CN107480917A - A kind of probability load flow calculation method based on quasi-Monte Carlo simulation - Google Patents

A kind of probability load flow calculation method based on quasi-Monte Carlo simulation Download PDF

Info

Publication number
CN107480917A
CN107480917A CN201710891563.8A CN201710891563A CN107480917A CN 107480917 A CN107480917 A CN 107480917A CN 201710891563 A CN201710891563 A CN 201710891563A CN 107480917 A CN107480917 A CN 107480917A
Authority
CN
China
Prior art keywords
load flow
flow calculation
quasi
stochastic variable
monte carlo
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710891563.8A
Other languages
Chinese (zh)
Inventor
崔勇
冯楠
冯煜尧
苏运
郭强
余颖辉
李禹鹏
严正
徐潇源
王晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiaotong University
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Original Assignee
Shanghai Jiaotong University
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiaotong University, State Grid Shanghai Electric Power Co Ltd, East China Power Test and Research Institute Co Ltd filed Critical Shanghai Jiaotong University
Priority to CN201710891563.8A priority Critical patent/CN107480917A/en
Publication of CN107480917A publication Critical patent/CN107480917A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • G06F17/11Complex mathematical operations for solving equations, e.g. nonlinear equations, general mathematical optimization problems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/067Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/04Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
    • H02J3/06Controlling transfer of power between connected networks; Controlling sharing of load between connected networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Mathematical Physics (AREA)
  • Game Theory and Decision Science (AREA)
  • Pure & Applied Mathematics (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Mathematical Optimization (AREA)
  • Mathematical Analysis (AREA)
  • Computational Mathematics (AREA)
  • Power Engineering (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Algebra (AREA)
  • Public Health (AREA)
  • Databases & Information Systems (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of probability load flow calculation method based on quasi-Monte Carlo simulation, to input stochastic variable as sample, is comprised the steps of:S1, obtain Load flow calculation deterministic data and input stochastic variable;S2, the selection method of sampling, it is determined that sampling scale N;S3, the sample matrix for obtaining input stochastic variable;S4, the I row based on sample matrix carry out probabilistic load flow successively, and preserve result(I=1,2,…,N);S5, the data distribution and statistics for analyzing output variable.The advantage of the invention is that:Analog sampling number is unrelated with system scale, and is easily processed the influence of various actual motion control strategies and many objective factors.

