CN107451696A - A kind of method that oil depot oil product mobile route is planned automatically - Google Patents

A kind of method that oil depot oil product mobile route is planned automatically Download PDF

Info

Publication number
CN107451696A
CN107451696A CN201710656078.2A CN201710656078A CN107451696A CN 107451696 A CN107451696 A CN 107451696A CN 201710656078 A CN201710656078 A CN 201710656078A CN 107451696 A CN107451696 A CN 107451696A
Authority
CN
China
Prior art keywords
oil
oil product
data
mobile route
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710656078.2A
Other languages
Chinese (zh)
Inventor
李玉杏
周兆林
姚自强
郭素琪
徐顺福
陈尧四
周云峰
钟杰
张柯
谭桃川
杨连成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Original Assignee
Wessen Jetnet Technology (beijing) Co Ltd
Sinopec Sales Co Ltd Zhejiang Petroleum Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wessen Jetnet Technology (beijing) Co Ltd, Sinopec Sales Co Ltd Zhejiang Petroleum Branch filed Critical Wessen Jetnet Technology (beijing) Co Ltd
Priority to CN201710656078.2A priority Critical patent/CN107451696A/en
Publication of CN107451696A publication Critical patent/CN107451696A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • G06Q10/047Optimisation of routes or paths, e.g. travelling salesman problem

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Pipeline Systems (AREA)

Abstract

The invention discloses oil product mobile route automatic planning in a kind of oil depot, including step:S1, for all types of equipment on oil product mobile route in the range of oil depot data model and graphical element model are established, and be saved in database;S2, on web interface by configuration mode, be that different oil products draw oil product mobile route process charts in oil depot, process chart data are combined into Json forms after the completion of configuration is uploaded to Web server, and it is medium to be saved in database;The present invention makes oil product mobile route program operation simpler, path planning is more efficient, route programming result is more accurate also more directly perceived, and the equipment being related in path accurately can be switched in a designated order, start-stop control, the problems such as avoiding carelessness or error for artificially planning etc..

