mark and group in the PHICH subframes.
Alternatively, first receiving unit receives the offset-lists by RRC signaling.
Alternatively, the offset-lists include the maximum number of PUSCH subframes to be feedback corresponding to single PHICH subframes
Amount.
In order to solve the above technical problems, the embodiment of the present invention also provides a kind of user equipment, the user equipment includes upper
The device for the merging feedback stated.
Compared with prior art, the technical scheme of the embodiment of the present invention has the advantages that:
The embodiment of the present invention is based on offset-lists, for all PUSCH subframes to be feedback, according to every PUSCH subframes
Corresponding offset, calculate the PHICH resource used for the HARQ feedback of each PUSCH subframes in PHICH subframes.Due to
Different PUSCH subframes have clear and definite corresponding relation with the offset in offset-lists, user equipment can be made to pass through offset
Table determines offset corresponding to every PUSCH subframes, so as to further determine that the HARQ for merging every PUSCH subframes in feedback is anti-
The PHICH resource used in PHICH subframes is presented, so as to correctly obtain information.
Further, the offset-lists according to corresponding to every PUSCH subframes, calculating are anti-for the HARQ of each PUSCH subframes
When presenting the PHICH resource used in the PHICH subframes, the embodiment of the present invention uses the input parameter of formula and existing skill
Input parameter in art is basically identical, increase only parameter known to numerical value, that is to say, that input parameter is gathered without extra,
It can calculate and be identified in PHICH group mark and group, the influence to system complexity is simultaneously little.
Brief description of the drawings
Fig. 1 is a kind of flow chart for the method for merging feedback in the embodiment of the present invention.
Fig. 2 is a kind of DFD for the method for merging feedback in the embodiment of the present invention.
Fig. 3 is the flow chart of another method for merging feedback in the embodiment of the present invention.
Fig. 4 is the DFD of another method for merging feedback in the embodiment of the present invention.
Fig. 5 is a kind of structural representation for the device for merging feedback in the embodiment of the present invention.
Fig. 6 is the structural representation of another device for merging feedback in the embodiment of the present invention.
Embodiment
As described in the background art, due to first listening the mechanism said afterwards, when base station can not preset corresponding to PUSCH subframes
PHICH subframe times obtain the right to use of unlicensed spectrum resource, it has to postpone after one or several subframes in a PHICH
When subframe sends the merging feedback for multiple PUSCH subframes simultaneously, it is possible to which the HARQ feedback of different PUSCH subframes corresponds to
Same PHICH resource, user equipment can not determine every PUSCH subframes corresponding PHICH moneys in the PHICH subframes
Source, feedback information also can not just be correctly received.
The present inventor has found that the key of above mentioned problem is the root in existing merging feedback technique by research
It is possible to calculate in identical PHICH groups mark and group according to different PUSCH subframes and identifies, due to PHICH groups mark and group
Interior mark together decides on a PHICH resource, namely the HARQ feedback of different PUSCH subframes corresponds to same PHICH simultaneously
Resource, so as to which PHICH resource collision problem occur.
The embodiment of the present invention is based on offset-lists, to all PUSCH subframes to be feedback, according to every PUSCH subframes pair
The offset answered, calculate the PHICH resource used for the HARQ feedback of each PUSCH subframes in PHICH subframes.Due to not
There is clear and definite corresponding relation with the offset in PUSCH subframes and offset-lists, user equipment can be made to pass through offset-lists
Offset corresponding to every PUSCH subframes is determined, so as to further determine that the HARQ feedback for merging every PUSCH subframes in feedback
The PHICH resource used in PHICH subframes, so as to correctly obtain information.
It is understandable to enable above-mentioned purpose, feature and the beneficial effect of the present invention to become apparent, below in conjunction with the accompanying drawings to this
The specific embodiment of invention is described in detail.
Reference picture 1, Fig. 1 is a kind of flow chart for the method for merging feedback in the embodiment of the present invention, described to merge what is fed back
Method can apply to base station side including step S101 to step S103, this method.
Step S101:The user equipment offset-lists of all feedbacks to be received are informed, the offset-lists are used to indicate
The corresponding relation of difference PUSCH subframes and offset when calculating PHICH resource.
Step S102:For all PUSCH subframes to be feedback, according to offset corresponding to every PUSCH subframes, calculate
The PHICH resource used for the HARQ feedback of each PUSCH subframes in PHICH subframes.
Step S103:PHICH is sent to the user equipment of all feedbacks to be received in the PHICH subframes.
Each step of the merging feedback method is described in detail below.
