CN107473054A - Construction elevator building method for building construction - Google Patents

Construction elevator building method for building construction Download PDF

Info

Publication number
CN107473054A
CN107473054A CN201710675832.7A CN201710675832A CN107473054A CN 107473054 A CN107473054 A CN 107473054A CN 201710675832 A CN201710675832 A CN 201710675832A CN 107473054 A CN107473054 A CN 107473054A
Authority
CN
China
Prior art keywords
screw rod
bar planting
construction
elevator
planting screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710675832.7A
Other languages
Chinese (zh)
Other versions
CN107473054B (en
Inventor
李子明
黄奉强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yujian Construction Industry Technology Group Dianjiang Co ltd
Original Assignee
Chongqing Yujian Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Yujian Industry Co ltd filed Critical Chongqing Yujian Industry Co ltd
Priority to CN201710675832.7A priority Critical patent/CN107473054B/en
Publication of CN107473054A publication Critical patent/CN107473054A/en
Application granted granted Critical
Publication of CN107473054B publication Critical patent/CN107473054B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/023Mounting means therefor
    • B66B7/025End supports, i.e. at top or bottom
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B11/00Connecting constructional elements or machine parts by sticking or pressing them together, e.g. cold pressure welding
    • F16B11/006Connecting constructional elements or machine parts by sticking or pressing them together, e.g. cold pressure welding by gluing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B35/00Screw-bolts; Stay-bolts; Screw-threaded studs; Screws; Set screws
    • F16B35/04Screw-bolts; Stay-bolts; Screw-threaded studs; Screws; Set screws with specially-shaped head or shaft in order to fix the bolt on or in an object
    • F16B35/041Specially-shaped shafts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M7/00Details of attaching or adjusting engine beds, frames, or supporting-legs on foundation or base; Attaching non-moving engine parts, e.g. cylinder blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a construction elevator building method for building construction, which comprises the steps of firstly, pouring beside a construction building to obtain a reinforced concrete elevator foundation; arranging a vertically upward screw on the upper surface of an elevator foundation, penetrating an installation hole in a base upwards by virtue of the screw and fixing the screw by adopting a nut to realize base installation, installing a guide rail frame on the base, and finally installing a suspension cage and a hoisting system on the guide rail frame, wherein the screw is a bar-planting screw, drilling a hole vertically downwards on the upper surface of the elevator foundation, the drilling position is over against the installation hole in the base, injecting an adhesive into the hole after drilling is finished and inserting the bar-planting screw, and the length of the part of the upper end of the bar-planting screw, which is exposed above the upper surface of the elevator foundation, is greater than the thickness of the base of the elevator under construction; after the adhesive is solidified, the upper end of the bar-planting screw penetrates out of the mounting hole of the base, and then the nut is screwed and mounted, so that the mounting and fixing of the base are completed. The invention has the advantages of better positioning and mounting of the guide rail frame, high construction efficiency and high stability.