Description

A kind of probability load flow calculation method based on quasi-Monte Carlo simulation
Technical field
The present invention relates to electric power network field, and in particular to a kind of probabilistic load flow side based on quasi-Monte Carlo simulation Method.
Background technology
Shanghai Power Network is China megapolis power network, and its power load total amount is big, density is high, electricity consumption peak-valley difference is drawn year by year Greatly, peak regulation is particularly thorny.Because Shanghai local power supply is less and is fired power generating unit, with the sustainable development of social economy, Environmental protection, economic problems become increasingly conspicuous caused by a large amount of coal units.With the operation successively of the domestic extra-high voltage alternating current-direct current in Shanghai, Entered a large amount of electric energy, actively consumption southwest cleaning water power from outside, be the great transition of the Shanghai energy.External electric power is especially clear Clean electric power is on the increase, and Shanghai Power Network will face the external TV university amount feed-in in area, and the office of the local continuous reduction of unit generated energy Face, power network step into the new normality of " the strong weak start of feed-in ".
Load flow calculation, short circuit calculation and stability Calculation are three big its main operationals of power system, and wherein Load flow calculation is three Basis in class calculating, it provides initial value for short circuit calculation and stability Calculation, constitutes the foundation stone of Power System Analysis.Power train The Load flow calculation of system is the running status that whole system is determined according to the network structure and service condition of system, is mainly to solve for The voltage magnitude and phase angle of each node, the power distribution in network and power attenuation etc., its essence be to solve for one group it is non-linear Equation group, equation group characterize the relation between Electric Power System Node Voltage and injecting power or Injection Current.Join in known network In the case of number, and generated power in addition to balancing machine contribute it is known in the case of, solving power flow equation group can obtain Obtain the voltage of each node in power system network, the active and reactive power of circuit conveying, generator reactive output and network damage Consumption.
Load flow calculation does not restrain the foundation for causing operational planner to lack further adjustment flow data.Now can only root Experience revised planning mode or the data repeatedly of personnel are arranged according to the method for operation, so as to obtain convergent flow solution.This method work Work amount is larger, inefficient.Therefore need to study and the constringent calculation of large-scale electrical power system Load flow calculation is improved under special operation condition Method, one is taken to have robustness and constringent tidal current computing method concurrently, to be carried out to electrical network parameter or operation controlled quentity controlled variable Adjustment provides foundation.
In conventional electric power network analysis, due to the uncertainty of load prediction, the change and generating of power system operating mode The factors such as the stoppage in transit of machine and other network original papers, the uncertainty of operation is brought to power system to a certain extent.Meanwhile With the continuous development of power industry, the new energy using the wind energy with intermittent and randomness, solar energy as representative accesses electricity Net, also it certainly will introduce uncertain factor to power network;The new ideas such as microgrid, electric automobile and distributed power source in power distribution network Development also greatly strengthen interactive between " source-net-lotus ", the uncertain factor that result in power system significantly increases Add.Therefore, above-mentioned a variety of uncertainties are described using probability theory, corresponding mathematical models of power system is inquired into and application is calculated Method, also it is formed Probabilistic Load (PLF) research.PLF can be used for analysis circuit trend, the probability point of node voltage Cloth, desired value, variance and limiting value, to have to the performance of whole power network at various operating conditions one comprehensively, it is comprehensive Evaluation, and quantization point is made to weak link existing for power network, these information are to planning and the great reference of decision-making of traffic department Value, thus it is widely used in medium-term and long-term Electric Power Network Planning and short-term operation planning, state estimation and measuring point arrangement, transmission system Transmission capacity and idle planning etc..
The content of the invention
It is an object of the invention to provide a kind of probability load flow calculation method based on quasi-Monte Carlo simulation, applied to hair Weak link in existing power network, the control reference of the person's of being scheduled for scheduler routine, and planning, bouw/infra are proposed to improve grid structure, Accelerate the suggestion of capital construction progress.
Probabilistic load flow is in the nature to solve the Nonlinear System of Equations containing random parameter, and its key element includes:Generally Rate power flow equation, input stochastic variable and output stochastic variable.Probabilistic Load Flow equation is based on power flow equation, including node work( Rate equation and Line Flow equation.It is Power System Planning and operating uncertain factor to input stochastic variable, is mainly included: Node load fluctuates, the maintenance of generator and circuit or failure, fluctuation that generation of electricity by new energy is contributed etc..Export stochastic variable bag Include:The voltage magnitude and phase angle of PQ nodes, the voltage phase angle of PV node, Line Flow it is active and idle etc..
Disclosure sets forth it is a kind of based on quasi-Monte Carlo simulation probability load flow calculation method, using input stochastic variable as Sample, comprise the steps of:
S1, obtain Load flow calculation deterministic data and input stochastic variable;
S2, the selection method of sampling, it is determined that sampling scale N;
S3, the sample matrix for obtaining input stochastic variable;
S4, the I row based on sample matrix carry out probabilistic load flow successively, and preserve result (I=1,2 ... ..., N);
S5, the data distribution and statistics for analyzing output variable.
A kind of above-mentioned probability load flow calculation method based on quasi-Monte Carlo simulation, input described in the step S1 with Machine variable is independent between each other.
A kind of above-mentioned probability load flow calculation method based on quasi-Monte Carlo simulation, the Probabilistic Load Flow in the step S4 The model of calculating is:
X=g (y), z=h (y)
X={ x1,x2,...,xs}
ui=Fi(xi) i=1,2 ..., s
A kind of above-mentioned probability load flow calculation method based on quasi-Monte Carlo simulation, the step S5 are specifically included:
S51, the frequency histogram for establishing accurate result;
S52, according to the block count nb set in step S51, obtain the frequency histogram M of accurate data;
S53, frequency histogram M in step S52 method of partition, obtain the frequency histogram P of test data;
The difference of S54, the frequency histogram that definition distribution error is test data and accurate data frequency histogram.
The advantages of the present invention are:Analog sampling number is unrelated with system scale, and is easily processed various realities Run the influence of control strategy and many objective factors in border.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, institute in being described below to the embodiment of the present invention The accompanying drawing needed to use is briefly described, it should be apparent that, drawings in the following description are only embodiments of the invention, right For those of ordinary skill in the art, on the premise of not paying creative work, can also be according to embodiments of the present invention Content and these accompanying drawings obtain other accompanying drawings.
Fig. 1 is the flow chart of the present invention.
Embodiment
Below in conjunction with accompanying drawing, by describing a preferable specific embodiment in detail, the present invention is further elaborated.
In probabilistic load flow, determine Nonlinear System of Equations and establish the master that input stochastic variable is Probabilistic Load Flow modeling Content is wanted, and exports stochastic variable then by Probabilistic Load Flow equation, stochastic variable is inputted and probability load flow calculation method together decides on.
Three key elements of probabilistic load flow are Probabilistic Load Flow equation, input stochastic variable and output stochastic variable.Probability Power flow equation is contact input stochastic variable and the tie for exporting stochastic variable based on traditional power flow equation.It is random in input In variate model, the information of single stochastic variable is represented using probability-distribution function, using correlation matrix represent it is multiple with Correlation between machine variable, correlation matrix is not needed between separate input stochastic variable.Given input is random The probability distribution information of variable, based on Probabilistic Load Flow equation, the purpose of probabilistic load flow is to obtain the system of output stochastic variable Count word and probability-distribution function.
As shown in figure 1, be it is a kind of based on quasi-Monte Carlo simulation probability load flow calculation method, using input stochastic variable as Sample, comprise the steps of:
S1, obtain Load flow calculation deterministic data and input stochastic variable;
S2, the selection method of sampling, it is determined that sampling scale N;
S3, the sample matrix for obtaining input stochastic variable;
S4, the I row based on sample matrix carry out probabilistic load flow successively, and preserve result (I=1,2 ... ..., N);
S5, the data distribution and statistics for analyzing output variable.
Select the input stochastic variable described in step S1 independent between each other in the present embodiment.
The model of probabilistic load flow in step S4 is:
X=g (y), z=h (y)
X={ x1,x2,...,xs}
ui=Fi(xi) i=1,2 ..., s
Step S5 is specifically included:
S51, the frequency histogram for establishing accurate result, frequency histogram is obtained by Freedman-Diaconis methods Block count nb:
ω=2 (Q3(data)-Q1(data))/N1/3 (1)
In formula (1), data is accurate data;ω is the width of each block in frequency histogram;Square brackets represent to take upwards It is whole;Q3() and Q1() represents data upper and lower quartile respectively.
S52, according to the block count nb set in step S51, obtain the frequency histogram M of accurate data;
S53, frequency histogram M in step S52 method of partition, obtain the frequency histogram P of test data;
The difference of S54, the frequency histogram that definition distribution error is test data and accurate data frequency histogram:
In formula (2), MiAnd PiRespectively i-th piece of sample number accounts in the frequency histogram of accurate data and test data The frequency of total number of samples.
The evaluation index ε examined based on bivariate KSksIt is defined as Kolmogorov-Smirnov statistics, its calculation formula For:
In formula (3):Sup is max-value function;WithThe empirical distribution function of the sample of respectively two variables.
Assuming that stochastic variable x sample is x{i}(i=1,2 ..., N), then stochastic variable x empirical distribution function is:
In formula (4):I[-∞,x](x{i}) it is indicator function, work as x{i}During≤x, its value is 1;Otherwise it is 0.
Technical scheme is described in detail above in association with accompanying drawing, the present invention proposes one kind and is based on quasi-Monte Carlo The probability load flow calculation method of simulation, by sketching Load flow calculation and appraisal procedure, give weak ring in a kind of discovery power network Section, the control reference of the person's of being scheduled for scheduler routine, and planning, bouw/infra are proposed to improve grid structure, accelerate capital construction progress It is recommended that.
Although present disclosure is discussed in detail by above preferred embodiment, but it should be appreciated that above-mentioned Description is not considered as limitation of the present invention.After those skilled in the art have read the above, for the present invention's A variety of modifications and substitutions all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (4)