In step S101 specific implementation, base station indicates calculating PHICH resource by offset-lists to user equipment
Shi Butong PUSCH subframes have corresponding relation with offset.Wherein, the PUSCH subframes refer to that user equipment is sent in PUSCH
The subframe of data.
In specific implementation, the offset-lists can include with different first time differences PUSCH subframes with partially
The corresponding relation of shifting amount, the first time difference are that PHICH subframes and the PHICH are preset corresponding to the PUSCH subframes
The time difference of subframe, wherein, the default PHICH subframes have default sequential corresponding relation with the PUSCH subframes.
In this case, the first time difference can be referred to as feedback delay time again.
It is understood that PHICH subframes refer to that base station is used to send PHICH to indicate the subframe of HARQ feedback, more
For body, PHICH subframes are used for the HARQ feedback for carrying PUSCH subframes.
Optionally, the offset-lists can also include PUSCH subframes to be feedback corresponding to single PHICH subframes most
Big quantity.
For example, base station can inform that one PHICH subframe of user equipment may correspond to the maximum quantity of PUSCH subframes, example
N, and offset corresponding to the PUSCH subframes with different feedback delay times are such as can be set as, N is positive integer.As
One not limiting example, for all PUSCH subframes to be feedback, when feedback delay time is 0 subframe, base station can be with
It is 0 to configure offset corresponding to PUSCH subframes.When feedback delay time is 1 subframe, base station can configure PUSCH subframes
Corresponding offset is P1.When feedback delay time is 2 subframes, base station can configure offset corresponding to PUSCH subframes
For P2.By that analogy, until when feedback delay time is N-1 subframe, base station can configure and be offset corresponding to PUSCH subframes
Measure as PN-1。
It is understood that the method for above-mentioned configuration offset is only example, and it is nonrestrictive.Such as it can also use
Following manner configures offset:For the PUSCH subframes of all feedbacks to be received, when feedback delay time is N-1 subframe
When, base station can configure offset corresponding to PUSCH subframes as 0;When feedback delay is N-2 subframe, base station can configure
Offset corresponding to PUSCH subframes is Q1;By that analogy, until when feedback delay time is 0 subframe, base station can configure
Offset corresponding to PUSCH subframes is QN-1。
In specific implementation, base station configures more than, specify that different PUSCH subframes and the offset in offset-lists
Corresponding relation, user equipment can be made to determine offset corresponding to every PUSCH subframes by offset-lists.
Wherein, the feedback delay time is that PHICH subframes and actual use are preset corresponding to the PUSCH subframes
The time difference of PHICH subframes.The default PHICH subframes have default sequential corresponding relation with the PUSCH subframes.
For example, in FDD LTE, user equipment carries out transmitting uplink data, base station in subframe n (namely PUSCH subframes)
PHICH is sent in subframe n+4 (namely default PHICH subframes), that is to say, that default PHICH subframes and the PUSCH subframes
Send 4 subframes in interval.
But due to first listening the mechanism said afterwards, when base station can not obtain the use of unlicensed spectrum resource on subframe n+4
Power, it has to postpone m subframes (m>=1) it is described when subframe n+4+m (namely PHICH subframes of actual use) sends PHICH
First time difference is m, the transmission interval subframe of the default PHICH subframes and the PHICH subframes of the actual use,
I.e. feedback delay time is m subframe.
In TDD LTE, user equipment carries out transmitting uplink data in subframe n (namely PUSCH subframes), and base station is in subframe
n+k(k>=4) (namely default PHICH subframes) sends PHICH, that is to say, that default PHICH subframes and the PUSCH subframes
K, transmission interval subframe.
Due to first listening the mechanism said afterwards, when base station can not obtain the right to use of unlicensed spectrum resource on subframe n+k, no
Obtain and do not postpone m subframes (m>=1) when subframe n+k+m (namely PHICH subframes of actual use) sends PHICH, described first
Time difference is m, the transmission interval subframe of the default PHICH subframes and the PHICH subframes of the actual use, namely instead
Feedback time delay is m subframe.
In another specific example, the offset-lists can include the PUSCH subframes with different second time differences
With the corresponding relation of offset, second time difference is the time difference of the PUSCH subframes and PHICH subframes, described
PHICH subframes are used for the HARQ feedback for carrying the PUSCH subframes.
For example, in FDD LTE, user equipment carries out transmitting uplink data in subframe n (namely PUSCH subframes).Normal
In the case of rule, base station sends PHICH in subframe n+4 (namely PHICH subframes), and the time difference is 4 subframes.And it is being related to
First listen in the case of saying mechanism afterwards, when base station can not obtain the right to use of unlicensed spectrum resource on subframe n+4, it has to prolong
Slow m subframes (m>=1) when subframe n+4+m (namely PHICH subframes) sends PHICH, in this case, second time
Difference is 4+m subframe.
