CN107476775B - It is a kind of to assist under water to wellhead assembly and operating method - Google Patents

It is a kind of to assist under water to wellhead assembly and operating method Download PDF

Info

Publication number
CN107476775B
CN107476775B CN201710873937.3A CN201710873937A CN107476775B CN 107476775 B CN107476775 B CN 107476775B CN 201710873937 A CN201710873937 A CN 201710873937A CN 107476775 B CN107476775 B CN 107476775B
Authority
CN
China
Prior art keywords
plate
wellhead assembly
semi
rov
semicircular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710873937.3A
Other languages
Chinese (zh)
Other versions
CN107476775A (en
Inventor
彭巍
韦龙贵
徐一龙
袁辉
廖云虎
梁继文
龚云雷
王成龙
张崇
李磊
吴江
黄亮
郑浩鹏
任冠龙
熊永卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC China Ltd Zhanjiang Branch filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201710873937.3A priority Critical patent/CN107476775B/en
Publication of CN107476775A publication Critical patent/CN107476775A/en
Application granted granted Critical
Publication of CN107476775B publication Critical patent/CN107476775B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/035Well heads; Setting-up thereof specially adapted for underwater installations

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of underwater auxiliary to wellhead assembly and operating method, wherein underwater auxiliary includes symmetrically arranged two sets to shaft collar to wellhead assembly, two sets of edges to shaft collar are connected by door-hinge, by switch locking, two sets are cylindrical in shape opposite other edge when locking to shaft collar;Described includes semi-circular buffering steel plate, spring, semi arch plate, semicircular cylinder stressed plate, semicircular ring base plate, semicircular cylinder bearing base and lifting earrings to shaft collar, semicircular ring base plate bottom surface is welded on semicircular cylinder bearing base, semi arch plate, semicircular cylinder stressed plate are respectively welded on semicircular ring pedestal plate top surface, it is connected between semi arch plate, semicircular cylinder stressed plate and semi-circular buffering steel plate by spring, the medial surface that semi-circular buffers steel plate is arcwall face, and lifting earrings is arranged on semicircular cylinder bearing base.The operating method of the present invention can be realized two open setting of casing safely, to rapidly enter low pressure well oral, reduce marine environment influences on shaft mouth operation bring.