Description

A kind of construction construction elevator building method
Technical field
The present invention relates to the realm of building construction, more particularly to a kind of construction construction elevator building method.
Background technology
Construction elevator is commonly referred to as building hoist, is generally used for vertically transporting pedestrian or building materials goods on building sites Thing, it is the most vertical-type people's goods means of transport of Contemporary Architecture industrial application.
Construction elevator is provided with to be provided with the basis of ground guard rail, elevator and led including elevator basis, elevator basis side Rail gantry, wall-attached frame is provided between guide rail bracket and wall, cage and elevator device are installed on guide rail bracket.Elevator basis is general To be made by concrete material, for bearing the isostructural weight of guide rail bracket, cage, guide rail bracket is played important positioning and Fixation.
During elevator foundation construction, first the debris on ground is cleaned out, construction elevator position releases elevator base position Line, then shuttering, casting concrete.Wherein in casting concrete, guide rail bracket is installed for convenience of the later stage, need to be according to guide rail bracket Size foundation bolt is cast in concrete.Embedding anchor bolts required precision is high, so required positioning time length, and And to ensure that elevator underlying strength and bearing capacity, concrete need vibration compacting, in concrete vibrating compacting process, lower margin Skew occurs in bolt, causes mounting hole during later stage installation guide rail bracket on guide rail bracket now to be needed with foundation bolt face Foundation bolt is rectified a deviation using oxygen welding, foundation bolt heat-treated is unqualified, causes foundation bolt to break in use Split.
The content of the invention
For deficiencies of the prior art, present invention solves the technical problem that being:How to provide one kind can be more Good carries out location and installation to guide rail bracket, and efficiency of construction is high, stability high construction construction elevator building method.
In order to solve the above-mentioned technical problem, present invention employs following technical scheme:
A kind of construction construction elevator building method, it is in block to be obtained first beside construction building by concreting The elevator basis of shape structure type, elevator basis upper surface is horizontal surface;After the solidification of elevator basis, in elevator basis upper table Face sets screw rod straight up, and the mounting hole being upward through by screw rod on base simultaneously realizes that base is pacified using nut fixation Dress, then in base upper mounting rail frame, cage and tackling system are finally installed on guide rail bracket, it is characterised in that the spiral shell Bar is bar planting screw rod, sets bar planting screw rod to comprise the following steps:Drilled straight down on the upper surface on elevator basis, the brill The mounting hole of corner is set on the face base of hole site, and drilling is completed to inject adhesive in backward drilled hole and inserts bar planting spiral shell Bar and vertical fixed, the length that bar planting screw rod upper end is exposed to the part of surface on the basis of elevator are more than construction elevator base Thickness;After adhesive solidification, the part that bar planting screw rod upper end passes the mounting hole of base spins install nut again, completes The installation of base is fixed.
In the technical program, casting concrete obtains elevator basis by construction building, and elevator basis upper surface level is set Put and mounting seat and guide rail bracket, elevator basis are used to bear the whole weight of construction elevator, positioning is also functioned to guide rail bracket And fixation.Cage is installed, cage can be slided up and down along guide rail bracket under the drive of tackling system, hung on guide rail bracket Cage is used to transport pedestrian or building materials goods, is used conveniently and safely.When elevator basis pours, bar planting screw rod is not cast in the lump It is interior, but after solidification, drilled on the basis of elevator, the mounting hole of drilling face base corner is set, and bar planting screw rod is led to Cross adhesive to be vertically fixed in drilling, can avoid offseting between bar planting screw rod and mounting hole, can preferably ensure bar planting The cooperation of screw rod and mounting hole, more preferable mounting seat.Bar planting screw rod is fixed in elevator basis by adhesive, Ke Yigeng The quality for the construction elevator that good raising efficiency of construction and construction obtains.
As optimization, will be inserted vertically into after the heating of implantation screw rod lower end.
So, when directly bar planting screw rod is vertically inserted into adhesive, the bubble of residual can be attached to plant in adhesive Muscle screw rod lateral surface, and then the reliability and stability of bar planting screw rod anchoring is influenceed after solidifying.It is (excellent after the heating of bar planting screw rod lower end Elect 100~300 degrees Celsius of heating-up temperature as, not change the performance of bar planting screw rod, the intensity for not influenceing bar planting screw rod is standard Determine the mobility scale of heating-up temperature), when bar planting screw rod lower end is inserted in adhesive, the bar planting screw rod heat of itself can cause glue Close to the air heats expansion of bar planting screw rod in stick, depart from bar planting screw surface so that bar planting screw rod is preferably and adhesive With reference to being more securely anchored in adhesive.Further, bar planting screw rod is inserted into straight down and in rotary manner glue In stick, increase the friction of bar planting screw surface and adhesive so that blibbing, which can be preferably squeezed and broken, departs from screw rod table Face so that bar planting screw surface is preferably combined with adhesive, further the reliability of increase anchoring.