In TDD LTE, user equipment carries out transmitting uplink data in subframe n (namely PUSCH subframes), in regular situation
Under, base station is in subframe n+k (k>=4) (namely PHICH subframes) sends PHICH, and the time difference is k subframe.And relating to
And in the case of first listening and saying mechanism afterwards, when base station can not obtain the right to use of unlicensed spectrum resource on subframe n+k, it has to
Postpone m subframes (m>=1) when subframe n+k+m (namely PHICH subframes) sends PHICH, in this case, when described second
Between difference be k+m subframe.
Furthermore, the embodiments of the invention provide two kinds of alternative methods for calculating time difference, in reality
In, computational methods can be selected according to actual conditions, be favorably improved the accuracy of information.In addition, above two calculates
Method is only example, and nonrestrictive.
Specifically, the offset-lists can be believed by wireless heterogeneous networks (Radio Resource Control, RRC)
The user equipment of all feedbacks to be received is informed in order, so as to effectively reduce signaling consumption, saves Radio Resource.
In step S102 specific implementation, according to offset corresponding to every PUSCH subframes, calculate for each
The PHICH resource that the HARQ feedback of PUSCH subframes uses in PHICH subframes includes:According to the user equipment in PUSCH
Corresponding to minimum PRB indexes, DMRS cyclic shift and the PUSCH subframes used in first time slot uplink of frame partially
Shifting amount, calculate the PHICH resource of the HARQ feedback and identified in the group mark and group in the PHICH subframes.
In specific implementation, base station can be directed to all PUSCH subframes to be feedback and carry out above-mentioned calculating, without passing through
PHICH subframes carry the HARQ feedback of which PUSCH subframe described in signaled user equipment, contribute to reduction signaling to open
Pin, save Radio Resource.
It will be appreciated by those skilled in the art that the HARQ feedback of the PUSCH subframes may belong to different user devices,
It may belong to identical user equipment.
Further, it is determined that the formula of mark can be with the group mark and group in the PHICH subframes for PHICH resource
For:
Wherein,Represent the group mark of PHICH resource;Identified in expression group;Represent in institute
State the number of PHICH groups in PHICH subframes;Offset represents offset corresponding to every PUSCH subframes;Table
Show that user equipment indexes in minimal physical resource block used in the first time slot uplink of PUSCH subframes;nDMRSRepresent to use
DMRS cyclic shift used in the equipment of family;Represent spreading factor (Spreading Factor during PHICH modulation
Size Used For PHICH Modulation) size.
Specifically, in the formula not comprising parameter shift amount, different PUSCH subframes are possible to calculate identical
PHICH groups, which identify, and group is interior is identified, but after formula adds parameter shift amount, the new PHICH groups being calculated are marked
Know and the interior mark of group will be influenceed by parameter shift amount.Due to being provided with to the PUSCH subframes with different time difference
Different offsets, so by being appropriately arranged with to offset, the HARQ feedback for different PUSCH subframes can be avoided to make
PHICH resource clashes.That is, the embodiment of the present invention is it is determined that introduce offset during PHICH resource, it is different
PUSCH subframes can have different offsets so that obtain do not conflict PHICH resource group mark and group internal standard
Knowledge is possibly realized, so as to advantageously account for merging the HARQ feedback of the different PUSCH subframes in feedback while correspond to same
The collision problem of PHICH resource.
Further, it can be seen from background technology, the embodiment of the present invention uses the input parameter and prior art of formula
In input parameter it is basically identical, increase only parameter shift amount known to numerical value, that is to say, that without extra collection input ginseng
Number, you can calculate and identified in the group mark and group of PHICH resource, the influence to system complexity is simultaneously little.
It will be appreciated by those skilled in the art that the HARQ feedback for multiple PUSCH subframes is being calculated described
After the PHICH resource used in PHICH subframes, it is anti-corresponding HARQ can be carried using the PHICH resource being calculated
Feedback.
In step S103 specific implementation, PHICH is sent to the use of all feedbacks to be received in the PHICH subframes
Family equipment.
Reference picture 2, Fig. 2 are a kind of DFDs for the method for merging feedback in the embodiment of the present invention.With reference to Fig. 2 pairs
The specific embodiment for merging feedback method is described in detail.
In step S201 specific implementation, offset-lists are informed in base station 21 to user equipment 22.The offset-lists are used
The corresponding relation of difference PUSCH subframes and offset when instruction is calculating PHICH resource.
Wherein, user equipment 22 refers to the user equipment of all feedbacks to be received.
