CN107464064A - 基于bim网络技术的建筑工程管理系统平台 - Google Patents
基于bim网络技术的建筑工程管理系统平台 Download PDFInfo
- Publication number
- CN107464064A CN107464064A CN201710697917.5A CN201710697917A CN107464064A CN 107464064 A CN107464064 A CN 107464064A CN 201710697917 A CN201710697917 A CN 201710697917A CN 107464064 A CN107464064 A CN 107464064A
- Authority
- CN
- China
- Prior art keywords
- bim
- management
- data
- unit
- output end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
本发明公开了一种基于BIM网络技术的建筑工程管理系统平台,包括BIM数据库、客户端、数据采集器、数据转换器、中央处理器、BIM建筑信息模块和存储器,所述BIM数据库的输出端信号连接于客户端的输入端,所述客户端的输出端信号连接于数据采集器的输入端,所述数据采集器的输出端信号连接于数据转换器的输入端,所述数据转换器的输出端信号连接于中央处理器的输入端,所述中央处理器的输出端分别连接存储器和BIM建筑信息模块。本发明提供的一种基于BIM网络技术的建筑工程管理系统平台,通过施工模拟,可以增加项目参与各方对工程内容及完成工程保证措施的了解。施工过程的可视化,使BIM成为一个便于施工参与各方交流的沟通平台。
Description
技术领域
本发明属于BIM应用技术领域,更具体地说,尤其涉及一种基于BIM网络技术的建筑工程管理系统平台。
背景技术
BIM建筑信息模型,是国际建筑师协会力推的技术层面。BIM作为建设项目的一个完整的信息承载体,它是一种创新的建筑设计、施工和管理方法。其主要的特点是可以持续即时的提供高质、一致、可靠的项目设计规模、进程和成本信息。建筑师、结构师和工程项目全过程管理各方通过BIM协同平台实现无缝连接,共享数据和信息。利用BIM技术提升精细化管理,降低能源消耗和资源消耗,BIM已成为建筑领域项目全过程管理的重要技术手段。为此,我们提出了一种基于BIM网络技术的建筑工程管理系统平台投入使用,以解决上述问题。
发明内容
本发明的目的是为了解决现有技术中存在的缺点,而提出的一种基于BIM网络技术的建筑工程管理系统平台。
为实现上述目的,本发明提供如下技术方案:一种基于BIM网络技术的建筑工程管理系统平台,包括BIM数据库、客户端、数据采集器、数据转换器、中央处理器、BIM建筑信息模块和存储器,所述BIM数据库的输出端信号连接于客户端的输入端,所述客户端的输出端信号连接于数据采集器的输入端,所述数据采集器的输出端信号连接于数据转换器的输入端,所述数据转换器的输出端信号连接于中央处理器的输入端,所述中央处理器的输出端分别连接存储器和BIM建筑信息模块。
优选的,所述BIM建筑信息模块包括功能管理单元、成本管理单元、系统设置单元、验收管理单元和施工管理单元。
优选的,所述功能管理单元包括备料管理和进度管理,所述系统设置单元包括材料类型设置和模型数据导入。
优选的,所述客户端为用户提供本体服务,且可从BIM数据库中调用数据,所述数据采集器用于采集建筑工地现场的图像数据,所述数据转换器用于将图像数据信息转换成中央处理器所能识别的电信号,所述中央处理器用于调控数据转换器、BIM建筑信息模块和存储器。
优选的,所述备料管理包括备料设置、备料查询、和工程提料,所述进度管理包括生成管理、运输管理和安装管理。
优选的,所述成本管理单元用于预测改项目支出,由于BIM数据库的数据精度达到构件级,可以快速提供支撑项目各条管理所需的数据信息,避免了算量不准确依靠经验的问题,所述施工管理单元对建筑施工进行模拟和现场监测,可有效的控制建筑工程质量,减少不必要的损失,规避各种事故风险,所述验收管理单元是用于对设计质量、施工质量和设备质量等的控制和管理,所述系统设置单元用于设置三维建模参数和选择施工材料类型。
本发明的技术效果和优点:本发明提供的一种基于BIM网络技术的建筑工程管理系统平台,通过施工模拟,可以增加项目参与各方对工程内容及完成工程保证措施的了解。施工过程的可视化,使BIM成为一个便于施工参与各方交流的沟通平台。通过这种可视化的模拟缩短了现场工作人员熟悉项目施工内容、方法的时间,减少了现场人员在工程施工初期犯错误的时间和成本。还可加快、加深对工程参与人员培训的速度及深度,同时在项目策划、运行和维护的全寿命周期过程中进行共享和传递,使工程技术人员对各种建筑信息作出正确理解和高效应对,为设计、施工以及运营单位在内的各参建主体提供协同工作的基础,在提高生产效率、节约成本和缩短工期方面发挥重要作用。
附图说明
