CN107462492B CN201710581911.1A CN201710581911A CN107462492B CN 107462492 B CN107462492 B CN 107462492B CN 201710581911 A CN201710581911 A CN 201710581911A CN 107462492 B CN107462492 B CN 107462492B
Authority
CN
China
Prior art keywords
rock
cement slurry
value
pressure
scan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710581911.1A
Other languages
Chinese (zh)
Other versions
CN107462492A (en
Inventor
刘杰
王连
童元申
付玲莉
张罗送
兰俊
高进
郑芊
申继辉
付鑫
谢元元
付晓茜
李昌海
刘宇昂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges University CTGU
Original Assignee
China Three Gorges University CTGU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges University CTGU filed Critical China Three Gorges University CTGU
Priority to CN201710581911.1A priority Critical patent/CN107462492B/en
Publication of CN107462492A publication Critical patent/CN107462492A/en
Application granted granted Critical
Publication of CN107462492B publication Critical patent/CN107462492B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N9/00Investigating density or specific gravity of materials; Analysing materials by determining density or specific gravity
    • G01N9/02Investigating density or specific gravity of materials; Analysing materials by determining density or specific gravity by measuring weight of a known volume
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N9/00Investigating density or specific gravity of materials; Analysing materials by determining density or specific gravity
    • G01N9/02Investigating density or specific gravity of materials; Analysing materials by determining density or specific gravity by measuring weight of a known volume
    • G01N2009/022Investigating density or specific gravity of materials; Analysing materials by determining density or specific gravity by measuring weight of a known volume of solids

Abstract

The present invention relates to the methods for carrying out the anchor rod anchored research of large dosage swelling agent for CT scan technology, this method includes choosing rock material or rock-like materials, cutting material production country rock body simultaneously drills, arrange pressure sensor, arrange foil gauge, configure expansion cement slurry, the pressure data of different time after acquisition perfusion expansion cement slurry, the expansion cement slurry compression for drawing different bulking agent levels changes over time image, pull-out test step by step, solve the problems, such as that the presence of metal in CT scan produces bigger effect the CT value inside anchor system, the anchor system expansion cement slurry compression that more can really study under crustal stress and groundwater effect different bulking agent levels changes with time rule, the failure mode and Evolution at three main bodys, two interface under crustal stress and groundwater effect, it anchor axial force and cuts The regularity of distribution of stress finally obtains withdrawal resistance with the changing rule of bulking agent levels.