As optimization, wherein drilling is carried out using diamond drilling machine installation water injection drill, drill bit is entered in boring procedure Row water filling aids in.
So, there is water to enter behind the drill bit inner chamber of diamond drilling machine during drilling to flow out from chisel edge again;By current Chip caused by drilling can be preferably taken away, improves drilling efficiency, it is ensured that drilling is smoothed out;Simultaneously in drill bit Chamber has the water outflow of abundance, and drill bit can be cooled down.
As optimization, the bar planting screw rod is processed to obtain using round steel, and bar planting screw rod top is provided with external screw thread, outside bottom Perimeter surface carries out coarse processing.
So, bar planting screw rod is processed to obtain using round steel, and for screw-thread steel, threading is relative on round steel It is simple and convenient, and round steel is generally used for manufacturing foundation bolt, has preferable moulding and solderability.Round steel processing is simple, system Make conveniently, cost is low, can preferably reduce construction cost.Bar planting screw rod bottom, which carries out coarse processing, (can use mill during implementation The modes such as sand carry out coarse processing), it can preferably increase the affinity of bar planting screw rod and adhesive, can preferably carry out anchor Gu.
As optimization, after drilling terminates, water and dust in drilling need to be first removed, reinjects adhesive.
So, drilling is cleaned out, can preferably improve the plybonding effect of adhesive so that adhesive preferably with The hole wall in drilled hole is combined, and preferably bar planting screw rod is anchored in drilling.When clearing up the water and dust in drilling, strip is taken The rod member of shape, towel being bundled in rod member one end end, then one end that rod member is bundled with to towel is filled in bore inner and extracted, Carry out cleaning to towel again to wring out, repeatedly, until the water in drilling and dust are cleaned out.
As optimization, adhesive uses the adhesive of Hilti HIT-RE 500.
So, the adhesive of Hilti HIT-RE 500 is a kind of anchoring adhesive, is mainly used in the reinforcing of structure muscle, Ke Yigeng Good is anchored at cage bar screw rod in drilling.
As optimization, wherein determining that the diameter D of bar planting screw rod uses following step:First, the material of bar planting screw rod is first determined Expect for No. 45 steel or 40Cr, the relative stiffness coefficient kc of bar planting screw rod is obtained according to the material of bar planting screw rod, obtain bar planting screw rod Pretension coefficient k o, obtain bar planting screw rod safety coefficient Pn and bar planting nut stem material yield strength σ s, then bring public affairs into FormulaThe diameter D of bar planting screw rod is obtained, it is straight that this is obtained according to the diameter D of the bar planting screw rod of acquisition The design pulling force F that the bar planting screw rod in footpath can bear;2nd, construction elevator maximum tilting moment M is obtained, obtains what is set on base Bar planting screw rod number i, the length of side a for building the standard knot horizontal cross-section used in guide rail bracket is obtained, brings formula P=M (2 × a × i) into Obtain the maximum pull P needed for practice of construction, three, compare needed for the design pulling force F and practice of construction that bar planting screw rod can bear Maximum pull P, if the design pulling force F that bar planting screw rod can bear is more than the maximum pull P needed for practice of construction, basis The model of the diameter D selection bar planting screw rods for the bar planting screw rod being calculated, bar planting screw rod model are shown in bore diameter corresponding relation Table 1,
Table 1, bar planting screw rod model and bore diameter corresponding relation
So, the diameter of bar planting screw rod is obtained according to bar planting nut stem material, bar planting screw rod is looked into according to the diameter of bar planting screw rod Performance parameter table or tested to obtain the design pulling force that the bar planting screw rod of the diameter can bear, then according to actually applying The maximum tilting moment that work elevator is subjected to obtains the pulling force that bar planting screw rod is subjected to, to ensure the security of construction elevator Can, the design pulling force of diameter screw need to be more than the actual pulling force to be born of bar planting screw rod, can be held needed for practice of construction elevator Whether the maximum pull received examines the design rubbish of bar planting screw rod qualified.It so can preferably ensure the security of construction elevator Energy, meet the needs of practice of construction.The model of bar planting screw rod is selected according to the diameter of bar planting screw rod, is then drilled, can be with Suitable drill bit is preferably selected, bore diameter obtains with bar planting screw rod model according to practical operation, is meeting that practice of construction will On the premise of asking, ensure the intensity of base, improve the reliability and stability of construction elevator.