图1为本发明系统结构示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1,本发明提供的一种基于BIM网络技术的建筑工程管理系统平台,包括BIM数据库、客户端、数据采集器、数据转换器、中央处理器、BIM建筑信息模块和存储器,所述BIM数据库的输出端信号连接于客户端的输入端,所述客户端的输出端信号连接于数据采集器的输入端,所述数据采集器的输出端信号连接于数据转换器的输入端,所述数据转换器的输出端信号连接于中央处理器的输入端,所述中央处理器的输出端分别连接存储器和BIM建筑信息模块,所述BIM建筑信息模块包括功能管理单元、成本管理单元、系统设置单元、验收管理单元和施工管理单元,所述功能管理单元包括备料管理和进度管理,所述系统设置单元包括材料类型设置和模型数据导入,所述客户端为用户提供本体服务,且可从BIM数据库中调用数据,所述数据采集器用于采集建筑工地现场的图像数据,所述数据转换器用于将图像数据信息转换成中央处理器所能识别的电信号,所述中央处理器用于调控数据转换器、BIM建筑信息模块和存储器,所述备料管理包括备料设置、备料查询、和工程提料,所述进度管理包括生成管理、运输管理和安装管理,所述成本管理单元用于预测改项目支出,由于BIM数据库的数据精度达到构件级,可以快速提供支撑项目各条管理所需的数据信息,避免了算量不准确依靠经验的问题,所述施工管理单元对建筑施工进行模拟和现场监测,可有效的控制建筑工程质量,减少不必要的损失,规避各种事故风险,所述验收管理单元是用于对设计质量、施工质量和设备质量等的控制和管理,所述系统设置单元用于设置三维建模参数和选择施工材料类型。
综上所述:具体使用时,用户通过BIM数据库把数据导入至客户端内,数据采集器用来采集客户端内部的数据,之后将数据传输至数据转换器中,数据转换器中将输入的数据转换为电信号,电信号由中央处理器进行分配,中央处理器将电信号输出至BIM建筑信息模块中,利用BIM建筑信息模块中的各项管理软件建立起工程项目各种相关信息的模型,对其进行详细的分析和优化模拟,以提高生产效率和节约成本,最终存储单元将输入的电信号和三维模型的数据进行存储。
最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (6)
1.一种基于BIM网络技术的建筑工程管理系统平台,包括BIM数据库、客户端、数据采集器、数据转换器、中央处理器、BIM建筑信息模块和存储器,其特征在于:所述BIM数据库的输出端信号连接于客户端的输入端,所述客户端的输出端信号连接于数据采集器的输入端,所述数据采集器的输出端信号连接于数据转换器的输入端,所述数据转换器的输出端信号连接于中央处理器的输入端,所述中央处理器的输出端分别连接存储器和BIM建筑信息模块。
2.根据权利要求1所述的一种基于BIM网络技术的建筑工程管理系统平台,其特征在于:所述BIM建筑信息模块包括功能管理单元、成本管理单元、系统设置单元、验收管理单元和施工管理单元。
3.根据权利要求2所述的一种基于BIM网络技术的建筑工程管理系统平台,其特征在于:所述功能管理单元包括备料管理和进度管理,所述系统设置单元包括材料类型设置和模型数据导入。
4.根据权利要求1所述的一种基于BIM网络技术的建筑工程管理系统平台,其特征在于:所述客户端为用户提供本体服务,且可从BIM数据库中调用数据,所述数据采集器用于采集建筑工地现场的图像数据,所述数据转换器用于将图像数据信息转换成中央处理器所能识别的电信号,所述中央处理器用于调控数据转换器、BIM建筑信息模块和存储器。
5.根据权利要求3所述的一种基于BIM网络技术的建筑工程管理系统平台,其特征在于:所述备料管理包括备料设置、备料查询、和工程提料,所述进度管理包括生产管理、运输管理和安装管理。
6.根据权利要求2所述的一种基于BIM网络技术的建筑工程管理系统平台,其特征在于:所述成本管理单元用于预测改项目支出,由于BIM数据库的数据精度达到构件级,可以快速提供支撑项目各条管理所需的数据信息,避免了算量不准确依靠经验的问题,所述施工管理单元对建筑施工进行模拟和现场监测,可有效的控制建筑工程质量,减少不必要的损失,规避各种事故风险,所述验收管理单元是用于对设计质量、施工质量和设备质量等的控制和管理,所述系统设置单元用于设置三维建模参数和选择施工材料类型。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710697917.5A CN107464064A (zh) | 2017-08-15 | 2017-08-15 | 基于bim网络技术的建筑工程管理系统平台 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710697917.5A CN107464064A (zh) | 2017-08-15 | 2017-08-15 | 基于bim网络技术的建筑工程管理系统平台 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107464064A true CN107464064A (zh) | 2017-12-12 |
Family
ID=60549847