Description

The anchor rod anchored research method of large dosage swelling agent is carried out for CT scan technology
Technical field
Utilize expanding cement that head is expanded substantially to carry out greatly for CT scan technology in aperture steel pipe the present invention relates to a kind of The anchor rod anchored research method of volume swelling agent belongs to civil engineering experimental rig field.
Background technique
CT scan technology is a kind of lossless decomposition technology, because having convenient and efficient, highly-safe, result is visual in image etc. Advantage has been widely studied and applied.CT scan can dynamically, quantitatively measure the change of material internal structure in loading process Change, institute can intuitively embody the defect and breakage of interior of articles at image, and can be to defect and damaged progress quantitative analysis.CT The working principle of scanning technique is to scan object to be detected from multiple directions using X ray under tested component nondestructive state One tomography gets off the information collection after being detected object ray attenuation with special detector, by computer using special The image reconstruction algorithm of door is shown scanned section in the form of two dimension or three dimensional grey scale image, detects direct result It is exactly tested object faultage image.It can clearly reflect that tested object selectes the structure sheaf in tomography by this faultage image Secondary, material situation has the inner cases such as zero defect.
In slope retaining protection, anchor system internal structure change in country rock body is analyzed using CT scan technology It is of great significance to the steady in a long-term of anchor system under the conditions of research crustal stress and immersion, but due to the metal in anchor system Ingredient is affected to CT scan, and institute can not accurately analyze the internal junction of anchor system at being easy to appear artifact in image Structure variation.In current CT scan technical application, for that can simulate true crustal stress and groundwater condition and accurately survey The internal structure change for determining anchor system, there are no find good method.
Summary of the invention
The anchor rod anchored research method of large dosage swelling agent is carried out provided by the present invention for CT scan technology, uses glass fibers Tie up anchor pole replace anchor metal, with high-strength carbon fiber cloth package security against fire air cushion inflation replace metal component to rock around Apply compression simulated ground stress, i.e., metal component is replaced with non-metallic member, solve the presence of metal in CT scan to anchor Gu the problem of CT value of internal system produces bigger effect more can really be studied different under crustal stress and groundwater effect The anchor system expansion cement slurry compression of bulking agent levels change with time rule, three under crustal stress and groundwater effect It the failure mode and Evolution, anchor axial force at main body (anchor pole, anchoring body, country rock) two interfaces (interface between three main bodys) and cuts The regularity of distribution of stress finally obtains withdrawal resistance with the changing rule of bulking agent levels, is slope retaining protection in Practical Project Reference and research application value are provided.
First, rock mass anchor pole failure caused by the anti-pulling of anchor bar solved in rock mass is insufficient, and extraction-resistant behavior is lower.
Second, solve the long construction period of conventional anchor, the high problem of construction cost.
In order to realize above-mentioned technical characteristic, the object of the present invention is achieved like this: carrying out for CT scan technology big The anchor rod anchored research method of volume swelling agent, which is characterized in that it the following steps are included:
Step1: rock material or rock-like materials are chosen;
Step2: cutting material makes multiple identical rock-like blocks or rocks test block, in each rock-like block Or rocks test block center drills through cylinder bore, the rock-like block made or rocks test block is carried out CT scan, and record Rock CT value, the rock CT value are the initial closely knit angle value before Rock experiment;
Step3: it in the different depth disposed at equal distance multiple groups pressure sensor group away from aperture, mutually hangs down in rock-like block two 10 pressure sensors are arranged in a manner of " four angle points, one central point " in straight sided, are made in the two sides of arrangement pressure sensor It is wrapped up with high-strength carbon fiber cloth, the fixed security against fire hoisting air cushion of surrounding, inflation is with applying pressure to simulate under full-scale condition Stress;
Step4: fixing identical non-metallic rock in each cylinder bore, and foil gauge is arranged on non-metallic rock, and It is inserted into same depth;
Step5: the expansion cement slurry of multiple groups difference bulking agent levels, the group number and circle of different content expansion cement slurry are prepared The quantity in cylinder hole is identical, and first into each hole, the progress of perfusion ordinary cement slurry is rebasing, then by the swollen of different bulking agent levels Swollen cement slurry is injected separately into cylinder bore and by its vibration compacting, is finally sealed envelope using ordinary cement slurry in aperture Mouthful, while record is numbered to each group test;
Multiple groups pressure sensor: connecting by Step6 with pressure acquisition system immediately after grouting, acquisition perfusion expansion cement slurry The pressure data of different time afterwards, while, i.e. initial set before rock and expansion primary to the CT scan before grouted rock progress initial set The CT value of slurry;Entire rock is soaked in water after initial set, it is intermediate to 28 days after initial set, each star is carried out to grouted rock Phase primary CT scan, the CT value of synchronous recording pressure data and rock and expanding cement slurry, as the stage rock and swollen The closely knit angle value of swollen cement slurry;
Step7: according to pressure data collected, the expansion cement slurry compression of different bulking agent levels is drawn at any time Modified-image;Simultaneously according to the CT value of record draw different bulking agent levels rock and expanding cement slurry CT value at any time The two modified-image is established corresponding relationship by modified-image in time, and research expanding cement slurry is swollen in true rock mass Swollen mechanism and changing rule;