In step S202 specific implementation, base station 21 is directed to all PUSCH subframes to be feedback, according to every PUSCH
Offset corresponding to subframe, calculate the PHICH resource used for the HARQ feedback of each PUSCH subframes in PHICH subframes.
In step S203 specific implementation, base station 21 is sent out to user equipment 22 with merging feedback system in PHICH subframes
Send PHICH.Specifically, PHICH corresponding to multiple PUSCH subframes is sent in a PHICH subframe.
Reference picture 3, Fig. 3 is the flow chart of another method for merging feedback in the embodiment of the present invention, described to merge feedback
Method can include step S301 and can apply to user equipment side to step S303, this method.
Step S301:Offset-lists are received from base station, the offset-lists are used to indicate different when calculating PHICH resource
The corresponding relation of PUSCH subframes and offset.
Step S302:The PHICH in PHICH sub-frame transmissions is received from base station, the PHICH subframes are for all to be feedback
PUSCH subframes;
Step S303:According to offset corresponding to user equipment itself every PUSCH subframes to be feedback, it is determined that for each
The PHICH resource that the HARQ feedback of individual PUSCH subframes uses in the PHICH subframes.
Each step of the merging feedback method is described in detail below.
In step S301 specific implementation, it is determined that during PHICH resource, the offset-lists that user equipment receives are used for
Instruction corresponding relation of difference PUSCH subframes and offset when calculating PHICH resource.
In specific implementation, the offset-lists can include with different first time differences PUSCH subframes with partially
The corresponding relation of shifting amount, the first time difference are that PHICH subframes and the PHICH are preset corresponding to the PUSCH subframes
The time difference of subframe, wherein, the default PHICH subframes have default sequential corresponding relation with the PUSCH subframes.
Optionally, the offset-lists can also include PUSCH subframes to be feedback corresponding to single PHICH subframes most
Big quantity.
Method about the configuration offset in the embodiment of the present invention, the computational methods of first time difference, and when second
Between difference computational methods, refer to previously for merge feedback method associated description, repeat no more here.
In specific implementation, by configuring offset, different PUSCH subframes and the offset in offset-lists are specify that
Corresponding relation, user equipment can determine offset corresponding to every PUSCH subframes by offset-lists.
Furthermore, the embodiments of the invention provide two kinds of alternative methods for calculating time difference, in reality
In, computational methods can be selected according to actual conditions, be favorably improved the accuracy of information.In addition, above two calculates
Method is only example, and nonrestrictive.
Specifically, the offset-lists can be believed by wireless heterogeneous networks (Radio Resource Control, RRC)
The user equipment of all feedbacks to be received is informed in order, so as to effectively reduce signaling consumption, saves Radio Resource.
In step S302 specific implementation, the PHICH in PHICH sub-frame transmissions, the PHICH subframes are received from base station
For all PUSCH subframes to be feedback.
In step S303 specific implementation, according to corresponding to user equipment itself every PUSCH subframes to be feedback partially
Shifting amount, it is determined that the PHICH resource used for the HARQ feedback of each PUSCH subframes in the PHICH subframes.
The formula of mark, refer to and close above in group mark and group about determining PHICH resource in the embodiment of the present invention
In the associated description for merging feedback method, repeat no more here.
Specifically, in the formula not comprising parameter shift amount, different PUSCH subframes are possible to calculate identical
PHICH groups, which identify, and group is interior is identified, but after formula adds parameter shift amount, the new PHICH groups being calculated are marked
Know and the interior mark of group will be influenceed by parameter shift amount.Due to being provided with to the PUSCH subframes with different time difference
Different offsets, the new PHICH groups mark and the group sensible different possibility of internal standard are very big.That is, for difference
PUSCH subframes, the embodiment of the present invention there is a strong possibility obtain do not conflict PHICH resource group mark and group in identify.This
Inventive embodiments largely solve the HARQ feedback for merging the different PUSCH subframes in feedback while corresponded to same
The collision problem of individual PHICH resource.
Further, it can be seen from background technology, the embodiment of the present invention uses the input parameter and prior art of formula
In input parameter it is basically identical, increase only parameter shift amount known to numerical value, that is to say, that without extra collection input ginseng
Number, you can calculate and identified in the group mark and group of PHICH resource, the influence to system complexity is simultaneously little.
Fig. 4 is the DFD of another method for merging feedback in the embodiment of the present invention.With reference to Fig. 4 to the conjunction
And the specific embodiment of feedback method is described in detail.
In step S401 specific implementation, the offset-lists that user equipment 41 receives from base station 42 are used to indicate calculating
The corresponding relation of difference PUSCH subframes and offset during PHICH resource.