Description

It is a kind of to assist under water to wellhead assembly and operating method
Technical field
The present invention relates to the drilling engineering field of the resources such as petroleum gas, especially a kind of deep water surface layer operation auxiliary set Pipe enters safely the oral underwater auxiliary of underwater low pressure well to wellhead assembly and operating method.
Background technique
Ocean deepwater drilling work flow is general are as follows: surface layer injection tripping in surface conductor pipe (band low pressure well is oral), two drive a well Eye drilling, setting of casing, well cementation, lower subsea blowout preventer and marine riser, under open operation etc..To open casing job be to install due to two Before subsea blowout preventer and marine riser, therefore, when casing is at low pressure well head, influenced by ocean bottom currents, casing waves not It is fixed, it is extremely low to well head efficiency, while operation process middle sleeve easily with low pressure well is oral collides, cause casing float shoe to damage Bad, junk or the oral port sealing damage of low pressure well, bring very big security risk to subsequent job.
Due to ocean deepwater operation develop at home it is later, it is domestic at present temporarily to open casing to low pressure well head without corresponding auxiliary two Therefore head dedicated unit needs to invent a kind of auxiliary casing to the oral device of underwater low pressure well.
Summary of the invention
It is an object of the invention to overcome the shortcomings of above-mentioned prior art, a kind of structure is provided and is simply assisted under water to well Mouthful device, using the underwater auxiliary to wellhead assembly and corresponding operation method, can be realized two open setting of casing safety, quickly into It is oral to enter low pressure well.
To achieve the goals above, the technical solution adopted by the present invention is that: a kind of underwater auxiliary is to wellhead assembly, feature Be: including symmetrically arranged two sets to shaft collar, two sets of edges to shaft collar are connected by door-hinge, relatively another By switch locking, two sets are cylindrical in shape when locking to shaft collar at edge;
Described includes semi-circular buffering steel plate, spring, semi arch plate, semicircular cylinder stressed plate, semicircular ring bottom to shaft collar Seat board, semicircular cylinder bearing base and lifting earrings, semicircular ring base plate bottom surface are welded on semicircular cylinder bearing base, semi arch Plate, semicircular cylinder stressed plate are respectively welded on semicircular ring pedestal plate top surface, and the semi arch plate, semicircular cylinder stressed plate pass through respectively Spring is connected with semi-circular buffering steel plate, and the medial surface of the semi-circular buffering steel plate is arcwall face, the lifting ear Ring is arranged on semicircular cylinder bearing base.
Further, chain-falling is additionally provided between the semi-circular buffering steel plate and semicircular ring base plate.
Further, the lifting is welded on position among the semicircular cylinder bearing base.
Invention additionally discloses a kind of underwater auxiliary to well head operating method, above-mentioned underwater auxiliary is utilized to wellhead assembly, Include the following steps as follows: (1) entering water:Underwater auxiliary is hung near ROV mechanical arm wellhead assembly;Check water Lower auxiliary is to each unit status of wellhead assembly, it is ensured that safety;Wirerope both ends are connect with two lifting earrings with block is unloaded;It is caught among wirerope with ROV mechanical arm;Drilling platforms crane slings underwater auxiliary to wellhead assembly, in company with ROV mono- It rises and is lauched and dives to seafloor wellhead locations.
(2) it installs:ROV at a distance observation well head, once two spud in head rise low pressure well it is oral after, do in well head head The underwater auxiliary of installation prepares wellhead assembly out;After drill bit rises to a distance from well head head safety work, using ROV by water Lower auxiliary to wellhead assembly cover low pressure well in word, and wirerope is pulled to the one side for being equipped with door-hinge;By ROV machinery Arm is opened, and is moved to safety zone and is observed.
3) to well head:Setting of casing is oral and underwater auxiliary is to 10m above wellhead assembly or so to underwater low pressure well; ROV is moved to suitable position observation well head situation;Casing is slowly transferred in observation, once casing float shoe contact two and half Loop buffer steel plate can quickly transfer casing, it is made to enter low pressure well head along semi-circular buffering steel plate circular arc;Confirmation set Pipe can be according to normal lowering velocity setting of casing after entering low pressure well head.
4) it dismantles:After casing enters low pressure well head, at mobile ROV to well head, touched using ROV mechanical arm underwater Auxiliary opens it to wellhead assembly switch button;Mobile ROV is complete to wellhead assembly to assist under water to wirerope one side It is complete to open, catch wirerope level to be assisted under water after being moved to safety zone to wellhead assembly in tow using ROV mechanical arm, it will It takes the water surface out of.
The beneficial effects of the present invention are: structure is simple, easy to process, production cost is low, reusable, and when operation operates It is convenient, can be realized two open setting of casing safely, to rapidly enter low pressure well oral, reduce marine environment to shaft mouth operation bring It influences, is greatly improved to well head efficiency and safety.
Detailed description of the invention
The present invention is described in further detail with reference to the accompanying drawing.
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the structural schematic diagram in the present invention after two semicircular cylinder bearing base connections.
Fig. 3 is that two semi-circulars buffer the structural schematic diagram after steel plate combination in the present invention.
Fig. 4 is the structural schematic diagram in the present invention after two semicircular cylinder stressed plate combinations.
Specific embodiment
As shown in Figs 1-4, a kind of underwater auxiliary of the present invention is to wellhead assembly, including symmetrically arranged two sets to shaft collar 10, two sets of edges to shaft collar are connected by door-hinge 20, and opposite other edge is locked by switch 30, and two sets to well head Structure 10 is cylindrical in shape when locking.