Step8: carrying out pull-out test step by step after expansion cement slurry final set, passes through CT scan, pressure acquisition system, strain Acquisition system obtains data CT value, pressure data, strain data respectively, draws the expansion cement slurry of different bulking agent levels CT value, pressure value, strain value change over time image, and analyze and obtain the anchor of the different bulking agent levels under real environmental conditions Gu system changes over time rule, three main bodys and two interfacial failure modes and Evolution, bolt shaft under real environmental conditions The regularity of distribution of power and shear stress finally obtains under real environmental conditions withdrawal resistance with the changing rule of bulking agent levels;
Three main body are as follows: anchor pole, anchoring body and rock mass or rocks body;
Two interface are as follows: two interfaces formed between anchor pole and anchoring body, between anchoring body and rock mass or rocks body.
In the Step1, select various rock mass as research object, rock-like materials are concrete casting.
Rock material is cut, 3 identical 300mm × 300mm × 300mm cube rock is made in this test Sample block drills through a cylinder bore at each rock-like block center, and the diameter of cylinder bore is 40mm, depth 300mm;Cylinder The quantity of body opening is 3;After the completion of drilling, CT scan is carried out to the rock-like block that will be made, and record rock CT value, it is described Rock CT value is the initial closely knit angle value before Rock experiment, obtains the situation as before testing inside rock exemplar using this.
In 50mm, 150mm, 250mm depth disposed at equal distance multiple groups pressure sensor group away from top aperture, every group of pressure Force snesor group is made of three pressure sensors being arranged on same depth section, in the same plane, three on section A mutual angle of pressure sensor is 120 °;With the side of " four angle points and an intermediate point " in the mutual vertical side of rock-like block two Formula arranges 10 pressure sensors;Surrounding is wrapped up using high-strength carbon fiber cloth in the two sides of arrangement pressure sensor, it is fixed Security against fire hoisting air cushion, inflation applies nMPa pressure to simulate crustal stress under full-scale condition after carbon fiber rubber solidification.
Use bolt diameter for 20mm, length is the glass fibre anchor pole of 600mm, insertion depth 300mm, in insertion 300mm depth end is from bottom groove milling on anchor pole along axial direction, slot length 250mm, wide 5mm, depth 2mm, between equal in slot Away from arrangement foil gauge.
The expansion cement slurry that bulking agent levels are respectively 15%, 25% and 35% is prepared, 25mm height is first perfused into each hole Ordinary cement slurry progress is rebasing, and the expansion cement slurry of the different bulking agent levels of 250mm height is then perfused respectively in hole simultaneously And by its vibration compacting, 25mm height ordinary cement slurry is finally perfused into each hole and is sealed.
The data time interval of acquisition are as follows: it is continued to monitor in first 2 hours after perfusion expansion cement slurry, in latter 24 hours, Every the pressure data of acquisition in 2 hours;In 24 hours to 48 hours after expansion cement slurry is perfused, one was acquired every 6 hours Secondary pressure data;It acquires a pressure data every three days backward, records data;The CT before initial set is carried out to grouted rock simultaneously Run-down, i.e., the CT value of rock and expansion slurry before initial set;Entire rock is soaked in water after initial set, to 28 after initial set It is intermediate, carries out grouted rock per CT scan once a week, synchronous recording pressure data and rock and expansion cement slurry The CT value of body, i.e., the closely knit angle value of the rock and expanding cement slurry intermediate to 28 days after initial set.
According to pressure data collected, the expansion cement slurry compression for drawing different bulking agent levels changes over time figure Picture;Simultaneously according to the pressure data and rock of record and the CT value of expanding cement slurry draw different bulking agent levels rock and The CT value of expanding cement slurry changes over time image, and the two modified-image is established corresponding relationship, research expansion in time Mechanism of intumescence and changing rule of the cement slurry in true rock mass.
Hydraulic jack is utilized after expansion cement slurry final set, and anchor pole is carried out step by step plus unloaded, when load reaches a certain When grade, unloading processing is carried out, entire anchor system is placed on spiral CT machine together with security against fire hoisting air cushion and is scanned, Simulative immersion condition is scanned after immersion container can be put into, synchronous to be adopted using pressure acquisition system and strain acquisition system Collect pressure data and strain data, is re-loaded to lower level again later, then be scanned test, is so recycled to anchor pole and pulls out Out, off-test, it is to obtain rock and swelling water in each grade loading procedure that CT scan is carried out after each unloading Multiple compactness variation before and after slurry body;
Obtain data CT value, pressure data, strain data, draw the expansion cement slurry of different bulking agent levels CT value, Pressure value, strain value change over time image, and analyze the anchor of available bulking agent levels different under real environmental conditions Gu system changes over time rule, the shape between real environmental conditions lower bolt, anchoring body and three main body of soil mass and three main bodys At two interfaces failure mode and Evolution, anchor axial force and shear stress the regularity of distribution, finally obtain in true environment Under the conditions of withdrawal resistance with the changing rule of bulking agent levels, the true environment, which refers to, simulates different crustal stress and immersion item Environment under part.
Wherein, it is previously mentioned the CT value that multiple CT scan obtains, including the initial CT value before Rock experiment described in Step2, The CT value of rock and expansion slurry before expansion cement slurry is pre-hardening in Step6;It is intermediate per CT once a week to 28 days after initial set The rock obtained and expanding cement slurry CT value are scanned, rock and the expansion of CT scan acquisition are carried out after unloading every time in Step8 All CT value drafting patterns can be shown rock mass before the expansion cement slurry of perfusion different content, filled by cement slurry CT value It is intermediate to 28 days after initial set after note before expansion cement slurry initial set, the variation relation in drawing experimentation is carried out after initial set, simultaneously Also it can get the variation relation of expanding cement slurry during this.
The method have the advantages that:
