CN107470315A - A kind of junk landfill yard - Google Patents

A kind of junk landfill yard Download PDF

Info

Publication number
CN107470315A
CN107470315A CN201710867561.5A CN201710867561A CN107470315A CN 107470315 A CN107470315 A CN 107470315A CN 201710867561 A CN201710867561 A CN 201710867561A CN 107470315 A CN107470315 A CN 107470315A
Authority
CN
China
Prior art keywords
level
layer
infiltration
junk
separation layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710867561.5A
Other languages
Chinese (zh)
Inventor
郑泽
林辉荣
阳杨
谷军
胡茂丽
郑伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINZHONGTIAN ENVIRONMENTAL PROTECTION Co Ltd
Original Assignee
XINZHONGTIAN ENVIRONMENTAL PROTECTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINZHONGTIAN ENVIRONMENTAL PROTECTION Co Ltd filed Critical XINZHONGTIAN ENVIRONMENTAL PROTECTION Co Ltd
Priority to CN201710867561.5A priority Critical patent/CN107470315A/en
Publication of CN107470315A publication Critical patent/CN107470315A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B1/00Dumping solid waste
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D24/00Filters comprising loose filtering material, i.e. filtering material without any binder between the individual particles or fibres thereof
    • B01D24/02Filters comprising loose filtering material, i.e. filtering material without any binder between the individual particles or fibres thereof with the filter bed stationary during the filtration
    • B01D24/10Filters comprising loose filtering material, i.e. filtering material without any binder between the individual particles or fibres thereof with the filter bed stationary during the filtration the filtering material being held in a closed container
    • B01D24/12Downward filtration, the filtering material being supported by pervious surfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B3/00Destroying solid waste or transforming solid waste into something useful or harmless
    • B09B3/10Destroying solid waste or transforming solid waste into something useful or harmless involving an adsorption step

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The invention discloses a kind of junk landfill yard, including Aerated Landfill Layers, Aerated Landfill Layers lower end is provided with one-level sand bed, one-level sand bed lower end is provided with infiltration separation layer, infiltration separation layer includes first grade clay layer and the one-level sand stone layer being arranged alternately, one-level osmos tube is provided with one-level sand stone layer, infiltration separation layer lower end is provided with one-level geotextile layer, one-level geotextile layer lower end is provided with two level sand bed, two level sand bed lower end is provided with two level infiltration separation layer, it is identical with infiltration insulation layer structure that two level permeates separation layer, layer of structure of the present invention is clearly demarcated, it is conveniently constructed, garbage loading embeading is convenient, the multistage recycling of refuse leachate can be realized, secondary pollution can be avoided, it is environmentally friendly reliable, meet present requirement.