As optimization, wherein determining that the anchorage depth for often taking root in muscle screw rod uses following step:One, it is determined that often taking root in muscle The basic anchorage depth La of screw rod, first obtain bar planting screw rod nominal diameter d;It is retrieved as preventing the calculating that concrete splitting is quoted again Coefficient aspc, to prevent the design factor aspc that concrete splitting is quoted according to pouring the basic thickness of elevator, pour elevator base The diameter and spacing of the stirrup of plinth and the nominal diameter of bar planting screw rod obtain;The tensile strength design of bar planting screw rod is obtained again Value fy, the tensile strength design load fy of bar planting screw rod obtain according to the model of reinforcing bar used by bar planting screw rod;Plant is obtained again The adhesion strength design load fbd of muscle adhesive, the adhesion strength design load fbd of bar planting adhesive according to adhesive etc. Level, bar planting back gauge and spacing and strength grade of concrete obtain;Formula La=0.2aspcdfy/fbd are finally brought into obtain often Take root in the basic anchorage depth La of muscle screw rod;Two, it is determined that often taking root in the anchorage depth design load l of muscle screw rodd, first obtain and consider respectively Kind factor influences on bar planting screw rod tensile capacity and need to increase the correction factor Ψ of anchorage depthN;Obtain again and consider bar planting spiral shell The correction factor Ψ of bar displacement Ductility requirementae;The basic anchorage depth for often taking root in muscle screw rod that finally step 1 is calculated La and consideration various factors influence on bar planting screw rod tensile capacity and need to increase the correction factor Ψ of anchorage depthNAnd consideration The correction factor Ψ of bar planting screw displacement Ductility RequirementaeBring formula l intod≥ΨNΨaeThe anchoring that La is often taken root in muscle screw rod is deep Spend design load ldIt is defined as the anchorage depth of bar planting screw rod.Slightly above several centimeters of minimum during specific implementation.
So, the basic anchorage depth for often taking root in muscle screw rod anchors under conditions of construction elevator security performance is ensured Minimum value, the anchorage depth design load for often taking root in muscle screw rod be by often take root in muscle screw rod basic anchorage depth combine it is various other Influence factor, such as the obtained optimal value of intensity of concrete for pouring of base etc..It is determined that often take root in the anchor of muscle screw rod Gu depth design value, preferably bar planting screw rod can be anchored on base, preferably ensure the reliability of whole construction elevator And stability.
As optimization, the base is diagonally horizontally outward to be fixedly connected at horizontal rectangular block shape structure and corner There is an anti-tipping reinforcement block, auxiliary mounting hole is vertically provided with along base diagonal on the anti-tipping reinforcement block, each auxiliary peace The step of dress Kong Jun uses above-mentioned setting bar planting screw rod is provided with auxiliary threaded rod.
So, anti-tipping reinforcement block is provided between base and elevator basis, anti-tipping reinforcement block one end is consolidated with base Fixed connection, on the basis of anti-tipping reinforcement block is fixedly connected on elevator by auxiliary threaded rod, equivalent to adding the to construction elevator Two insurances.When having strong wind or guide rail bracket unbalance stress, increased anti-tipping reinforcement block, can play certain prevents from leading The effect that rail gantry is tumbled, it can further increase the Stability and dependability of construction elevator.
In summary, the present invention has can preferably carry out location and installation to guide rail bracket, and efficiency of construction is high, and stability is high The advantages of.
Brief description of the drawings
Fig. 1 is the structural representation of the construction construction elevator obtained using method provided by the present invention.
Fig. 2 is the close-up schematic view at A in Fig. 1.
Fig. 3 removes the top view after guide rail bracket and cage for the construction construction elevator described in Fig. 1.
Embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings.
During specific implementation:As shown in FIG. 1 to 3, a kind of construction construction elevator building method, builds in construction first Build side and the elevator basis 1 in block structure form is obtained by concreting, 1 upper surface of elevator basis is horizontal surface;Electricity After ladder foundation 1 solidifies, screw rod straight up is set in basic 1 upper surface of elevator, is upward through by screw rod on base 2 Mounting hole is simultaneously fixed using nut and realizes that base 2 is installed, then in the upper mounting rail frame 3 of base 2, is finally installed on guide rail bracket 3 Cage 4 and tackling system, the screw rod are bar planting screw rod 5, set bar planting screw rod 5 to comprise the following steps:On elevator basis 1 Drilled straight down on upper surface, the mounting hole of corner is set on the bore position face base, and drilling is completed backward drilled Hole in inject adhesive and insert bar planting screw rod 5 and vertical fixed, the upper end of bar planting screw rod 5 is exposed to basic 1 upper surface of elevator The length of the part of top is more than the thickness of construction elevator base 2;After adhesive solidification, the upper end of bar planting screw rod 5 passes base 2 The part of mounting hole spin install nut again, the installation for completing base 2 is fixed.