In step S402 specific implementation, user equipment 41 is received in the PHICH sub-frame transmissions from base station 42
PHICH.The PHICH subframes are directed to all PUSCH subframes to be feedback.Specifically, the base station 42 passes through a PHICH
Subframe sends PHICH corresponding to multiple PUSCH subframes to merge feedback system.
In step S403 specific implementation, user equipment 41 is according to user equipment itself every PUSCH to be feedback
Offset corresponding to frame, it is determined that being provided for the PHICH that the HARQ feedback of each PUSCH subframes uses in the PHICH subframes
Source.
Fig. 5 is a kind of structural representation for the device for merging feedback in the embodiment of the present invention, with reference to Fig. 5 to the conjunction
And the specific embodiment of the apparatus structure fed back is described in detail.
The device 50 for merging feedback can include informing unit 501, computing unit 502 and transmitting element 503.Its
In, the computing unit 502 can include computation subunit 504.
Furthermore, informing unit 501 is suitable to the user equipment offset-lists for informing all feedbacks to be received, described inclined
Scale is moved to be used to indicate the corresponding relation of difference PUSCH subframes and offset when calculating PHICH resource.Computing unit 502 is suitable
In for all PUSCH subframes to be feedback, according to offset corresponding to every PUSCH subframes, calculate for each PUSCH
The PHICH resource that the HARQ feedback of frame uses in PHICH subframes.Transmitting element 503 is suitable to will in the PHICH subframes
PHICH is sent to the user equipment of all feedbacks to be received.
In specific implementation, the computation subunit 504 is suitable to according to the user equipment in PUSCH subframes first
Minimum PRB indexes, DMRS cyclic shift and offset corresponding to the PUSCH subframes used in gap uplink, calculate
The PHICH resource of the HARQ feedback identifies in the group mark and group in the PHICH subframes.
Specifically, the informing unit 501 informs offset-lists described in the user equipment by RRC signaling.
More detailed contents of the device 50 fed back on the merging are incorporated by reference to Fig. 1 to Fig. 2 and with reference to previously for merging
The associated description of feedback method, is repeated no more here.
Fig. 6 is the structural representation of another device for merging feedback in the embodiment of the present invention, with reference to Fig. 6 to described
The specific embodiment for merging the apparatus structure of feedback is described in detail.
The device 60 for merging feedback can include the first receiving unit 601, the second receiving unit 602 and determining unit
603.Wherein, the determining unit 603 can include determining that subelement 604.
Furthermore, the first receiving unit 601 is suitable to receive offset-lists from base station, and the offset-lists are used to indicate
The corresponding relation of difference PUSCH subframes and offset when calculating PHICH resource.Second receiving unit 602 is suitable to connect from base station
The PHICH of PHICH sub-frame transmissions is received in, the PHICH subframes are directed to all PUSCH subframes to be feedback.Determining unit 603 is suitable
In the offset according to corresponding to user equipment itself every PUSCH subframes to be feedback, it is determined that for each PUSCH subframes
The PHICH resource that HARQ feedback uses in the PHICH subframes.
In specific implementation, the determination subelement 604 is suitable to according in first time slot uplink institute of PUSCH subframes
Offset corresponding to minimum PRB indexes, DMRS cyclic shift and the PUSCH subframes used, calculates the HARQ feedback
PHICH resource in the PHICH subframes group mark and group in identify.
Specifically, first receiving unit 601 receives the offset-lists by RRC signaling.
More detailed contents of the device 60 fed back on the merging are incorporated by reference to Fig. 3 to Fig. 4 and with reference to previously for another
Kind merges the associated description of feedback method, repeats no more here.
The embodiment of the present invention additionally provides a kind of base station, and the base station includes merging the device 50 of feedback shown in Fig. 5, described
Base station can perform above-mentioned merging feedback method.
The embodiment of the present invention additionally provides a kind of user equipment, and the user equipment includes the dress for merging feedback shown in Fig. 6
60 are put, the user equipment can perform above-mentioned another merging feedback method.
One of ordinary skill in the art will appreciate that all or part of step in the various methods of above-described embodiment is can
To instruct the hardware of correlation to complete by program, the program can be stored in computer-readable recording medium, to store
Medium can include:ROM, RAM, disk or CD etc..
Although present disclosure is as above, the present invention is not limited to this.Any those skilled in the art, this is not being departed from
In the spirit and scope of invention, it can make various changes or modifications, therefore protection scope of the present invention should be with claim institute
The scope of restriction is defined.