Description

A kind of junk landfill yard
Technical field
The present invention relates to a kind of garbage disposal plant, specifically a kind of junk landfill yard.
Background technology
Rubbish is to be not needed or useless solid, flowing material.In densely populated big city, garbage disposal is one The problem of troubling.Common way is to be sent to landfill after collecting to carry out landfill disposal, or is incinerated with incinerator.But two Person can manufacturing environment protection the problem of, and landfill degree of saturation can further be mitigated by terminating overconsumption.In landfill Garbage disposal polluted underground water and can not only stink, and many cities are available for the area of landfill fewer and fewer.Incinerate It is then unavoidable to produce toxic gas, endanger organism.All method caused by rubbish, and drum are reduced in research in most cities Encourage resource reclaim.
Garbage loading embeading is still the main method that China most cities solve house refuse outlet, and the end of the year 2005 are national 356 household refuse landfill sites are shared, 85% domestic waste uses landfill disposal.According to engineering measure it is whether complete, Can environmental protection standard meet to judge, can be divided into Mini nutritionalassessment, controlled landfill yard and sanitary filling field Three Estate.
Present garbage loading embeading field structure is relatively simple, and function is single, it is easy to causes secondary pollution, can not meet now Requirement.
The content of the invention
It is an object of the invention to provide a kind of junk landfill yard, is asked with solve to propose in above-mentioned background technology Topic.
To achieve the above object, the present invention provides following technical scheme:
A kind of junk landfill yard, including Aerated Landfill Layers, the Aerated Landfill Layers lower end are provided with one-level sand bed, and one Level sand bed lower end is provided with infiltration separation layer, and infiltration separation layer includes first grade clay layer and the one-level sand stone layer being arranged alternately, and one One-level osmos tube is provided with level sand stone layer, infiltration separation layer lower end is provided with one-level geotextile layer, one-level geotextile layer lower end Two level sand bed is provided with, two level sand bed lower end is provided with two level infiltration separation layer, two level infiltration separation layer and infiltration separation layer knot Structure is identical.
As the further scheme of the present invention:The two level infiltration separation layer includes the two level argillic horizon and two being staggered Level sand stone layer, is provided with two level osmos tube in two level sand stone layer.
As the further scheme of the present invention:The two level infiltration separation layer lower end is provided with two level geotextile layer, two level HDPE film is provided with geotextile layer.
As the further scheme of the present invention:The Aerated Landfill Layers upper end is provided with blinding layer.
As the further scheme of the present invention:The thickness of the one-level sand bed and two level sand bed is 100-600mm.
As the further scheme of the present invention:First grade clay layer and one-level the sandstone layer cross section is trapezoidal, and one-level is glued Soil layer and one-level sand stone layer thickness are 200-800mm.
As the further scheme of the present invention:The one-level osmos tube connects penetrating fluid processing equipment.
As the further scheme of the present invention:The one-level geotextile layer 7 is double-decker, the thickness of one-level geotextile layer 7 Spend for 10-60mm.
As the further scheme of the present invention:The one-level sand stone layer 5 is that rubble and quartz sand are compacted construction and formed.
Compared with prior art, the beneficial effects of the invention are as follows:Layer of structure of the present invention is clearly demarcated, is conveniently constructed, and passes through rubbish The design of rubbish buring layer and upper blinding so that garbage loading embeading is convenient, passes through one-level sand bed, one-level osmos tube, one-level sand stone layer, one The design of level argillic horizon, the multistage recycling of refuse leachate can be realized, by reclaiming penetrating fluid, secondary dirt can be avoided Dye, environmental protection is reliable, meets present requirement.
Brief description of the drawings
Fig. 1 is the layer structure schematic diagram of junk landfill yard.
In figure:The upper blindings of 1-, 2- Aerated Landfill Layers, 3- one-levels sand bed, 4- one-levels osmos tube, 5- one-levels sand stone layer, 6- mono- Level argillic horizon, 7- one-levels geotextile layer, 8- two levels sand bed, 9- two levels sand stone layer, 10- two levels argillic horizon, 11- two level geotextiles Layer, 12- two level osmos tubes.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