1, the method for carrying out the anchor rod anchored research of large dosage swelling agent provided by the present invention for CT scan technology, uses glass Glass fiber anchor rod replaces anchor metal, replaces metal component to rock with high-strength carbon fiber cloth package security against fire air cushion inflation Surrounding applies compression simulated ground stress, i.e., replaces metal component with non-metallic member, solve the presence of metal in CT scan The problem of producing bigger effect to the CT value inside anchor system more can really be studied under crustal stress and groundwater effect The anchor system expansion cement slurry compression of different bulking agent levels change with time rule, in crustal stress and groundwater effect The failure mode at lower three main bodys, two interface and the regularity of distribution of Evolution, anchor axial force and shear stress, finally obtain withdrawal resistance With the changing rule of bulking agent levels, reference and research application value are provided for slope retaining protection in Practical Project.
2, the device simulates the anchor rod anchored support conditions in true slope retaining protective environment completely, studies anchor pole resistance to plucking Power under different environmental conditions with the changing rule of different bulking agent levels and under real environmental conditions three main bodys (anchor pole, Anchoring body, soil mass) two interfaces (interface between three main bodys) failure mode and Evolution, anchor axial force and shear stress distribution Rule;
3, in the Patent equipment, anchor metal is replaced using glass fibre anchor pole, wraps up fire-fighting with high-strength carbon fiber cloth Safety air cushion inflation replaces metal component to compression simulated ground stress is applied around rock, i.e., replaces metal with non-metallic member Component solves the problems, such as that the presence of metal in CT scan produces bigger effect the CT value inside anchor system;
4, the patent exploitation CT scan technology, pressure acquisition system, strain acquisition system, three are used in combination jointly, from Internal stress, internal modification, each interfacial failure damage carry out monitored over time, and outside carries out application confining pressure, simulates in true ring The truth under suspension roof support under the conditions of border, so that obtained data are authentic and valid, it is more accurate, meet practical application.
5, it can study under the conditions of crustal stress and underground immersion, changing rule of the withdrawal resistance with bulking agent levels, anchoring body Interface normal stress, shear stress, axle power the regularity of distribution;
6, the device can be recycled, and structure is simple, and material is easy to get, easy to operate, substantially save experimentation cost and period, ring Border remarkable benefit.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is overall schematic of the present invention;
Fig. 2 is the mutual vertical side pressure sensor layout drawing of rock mass two of the present invention;
Fig. 3 is 1-1 sectional view of the present invention;
In figure, non-metallic rock 1, expansion cement slurry anchoring body 2, rocks test block 3, security against fire hoisting air cushion 4, pressure Sensor 5, high-strength carbon fiber cloth 6, security against fire hoisting air cushion blowing mouth 7, foil gauge 8, pressure sensor group 9.
Specific embodiment
Embodiments of the present invention are described further with reference to the accompanying drawing.
Embodiment one:
The device and application method of the anchor rod anchored research of large dosage swelling agent are carried out for CT scan technology, this method includes Following steps:
Step1: selecting concrete test block is test material therefor;
Step2: 3 identical cube rocks test blocks are made using concreting, size is equal are as follows: 300mm×300mm×300mm;During being poured test block, a cylinder bore, circle are reserved at each rocks test block center The diameter in cylinder hole is 40mm, depth 300mm;It is primary to rocks test block progress CT scan after 28 days, obtain rocks CT value inside test block (CT value is closely knit angle value).
Step3: in 50mm, 150mm, 250mm depth disposed at equal distance multiple groups pressure sensor group away from top aperture, Every group of pressure sensor group is made of three pressure sensors being arranged on same depth section, in the same plane, section On three mutual angles of pressure sensor be 120 °;In the mutual vertical side of rock-like block two " among four angle points and one The mode of point " arranges 10 pressure sensors;High-strength carbon fiber cloth package four is used in the two sides of arrangement pressure sensor Week fixes security against fire hoisting air cushion, and inflation applies 1MPa pressure and answered under full-scale condition with simulating after carbon fiber rubber solidification Power;
Step4: selection bolt diameter is 20mm, and length is the glass fibre anchor pole of 600mm, is inserted into rocks test block center Kong Zhong, depth 300mm, insertion 300mm depth end from bottom groove milling on anchor pole along axial direction, slot length 250mm is wide 5mm, depth 2mm, is equally spaced foil gauge in slot.
Step5: electronic scale weighs the cement that 3 deck labels are 42.5, and weight is respectively 183.6g, 162g, 140.4g, claims Taking weight is respectively the swelling agent of 32.4g, 34g, 75.6g, is weighed 3 groups of warm water (50 degrees centigrade), every group of 64.8g, successively 3 groups of cement, swelling agent and warm water are mixed, the expansion cement slurry that bulking agent levels are 15%, 25%, 35% is configured to.It connects down It is rebasing first to be perfused 25mm height ordinary cement slurry into each hole, 250mm height is then perfused respectively into each hole again 25mm height ordinary cement is finally perfused in the expansion cement slurry of different bulking agent levels and by its vibration compacting into each hole Slurry is sealed;
Step6: multiple groups pressure sensor group is connect with pressure acquisition system, when different after acquisition perfusion expansion cement slurry Between pressure data, the data time interval of acquisition are as follows: perfusion expansion cement slurry after first 2 hours in continue to monitor, rear 24 is small When it is interior, every the pressure data of acquisition in 2 hours;In 24 hours to 48 hours after expansion cement slurry is perfused, adopted every 6 hours Collect a pressure data;It acquires a pressure data every three days backward, records data;Before carrying out initial set to grouted rock simultaneously CT scan it is primary;Entire rock is soaked in water after initial set, it is intermediate to 28 days after initial set, grouted rock is carried out each Week primary CT scan, (CT value is the compactness of rock and expanding cement slurry for synchronous recording pressure data and CT value Value).
Step7: according to pressure data collected, the expansion cement slurry compression of different bulking agent levels is drawn at any time Modified-image;The CT value for the expansion cement slurry for drawing different bulking agent levels according to the CT value of record simultaneously changes over time figure The two modified-image is established corresponding relationship by picture in time, studies mechanism of intumescence of the expanding cement slurry in true rock mass And changing rule.