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710697917.5A Withdrawn CN107464064A (zh) | 2017-08-15 | 2017-08-15 | 基于bim网络技术的建筑工程管理系统平台 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107464064A (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107958357A (zh) * | 2018-01-22 | 2018-04-24 | 东华理工大学 | 一种bim项目的成本管理系统 |
CN108492040A (zh) * | 2018-03-29 | 2018-09-04 | 新乡学院 | 一种智能建筑管理装置 |
CN108537440A (zh) * | 2018-04-09 | 2018-09-14 | 四川交通职业技术学院 | 一种基于bim的建筑方案工程管理系统 |
CN109299504A (zh) * | 2018-08-15 | 2019-02-01 | 深圳市君盈建筑科技有限公司 | 一种基于bim平台的智慧建筑工程管理系统 |
CN109543310A (zh) * | 2018-11-26 | 2019-03-29 | 广东电网有限责任公司 | 一种基于4d动态展示技术的变电修理技改施工模拟方法 |
CN109544102A (zh) * | 2018-10-26 | 2019-03-29 | 中交第航务工程局有限公司 | 一种基于bim模型的工程船舶施工管理系统及应用方法 |
CN111275297A (zh) * | 2020-01-14 | 2020-06-12 | 中资锐诚工程项目管理有限公司 | 一种基于bim技术的建筑工程epc造价和进度管理系统及管理方法 |
CN112651126A (zh) * | 2020-12-24 | 2021-04-13 | 河南省第八建设集团有限公司 | 一种基于bim的建筑工程施工优化系统、方法、终端及存储介质 |
CN113450072A (zh) * | 2021-06-29 | 2021-09-28 | 上海至贤工程管理咨询有限公司 | 一种基于物联网的建筑工程信息查询系统 |
CN117271011A (zh) * | 2023-09-28 | 2023-12-22 | 北京构力科技有限公司 | 一种建筑信息模型数据的转换处理系统和方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106920049A (zh) * | 2017-03-28 | 2017-07-04 | 内蒙古科技大学 | 一种基于bim网络技术的建筑工程管理系统平台 |
CN106934852A (zh) * | 2017-02-16 | 2017-07-07 | 西安科技大学 | 一种基于bim网络技术的建筑工程管理系统平台 |
-
2017
- 2017-08-15 CN CN201710697917.5A patent/CN107464064A/zh not_active Withdrawn
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106934852A (zh) * | 2017-02-16 | 2017-07-07 | 西安科技大学 | 一种基于bim网络技术的建筑工程管理系统平台 |
CN106920049A (zh) * | 2017-03-28 | 2017-07-04 | 内蒙古科技大学 | 一种基于bim网络技术的建筑工程管理系统平台 |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107958357A (zh) * | 2018-01-22 | 2018-04-24 | 东华理工大学 | 一种bim项目的成本管理系统 |
CN108492040A (zh) * | 2018-03-29 | 2018-09-04 | 新乡学院 | 一种智能建筑管理装置 |
CN108537440A (zh) * | 2018-04-09 | 2018-09-14 | 四川交通职业技术学院 | 一种基于bim的建筑方案工程管理系统 |
CN109299504A (zh) * | 2018-08-15 | 2019-02-01 | 深圳市君盈建筑科技有限公司 | 一种基于bim平台的智慧建筑工程管理系统 |
CN109544102A (zh) * | 2018-10-26 | 2019-03-29 | 中交第航务工程局有限公司 | 一种基于bim模型的工程船舶施工管理系统及应用方法 |
CN109543310A (zh) * | 2018-11-26 | 2019-03-29 | 广东电网有限责任公司 | 一种基于4d动态展示技术的变电修理技改施工模拟方法 |
CN111275297A (zh) * | 2020-01-14 | 2020-06-12 | 中资锐诚工程项目管理有限公司 | 一种基于bim技术的建筑工程epc造价和进度管理系统及管理方法 |
CN112651126A (zh) * | 2020-12-24 | 2021-04-13 | 河南省第八建设集团有限公司 | 一种基于bim的建筑工程施工优化系统、方法、终端及存储介质 |