Referring to Fig. 1, in the embodiment of the present invention, a kind of junk landfill yard, including Aerated Landfill Layers 2, the rubbish The lower end of buring layer 2 is provided with one-level sand bed 3, and the lower end of one-level sand bed 3 is provided with infiltration separation layer, and infiltration separation layer includes alternately setting The first grade clay layer 6 and one-level sand stone layer 5 put, one-level osmos tube 4 is provided with one-level sand stone layer 5, and infiltration separation layer lower end is set One-level geotextile layer 7 is equipped with, the lower end of one-level geotextile layer 7 is provided with two level sand bed 8, and the lower end of two level sand bed 8 is provided with two level and oozed Saturating separation layer, two level infiltration separation layer is identical with infiltration insulation layer structure, and two level infiltration separation layer includes the two level being staggered Argillic horizon 10 and two level sand stone layer 11, two level osmos tube 12 is provided with two level sand stone layer 11, and two level infiltration separation layer lower end is set Two level geotextile layer 11 is equipped with, HDPE film is provided with two level geotextile layer 11, the upper end of Aerated Landfill Layers 2 is provided with blinding layer 1, the thickness of one-level sand bed 3 and two level sand bed 8 be 100-600mm, first grade clay layer 6 and the section of one-level sand stone layer 5 to be trapezoidal, and First grade clay layer 6 and the thickness of one-level sand stone layer 5 are 200-800mm, and one-level osmos tube 4 connects penetrating fluid processing equipment, one-level soil Work layer of cloth 7 is double-decker, and the thickness of one-level geotextile layer 7 is 10-60mm, and one-level sand stone layer 5 is that rubble and quartz sand are compacted Construction forms.
Design of the invention by Aerated Landfill Layers 2, the function of garbage loading embeading is realized, it is real by the design of upper blinding 1 Show the function of garbage loading embeading lid pressure, then the design by one-level sand bed 3, realized the function of one-level sand filtration, then pass through infiltration The design of separation layer, the function of infiltration isolation is realized, by the design of one-level sand stone layer 5, realizes and is easy to penetrating fluid to permeate Function, be easy to the infiltration recovery penetrating fluid of one-level osmos tube 4, by the design of first grade clay layer 6, realize the work(of clay isolation Can, by the design of two level sand bed 8, two level sand filtration function is realized, while the design of separation layer is permeated by two level, realize Two level penetrating fluid reclaims and isolation is common, ensure that penetrating fluid is fully reclaimed and isolated, and avoids polluting deep soil and water source, this hair Bright layer of structure is clearly demarcated, is conveniently constructed, and garbage loading embeading is convenient, can realize the multistage recycling of refuse leachate, can keep away Exempt from secondary pollution, environmental protection is reliable, meets present requirement.
Embodiment 1
When being filled to solid refuse;
A kind of junk landfill yard, including Aerated Landfill Layers 2, the lower end of Aerated Landfill Layers 2 are provided with one-level sand bed 3, the lower end of one-level sand bed 3 is provided with infiltration separation layer, and infiltration separation layer includes the first grade clay layer 6 and one-level sandstone being arranged alternately Layer 5, one-level osmos tube 4 is provided with one-level sand stone layer 5, and infiltration separation layer lower end is provided with one-level geotextile layer 7, one-level geotechnique The lower end of layer of cloth 7 is provided with two level sand bed 8, and the lower end of two level sand bed 8 is provided with two level infiltration separation layer, and two level permeates separation layer with oozing Saturating insulation layer structure is identical, and two level infiltration separation layer includes two level argillic horizon 10 and the two level sand stone layer 11 being staggered, two level Two level osmos tube 12 is provided with sand stone layer 11, two level infiltration separation layer lower end is provided with two level geotextile layer 11, two level geotechnique HDPE film is provided with layer of cloth 11, the upper end of Aerated Landfill Layers 2 is provided with the thickness of blinding layer 1, one-level sand bed 3 and two level sand bed 8 It is trapezoidal to spend for 400mm, first grade clay layer 6 and the section of one-level sand stone layer 5, and first grade clay layer 6 and the thickness of one-level sand stone layer 5 are 500mm, one-level osmos tube 4 connect penetrating fluid processing equipment, and one-level geotextile layer 7 is double-decker, the thickness of one-level geotextile layer 7 It is that rubble and quartz sand are compacted construction and formed to spend for 30mm, one-level sand stone layer 5.
During present invention work, the solid refuse after processing is filled in Aerated Landfill Layers 2 first, by upper blinding 1, Landfill compacting, when rainy, rain penetration is entered in solid refuse, and storage or fermentation are rinsed in rubbish, and this kind of rubbish permeates Liquid gradually can down permeate, and penetrating fluid enters in one-level sand bed 3, realizes primary sand screen, subsequently into infiltration separation layer, pass through One-level osmos tube 4, the recovery operation of penetrating fluid is realized, unnecessary penetrating fluid continues traveling downwardly infiltration, permeates separation layer by two level, Secondary recovery and isolation are realized, ensure that the abundant recovery and isolation of penetrating fluid.
Embodiment 2
When being filled to solid and liquid composting;