In Step8, hydraulic jack is utilized after expansion cement slurry final set, and anchor pole is carried out step by step plus unloaded, load is worked as When reaching a certain grade, unloading processing is carried out, entire anchor system is placed on spiral CT machine together with security against fire hoisting air cushion Upper scanning (simulative immersion condition is scanned after can also being put into immersion container) is synchronous to use pressure acquisition system and strain acquirement System is acquired pressure data and strain data, is re-loaded to lower level again later, then is scanned test, so follows Ring to anchor pole is extracted, off-test.Data CT value, pressure data, strain data are obtained, the expansion of different bulking agent levels is drawn The CT value of cement slurry, pressure value, strain value change over time image, and analyze available different swollen under real environmental conditions The anchor system of swollen agent content changes over time rule, three main bodys (anchor pole, anchoring body, soil mass) two under real environmental conditions The regularity of distribution of interface (interface between three main bodys) failure mode and Evolution, anchor axial force and shear stress, finally obtains For withdrawal resistance with the changing rule of bulking agent levels, the true environment in the present invention, which refers to, simulates different ground under real environmental conditions Under the conditions of stress and immersion.
Embodiment two:
For the method that CT scan technology carries out the anchor rod anchored research of large dosage swelling agent, method includes the following steps:
Step1: selecting rigid sandstone is test material therefor;
Step2: cutting rock material makes 3 identical 300mm × 300mm × 300mm cube rock-like Block turns to take 1 cylinder bore at each rock-like block center, and the diameter of cylinder bore is 40mm, depth 300mm;Cylindrical body The quantity in hole is 3;After the completion of drilling, CT scan is carried out to rock-like block that will make, and records CT value (CT value is rock The closely knit angle value of stone).
Step3: in 50mm, 150mm, 250mm depth disposed at equal distance multiple groups pressure sensor group away from top aperture, Every group of pressure sensor group is made of three pressure sensors being arranged on same depth section, in the same plane, section On three mutual angles of pressure sensor be 120 °;In the mutual vertical side of rock-like block two " among four angle points and one The mode of point " arranges 10 pressure sensors;High-strength carbon fiber cloth package four is used in the two sides of arrangement pressure sensor Week fixes security against fire hoisting air cushion, and inflation applies 1.5MPa pressure and answered under full-scale condition with simulating after carbon fiber rubber solidification Power;
Step4: selection bolt diameter is 20mm, and length is the glass fibre anchor pole of 600mm, is inserted into rocks test block center Kong Zhong, depth 300mm, insertion 300mm depth end from bottom groove milling on anchor pole along axial direction, slot length 250mm is wide 5mm, depth 2mm, is equally spaced foil gauge in slot.
Step5: electronic scale weighs the cement that 3 deck labels are 42.5, and weight is respectively 183.6g, 162g, 140.4g, claims Taking weight is respectively the swelling agent of 32.4g, 34g, 75.6g, is weighed 3 groups of warm water (50 degrees centigrade), every group of 64.8g, successively 3 groups of cement, swelling agent and warm water are mixed, the expansion cement slurry that bulking agent levels are 15%, 25%, 35% is configured to, connects down It is rebasing that 25mm height ordinary cement slurry is first perfused into each hole, 250mm height is then perfused respectively not into each hole again With bulking agent levels expansion cement slurry and by its vibration compacting, finally into each hole be perfused 25mm height ordinary cement slurry It is sealed;
Step6: multiple groups pressure sensor group is connect with pressure acquisition system, when different after acquisition perfusion expansion cement slurry Between pressure data, the data time interval of acquisition are as follows: perfusion expansion cement slurry after first 2 hours in continue to monitor, rear 24 is small When it is interior, every the pressure data of acquisition in 2 hours;In 24 hours to 48 hours after expansion cement slurry is perfused, adopted every 6 hours Collect a pressure data;It acquires a pressure data every three days backward, records data;Before carrying out initial set to grouted rock simultaneously CT scan it is primary;Entire rock is soaked in water after initial set, it is intermediate to 28 days after initial set, grouted rock is carried out each Week primary CT scan, (CT value is the compactness of rock and expanding cement slurry for synchronous recording pressure data and CT value Value).
Step7: according to pressure data collected, the expansion cement slurry compression of different bulking agent levels is drawn at any time Modified-image;The CT value for the expansion cement slurry for drawing different bulking agent levels according to the CT value of record simultaneously changes over time figure The two modified-image is established corresponding relationship by picture in time, studies mechanism of intumescence of the expanding cement slurry in true rock mass And changing rule.
In Step8, hydraulic jack is utilized after expansion cement slurry final set, and anchor pole is carried out step by step plus unloaded, load is worked as When reaching a certain grade, unloading processing is carried out, entire anchor system is placed on spiral CT machine together with security against fire hoisting air cushion Upper scanning (simulative immersion condition is scanned after can also being put into immersion container) is synchronous to use pressure acquisition system and strain acquirement System is acquired pressure data and strain data, is re-loaded to lower level again later, then is scanned test, so follows Ring to anchor pole is extracted, off-test.Data CT value, pressure data, strain data are obtained, the expansion of different bulking agent levels is drawn The CT value of cement slurry, pressure value, strain value change over time image, and analyze available different swollen under real environmental conditions The anchor system of swollen agent content changes over time rule, three main bodys (anchor pole, anchoring body, soil mass) two under real environmental conditions The regularity of distribution of interface (interface between three main bodys) failure mode and Evolution, anchor axial force and shear stress, finally obtains For withdrawal resistance with the changing rule of bulking agent levels, the true environment in the present invention, which refers to, simulates different ground under real environmental conditions Under the conditions of stress and immersion.
Above-described embodiment is used to illustrate the present invention, rather than limits the invention, in spirit of the invention and In scope of protection of the claims, to any modifications and changes that the present invention makes, protection scope of the present invention is both fallen within.