So, casting concrete obtains elevator basis by construction building, and elevator basis upper surface is horizontally disposed with and installed Base and guide rail bracket, elevator basis are used to bear the whole weight of construction elevator, positioning are also functioned to guide rail bracket and is fixed Effect.Cage is installed, cage can slide up and down under the drive of tackling system along guide rail bracket, and cage is used to transport on guide rail bracket See off people or building materials goods, be used conveniently and safely.When elevator basis pours, bar planting screw rod is not cast in the lump in, but After solidification, drilled on the basis of elevator, the mounting hole of drilling face base corner is set, and bar planting screw rod is passed through into adhesive Vertically it is fixed in drilling, can avoids offseting between bar planting screw rod and mounting hole, can preferably ensures bar planting screw rod and peace Fill the cooperation in hole, more preferable mounting seat.Bar planting screw rod is fixed in elevator basis by adhesive, can preferably be improved The quality for the construction elevator that efficiency of construction and construction obtain.
Wherein, will be inserted vertically into after the heating of implantation screw rod 5 lower end.
So, when directly bar planting screw rod is vertically inserted into adhesive, the bubble of residual can be attached to plant in adhesive Muscle screw rod lateral surface, and then the reliability and stability of bar planting screw rod anchoring is influenceed after solidifying.It is (excellent after the heating of bar planting screw rod lower end Elect 100~300 degrees Celsius of heating-up temperature as, not change the performance of bar planting screw rod, the intensity for not influenceing bar planting screw rod is standard Determine the mobility scale of heating-up temperature), when bar planting screw rod lower end is inserted in adhesive, the bar planting screw rod heat of itself can cause glue Close to the air heats expansion of bar planting screw rod in stick, depart from bar planting screw surface so that bar planting screw rod is preferably and adhesive With reference to being more securely anchored in adhesive.Further, bar planting screw rod is inserted into straight down and in rotary manner glue In stick, increase the friction of bar planting screw surface and adhesive so that blibbing, which can be preferably squeezed and broken, departs from screw rod table Face so that bar planting screw surface is preferably combined with adhesive, further the reliability of increase anchoring.
Wherein, drilling is carried out using diamond drilling machine installation water injection drill, and it is auxiliary to carry out water filling to drill bit in boring procedure Help.
So, there is water to enter behind the drill bit inner chamber of diamond drilling machine during drilling to flow out from chisel edge again;By current Chip caused by drilling can be preferably taken away, improves drilling efficiency, it is ensured that drilling is smoothed out;Simultaneously in drill bit Chamber has the water outflow of abundance, and drill bit can be cooled down.
Wherein, the bar planting screw rod 5 is processed to obtain using round steel, and the top of bar planting screw rod 5 is provided with external screw thread, lower, outer perimeter Surface carries out coarse processing.
So, bar planting screw rod is processed to obtain using round steel, and for screw-thread steel, threading is relative on round steel It is simple and convenient, and round steel is generally used for manufacturing foundation bolt, has preferable moulding and solderability.Round steel processing is simple, system Make conveniently, cost is low, can preferably reduce construction cost.Bar planting screw rod bottom, which carries out coarse processing, (can use mill during implementation The modes such as sand carry out coarse processing), it can preferably increase the affinity of bar planting screw rod and adhesive, can preferably carry out anchor Gu.
Wherein, after drilling terminates, water and dust in drilling need to be first removed, reinjects adhesive.
So, drilling is cleaned out, can preferably improve the plybonding effect of adhesive so that adhesive preferably with The hole wall in drilled hole is combined, and preferably bar planting screw rod is anchored in drilling.When clearing up the water and dust in drilling, strip is taken The rod member of shape, towel being bundled in rod member one end end, then one end that rod member is bundled with to towel is filled in bore inner and extracted, Carry out cleaning to towel again to wring out, repeatedly, until the water in drilling and dust are cleaned out.
Wherein, adhesive uses the adhesive of Hilti HIT-RE 500.
So, the adhesive of Hilti HIT-RE 500 is a kind of anchoring adhesive, is mainly used in the reinforcing of structure muscle, Ke Yigeng Good is anchored at cage bar screw rod in drilling.
Wherein it is determined that the diameter D of bar planting screw rod uses following step:First, the material for first determining bar planting screw rod is No. 45 Steel or 40Cr, the relative stiffness coefficient kc of bar planting screw rod is obtained according to the material of bar planting screw rod, obtain the pretension system of bar planting screw rod Number ko, the safety coefficient Pn of the bar planting screw rod and yield strength σ s of bar planting nut stem material is obtained, then brings formula intoThe diameter D of bar planting screw rod is obtained, the diameter is obtained according to the diameter D of the bar planting screw rod of acquisition The design pulling force F that can bear of bar planting screw rod;2nd, construction elevator maximum tilting moment M is obtained, obtains the plant set on base Muscle screw rod number i, the length of side a for building the standard knot horizontal cross-section used in guide rail bracket is obtained, formula P=M (2 × a × i) is brought into and obtains Maximum pull P needed for practice of construction, three, compare needed for the design pulling force F and practice of construction that bar planting screw rod can bear Maximum pull P, if the design pulling force F that bar planting screw rod can bear is more than the maximum pull P needed for practice of construction, according to calculating The model of the diameter D selection bar planting screw rods of obtained bar planting screw rod, bar planting screw rod model are shown in Table 1 with bore diameter corresponding relation,