Described includes that semi-circular buffers steel plate 101, spring 102, semi arch plate 103, semicircular cylinder stress to shaft collar 10 Plate 104, semicircular ring base plate 105, chain-falling 106, semicircular cylinder bearing base 107 and lifting earrings 108.The semicircular ring base plate 105 bottom surfaces are welded on semicircular cylinder bearing base 107.Semi arch plate 103, semicircular cylinder stressed plate 104 are respectively welded at semicircular ring bottom On 105 top surface of seat board.The semi arch plate 103, semicircular cylinder stressed plate 104 are buffered by spring 109 and the semi-circular respectively Steel plate 101 is connected.The medial surface of the semi-circular buffering steel plate 101 is arcwall face, and the lifting earrings 108 is arranged in semicircle On cylinder bearing base 107.
The both ends of the chain-falling 106 are connect with semi-circular buffering steel plate 101 with semicircular ring base plate 105 respectively.Entirely 6~9 chain-fallings are installed on device.
The lifting earrings 108 is welded on the intermediate position of semicircular cylinder bearing base 107.In this way, whole device has symmetrically Two lifting earrings, be able to maintain stable lifting during installation.
Specifically, two above-mentioned semicircular cylinder bearing bases 107 are connected by two door-hinges 20, the opposite other side passes through switch 30 Locking, when locking, form hollow cylinder bearing base;To it is semi-open when for two hinged semicircular cylinder bearing bases.Cylinder The internal diameter of bearing base is more normal than deep water to use the big 20cm of the oral outer diameter of low pressure well, and the outer diameter of cylinder bearing base is 110cm bigger than internal diameter, cylinder Bearing base side wall be it is hollow, be welded by 10cm thick steel plate, entire cylinder bearing base height low pressure well more underwater than deep water is oral The high 15cm of mud extraction height.
Above-mentioned two pieces of symmetrically arranged semicircular ring base plates 105, which respectively correspond, to be welded on cylinder bearing base, the circle of composition Board bottom seat, for internal diameter as cylinder bearing base internal diameter, outer diameter is consistent with cylinder bearing base outer diameter, and plectane base thickness is 20cm, It can be with cylinder bearing base open or close.
The cylinder stressed plate that above-mentioned two pieces of semicircular cylinder stressed plates 104 are combined into, outer diameter is consistent with cylinder bearing base outer diameter, Wall thickness 15cm, cylinder stressed plate upper surface are evenly distributed with 6 or 12 circular holes, aperture 10cm, hole depth 5cm, for installing and fixing The end of spring 109.
Above-mentioned two blocks of semi arch plates 103 are combined into arc of circle plate, and section is arc-shaped at 1/4, radius 40cm, arc end surface Uniformly distributed 2~3 circular holes, aperture 10cm, hole depth 5cm, for installing and fixing the end of spring 109.Arc plate right-angle side end face It is welded with cylinder stressed plate, welding position is the same radial orientation of cylinder stressed plate circular hole, another right-angle side end face weld of arc plate It connects on plectane pedestal.
Above-mentioned two pieces of semi-circulars buffering steel plate 101 with a thickness of 15cm, at 1/4 circular ring shape, circular arc inner wall radius 65cm, Exterior radius 80cm.There are circular hole, aperture 10cm, hole depth 5cm, circular hole position and arc plate on every semi-circular buffering steel plate inner wall It is corresponding with cylinder stressed plate circular hole position, it is used to install and fix spring.109 diameter of spring and arc plate, cylinder by Circularhole diameter on power plate, loop buffer steel plate matches, and each spring screen resilience when compressing 10cm can reach the left side 1~2t The right side, spring are in point of neutralization length and are no less than 20cm.Each both ends of the spring is firmly welded on corresponding circular hole bottom face.
The state of above-mentioned door-hinge 20 and the switch 30 of cylinder bearing base is on the contrary, i.e. cylinder bearing base is in an open position When, door-hinge 20 resets dynamics minimum, and when cylinder bearing base is in the closed position, it is maximum that door-hinge 20 resets dynamics.Door-hinge and corresponding Junction is secured by being welded to connect.
Above-mentioned switch 30 is push-button switch, the button force phase that button force is provided with underwater robot ROV mechanical arm Match, is welded on corresponding link position.
Auxiliary of the invention a kind of underwater specifically includes that steps are as follows to well head operating method:
(1) enter water:Underwater auxiliary is hung near ROV mechanical arm wellhead assembly;Check underwater auxiliary to well Mouth each unit status of device, it is ensured that safety;Wirerope both ends are connect with two lifting earrings with block is unloaded;With ROV machinery Arm is caught among wirerope;Drilling platforms crane slings underwater auxiliary to wellhead assembly, is lauched and dives together in company with ROV To seafloor wellhead locations.
(2) it installs:ROV at a distance observation well head, once two spud in head rise low pressure well it is oral after, do in well head head The underwater auxiliary of installation prepares wellhead assembly out;After drill bit rises to a distance from well head head safety work, using ROV by water Lower auxiliary to wellhead assembly cover low pressure well in word, and wirerope is pulled to the one side for being equipped with door-hinge;By ROV machinery Arm is opened, and is moved to safety zone and is observed.
3) to well head:Setting of casing is oral and underwater auxiliary is to 10m above wellhead assembly or so to underwater low pressure well; ROV is moved to suitable position observation well head situation;Casing is slowly transferred in observation, once casing float shoe contact two and half Loop buffer steel plate can quickly transfer casing, it is made to enter low pressure well head along semi-circular buffering steel plate circular arc;Confirmation set Pipe can be according to normal lowering velocity setting of casing after entering low pressure well head.
4) it dismantles:After casing enters low pressure well head, at mobile ROV to well head, touched using ROV mechanical arm underwater Auxiliary opens it to wellhead assembly switch button;Mobile ROV is complete to wellhead assembly to assist under water to wirerope one side It is complete to open, catch wirerope level to be assisted under water after being moved to safety zone to wellhead assembly in tow using ROV mechanical arm, it will It takes the water surface out of.
The above content is merely illustrative of the technical solution of the present invention, and those skilled in the art are to technology of the invention The simple modification or equivalent replacement that scheme carries out, all without departing from the spirit and scope of technical solution of the present invention.