1. a kind of probability load flow calculation method based on quasi-Monte Carlo simulation, it is characterised in that to input stochastic variable as sample This, comprises the steps of:
S1, obtain Load flow calculation deterministic data and input stochastic variable;
S2, the selection method of sampling, it is determined that sampling scale N;
S3, the sample matrix for obtaining input stochastic variable;
S4, the I row based on sample matrix carry out probabilistic load flow successively, and preserve result (I=1,2 ... ..., N);
S5, the data distribution and statistics for analyzing output variable.
A kind of 2. probability load flow calculation method based on quasi-Monte Carlo simulation as claimed in claim 1, it is characterised in that institute State and stochastic variable is inputted described in step S1 between each other independently.
A kind of 3. probability load flow calculation method based on quasi-Monte Carlo simulation as claimed in claim 1, it is characterised in that institute The model for stating the probabilistic load flow in step S4 is:
A kind of 4. probability load flow calculation method based on quasi-Monte Carlo simulation as claimed in claim 1, it is characterised in that institute Step S5 is stated specifically to include:
S51, the frequency histogram for establishing accurate result;
S52, according to the block count nb set in step S51, obtain the frequency histogram M of accurate data;
S53, frequency histogram M in step S52 method of partition, obtain the frequency histogram P of test data;
The difference of S54, the frequency histogram that definition distribution error is test data and accurate data frequency histogram.
CN201710891563.8A 2017-09-27 2017-09-27 A kind of probability load flow calculation method based on quasi-Monte Carlo simulation Pending CN107480917A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710891563.8A CN107480917A (en) 2017-09-27 2017-09-27 A kind of probability load flow calculation method based on quasi-Monte Carlo simulation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710891563.8A CN107480917A (en) 2017-09-27 2017-09-27 A kind of probability load flow calculation method based on quasi-Monte Carlo simulation