Table 1, bar planting screw rod model and bore diameter corresponding relation
So, the diameter of bar planting screw rod is obtained according to bar planting nut stem material, bar planting screw rod is looked into according to the diameter of bar planting screw rod Performance parameter table or tested to obtain the design pulling force that the bar planting screw rod of the diameter can bear, then according to actually applying The maximum tilting moment that work elevator is subjected to obtains the pulling force that bar planting screw rod is subjected to, to ensure the security of construction elevator Can, the design pulling force of diameter screw need to be more than the actual pulling force to be born of bar planting screw rod, can be held needed for practice of construction elevator Whether the maximum pull received examines the design rubbish of bar planting screw rod qualified.It so can preferably ensure the security of construction elevator Energy, meet the needs of practice of construction.The model of bar planting screw rod is selected according to the diameter of bar planting screw rod, is then drilled, can be with Suitable drill bit is preferably selected, bore diameter obtains with bar planting screw rod model according to practical operation, is meeting that practice of construction will On the premise of asking, ensure the intensity of base, improve the reliability and stability of construction elevator.
Wherein it is determined that the anchorage depth for often taking root in muscle screw rod 5 uses following step:One, it is determined that often taking root in muscle screw rod Basic anchorage depth La, first obtains bar planting screw rod nominal diameter d;It is retrieved as preventing the design factor that concrete splitting is quoted again Aspc, to prevent the design factor aspc that concrete splitting is quoted according to pouring the thickness on elevator basis 1, pour elevator basis 1 Stirrup diameter and the nominal diameter of spacing and bar planting screw rod obtain;The tensile strength design load of bar planting screw rod is obtained again Fy, the tensile strength design load fy of bar planting screw rod obtain according to the model of reinforcing bar used by bar planting screw rod;Bar planting is obtained again With the adhesion strength design load fbd of adhesive, the adhesion strength design load fbd of bar planting adhesive according to the grade of adhesive, Bar planting back gauge and spacing and strength grade of concrete obtain;Finally bring formula La=0.2aspcdfy/fbd into and obtain every The basic anchorage depth La of bar planting screw rod;Two, it is determined that often taking root in the anchorage depth design load l of muscle screw rodd, it is various first to obtain consideration Factor influences on bar planting screw rod tensile capacity and need to increase the correction factor Ψ of anchorage depthN;Obtain again and consider bar planting screw rod The correction factor Ψ of displacement Ductility requirementae;The basic anchorage depth La for often taking root in muscle screw rod that finally step 1 is calculated And consider that various factors influences on bar planting screw rod tensile capacity and need to increase the correction factor Ψ of anchorage depthNPlanted with consideration The correction factor Ψ of muscle screw displacement Ductility RequirementaeBring formula l intod≥ΨNΨaeLa is often taken root in the anchorage depth of muscle screw rod Design load ld
So, the basic anchorage depth for often taking root in muscle screw rod anchors under conditions of construction elevator security performance is ensured Minimum value, the anchorage depth design load for often taking root in muscle screw rod be by often take root in muscle screw rod basic anchorage depth combine it is various other Influence factor, such as the obtained optimal value of intensity of concrete for pouring of base etc..It is determined that often take root in the anchor of muscle screw rod Gu depth design value, preferably bar planting screw rod can be anchored on base, preferably ensure the reliability of whole construction elevator And stability.
Wherein, the base 2 is diagonally horizontally outward to be fixedly connected with horizontal rectangular block shape structure and corner Anti-tipping reinforcement block 6, auxiliary mounting hole is vertically provided with along the diagonal of base 2 on the anti-tipping reinforcement block 6, each auxiliary peace The step of dress Kong Jun uses above-mentioned setting bar planting screw rod 5 is provided with auxiliary threaded rod.
So, anti-tipping reinforcement block is provided between base and elevator basis, anti-tipping reinforcement block one end is consolidated with base Fixed connection, on the basis of anti-tipping reinforcement block is fixedly connected on elevator by auxiliary threaded rod, equivalent to adding the to construction elevator Two insurances.When having strong wind or guide rail bracket unbalance stress, increased anti-tipping reinforcement block, can play certain prevents from leading The effect that rail gantry is tumbled, it can further increase the Stability and dependability of construction elevator.