A kind of junk landfill yard, including Aerated Landfill Layers 2, the lower end of Aerated Landfill Layers 2 are provided with one-level sand bed 3, the lower end of one-level sand bed 3 is provided with infiltration separation layer, and infiltration separation layer includes the first grade clay layer 6 and one-level sandstone being arranged alternately Layer 5, one-level osmos tube 4 is provided with one-level sand stone layer 5, and infiltration separation layer lower end is provided with one-level geotextile layer 7, one-level geotechnique The lower end of layer of cloth 7 is provided with two level sand bed 8, and the lower end of two level sand bed 8 is provided with two level infiltration separation layer, and two level permeates separation layer with oozing Saturating insulation layer structure is identical, and two level infiltration separation layer includes two level argillic horizon 10 and the two level sand stone layer 11 being staggered, two level Two level osmos tube 12 is provided with sand stone layer 11, two level infiltration separation layer lower end is provided with two level geotextile layer 11, two level geotechnique HDPE film is provided with layer of cloth 11, the upper end of Aerated Landfill Layers 2 is provided with the thickness of blinding layer 1, one-level sand bed 3 and two level sand bed 8 It is trapezoidal to spend for 400mm, first grade clay layer 6 and the section of one-level sand stone layer 5, and first grade clay layer 6 and the thickness of one-level sand stone layer 5 are 500mm, one-level osmos tube 4 connect penetrating fluid processing equipment, and one-level geotextile layer 7 is double-decker, the thickness of one-level geotextile layer 7 It is that rubble and quartz sand are compacted construction and formed to spend for 30mm, one-level sand stone layer 5.
During present invention work, first the composting of the solid after processing and liquid landfill in Aerated Landfill Layers 2, By upper blinding 1, landfill compacting, penetrating fluid in composting can descending infiltration, penetrating fluid enters in one-level sand bed 3, realization Primary sand screen, subsequently into infiltration separation layer, by one-level osmos tube 4, realize the recovery operation of penetrating fluid, unnecessary infiltration Liquid continues traveling downwardly infiltration, by two level permeate separation layer, realize secondary recovery and isolation, ensure that penetrating fluid abundant recovery and Isolation.
Embodiment 3
When being filled to solid, liquid and paste rubbish;
A kind of junk landfill yard, including Aerated Landfill Layers 2, the lower end of Aerated Landfill Layers 2 are provided with one-level sand bed 3, the lower end of one-level sand bed 3 is provided with infiltration separation layer, and infiltration separation layer includes the first grade clay layer 6 and one-level sandstone being arranged alternately Layer 5, one-level osmos tube 4 is provided with one-level sand stone layer 5, and infiltration separation layer lower end is provided with one-level geotextile layer 7, one-level geotechnique The lower end of layer of cloth 7 is provided with two level sand bed 8, and the lower end of two level sand bed 8 is provided with two level infiltration separation layer, and two level permeates separation layer with oozing Saturating insulation layer structure is identical, and two level infiltration separation layer includes two level argillic horizon 10 and the two level sand stone layer 11 being staggered, two level Two level osmos tube 12 is provided with sand stone layer 11, two level infiltration separation layer lower end is provided with two level geotextile layer 11, two level geotechnique HDPE film is provided with layer of cloth 11, the upper end of Aerated Landfill Layers 2 is provided with the thickness of blinding layer 1, one-level sand bed 3 and two level sand bed 8 It is trapezoidal to spend for 400mm, first grade clay layer 6 and the section of one-level sand stone layer 5, and first grade clay layer 6 and the thickness of one-level sand stone layer 5 are 500mm, one-level osmos tube 4 connect penetrating fluid processing equipment, and one-level geotextile layer 7 is double-decker, the thickness of one-level geotextile layer 7 It is that rubble and quartz sand are compacted construction and formed to spend for 30mm, one-level sand stone layer 5.
During present invention work, the composting of the solid after processing, liquid and paste is filled in garbage loading embeading first In layer 2, by upper blinding 1, landfill compacting, the penetrating fluid that composting can be formed, the rubbish of paste, pass through breaking up for rainwater Can form penetrating fluid, the penetrating fluid of this kind of mixing can descending infiltration, penetrating fluid enters in one-level sand bed 3, realizes primary sand screen, so Enter afterwards in infiltration separation layer, by one-level osmos tube 4, realize the recovery operation of penetrating fluid, unnecessary penetrating fluid continues traveling downwardly Infiltration, separation layer is permeated by two level, secondary recovery and isolation is realized, ensure that the abundant recovery and isolation of penetrating fluid.
In the description of the invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " on ", " under ", The orientation or position relationship of the instruction such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " are Based on orientation shown in the drawings or position relationship, it is for only for ease of the description present invention and simplifies description, rather than instruction or dark Show that the device of meaning or element there must be specific orientation, with specific azimuth configuration and operation, thus it is it is not intended that right The limitation of the present invention.In addition, term " first ", " second " etc. are only used for describing purpose, and it is not intended that instruction or hint phase To importance or the implicit quantity for indicating indicated technical characteristic.Thus, the feature for defining " first ", " second " etc. can To express or implicitly include one or more this feature.In the description of the invention, unless otherwise indicated, " multiple " It is meant that two or more.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, above-mentioned term can be understood by concrete condition Concrete meaning in the present invention.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any reference in claim should not be considered as to the involved claim of limitation.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (9)