Claims (4)

1. a kind of underwater auxiliary is to wellhead assembly, it is characterised in that: including symmetrically arranged two sets to shaft collar, two sets to well One edge of mouth structure is connected by door-hinge, and for opposite other edge by switch locking, two sets are in cylinder when locking to shaft collar Shape;
It is described to shaft collar include semi-circular buffering steel plate, spring, semi arch plate, semicircular cylinder stressed plate, semicircular ring base plate, Semicircular cylinder bearing base and lifting earrings, semicircular ring base plate bottom surface are welded on semicircular cylinder bearing base, semi arch plate, semicircle Cylinder stressed plate be respectively welded on semicircular ring pedestal plate top surface, the semi arch plate, semicircular cylinder stressed plate pass through respectively spring with The semi-circular buffering steel plate is connected, and the medial surface of the semi-circular buffering steel plate is arcwall face, the lifting earrings setting On semicircular cylinder bearing base.
2. underwater auxiliary according to claim 1 is to wellhead assembly, it is characterised in that: the semi-circular buffering steel plate and half Chain-falling is additionally provided between annulus base plate.
3. underwater auxiliary according to claim 1 or 2 is to wellhead assembly, it is characterised in that: the lifting earrings is welded on Position among the semicircular cylinder bearing base.
4. a kind of well head operating method using underwater auxiliary as described in any one of claims 1-3 to wellhead assembly, spy Sign is, includes the following steps as follows:
(1) enter water:Underwater auxiliary is hung near ROV mechanical arm wellhead assembly;Check underwater auxiliary to wellhead assembly Each unit status, it is ensured that safety;Wirerope both ends are connect with two lifting earrings with block is unloaded;It is grabbed with ROV mechanical arm Firmly among wirerope;Drilling platforms crane slings underwater auxiliary to wellhead assembly, is lauched and is dived to submarine well together in company with ROV Mouth position;
(2) it installs:ROV at a distance observation well head, once two spud in head rise low pressure well it is oral after, do at well head head install Underwater auxiliary prepares wellhead assembly;After drill bit rises to a distance from well head head safety work, it will be assisted under water pair using ROV Wellhead assembly cover low pressure well in word, and wirerope is pulled to the one side for being equipped with door-hinge;ROV mechanical arm is opened, Safety zone is moved to be observed;
3) to well head:Setting of casing is oral and underwater auxiliary is to 10m above wellhead assembly or so to underwater low pressure well;It is mobile ROV to suitable position observe well head situation;Casing is slowly transferred in observation, is delayed once casing float shoe contacts two semi-circulars Casing can quickly be transferred by rushing steel plate, it is made to enter low pressure well head along semi-circular buffering steel plate circular arc;Confirm that casing enters It can be according to normal lowering velocity setting of casing after low pressure well head;
4) it dismantles:After casing enters low pressure well head, at mobile ROV to well head, underwater auxiliary pair is touched using ROV mechanical arm Wellhead assembly switch button opens it;Mobile ROV on one side, fully opens wellhead assembly to assist under water to wirerope, It catches wirerope level to be assisted under water after being moved to safety zone to wellhead assembly in tow using ROV mechanical arm, takes it out The water surface.
CN201710873937.3A 2017-09-25 2017-09-25 It is a kind of to assist under water to wellhead assembly and operating method Active CN107476775B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710873937.3A CN107476775B (en) 2017-09-25 2017-09-25 It is a kind of to assist under water to wellhead assembly and operating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710873937.3A CN107476775B (en) 2017-09-25 2017-09-25 It is a kind of to assist under water to wellhead assembly and operating method

Publications (2)

Publication Number Publication Date
CN107476775A CN107476775A (en) 2017-12-15
CN107476775B true CN107476775B (en) 2019-10-18

Family

ID=60586456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710873937.3A Active CN107476775B (en) 2017-09-25 2017-09-25 It is a kind of to assist under water to wellhead assembly and operating method