Claims (9)

1. carrying out the anchor rod anchored research method of large dosage swelling agent for CT scan technology, which is characterized in that it includes following step It is rapid:
Step1: rock material or rock-like materials are chosen;
Step2: cutting material makes multiple identical rock-like blocks or rocks test block (3), in each rock-like block or Rocks test block (3) center drills through cylinder bore, and the rock-like block made or rocks test block (3) are carried out CT scan, and Rock CT value is recorded, the rock CT value is the initial closely knit angle value before Rock experiment;
Step3: it in the different depth disposed at equal distance multiple groups pressure sensor group (9) away from aperture, mutually hangs down in rock-like block two 10 pressure sensors (5) are arranged in straight sided in a manner of " four angle points, one central point ", in the two sides of arrangement pressure sensor Face is wrapped up using high-strength carbon fiber cloth (6), and surrounding is fixed security against fire hoisting air cushion (4), and it is true to simulate that inflation applies pressure Crustal stress under reality condition;
Step4: fixing identical non-metallic rock (1) in each cylinder bore, arrange foil gauge (8) on non-metallic rock (1), And it is inserted into same depth;
Step5: the expansion cement slurry of multiple groups difference bulking agent levels, the group number and cylindrical body of different content expansion cement slurry are prepared The quantity in hole is identical, and first into each hole, the progress of perfusion ordinary cement slurry is rebasing, then by the swelling water of different bulking agent levels Mud is injected separately into cylinder bore and by its vibration compacting, is finally sealed sealing using ordinary cement slurry in aperture, Record is numbered to each group test simultaneously;
Multiple groups pressure sensor (5): connecting by Step6 with pressure acquisition system immediately after grouting, acquisition perfusion expansion cement slurry The pressure data of different time afterwards, while, i.e. initial set before rock and expansion primary to the CT scan before grouted rock progress initial set The CT value of slurry;Entire rock is soaked in water after initial set, it is intermediate to 28 days after initial set, each star is carried out to grouted rock Phase primary CT scan, the CT value of synchronous recording pressure data and rock and expanding cement slurry, as the stage rock and swollen The closely knit angle value of swollen cement slurry;
Step7: according to pressure data collected, the expansion cement slurry compression for drawing different bulking agent levels is changed over time Image;The CT value of the rock and expanding cement slurry of drawing different bulking agent levels according to the CT value of record simultaneously changes over time The two modified-image is established corresponding relationship by image in time, studies expanding machine of the expanding cement slurry in true rock mass Reason and changing rule;
Step8: carrying out pull-out test step by step after expansion cement slurry final set, passes through CT scan, pressure acquisition system, strain acquirement System, respectively obtain data CT value, pressure data, strain data, draw the expansion cement slurry of different bulking agent levels CT value, Pressure value, strain value change over time image, and analyze and obtain the anchoring system of the different bulking agent levels under real environmental conditions System change over time rule, under real environmental conditions three main bodys and two interfacial failure modes and Evolution, anchor axial force and The regularity of distribution of shear stress finally obtains under real environmental conditions withdrawal resistance with the changing rule of bulking agent levels;
Three main body are as follows: anchor pole, anchoring body and rock mass or rocks body;
Two interface are as follows: two interfaces formed between anchor pole and anchoring body, between anchoring body and rock mass or rocks body.
2. according to claim 1 carry out the anchor rod anchored research method of large dosage swelling agent for CT scan technology, special Sign is, in the Step1, selects various rock mass as research object, rock-like materials are concrete casting.
3. according to claim 1 carry out the anchor rod anchored research method of large dosage swelling agent for CT scan technology, special Sign is, in the Step2, cut rock material, in this test make 3 identical 300mm × 300mm × 300mm cube rock-like block drills through a cylinder bore at each rock-like block center, and the diameter of cylinder bore is 40mm, Depth is 300mm;The quantity of cylinder bore is 3;After the completion of drilling, CT scan is carried out to the rock-like block that will be made, and Rock CT value is recorded, the rock CT value is the initial closely knit angle value before Rock experiment, obtains the rock as before testing using this Situation inside exemplar.
4. according to claim 1 carry out the anchor rod anchored research method of large dosage swelling agent for CT scan technology, special Sign is, in the Step3, in 50mm, 150mm, 250mm depth disposed at equal distance multiple groups pressure sensing away from top aperture Device group (9), every group of pressure sensor group (9) is made of three pressure sensors being arranged on same depth section, same In plane, three mutual angles of pressure sensor on section are 120 °;With " quadrangle in the mutual vertical side of rock-like block two The mode of point and an intermediate point " arranges 10 pressure sensors (5);It is used in the two sides of arrangement pressure sensor (5) high-strength It spends carbon cloth (6) and wraps up surrounding, fixed security against fire hoisting air cushion (4), inflation applies nMPa pressure after carbon fiber rubber solidification Power is to simulate crustal stress under full-scale condition.