1. a kind of junk landfill yard, including Aerated Landfill Layers (2), it is characterised in that Aerated Landfill Layers (2) lower end is set One-level sand bed (3) is equipped with, one-level sand bed (3) lower end is provided with infiltration separation layer, and infiltration separation layer includes the one-level being arranged alternately Argillic horizon (6) and one-level sand stone layer (5), one-level sand stone layer (5) is interior to be provided with one-level osmos tube (4), and infiltration separation layer lower end is set One-level geotextile layer (7) is equipped with, one-level geotextile layer (7) lower end is provided with two level sand bed (8), and two level sand bed (8) lower end is set There is two level to permeate separation layer, it is identical with infiltration insulation layer structure that two level permeates separation layer.
2. junk landfill yard according to claim 1, it is characterised in that the two level infiltration separation layer is included staggeredly The two level argillic horizon (10) and two level sand stone layer (11) of setting, two level sand stone layer (11) is interior to be provided with two level osmos tube (12).
3. junk landfill yard according to claim 1, it is characterised in that the two level infiltration separation layer lower end is set There is two level geotextile layer (11), HDPE film is provided with two level geotextile layer (11).
4. junk landfill yard according to claim 1, it is characterised in that Aerated Landfill Layers (2) upper end is set There is upper blinding layer (1).
5. junk landfill yard according to claim 1, it is characterised in that the one-level sand bed (3) and two level sand bed (8) thickness is 100-600mm.
6. junk landfill yard according to claim 1, it is characterised in that the first grade clay layer (6) and one-level sand Rock layers (5) section is trapezoidal, and first grade clay layer (6) and one-level sand stone layer (5) thickness are 200-800mm.
7. junk landfill yard according to claim 1, it is characterised in that one-level osmos tube (4) the connection infiltration Liquid processing equipment.
8. junk landfill yard according to claim 1, it is characterised in that the one-level geotextile layer (7) is bilayer Structure, the thickness of one-level geotextile layer (7) is 10-60mm.
9. junk landfill yard according to claim 1, it is characterised in that the one-level sand stone layer (5) be rubble and Quartz sand compacting construction forms.
CN201710867561.5A 2017-09-22 2017-09-22 A kind of junk landfill yard Pending CN107470315A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710867561.5A CN107470315A (en) 2017-09-22 2017-09-22 A kind of junk landfill yard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710867561.5A CN107470315A (en) 2017-09-22 2017-09-22 A kind of junk landfill yard