Claims (9)

1. a kind of construction construction elevator building method, obtained first beside construction building by concreting in bulk The elevator basis of structure type, elevator basis upper surface is horizontal surface;After the solidification of elevator basis, in elevator basis upper surface Screw rod straight up is set, the mounting hole being upward through by screw rod on base simultaneously realizes floor installation using nut fixation, Again in base upper mounting rail frame, cage and tackling system are finally installed on guide rail bracket, it is characterised in that the screw rod is Bar planting screw rod, bar planting screw rod is set to comprise the following steps:Drilled straight down on the upper surface on elevator basis, the drilling position The mounting hole for putting corner on face base is set, drilling complete in backward drilled hole injection adhesive and insert bar planting screw rod and Vertical fixed, the length that bar planting screw rod upper end is exposed to the part of surface on the basis of elevator is more than the thickness of construction elevator base Degree;After adhesive solidification, the part that bar planting screw rod upper end passes the mounting hole of base spins install nut again, completes base Installation fix.
2. construction as claimed in claim 1 construction elevator building method, it is characterised in that add implantation screw rod lower end It is inserted vertically into after heat.
3. construction as claimed in claim 1 construction elevator building method, it is characterised in that wherein drilling uses Buddha's warrior attendant Stone drilling machine installation water injection drill is carried out, and water filling auxiliary is carried out to drill bit in boring procedure.
4. construction as claimed in claim 1 construction elevator building method, it is characterised in that the bar planting screw rod uses Round steel is processed to obtain, and bar planting screw rod top is provided with external screw thread, and lower outer peripheral surface carries out coarse processing.
5. construction as claimed in claim 1 construction elevator building method, it is characterised in that after drilling terminates, need elder generation The water and dust in drilling are removed, reinjects adhesive.
6. construction as claimed in claim 1 construction elevator building method, it is characterised in that adhesive uses Hilti The adhesive of HIT-RE 500.
7. construction as claimed in claim 1 construction elevator building method, it is characterised in that wherein determine bar planting screw rod Diameter D use following step:First, the material for first determining bar planting screw rod is No. 45 steel or 40Cr, according to the material of bar planting screw rod Material obtains the relative stiffness coefficient kc of bar planting screw rod, obtains the pretension coefficient k o of bar planting screw rod, obtains the safety system of bar planting screw rod Number Pn and bar planting nut stem material yield strength σ s, then bring formula intoObtain bar planting spiral shell The diameter D of bar, the design pulling force F that the bar planting screw rod of the diameter can bear is obtained according to the diameter D of the bar planting screw rod of acquisition; 2nd, construction elevator maximum tilting moment M is obtained, obtains the bar planting screw rod number i set on base, acquisition is built used in guide rail bracket Standard knot horizontal cross-section length of side a, bring formula P=M (2 × a × i) into and obtain maximum pull P needed for practice of construction, three, Compare the design pulling force F and maximum pull P needed for practice of construction that bar planting screw rod can bear, if what bar planting screw rod can bear Design the diameter D selection bar plantings that pulling force F is more than maximum pull P, then the bar planting screw rod that basis is calculated needed for practice of construction The model of screw rod, bar planting screw rod model are shown in Table 1 with bore diameter corresponding relation,
Table 1, bar planting screw rod model and bore diameter corresponding relation
8. construction as claimed in claim 1 construction elevator building method, it is characterised in that wherein determine often to take root in muscle The anchorage depth of screw rod uses following step:One, it is determined that often taking root in the basic anchorage depth La of muscle screw rod, first obtain bar planting spiral shell Bar nominal diameter d;It is retrieved as preventing the design factor aspc that concrete splitting is quoted again, to prevent the meter of concrete splitting reference Coefficient aspc is calculated according to pouring the thickness on elevator basis, the diameter for pouring the basic stirrup of elevator and spacing and bar planting screw rod Nominal diameter obtains;The tensile strength design load fy of bar planting screw rod, the tensile strength design load fy of bar planting screw rod are obtained again Obtained according to the model of reinforcing bar used by bar planting screw rod;The adhesion strength design load fbd of bar planting adhesive, bar planting are obtained again Grade, bar planting back gauge and spacing and strength grade of concrete with the adhesion strength design load fbd of adhesive according to adhesive Obtain;Finally bring formula La=0.2aspcdfy/fbd into and obtain the basic anchorage depth La for often taking root in muscle screw rod;Two, it is determined that often Take root in the anchorage depth design load l of muscle screw rodd, first obtain and consider that various factors influences on bar planting screw rod tensile capacity and need to added The correction factor Ψ of big anchorage depthN;The correction factor Ψ for considering bar planting screw displacement Ductility Requirement is obtained againae;Finally will step The rapid one basic anchorage depth La for often taking root in muscle screw rod being calculated and consideration various factors carry to bar planting screw rod tension Power influences and need to increase the correction factor Ψ of anchorage depthNWith the correction factor Ψ for considering bar planting screw displacement Ductility RequirementaeBand Enter formula ld≥ΨNΨaeLa is often taken root in the anchorage depth design load l of muscle screw roddThe anchoring for being defined as bar planting screw rod is deep Degree.
9. construction as claimed in claim 1 construction elevator building method, it is characterised in that the base is horizontal Anti-tipping reinforcement block is diagonally horizontally outward fixedly connected with rectangular block shape structure and corner, on the anti-tipping reinforcement block Auxiliary mounting hole is vertically provided with along base diagonal, each auxiliary mounting hole is pacified using the step of above-mentioned setting bar planting screw rod Equipped with auxiliary threaded rod.
CN201710675832.7A 2017-08-09 2017-08-09 Construction elevator building method for building construction Active CN107473054B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710675832.7A CN107473054B (en) 2017-08-09 2017-08-09 Construction elevator building method for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710675832.7A CN107473054B (en) 2017-08-09 2017-08-09 Construction elevator building method for building construction