Country Status (1)

Country Link
CN (1) CN107476775B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343392A (en) * 2018-03-28 2018-07-31 中海石油(中国)有限公司湛江分公司 Auxiliary installation increases the device and application process of pipe

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6330919B1 (en) * 1996-03-08 2001-12-18 Smith International, Inc. Method of removing wellhead assemblies and cutting assembly for use therein
CN202108460U (en) * 2011-06-10 2012-01-11 中国石油天然气集团公司 Wellhead device used for ocean deep water well drilling
CN102733775A (en) * 2012-07-12 2012-10-17 中国海洋石油总公司 C-shaped plate for lifting well mouth
CN103397871A (en) * 2013-08-14 2013-11-20 大连理工大学 Dry-type Christmas tree based ultra-deepwater oil and gas development system and mounting method thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203321407U (en) * 2013-05-24 2013-12-04 重庆前卫海洋石油工程设备有限责任公司 Christmas tree cap
CN205400653U (en) * 2016-03-04 2016-07-27 苏州道森钻采设备股份有限公司 Interior locking oil gas wellhead assembly
CN106741755B (en) * 2016-12-16 2018-07-10 中国海洋石油集团有限公司 The running tool of subsea control modules

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6330919B1 (en) * 1996-03-08 2001-12-18 Smith International, Inc. Method of removing wellhead assemblies and cutting assembly for use therein
CN202108460U (en) * 2011-06-10 2012-01-11 中国石油天然气集团公司 Wellhead device used for ocean deep water well drilling
CN102733775A (en) * 2012-07-12 2012-10-17 中国海洋石油总公司 C-shaped plate for lifting well mouth
CN103397871A (en) * 2013-08-14 2013-11-20 大连理工大学 Dry-type Christmas tree based ultra-deepwater oil and gas development system and mounting method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"半潜式钻井平台水下井口扶正技术及其现场实践";邵诗军等;<中国海上油气>;20111231;第23卷(第4期);第256-258页 *

Also Published As

Publication number Publication date
CN107476775A (en) 2017-12-15

Similar Documents

Publication Publication Date Title
US2988144A (en) Method and apparatus for drilling and completing underwater well bores
NO346343B1 (en) Module seabed completion
US9574426B2 (en) Offshore well system with a subsea pressure control system movable with a remotely operated vehicle
NO20150570A1 (en) Remote controlled well completion equipment
BRPI0504669A (en) marine rig pipe maneuvering equipment with surface eruption preventer
US8590625B1 (en) Subsea completion with a tubing spool connection system
US6962205B1 (en) Subsea wellhead landing clamp and slip bowl assembly
AU2015354871A1 (en) Arrangement for supporting a wellhead
CN107476775B (en) It is a kind of to assist under water to wellhead assembly and operating method
US10837251B2 (en) Power feedthrough system for in-riser equipment
US11603729B2 (en) Single-tube double-wellhead drilling and production apparatus
US20230030302A1 (en) Method for shearing pipe and providing a compression seal
CN205532515U (en) Combustible ice is separated stifled device, is separated stifled system
CN108166941B (en) TLP double-layer vertical pipe drilling well completion construction operation method
US10907316B2 (en) Offshore apparatus and method
CN209780809U (en) one-way feeding tool for casing hanger and sealing assembly for underwater wellhead
CN219472061U (en) Large-size hanger suitable for deep water tubing hanger protection
KR101599315B1 (en) Test Wellhead Assembly and BOP Test Apparatus Using The Same
CN203223199U (en) Special hoisting tool for realizing installation of underwater wellhead cap without occupying wellhead
KR101548267B1 (en) Inside blowout and backdraft preventing equipment in drill string
EP3368723B1 (en) Offshore apparatus and method
KR20150097965A (en) BOP Test Apparatus and Method
US20130284444A1 (en) Systems, Spacer Devices and Methods For Aligning Multi-Well Modular Templates and Associated Wells
CN104234655A (en) Offshore christmas tree double-V-shaped high-pressure sealing device
CN205078248U (en) Oil recovery borehole operation stretching device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Applicant after: China Offshore Oil Group Co., Ltd.

Applicant after: CNOOC (China) Limited Zhanjiang Branch

Address before: Chinese CNOOC Building No. 25 Beijing 100010 Dongcheng District Chaoyangmen North Street

Applicant before: China National Offshore Oil Corporation

Applicant before: CNOOC (China) Limited Zhanjiang Branch

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant