CN107476360A - A kind of strengthening of foundation platform encloses curtain grouting lifting correction engineering method - Google Patents

A kind of strengthening of foundation platform encloses curtain grouting lifting correction engineering method Download PDF

Info

Publication number
CN107476360A
CN107476360A CN201710598343.6A CN201710598343A CN107476360A CN 107476360 A CN107476360 A CN 107476360A CN 201710598343 A CN201710598343 A CN 201710598343A CN 107476360 A CN107476360 A CN 107476360A
Authority
CN
China
Prior art keywords
house
platform
foundation
grouting
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710598343.6A
Other languages
Chinese (zh)
Inventor
陈胜强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hongshi Construction Technology Development Engineering Co Ltd
Original Assignee
Guangdong Hongshi Construction Technology Development Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Hongshi Construction Technology Development Engineering Co Ltd filed Critical Guangdong Hongshi Construction Technology Development Engineering Co Ltd
Priority to CN201710598343.6A priority Critical patent/CN107476360A/en
Publication of CN107476360A publication Critical patent/CN107476360A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • E02D35/005Lowering or lifting of foundation structures

Abstract

The present invention provides a kind of strengthening of foundation platform and encloses curtain grouting lifting correction engineering method, in house, surrounding sets grout hole, carry out the closing sealing of curtain grouting all around, sub-surface forms one layer of cement foundation wall, after inside and outside soil layer is undisturbed during protection house platform correction, right quantity grout hole is set as requested in house platform respectively, according to certain sequence of construction, slip casting is carried out simultaneously to the tilted both sides foundation soil in house, utilize slip casting principle, house lower position basis is set to realize the compacted lifting of mud jacking, pass through the pressure different to tilting basic both sides slip casting, it is allowed to balanced Matching regulation and control appropriateness, tilting building platform will be enable safely and fast to rectify a deviation righting, recover normal use.This engineering method can effectively prevent grouting material in the mobility of soil layer, avoid underground utilities from blocking or destroy, be effectively saved construction cost, while ensure that house platform lifting correction righting.

Description

A kind of strengthening of foundation platform encloses curtain grouting lifting correction engineering method
Technical field
The invention belongs to administer the method and technology category of building pathology accident, particularly a kind of strengthening of foundation platform encloses curtain filling Starch lifting correction engineering method.Mainly handle because foundation differential settlement reason causes house platform cracking, inclination, and to room Room platform correction righting, ensures its normal use after making the house reparation.
Background technology
In building pathology is administered, because foundation differential settlement accident pathological manifestations house platform ftracture, tilt, Wall or filling wall cracking.But the sedimentation that foundation has differences, it is exactly differential settlement.Thus administer means and adopt The measure taken must necessarily be placed on the foundation in house.Therefore for house platform reinforcement means, basic filling is commonly used Slurry processes, this method can make its sub-surface form new composite foundation, no longer be settled so as to stablize house foundation platform.Wherein, The technique way of foundation grouting method is:First measurement and positioning, then rig is in place, next enters by design hole drill, is washed by water, is pressed Water test, start foundation grouting, until design pressure, preferably removes equipment and sealing of hole reparation.
The shortcomings that method used in the prior art is present and deficiency are:1. because foundation grouting is receiving the work of pressure With having mobility in lower cement base soil layer, easily underground utilities, Chi Keng are resulted in blockage or destroyed, causes unnecessary economy Loss;2. foundation grouting method functions only as improving foundation bearing capacity, so as to which firm ground is basic, under making house platform no longer It is heavy, only reach foundation effect;House platform is still tilting, and can not rectify a deviation righting, so conventional foundation grouting method Relatively simple property, only with foundation stabilization action effect.
The content of the invention
It is an object of the invention to overcome above-mentioned deficiency of the prior art, there is provided a kind of strengthening of foundation platform encloses curtain grouting Lifting is rectified a deviation engineering method, can effectively be prevented grouting material in the mobility of soil layer, be avoided underground utilities from blocking or destroy, effectively section About construction cost, while ensure that house platform lifting correction righting.Therefore strengthening of foundation platform encloses curtain grouting lifting and entangled Inclined engineering method be it is a kind of both reach strengthening of foundation, and can carries out a kind of steady novel construction method of safety of house platform correction, and it is extensive Suitable for after the quick reparation of the inclined building pathology accident caused by the foundation differential settlement reason and being continuing with down Go.
To achieve these goals, the technical scheme of novel construction method use of the present invention is:
A kind of strengthening of foundation platform encloses curtain grouting lifting correction engineering method, and in house, surrounding sets grout hole, carries out all around Curtain grouting closing sealing, sub-surface form one layer of cement foundation wall, and inside and outside soil layer is not disturbed during protecting house platform correction After dynamic, right quantity grout hole is set as requested in house platform respectively, according to certain sequence of construction, in house Tilt both sides foundation soil and carry out slip casting simultaneously, using slip casting principle, house lower position basis is realized the compacted lifting of mud jacking, lead to The pressure different to tilting basic both sides slip casting is crossed, balanced Matching regulation and control appropriateness is allowed to, tilting building platform will be enable fast safely Speed correction righting, recovers normal use;Including step in detail below:
Step 1: measurement and positioning:Existed according to site inspection and combination design using theodolite, spirit level, Sopwith staff, steel tape House platform carries out grout hole positioning;Repetition measurement is carried out after positioning, to ensure accuracy;
Step 2: rig is in place:Rig must be kept when in place it is smooth it is firm, do not tilt and displacement, and take certain Fixation prevents rig displacement in drilling process and rocked;
Step 3: rig is crept into:Drilling start to drill among the predetermined soil depth of design, and carry out drilling bath, Packer permeability test;
Step 4: grouting intubation makes:Made by design aperture, intubation need to open circular hole;
Step 5: carry out first paragraph foundation grouting:In house, all around curtain is in the milk platform, and adds waterglass, makes cement Quick-hardening is starched, one layer of cement foundation wall is formed in sub-surface;
Step 6: after solidifying 24 hours, second stage foundation grouting lifting correction is carried out:To the tilted both sides of house platform Foundation soil carries out slip casting simultaneously, using slip casting principle, realizes house lower position basis, the compacted lifting of mud jacking, by inclining The different pressure of oblique basic both sides slip casting, balanced Matching regulation and control appropriateness is allowed to, the safely and fast lifting of tilting building platform will be enable, The step need to be repeated up to completion strengthening of foundation platform and enclose curtain grouting lifting Deviation Correction Construction;
Step 7: remove equipment and sealing of hole:After completing foundation grouting, after removing equipment, and cement bonded sand is used to hole Slurry repair floating.
Compared with prior art, the present invention has the advantage that:
Engineering method of the present invention is to have the function of foundation grouting method concurrently and reach correction novel construction method, it the advantages of it is a lot:
First, it typically sets grout hole in house surrounding, carries out the closing sealing of curtain grouting all around, and sub-surface is formed One layer of cement foundation wall, quantities is relatively small, and operating expenses is also than relatively low.
Second, its grout hole is smaller, very small to soil layer disturbance, can be at any time using giant punching or drilling Sealing of hole and perforate construction, adjustment pressure is steadily controllable, easy for construction simple.
3rd, skilled worker implements correction operation in house platform, fool proof reliable, and completes correction only Make sealing pores, it is very easy without backfill and compacting, labor and material saving, construction.
Brief description of the drawings
Fig. 1 is the construction process figure that strengthening of foundation platform of the present invention encloses curtain grouting lifting correction engineering method.
Fig. 2 is that strengthening of foundation platform of the present invention encloses curtain grouting lifting correction engineering method embodiment schematic diagram.
Embodiment
Below in conjunction with the accompanying drawings, the specific embodiment of the present invention is described further.
As depicted in figs. 1 and 2, the strengthening of foundation platform encloses curtain grouting lifting correction engineering method, to be fitted in house periphery When the grout hole that appropriate quantity is set in the ground of position, slip casting respectively forms one layer of cement base in peripherally base, protects room After inside and outside soil layer is undisturbed during the correction of room platform, right quantity (or particular number is set in house platform respectively Refer to design drawing) grout hole, according to certain sequence of construction, slip casting is carried out simultaneously to the tilted both sides foundation soil in house, It using slip casting principle, can realize house lower position basis, the compacted lifting of mud jacking, by different to tilting basic both sides slip casting Pressure, be allowed to balanced Matching regulation and control appropriateness, the safely and fast lifting of tilting building platform will be enable;Grout hole size, can basis Actual field requires to formulate, and general aperture is that 50mm~110mm depends on engineering design data to require, the long and short wheelbase of the grout hole From not less than between 1000mm~2000mm;To facilitate skilled worker's standing operation, to below lower water level and water feed it is abundant When, foundation grouting needs slip casting mortar back cover sealing, or adds waterglass rapidity back cover;Set intubation grouting construction generally requires Made and constructed by design and settled at one go.
There is a variety of method for setting an appropriate number of grout hole in suitable position ground in tilting building, right on this In common private residence, choose appropriate location and try one's best equivalent arrangement grout hole, but be in the milk simultaneously to tilting both sides ground, mud jacking Compacted lifting.
When during correction, when implementing slip casting, the deep-controlled of slip casting, slurry configurations, lifting speed, grouting pressure, Grouting amount and off time control are carried out all in accordance with Control Criterion of Design, and are combined soil condition and pause grouting and sealing of hole etc. and adjusted Prosecutor case controls by the lifting standard of design, it is impossible to blindly operates;When implementing correction, by design requirement drilling to design soil layer Depth, sleeve pipe slip casting is inserted into, prepares slurries by design requirement and the technical essential such as control pressure and mud jacking amount uses slip casting Operation.Realize lifting simultaneously and carry out leveling construction.
The compacted lifting of mud jacking used for correction, it is necessary to first prepare slurries, such as use list of the cement for binder materials Slurries, appropriate adding coal ash is answered, its proportioning can determine after strength test indoors.Also 40Be20 DEG C of waterglass can be filled.This Invention engineering method grouting pressure control standard can use 0.2~0.4MPa, meanwhile, added according to soil condition feature and combined process process With Effective Regulation, if during grouting difficulty, can be gradually increased between 0.8~0.9, lifting extruding is set to reach required design requirement. Be advantageous to the balanced adjustment of building structure integral rigidity, it is ensured that the safe handling after lifting correction righting.
To improve correction monitoring materials and evaluation effect, follow-up work settlement monitoring, settlement observation needs 2 months one It is secondary, 1 year is observed, and establish construction archives.

Claims (1)

1. a kind of strengthening of foundation platform encloses curtain grouting lifting correction engineering method, it is characterised in that in house, surrounding sets grout hole, enters The row closing sealing of curtain grouting all around, sub-surface form one layer of cement foundation wall, inside and outside soil during protection house platform correction After layer is undisturbed, right quantity grout hole is set as requested in house platform respectively, according to certain sequence of construction, Slip casting is carried out simultaneously to the tilted both sides foundation soil in house, using slip casting principle, house lower position basis is realized grouting extrusion Close lifting, by the pressure different to tilting basic both sides slip casting, balanced Matching regulation and control appropriateness is allowed to, tilting building platform will be made Can safely and fast be rectified a deviation righting, recover normal use;Including step in detail below:
Step 1: measurement and positioning:According to site inspection and design is combined using theodolite, spirit level, Sopwith staff, steel tape in house Platform carries out grout hole positioning;Repetition measurement is carried out after positioning, to ensure accuracy;
Step 2: rig is in place:Rig must be kept when in place it is smooth it is firm, do not tilt and displacement, and take certain fixation Measure prevents rig displacement in drilling process and rocked;
Step 3: rig is crept into:Drilling starts to drill among the predetermined soil depth of design, and carries out drilling bath, pressure water Experiment;
Step 4: grouting intubation makes:Made by design aperture, intubation need to open circular hole;
Step 5: carry out first paragraph foundation grouting:In house, all around curtain is in the milk platform, and adds waterglass, makes cement mortar fast Speed hardening, one layer of cement foundation wall is formed in sub-surface;
Step 6: after solidifying 24 hours, second stage foundation grouting lifting correction is carried out:To the tilted both sides ground of house platform Soil carries out slip casting simultaneously, using slip casting principle, realizes house lower position basis, the compacted lifting of mud jacking, by tilting base The different pressure of plinth both sides slip casting, balanced Matching regulation and control appropriateness is allowed to, the safely and fast lifting of tilting building platform, the step will be enable Suddenly completion strengthening of foundation platform need to be repeated up to and enclose curtain grouting lifting Deviation Correction Construction;
Step 7: remove equipment and sealing of hole:After completing foundation grouting, after removing equipment, and hole is entered using cement mortar Row is repaired floating.
CN201710598343.6A 2017-07-21 2017-07-21 A kind of strengthening of foundation platform encloses curtain grouting lifting correction engineering method Pending CN107476360A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710598343.6A CN107476360A (en) 2017-07-21 2017-07-21 A kind of strengthening of foundation platform encloses curtain grouting lifting correction engineering method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710598343.6A CN107476360A (en) 2017-07-21 2017-07-21 A kind of strengthening of foundation platform encloses curtain grouting lifting correction engineering method

Publications (1)

Publication Number Publication Date
CN107476360A true CN107476360A (en) 2017-12-15

Family

ID=60595157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710598343.6A Pending CN107476360A (en) 2017-07-21 2017-07-21 A kind of strengthening of foundation platform encloses curtain grouting lifting correction engineering method

Country Status (1)

Country Link
CN (1) CN107476360A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547336A (en) * 2018-04-26 2018-09-18 北京恒祥宏业基础加固技术有限公司 Jacking leveling technology is reinforced in a kind of sedimentation suitable for industrial premises independence pile foundation
WO2021027696A1 (en) * 2019-08-09 2021-02-18 北京恒祥宏业基础加固技术有限公司 Reinforcing and lifting method and reinforcing and lifting structure for large-scale piers of high-speed rail
WO2021027695A1 (en) * 2019-08-09 2021-02-18 北京恒祥宏业基础加固技术有限公司 Precise lifting method for plant equipment foundation, and lifting and reinforcing structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51103609A (en) * 1975-03-08 1976-09-13 Seiko Kogyo Kk Kochikubutsuno fudochinkakyoseikoho
CN102061697A (en) * 2010-11-25 2011-05-18 中铁六局集团有限公司广州分公司 Method for treating uneven settlement of building
CN106320403A (en) * 2016-09-20 2017-01-11 武汉理工大学 Inclination rectification and reinforcement method for existing building
CN106894409A (en) * 2015-12-17 2017-06-27 上海华峰材料科技研究院(有限合伙) For the polyurethane grouting and reinforcing lifting fast repairing method of settlement of foundation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51103609A (en) * 1975-03-08 1976-09-13 Seiko Kogyo Kk Kochikubutsuno fudochinkakyoseikoho
CN102061697A (en) * 2010-11-25 2011-05-18 中铁六局集团有限公司广州分公司 Method for treating uneven settlement of building
CN106894409A (en) * 2015-12-17 2017-06-27 上海华峰材料科技研究院(有限合伙) For the polyurethane grouting and reinforcing lifting fast repairing method of settlement of foundation
CN106320403A (en) * 2016-09-20 2017-01-11 武汉理工大学 Inclination rectification and reinforcement method for existing building

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547336A (en) * 2018-04-26 2018-09-18 北京恒祥宏业基础加固技术有限公司 Jacking leveling technology is reinforced in a kind of sedimentation suitable for industrial premises independence pile foundation
CN108547336B (en) * 2018-04-26 2021-03-23 北京恒祥宏业基础加固技术有限公司 Sedimentation, reinforcement, jacking and leveling method suitable for independent pile foundation of industrial plant
WO2021027696A1 (en) * 2019-08-09 2021-02-18 北京恒祥宏业基础加固技术有限公司 Reinforcing and lifting method and reinforcing and lifting structure for large-scale piers of high-speed rail
WO2021027695A1 (en) * 2019-08-09 2021-02-18 北京恒祥宏业基础加固技术有限公司 Precise lifting method for plant equipment foundation, and lifting and reinforcing structure
US11739495B2 (en) 2019-08-09 2023-08-29 Beijing Hengxiang Hongye Foundation Reinforcement Technology Co., Ltd. Reinforcing and lifting method and reinforcing and lifting structure for large-scale piers of high-speed rail
US11746496B2 (en) 2019-08-09 2023-09-05 Beijing Hengxiang Hongye Foundation Reinforcement Technology Co., Ltd. Precise lifting method and lifting and reinforcing structure for plant equipment foundation

Similar Documents

Publication Publication Date Title
CN103343544B (en) Construction method for large-scale open caisson
CN102011397B (en) Construction process of concrete form water-stopping occlusion pile
CN103195076B (en) Muddy Bottoms deep-excavation tower crane foundation construction method
CN100567660C (en) The sink well given force construction method of house deviation rectifying
CN109630127B (en) Construction method of ultra-deep shield vertical shaft for water-rich weak stratum
CN106759379A (en) A kind of construction method of the asymmetric water-stop curtain of foundation ditch
CN105178368B (en) Mini pile stake holes fetches earth building inclination rectification method
CN103993603A (en) Top-down construction method for anchor rod and rotary jet grouting back cover deep foundation pit without precipitation operation
CN104895055A (en) Building grouting pile foundation construction method
CN107476360A (en) A kind of strengthening of foundation platform encloses curtain grouting lifting correction engineering method
CN104264683B (en) Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition
CN106677168A (en) Construction method of cast-in-place superfluid concrete pile
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN112127897A (en) Large-caliber directional grouting method for ultra-deep hole ground surface
CN101798823B (en) Construction method of performing remote deviation rectification by passageway method
CN112459078A (en) Construction method of foundation pit supporting system
CN110080779B (en) Tunnel bottom karst cave treatment construction method
CN107675704A (en) A kind of artificial digging pile assembled retaining wall and its construction technology
CN106677161A (en) Treatment method for soft soil foundation of existing shield rectangular tunnel
CN102235007A (en) Method for supporting deep foundation with upper nail-lower pile combination
CN108625388A (en) A kind of sleeve combination formula large diameter single pile foundation and its construction method suitable for Shallow Bedrock geological conditions
CN109056808A (en) Stake and steel pipe column construction method in a kind of subway station
CN108104115A (en) Cast-in-place pile construction method
CN110565709B (en) Method for correcting inclination of composite foundation building by taking soil from mattress layer and forcing to land
CN106703836A (en) Treatment method of the bedding soft soil of existing circular shield tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171215