5. according to claim 1 carry out the anchor rod anchored research method of large dosage swelling agent for CT scan technology, special Sign is, in the Step4, uses bolt diameter for 20mm, and length is the glass fibre anchor pole of 600mm, and insertion depth is 300mm, insertion 300mm depth end from bottom groove milling on anchor pole along axial direction, slot length 250mm, wide 5mm, depth is 2mm is equally spaced foil gauge (8) in slot.
6. according to claim 1 carry out the anchor rod anchored research method of large dosage swelling agent for CT scan technology, special Sign is, in the Step5, the expansion cement slurry that bulking agent levels are respectively 15%, 25% and 35% is prepared, first into each hole It is rebasing that the progress of 25mm height ordinary cement slurry is perfused, the different bulking agent levels of 250mm height are then perfused respectively in hole 25mm height ordinary cement slurry is finally perfused into each hole and is sealed for expansion cement slurry and by its vibration compacting.
7. according to claim 1 carry out the anchor rod anchored research method of large dosage swelling agent for CT scan technology, special Sign is, in the Step6, the data time interval of acquisition are as follows: and it is continued to monitor in first 2 hours after perfusion expansion cement slurry, Afterwards in 24 hours, every the pressure data of acquisition in 2 hours;In 24 hours to 48 hours after expansion cement slurry is perfused, every 6 Pressure data of hour acquisition;It acquires a pressure data every three days backward, records data;Grouted rock is carried out simultaneously CT scan before initial set is primary, i.e., the CT value of rock and expansion slurry before initial set;Entire rock is soaked in water after initial set, It is intermediate to 28 days after initial set, grouted rock is carried out per CT scan once a week, synchronous recording pressure data and rock and The CT value of expanding cement slurry, i.e., the closely knit angle value of the rock and expanding cement slurry intermediate to 28 days after initial set.
8. according to claim 1 carry out the anchor rod anchored research method of large dosage swelling agent for CT scan technology, special Sign is, in the Step7, according to pressure data collected, draws the expansion cement slurry compression of different bulking agent levels Change over time image;Different swelling agents are drawn according to the CT value of the pressure data and rock of record and expanding cement slurry simultaneously The rock of content and the CT value of expanding cement slurry change over time image, and the two modified-image is established to corresponding pass in time Mechanism of intumescence and changing rule of the expanding cement slurry in true rock mass are studied by system.
9. according to claim 1 carry out the anchor rod anchored research method of large dosage swelling agent for CT scan technology, special Sign is, in the Step8, hydraulic jack is utilized after expansion cement slurry final set, and anchor pole is carried out step by step plus unloaded, works as lotus When load reaches a certain grade, unloading processing is carried out, entire anchor system is placed on spiral CT together with security against fire hoisting air cushion It is scanned on machine, simulative immersion condition is scanned after can also being put into immersion container, synchronous to be adopted using pressure acquisition system and strain Collecting system is acquired pressure data and strain data, is re-loaded to lower level again later, then is scanned test, so It is recycled to anchor pole extraction, off-test, it is to obtain the rock and swollen in each grade loading procedure that CT scan is carried out after unloading Multiple compactness variation before and after swollen cement slurry;
Data CT value, pressure data, strain data are obtained, CT value, the pressure of the expansion cement slurry of different bulking agent levels are drawn Value, strain value change over time image, and analyze the anchoring system of available bulking agent levels different under real environmental conditions It unites and changes over time rule, formed between real environmental conditions lower bolt, anchoring body and three main body of soil mass and three main bodys The regularity of distribution of the failure mode and Evolution at two interfaces, anchor axial force and shear stress, finally obtains in real environmental conditions Lower withdrawal resistance with bulking agent levels changing rule, the true environment refers to simulate different crustal stress and immersion under the conditions of Environment.
CN201710581911.1A 2017-07-17 2017-07-17 The anchor rod anchored research method of large dosage swelling agent is carried out for CT scan technology Active CN107462492B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710581911.1A CN107462492B (en) 2017-07-17 2017-07-17 The anchor rod anchored research method of large dosage swelling agent is carried out for CT scan technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710581911.1A CN107462492B (en) 2017-07-17 2017-07-17 The anchor rod anchored research method of large dosage swelling agent is carried out for CT scan technology