Publications (1)

Publication Number Publication Date
CN107470315A true CN107470315A (en) 2017-12-15

Family

ID=60585788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710867561.5A Pending CN107470315A (en) 2017-09-22 2017-09-22 A kind of junk landfill yard

Country Status (1)

Country Link
CN (1) CN107470315A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335363A (en) * 2020-03-05 2020-06-26 中钢集团马鞍山矿山研究总院股份有限公司 New method for storing and disposing general industrial solid waste
CN115072400A (en) * 2022-08-18 2022-09-20 矿冶科技集团有限公司 Modified concentrated full-tailings piling method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5857807A (en) * 1996-06-14 1999-01-12 R. J. Longo Construction Co., Inc. Municipal solid waste landfill system
JP2002035710A (en) * 2000-07-26 2002-02-05 Shinichiro Hayashi Landfilling facility for object to be disposed
CN1449873A (en) * 2003-05-15 2003-10-22 武汉大学 Refuse burying method with percolation liquid treatment layer
CN103097044A (en) * 2010-03-22 2013-05-08 克洛叙尔特夫有限责任公司 Cover system for waste sites
CN206296294U (en) * 2016-12-22 2017-07-04 中科绿洲(北京)环境咨询有限公司 A kind of underground landfill heap body of the heavy metal pollution clayed soil based on flexible structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5857807A (en) * 1996-06-14 1999-01-12 R. J. Longo Construction Co., Inc. Municipal solid waste landfill system
JP2002035710A (en) * 2000-07-26 2002-02-05 Shinichiro Hayashi Landfilling facility for object to be disposed
CN1449873A (en) * 2003-05-15 2003-10-22 武汉大学 Refuse burying method with percolation liquid treatment layer
CN103097044A (en) * 2010-03-22 2013-05-08 克洛叙尔特夫有限责任公司 Cover system for waste sites
CN206296294U (en) * 2016-12-22 2017-07-04 中科绿洲(北京)环境咨询有限公司 A kind of underground landfill heap body of the heavy metal pollution clayed soil based on flexible structure

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
《山西住房和城乡建设年鉴》编纂委员会: "《山西住房和城乡建设年鉴》", 30 April 2014, 方志出版社 *
周小军等: "卫生填埋场土工防渗系统", 《辽宁工程技术大学学报(自然科学版)》 *
王铁军: "垃圾填埋场渗滤液收集系统排水性能研究", 《中国优秀硕士学位论文全文数据库工程科技II辑》 *
高海: "城市固体废弃物卫生填埋场设计理论与应用研究", 《中国优秀硕士学位论文全文数据库工程科技II辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335363A (en) * 2020-03-05 2020-06-26 中钢集团马鞍山矿山研究总院股份有限公司 New method for storing and disposing general industrial solid waste
CN115072400A (en) * 2022-08-18 2022-09-20 矿冶科技集团有限公司 Modified concentrated full-tailings piling method

Similar Documents

Publication Publication Date Title
CN205530203U (en) Domestic waste landfill yard closes structure for wastes material is sharp
CN105839622B (en) Soft soil foundation reinforcing method based on flying dust, flying dust stake and foundation stabilization pipe casing
CN202099865U (en) Leachate drainage system for hazardous waste safety landfill
CN102367193B (en) Method for landfilling and processing municipal sludge by using geotechnical filter bag
CN109570181A (en) A kind of Combined garbage Closure of landfill site system
CN216007052U (en) Rigid refuse landfill
CN214423422U (en) Flexible hazardous waste landfill seepage-proofing structure
CN205421353U (en) A seepage prevention structure that dilatation after is used for domestic waste sanitary landfills field to close
CN107470315A (en) A kind of junk landfill yard
CN201358205Y (en) Dehydrated mud burying device
CN206090642U (en) Protective surface layer is passed through in landfill's prevention of seepage
CN207194038U (en) Anti-seepage system for refuse landfill
CN1187136C (en) Method of refill spent mining field using city solid garbage
CN101486526B (en) Dewatered sludge landfill method
CN219503430U (en) Vertical partition structure of household garbage landfill
CN101974899B (en) Method for converting obsolete refuse landfill into construction land
CN210288489U (en) Refuse landfill based on coal gangue
CN213062298U (en) Garbage storage pit leachate collection device
CN111335362B (en) Structural arrangement mode of common industrial solid waste storage place
CN1850369A (en) Inertial-garbage dry burying method
CN110303022A (en) A kind of consumer waste filling and embedding system and method for impermeable pollution
CN202201785U (en) Safety landfill site for sludge immobilization
CN206205006U (en) A kind of leakage preventing structure in geotextile tube bag dehydration place
CN101517167A (en) A method for construction of waste landfills
CN220927963U (en) Seepage-proofing and blocking structure of flexible landfill of dangerous waste

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171215

RJ01 Rejection of invention patent application after publication