Publications (1)

Publication Number Publication Date
CN107480917A true CN107480917A (en) 2017-12-15

Family

ID=60586534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710891563.8A Pending CN107480917A (en) 2017-09-27 2017-09-27 A kind of probability load flow calculation method based on quasi-Monte Carlo simulation

Country Status (1)

Country Link
CN (1) CN107480917A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111563637A (en) * 2019-02-13 2020-08-21 株洲中车时代电气股份有限公司 Multi-target probability optimal power flow calculation method and device based on demand response
CN110334366B (en) * 2019-03-14 2023-07-14 华电电力科学研究院有限公司 Building instantaneous cold load prediction method based on Monte Carlo method using Latin hypercube sampling

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105162112A (en) * 2015-08-25 2015-12-16 许继集团有限公司 Faure sequence based photovoltaic system power flow calculation and probabilistic power flow statistical method
CN106712037A (en) * 2016-11-28 2017-05-24 武汉大学 Electric power system static voltage stability assessment method considering electric automobile charging characteristic and load fluctuation limit

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105162112A (en) * 2015-08-25 2015-12-16 许继集团有限公司 Faure sequence based photovoltaic system power flow calculation and probabilistic power flow statistical method
CN106712037A (en) * 2016-11-28 2017-05-24 武汉大学 Electric power system static voltage stability assessment method considering electric automobile charging characteristic and load fluctuation limit