Claims (26)
- A kind of 1. method for merging feedback, it is characterised in that including:The user equipment offset-lists of all feedbacks to be received are informed, the offset-lists are used to indicate calculating PHICH resource The corresponding relation of Shi Butong PUSCH subframes and offset;For all PUSCH subframes to be feedback, according to offset corresponding to every PUSCH subframes, calculating is directed to each PUSCH The PHICH resource that the HARQ feedback of subframe uses in PHICH subframes;PHICH is sent to the user equipment of all feedbacks to be received in the PHICH subframes.
- 2. the method according to claim 1 for merging feedback, it is characterised in that the offset-lists include having different the The PUSCH subframes of one time difference and the corresponding relation of offset,The first time difference is that the time difference of PHICH subframes and the PHICH subframes is preset corresponding to the PUSCH subframes Value, wherein, the default PHICH subframes have default sequential corresponding relation with the PUSCH subframes.
- 3. the method according to claim 1 for merging feedback, it is characterised in that the offset-lists include having different the The PUSCH subframes of two time differences and the corresponding relation of offset,Second time difference is the time difference of the PUSCH subframes and the PHICH subframes.
- 4. the method according to claim 1 for merging feedback, it is characterised in that described corresponding according to every PUSCH subframes Offset, the PHICH resource that is used in PHICH subframes of HARQ feedback calculated for each PUSCH subframes includes:Minimum PRB indexes, DMRS follow according to used in the user equipment in the first time slot uplink of PUSCH subframes Offset corresponding to ring displacement and the PUSCH subframes, calculates the PHICH resource of the HARQ feedback in the PHICH subframes Identified in interior group mark and group.
- 5. the method according to claim 1 for merging feedback, it is characterised in that the offset-lists are to pass through RRC signaling Inform the user equipment.
- 6. the method according to claim 1 for merging feedback, it is characterised in that the offset-lists include single PHICH The maximum quantity of PUSCH subframes to be feedback corresponding to subframe.
- A kind of 7. method for merging feedback, it is characterised in that including:Receive offset-lists from base station, the offset-lists be used to indicate when calculating PHICH resource difference PUSCH subframes with it is inclined The corresponding relation of shifting amount;The PHICH in PHICH sub-frame transmissions is received from base station, the PHICH subframes are directed to all PUSCH subframes to be feedback;According to offset corresponding to user equipment itself every PUSCH subframes to be feedback, it is determined that for each PUSCH subframes The PHICH resource that HARQ feedback uses in the PHICH subframes.
- 8. the method according to claim 7 for merging feedback, it is characterised in that the offset-lists, which include, has different the The PUSCH subframes of one time difference and the corresponding relation of offset,The first time difference is that the time difference of PHICH subframes and the PHICH subframes is preset corresponding to the PUSCH subframes Value, wherein, the default PHICH subframes have default sequential corresponding relation with the PUSCH subframes.
- 9. the method according to claim 7 for merging feedback, it is characterised in that the offset-lists include having different the The PUSCH subframes of two time differences and the corresponding relation of offset,Second time difference is the time difference of the PUSCH subframes and the PHICH subframes.
- 10. the method according to claim 7 for merging feedback, it is characterised in that according to corresponding to every PUSCH subframes partially Shifting amount, it is determined that the PHICH resource used for the HARQ feedback of each PUSCH subframes in the PHICH subframes includes:Minimum PRB indexes, DMRS cyclic shift and described according to used in the first time slot uplink of PUSCH subframes Offset corresponding to PUSCH subframes, calculate the PHICH resource of the HARQ feedback in the PHICH subframes group mark and Identified in group.
- 11. the method according to claim 7 for merging feedback, it is characterised in that the offset-lists are to pass through RRC signaling Receive.
- 12. the method according to claim 7 for merging feedback, it is characterised in that the offset-lists include single PHICH The maximum quantity of PUSCH subframes to be feedback corresponding to subframe.
- 13. one kind merges feedback device, it is characterised in that including:Informing unit, suitable for informing the user equipment offset-lists of all feedbacks to be received, the offset-lists are used to indicate The corresponding relation of difference PUSCH subframes and offset when calculating PHICH resource;Computing unit, suitable for for all PUSCH subframes to be feedback, according to offset corresponding to every PUSCH subframes, calculating The PHICH resource used for the HARQ feedback of each PUSCH subframes in PHICH subframes;Transmitting element, suitable for sending PHICH to the user equipment of all feedbacks to be received in the PHICH subframes.
- 14. merging feedback device according to claim 13, it is characterised in that the offset-lists include having different the The PUSCH subframes of one time difference and the corresponding relation of offset,The first time difference is that the time difference of PHICH subframes and the PHICH subframes is preset corresponding to the PUSCH subframes Value, wherein, the default PHICH subframes have default sequential corresponding relation with the PUSCH subframes.