Publications (2)

Publication Number Publication Date
CN107462492A CN107462492A (en) 2017-12-12
CN107462492B true CN107462492B (en) 2019-07-12

Family

ID=60546832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710581911.1A Active CN107462492B (en) 2017-07-17 2017-07-17 The anchor rod anchored research method of large dosage swelling agent is carried out for CT scan technology

Country Status (1)

Country Link
CN (1) CN107462492B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108051294B (en) * 2017-11-06 2020-04-24 三峡大学 Device and method for simulating rock mass anchoring under conditions of high ground stress and underground water
CN108169260B (en) * 2017-12-28 2020-06-30 三峡大学 Method for analyzing expansion mechanism of anchoring body with different content of expanding agent by CT scanning
CN109030340B (en) * 2018-07-16 2021-02-19 三峡大学 Self-expansion loading and unloading device and method
CN109211949B (en) * 2018-09-30 2021-06-29 三峡大学 Test method for measuring compactness of anchoring body and surrounding soil layer of expansive cement paste based on CT scanning
CN110359959B (en) * 2019-06-19 2020-06-26 中国矿业大学 Method for rapidly measuring gas content and advance stress of coal face
CN110296899B (en) * 2019-07-11 2021-07-13 三峡大学 Test method for researching rock creep by unpowered stress locking
CN111060400B (en) * 2019-12-31 2022-04-19 三峡大学 Device for testing extruding process of coral sand around expansion pile by CT (computed tomography) and using method
CN111735724B (en) * 2020-06-23 2023-03-10 三峡大学 Device and method for detecting creep stress of in-situ rock-soil body
CN112985989B (en) * 2021-02-19 2022-08-30 三峡大学 Verification device and method for load platform effect of self-expansion anchoring system

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9507047B1 (en) * 2011-05-10 2016-11-29 Ingrain, Inc. Method and system for integrating logging tool data and digital rock physics to estimate rock formation properties
CN104155176A (en) * 2014-08-28 2014-11-19 中国电建集团中南勘测设计研究院有限公司 Simulation test device and method for working state of anchor rod and anchor rod stress meter
CN105509934B (en) * 2016-01-27 2018-03-16 三峡大学 A kind of method for measuring expansion cement slurry expansion compression
CN106228558B (en) * 2016-07-26 2018-11-09 三峡大学 A method of layer being carried out into formula breakdown diagnosis to rock
CN106053214A (en) * 2016-07-28 2016-10-26 西安工业大学 Testing apparatus for research of imposed load of bed separation to anchor pole and manufacturing method
CN106638594B (en) * 2017-01-21 2019-07-26 三峡大学 A kind of method and its application of the most suitable bulking agent levels addition of quick determination

Also Published As

Publication number Publication date
CN107462492A (en) 2017-12-12

Similar Documents

Publication Publication Date Title
CN107462492B (en) The anchor rod anchored research method of large dosage swelling agent is carried out for CT scan technology
Fairhurst Stress estimation in rock: a brief history and review
Lisjak et al. The excavation of a circular tunnel in a bedded argillaceous rock (Opalinus Clay): short-term rock mass response and FDEM numerical analysis
CN103806906B (en) Rock/upper boring in-situ testing device and method
Zhang et al. Large-scale geo-mechanical model tests for the stability assessment of deep underground complex under true-triaxial stress
CN102680647B (en) Coal-rock mass grouting reinforcement test bed and test method
CN112649086A (en) Improved jointed rock mass blasting model test vibration monitoring system and method
CN103645061A (en) Lattice anchoring technology large-scale physical model test method
CN105275024B (en) Defective Big-Diameter Rock-Embedded Pile vertical bearing capacity detection and the method reinforced
CN113669063A (en) Roof cutting self-entry surrounding rock control method
CN110374636A (en) A kind of construction method of tunnel rock burst security protection
Su Laboratory pull-out testing study on soil nails in compacted completely decomposed granite fill
Blazejowski Flexural behaviour of steel fibre reinforced concrete tunnel linings
CN109459290A (en) A kind of NSCB sample preparation device and its application method for testing compacted cohesive soil I type fracture toughness
CN204556387U (en) Complex condition Rock And Soil adit digging and surrouding rock stress, strain monitoring model test apparatus
CN206329335U (en) A kind of testing equipment of rational evaluation rock mass TBM constructions suitability
Lin et al. Some new correlations of Q-value with rock mechanics parameters in underground oil storage caverns
Wen et al. The use of Hoek Brown failure criterion on determination of the geo-mechanical parameters of a grouting consolidation body
CN111827375A (en) Construction method for detecting foundation pile load based on self-balancing static load
CN205743879U (en) Test system is spied in the imaging of bushing type CT
CN111721457A (en) Method for monitoring sliding surface shearing force and burial depth in tunnel deeply buried across sliding mass
CN206648761U (en) Colliery depth shaft wall safety monitoring assembly
Pusch et al. Final report of the Buffer Mass Test-Volume I: Scope, preparative field work and test arrangement
Yan-yan et al. Experimental Study on Uniaxial Compression Fracture Process of Marble Specimens with Circular Holes with Different Diameters
CN210005489U (en) test field structure for comprehensive test hole for relaxation effect of columnar joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20171212

Assignee: Hubei Hongzhuo Architectural Design Co.,Ltd.

Assignor: CHINA THREE GORGES University

Contract record no.: X2023980043461

Denomination of invention: Research method for anchoring anchor bolts with high volume expansion agent using CT scanning technology

Granted publication date: 20190712

License type: Exclusive License

Record date: 20231019

EC01 Cancellation of recordation of patent licensing contract

Assignee: Hubei Hongzhuo Architectural Design Co.,Ltd.

Assignor: CHINA THREE GORGES University