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
MAHDI HAJIAN 等: ""Probabilistic Power Flow by Monte Carlo Simulation With Latin Supercube Sampling"", 《IEEE TRANSACTIONS ON POWER SYSTEMS》 *
SIDUN FANG 等: "A Probabilitic Load Flow Method Based on Modified Nataf Transformation and Quasi Monte Carlo Simulation", 《2015 IEEE PES ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC)》 *
WEI CHEN 等: "A Quasi Monte Carlo Probabilistic Load Flow Method of Distribution System Containing Distributed Generation and Electric Vehicle Charging Load Based on Sobol Sequence", 《2016 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED 2016)》 *
XIAOYUAN XU 等: "Probabilistic load flow calculation with quasi-Monte Carlo and multiple linear regression", 《INTERNATIONAL JOURNAL OF ELECTRICAL POWERAND ENERGY SYSTEMS》 *
XIYANG WANG 等: ""Autoregressive model-based gear shaft fault diagnosis using the Kolmogorov–Smirnov test"", 《JOURNAL OF SOUND AND VIBRATION》 *
赵建伟 等: ""基于拟蒙特卡罗模拟和核密度估计的概率静态电压稳定计算方法"", 《电网技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111563637A (en) * 2019-02-13 2020-08-21 株洲中车时代电气股份有限公司 Multi-target probability optimal power flow calculation method and device based on demand response
CN111563637B (en) * 2019-02-13 2023-09-12 株洲中车时代电气股份有限公司 Multi-objective probability optimal power flow calculation method and device based on demand response
CN110334366B (en) * 2019-03-14 2023-07-14 华电电力科学研究院有限公司 Building instantaneous cold load prediction method based on Monte Carlo method using Latin hypercube sampling

Similar Documents

Publication Publication Date Title
Zhuo et al. Incorporating massive scenarios in transmission expansion planning with high renewable energy penetration
Ji et al. Quantified flexibility evaluation of soft open points to improve distributed generator penetration in active distribution networks based on difference-of-convex programming
CN106505593B (en) A kind of analysis of distribution transforming three-phase imbalance and the method for load adjustment based on big data
CN104616069B (en) A kind of annual generation schedule rolls decomposition optimization
CN103106544B (en) A kind of photovoltaic generation prognoses system based on T-S Fuzzy neutral net
CN105449713A (en) Active power distribution network soft normally open point (SNOP) planning method considering distributed generator characteristics
CN107425520A (en) A kind of probabilistic active distribution network three-phase section method for estimating state of injecting power containing node
CN107800157A (en) The virtual power plant dual-layer optimization dispatching method of the temperature control load containing polymerization and new energy
CN105005940A (en) Correlation-considered GEPOPF calculation method
CN104269867B (en) A kind of node power of disturbance transfer distributing equilibrium degree analytical method
CN103246806A (en) Operation risk evaluation method comprising wind- power plant electric system
CN111079972A (en) Method, device and medium for planning reliability of active power distribution network
CN113158573B (en) Small hydropower station regional distribution network optimal power flow obtaining method based on deep learning
CN106786608B (en) A kind of uncertain harmonic flow calculation method suitable for distributed generation resource access
CN105046584A (en) K-MEANS algorithm-based ideal line loss rate calculation method
CN105226651A (en) A kind of consider risk containing large-scale wind power Transmission Expansion Planning in Electric system
CN110429637A (en) A kind of method for visualizing of probability Static Voltage Stability Region
CN105305488A (en) Evaluation method considering influence of new energy grid connection on utilization rate of transmission network
CN110429636A (en) A kind of method of static voltage stability Contingency screening and ranking
Si et al. Cost-effective operation of the urban energy system with variable supply and demand via coordination of multi-energy flows
CN107480917A (en) A kind of probability load flow calculation method based on quasi-Monte Carlo simulation
CN105633950B (en) A kind of probabilistic multiple target Random-fuzzy Dynamic Optimal Power Flow Problem method for solving of consideration wind-powered electricity generation injection
Syed et al. Simultaneous optimal placement of DGs and fixed capacitor banks in radial distribution systems using BSA optimization
Elombo et al. Residential load variability and diversity at different sampling time and aggregation scales
Ma et al. Coordination of generation and transmission planning for power system with large wind farms

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171215