- 15. merging feedback device according to claim 13, it is characterised in that the offset-lists include having different the The PUSCH subframes of two time differences and the corresponding relation of offset,Second time difference is the time difference of the PUSCH subframes and the PHICH subframes.
- 16. merging feedback device according to claim 13, it is characterised in that the computing unit includes:Computation subunit, suitable for according to the user equipment in the first time slot uplink of PUSCH subframes used in it is minimum PRB indexes, DMRS cyclic shift and offset corresponding to the PUSCH subframes, calculate the PHICH resource of the HARQ feedback Identified in group mark and group in the PHICH subframes.
- 17. merging feedback device according to claim 13, it is characterised in that the informing unit is accused by RRC signaling Know offset-lists described in the user equipment.
- 18. merging feedback device according to claim 13, it is characterised in that the offset-lists include single PHICH The maximum quantity of PUSCH subframes to be feedback corresponding to subframe.
- 19. one kind merges feedback device, it is characterised in that including:First receiving unit, suitable for receiving offset-lists from base station, the offset-lists are used to indicate when calculating PHICH resource The corresponding relation of different PUSCH subframes and offset;Second receiving unit, suitable for receiving the PHICH in PHICH sub-frame transmissions from base station, the PHICH subframes are for being needed The PUSCH subframes of feedback;Determining unit, suitable for the offset according to corresponding to user equipment itself every PUSCH subframes to be feedback, it is determined that for each The PHICH resource that the HARQ feedback of individual PUSCH subframes uses in the PHICH subframes.
- 20. merging feedback device according to claim 19, it is characterised in that the offset-lists, which include, has different the The PUSCH subframes of one time difference and the corresponding relation of offset,The first time difference is that the time difference of PHICH subframes and the PHICH subframes is preset corresponding to the PUSCH subframes Value, wherein, the default PHICH subframes have default sequential corresponding relation with the PUSCH subframes.
- 21. merging feedback device according to claim 19, it is characterised in that the offset-lists include having different the The PUSCH subframes of two time differences and the corresponding relation of offset,Second time difference is the time difference of the PUSCH subframes and the PHICH subframes.
- 22. merging feedback device according to claim 19, it is characterised in that the determining unit includes:Determination subelement, suitable for according in minimum PRB indexes, DMRS used in the first time slot uplink of PUSCH subframes Cyclic shift and the PUSCH subframes corresponding to offset, calculate the PHICH resource of the HARQ feedback in the PHICH Identified in group mark and group in subframe.
- 23. merging feedback device according to claim 19, it is characterised in that first receiving unit is believed by RRC Order receives the offset-lists.
- 24. merging feedback device according to claim 19, it is characterised in that the offset-lists include single PHICH The maximum quantity of PUSCH subframes to be feedback corresponding to subframe.
- 25. a kind of base station, it is characterised in that including the merging feedback device described in any one of claim 13 to 18.
- 26. a kind of user equipment, it is characterised in that including the merging feedback device described in any one of claim 19 to 24.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610405714.XA CN107483165B (en) | 2016-06-08 | 2016-06-08 | Method, device, base station and user equipment for combining feedback |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610405714.XA CN107483165B (en) | 2016-06-08 | 2016-06-08 | Method, device, base station and user equipment for combining feedback |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107483165A true CN107483165A (en) | 2017-12-15 |
CN107483165B CN107483165B (en) | 2020-07-03 |
Family
ID=60594338
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610405714.XA Active CN107483165B (en) | 2016-06-08 | 2016-06-08 | Method, device, base station and user equipment for combining feedback |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107483165B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115085873A (en) * | 2019-09-30 | 2022-09-20 | 维沃移动通信有限公司 | Indication and determination method and device for HARQ (hybrid automatic repeat request) feedback mode |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090268685A1 (en) * | 2008-04-29 | 2009-10-29 | Qualcomm Incorporated | Assignment of ack resource in a wireless communication system |
CN102498689A (en) * | 2009-07-30 | 2012-06-13 | 高通股份有限公司 | Hybrid automatic repeat request operation and decoding status signaling for uplink multiple-input multiple-output |