CN112651126B (zh) * | 2020-12-24 | 2024-01-12 | 河南省第八建设集团有限公司 | 一种基于bim的建筑工程施工优化系统、方法、终端及存储介质 |
CN113450072A (zh) * | 2021-06-29 | 2021-09-28 | 上海至贤工程管理咨询有限公司 | 一种基于物联网的建筑工程信息查询系统 |
CN117271011A (zh) * | 2023-09-28 | 2023-12-22 | 北京构力科技有限公司 | 一种建筑信息模型数据的转换处理系统和方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107464064A (zh) | 基于bim网络技术的建筑工程管理系统平台 | |
CN105652830B (zh) | 一种基于bim的桥梁监测系统 | |
CN108388711A (zh) | 一种基于bim的工程设计与管理系统 | |
CN109523424A (zh) | 一种基于bim的装配式建筑信息化管理系统及方法 | |
CN106503896A (zh) | 基于bim技术的施工设备管理方法 | |
CN110750827A (zh) | 一种基于bim的进度管理方法 | |
Wen | Research on the intelligent construction of prefabricated building and personnel training based on BIM5D | |
CN111861825A (zh) | 一种轨道交通行业职业培训体系模型构建方法及系统 | |
CN103310668A (zh) | 电力设备模拟检修多任务多角色协同交互实现方法 | |
Jiang et al. | “Intelligent Construction, Digital Modeling of the Future” Internet+ BIM Service EPC Project——Take the Exhibition Center of National Cybersecurity Center for Education and Innovation Project as an Example | |
CN216014298U (zh) | 一种基于bim的建筑监管系统 | |
CN106780722B (zh) | 一种同种异态森林场景构建方法及系统 | |
Ma et al. | A review of advanced manufacturing strategies and development in typical industrialized countries | |
CN114004417A (zh) | 一种电力设施共享基站建设方法和装置 | |
Chen et al. | The function of GIS in the smart city construction | |
Wu et al. | The analysis of Business Process Reengineering applicability and process of implementation | |
Daglio et al. | Towards a new strategic dimension for Technological design | |
Dekkers et al. | The European network for dynamic microsimulation (EURODYM)–A vision and the state of affairs | |
Zhu | Research on assembly building design and construction management based on computer building information model | |
Stracchi et al. | Not really an aftermath. The role of actual construction in the design process of the Sydney Opera House roof | |
Adámek | A research agenda of industry 4.0 from the Czech Perspective | |
Dong et al. | Research on the Multi-project Management of IT Enterprises | |
Li | Application of Software Simulation in Guiding Reform of Engineering Project with VR Tools | |
Zhao et al. | Construction and Application of BIM Engineering Technology Research Center | |
CN202424777U (zh) | 水利监控装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20171212 |