Publications (2)

Publication Number Publication Date
CN107473054A true CN107473054A (en) 2017-12-15
CN107473054B CN107473054B (en) 2019-07-26

Family

ID=60599002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710675832.7A Active CN107473054B (en) 2017-08-09 2017-08-09 Construction elevator building method for building construction

Country Status (1)

Country Link
CN (1) CN107473054B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101839070A (en) * 2010-04-07 2010-09-22 南通建工集团股份有限公司 Construction method for temporarily supporting and strengthening reinforced concrete structured beam by using steel column
CN201901879U (en) * 2010-11-12 2011-07-20 上海市机械施工有限公司 Nonstandard foundation used for fixing tower crane
CN103112766A (en) * 2013-02-06 2013-05-22 山河建设集团有限公司 Construction elevator suspending over basement roof of building and construction method thereof
CN203878601U (en) * 2014-05-19 2014-10-15 中国建筑第八工程局有限公司 Tower crane foundation structure
CN204530742U (en) * 2014-12-15 2015-08-05 中建八局第四建设有限公司 A kind of adjustable suspension column
CN106088141A (en) * 2014-08-14 2016-11-09 中国建筑第八工程局有限公司 For reinforcing the construction method of the base structure of lowering or hoisting gear

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101839070A (en) * 2010-04-07 2010-09-22 南通建工集团股份有限公司 Construction method for temporarily supporting and strengthening reinforced concrete structured beam by using steel column
CN201901879U (en) * 2010-11-12 2011-07-20 上海市机械施工有限公司 Nonstandard foundation used for fixing tower crane
CN103112766A (en) * 2013-02-06 2013-05-22 山河建设集团有限公司 Construction elevator suspending over basement roof of building and construction method thereof
CN203878601U (en) * 2014-05-19 2014-10-15 中国建筑第八工程局有限公司 Tower crane foundation structure
CN106088141A (en) * 2014-08-14 2016-11-09 中国建筑第八工程局有限公司 For reinforcing the construction method of the base structure of lowering or hoisting gear
CN106185543A (en) * 2014-08-14 2016-12-07 中国建筑第八工程局有限公司 In lowering or hoisting gear, attachment basis supports, with section, the construction method being connected
CN204530742U (en) * 2014-12-15 2015-08-05 中建八局第四建设有限公司 A kind of adjustable suspension column

Also Published As

Publication number Publication date
CN107473054B (en) 2019-07-26

Similar Documents

Publication Publication Date Title
CN106836463A (en) The constructing device and construction method of cushion cap and ground girder construction
CN105586867B (en) The installation method of ultralong overweight steel reinforcement cage
CN107605177A (en) The construction method of efficient precast floor slab and its independent support frame
CN105604344B (en) A kind of reinforcement means for having crack interior wall
CN106223267B (en) A kind of installation method of multilayer reaming self-locking prestressed anchor
CN108517861B (en) Composite reinforced pile structure for resisting foundation uplift and construction method
CN207714314U (en) A kind of pile foundation construction supporting construction in soft soil foundation
CN206467667U (en) Suspended net shotcrete building enclosure between a kind of stake of use expansion type fixation reinforced mesh
CN107100192A (en) A kind of foundation ring of wind generating set local stiffening device and reinforcement means
CN109469349A (en) A kind of floor strengthening reconstruction method for adding reinforced concrete secondary beam
JP2016084690A (en) Base type foundation unit
CN207047881U (en) The prefabricated cushion cap of core is filled with joint bar
JP5150596B2 (en) Anchor device and anchor construction method
CN110130423B (en) Inclination correction design method for existing super high-rise building
CN107355008A (en) A kind of prefabricated attachment structure and method of newly-increased steel core concrete column and existing structure
CN105862897B (en) Sandy Silt ground shallow foundation original groove pouring construction engineering method
CN105438965B (en) The hanging method of glomeration pattern masonry wall 2 centering hanging apparatus of piece
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN109610446A (en) A kind of borehole filling pile cage of reinforcement and anti-floating cage method
CN107473054B (en) Construction elevator building method for building construction
CN108978870A (en) Fold-line-shaped girder steel and concrete combined structure construction method
CN205822206U (en) A kind of vertical side slope bracing means
CN206529881U (en) The constructing device of cushion cap and ground girder construction
CN206554428U (en) A kind of precast stair connecting node
CN207436515U (en) The hoisting beam of efficient construction of precast floorslab

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 400060 building 23, Rui Rui center, 9 misty Road, Nan'an District, Chongqing

Patentee after: CHONGQING YUJIAN INDUSTRY GROUP Co.,Ltd.

Address before: 400060 building 23, Rui Rui center, 9 misty Road, Nan'an District, Chongqing

Patentee before: CHONGQING YUJIAN INDUSTRY Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 400060 floor 23, national Rui center, 9 Yanyu Road, Nan'an District, Chongqing.

Patentee after: Yujian Industrial Group Co.,Ltd.

Address before: 400060 floor 23, national Rui center, 9 Yanyu Road, Nan'an District, Chongqing.

Patentee before: CHONGQING YUJIAN INDUSTRY GROUP Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220428

Address after: 408399 Chongqing Dianjiang Industrial Park

Patentee after: Yujian construction industry technology group Dianjiang Co.,Ltd.

Address before: 400060 floor 23, national Rui center, 9 Yanyu Road, Nan'an District, Chongqing.

Patentee before: Yujian Industrial Group Co.,Ltd.