CN104468030A (en) * | 2014-08-26 | 2015-03-25 | 上海华为技术有限公司 | Data transmission method, user equipment and base station |
CN104917597A (en) * | 2014-03-13 | 2015-09-16 | 上海朗帛通信技术有限公司 | Transmission method on non-authorized spectrum and device |
CN105101446A (en) * | 2015-06-30 | 2015-11-25 | 宇龙计算机通信科技(深圳)有限公司 | Conflict avoiding method and device for unlicensed bands |
CN105306180A (en) * | 2014-07-28 | 2016-02-03 | 上海朗帛通信技术有限公司 | LAA (License Assisted Access) communication method and device |
WO2016046625A1 (en) * | 2014-09-24 | 2016-03-31 | Alcatel Lucent | Methods and apparatuses for harq retransmission on unlicensed carrier in lte-laa system |
WO2016040254A3 (en) * | 2014-09-09 | 2016-05-26 | Blackberry Limited | Medium access control in lte-u |
-
2016
- 2016-06-08 CN CN201610405714.XA patent/CN107483165B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090268685A1 (en) * | 2008-04-29 | 2009-10-29 | Qualcomm Incorporated | Assignment of ack resource in a wireless communication system |
CN102498689A (en) * | 2009-07-30 | 2012-06-13 | 高通股份有限公司 | Hybrid automatic repeat request operation and decoding status signaling for uplink multiple-input multiple-output |
CN104917597A (en) * | 2014-03-13 | 2015-09-16 | 上海朗帛通信技术有限公司 | Transmission method on non-authorized spectrum and device |
CN105306180A (en) * | 2014-07-28 | 2016-02-03 | 上海朗帛通信技术有限公司 | LAA (License Assisted Access) communication method and device |
CN104468030A (en) * | 2014-08-26 | 2015-03-25 | 上海华为技术有限公司 | Data transmission method, user equipment and base station |
WO2016040254A3 (en) * | 2014-09-09 | 2016-05-26 | Blackberry Limited | Medium access control in lte-u |
WO2016046625A1 (en) * | 2014-09-24 | 2016-03-31 | Alcatel Lucent | Methods and apparatuses for harq retransmission on unlicensed carrier in lte-laa system |
CN105101446A (en) * | 2015-06-30 | 2015-11-25 | 宇龙计算机通信科技(深圳)有限公司 | Conflict avoiding method and device for unlicensed bands |
Non-Patent Citations (1)
Title |
---|
3RD GENERATION PARTNERSHIP PROJECT: ""Physical layer procedures"", 《3GPP TS 36.213 V12.5.0》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115085873A (en) * | 2019-09-30 | 2022-09-20 | 维沃移动通信有限公司 | Indication and determination method and device for HARQ (hybrid automatic repeat request) feedback mode |
Also Published As
Publication number | Publication date |
---|---|
CN107483165B (en) | 2020-07-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10638413B2 (en) | Mobile station device and base station device | |
CN106301738B (en) | Communication method based on frame structure | |
US9913255B2 (en) | Time domain multiplexing UL transmission on multiple serving cells for a mobile station with single transmitter | |
EP3179654A1 (en) | Data transmission method, user equipment and base station | |
EP2918033B1 (en) | Method and apparatus for operation with carrier aggregation of time division duplex cells | |
CN106664702B (en) | Data transmission method, device and system | |
CN103190192B (en) | Wireless communication system, radio base station apparatus and mobile terminal apparatus | |
EP2742757B1 (en) | Storage and assignment of control timing configurations in a multiple cell communications network | |
EP3013092B1 (en) | Terminal apparatus, base station apparatus, integrated circuit, and radio communication method | |
TWI772312B (en) | Communication method based on wireless network, terminal equipment, and network equipment | |
EP2604081A1 (en) | Configuring an uplink and downlink splitting pattern for device-to-device communication under a cellular network | |
WO2012148141A9 (en) | Method for configuring resource for carrier aggregation and apparatus for same | |
CN103392368A (en) | Mobile terminal device, base station device, and communication control method | |
CN104303446A (en) | Hybrid automatic repeat request (harq) mapping for carrier aggregation (ca) | |
EP2995106A1 (en) | Method, apparatus and computer program for wireless communications | |
KR20150079939A (en) | Information transmission method, user equipment and base station | |
WO2014005529A1 (en) | Dci transmission method and device under cross-band carrier aggregation | |
KR20190028372A (en) | Data transmission method, terminal device and network device | |
AU2013397787A1 (en) | Resource allocation method and device | |
TW201818752A (en) | Monitoring instructing and monitoring method and apparatus with short transmission time interval | |
WO2013189252A1 (en) | Ack/nack feedback bit number determination method and device | |
CN105991274B (en) | Method, feedback information transmission method and the relevant device of data transmission | |
JP6317344B2 (en) | Method and apparatus for transmitting HARQ-ACK | |
WO2018121052A1 (en) | Method and apparatus for determining uplink-controlled resources, transmitting terminal and receiving terminal | |
KR20210034131A (en) | Data transmission method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Han Chuanhua Inventor before: Han Chuanhua Inventor before: Deng Yun |