Description

A kind of method that oil depot oil product mobile route is planned automatically
Technical field
The present invention relates to a kind of oil depot technical field, more particularly to a kind of planing method of oil depot oil product mobile route.
Background technology
Oil product mobile route selection at present mainly confirms card by artificial first predetermined process path, or on system process figure Artificial selection processing route, manual or automaticization operation is carried out further according to the processing route of selection.
But the method for this artificial setting oil product mobile route has complex operation, path planning is ineffective to ask Topic, and it is not easy to judge whether the equipment on processing route is in shape during artificial path planning, easily occur artificial wrong By mistake.
The content of the invention
In view of this, it is existing to solve it is an object of the invention to provide a kind of oil depot oil product mobile route automatic planning There is technology using oil product path in manual type planning oil depot, ineffective technical problem be present.
Oil depot oil product mobile route automatic planning of the present invention, comprises the following steps:
S1, for all types of equipment on oil product mobile route in the range of oil depot data model and graphical element model are established, and It is saved in database;
S2, on web interface by configuration mode, be that different oil products draw oil product mobile route technological processes in oil depot Scheme, process chart data are combined into Json forms after the completion of configuration is uploaded to Web server, and is saved in database;
Technological process diagram data is resolved to a digraph by S3, Web server, and the equipment in process chart is abstracted For the node in digraph, pipeline is conceptualized as the line segment in figure, by the attribute data of equipment, each line segment pair corresponding to each node The attribute data and node for the pipeline answered attribute data corresponding with the annexation of line segment while it is saved in database;
S4, all devices on the pipeline between two adjacent oil pipe nodes are created as a unit pipe set, oil pipe node The cross-connect unit of i.e. different oil pipes, and be stored in database;
S5, the Mesh nodes structure for creating single oil tank, the Mesh nodes structure is by single oil tank and connected All oil pipes are formed, and it is saved as to the start point data and stop data of oil product mobile route in tables of data;
S6, the processing route to oil product to be moved are planned
A, Web server inquires digraph corresponding with oil product to be moved, start point data, stop number from database According to and digraph in each unit pipeline set sum state and weight;
The unit pipe set is three kinds by state demarcation:The set of normal cell pipeline, the set of deactivated cell pipeline and Trouble unit pipeline set, prioritizing selection oil product move in normal unit pipe set, secondly select oil product in deactivation Moved in unit pipe set, do not select the unit pipe set of failure;The normal cell pipeline set is divided into by weight Two kinds:The common elements pipeline set of high weight and the stand-by unit pipeline set of low weight, prioritizing selection oil product is in high weight Common elements pipeline set in move;
B, Web server is according to state and weight selecting unit pipeline set, by the unit pipe set selected again group Into the optimization moving process path of oil product to be moved, and optimization moving process path data is combined into Json forms and is sent to use Family end browser;
C, user terminal browser is redrawn out optimization moving process path profile in Web page in a manner of graphical interfaces Come.
Further, described oil depot oil product mobile route automatic planning also includes step S7:Web server will optimize Moving process path data is pushed to Background control program, and data are parsed and are assembled into corresponding communication protocol packet by control program Afterwards, then by OPC far calls or RS-485 automation control system is sent to, automation control system is to choosing processing route On all devices carry out remote control in a designated order, realize automatically controlling for oil product mobile route.
Beneficial effects of the present invention:
Oil depot oil product mobile route automatic planning of the present invention, after oil product kind and target oil tank is determined, just can The automatic mobile route for cooking up oil product so that the planning of oil product mobile route is simpler, route programming result more it is accurate also more Intuitively, path planning operating efficiency is higher, and is avoided that the problem of artificial planning processing route easily malfunctions.
Brief description of the drawings
Fig. 1 is processing route graphical interfaces schematic diagram.
Embodiment
With reference to embodiment, the invention will be further described.
The present embodiment oil depot oil product mobile route automatic planning, comprises the following steps:
S1, for all types of equipment on oil product mobile route in the range of oil depot data model and graphical element model are established, and It is saved in database;
S2, on web interface by configuration mode, be that different oil products draw oil product mobile route technological processes in oil depot Scheme, process chart data are combined into Json forms after the completion of configuration is uploaded to Web server, and is saved in database;
Technological process diagram data is resolved to a digraph by S3, Web server, and the equipment in process chart is abstracted For the node in digraph, pipeline is conceptualized as the line segment in figure, by the attribute data of equipment, each line segment pair corresponding to each node The attribute data and node for the pipeline answered attribute data corresponding with the annexation of line segment while it is saved in database;
S4, all devices on the pipeline between two adjacent oil pipe nodes are created as a unit pipe set, oil pipe node The cross-connect unit of i.e. different oil pipes, and be stored in database;
S5, the Mesh nodes structure for creating single oil tank, the Mesh nodes structure is by single oil tank and connected All oil pipes are formed, and it is saved as to the start point data and stop data of oil product mobile route in tables of data;
S6, the processing route to oil product to be moved are planned
A, Web server inquires digraph corresponding with oil product to be moved, start point data, stop number from database According to and digraph in each unit pipeline set sum state and weight;
The unit pipe set is three kinds by state demarcation:The set of normal cell pipeline, the set of deactivated cell pipeline and Trouble unit pipeline set, prioritizing selection oil product move in normal unit pipe set, secondly select oil product in deactivation Moved in unit pipe set, do not select the unit pipe set of failure;The normal cell pipeline set is divided into by weight Two kinds:The common elements pipeline set of high weight and the stand-by unit pipeline set of low weight, prioritizing selection oil product is in high weight Common elements pipeline set in move;
B, Web server is according to state and weight selecting unit pipeline set, by the unit pipe set selected again group Into the optimization moving process path of oil product to be moved, and optimization moving process path data is combined into Json forms and is sent to use Family end browser;
C, user terminal browser is redrawn out optimization moving process path profile in Web page in a manner of graphical interfaces Come.
The present embodiment oil depot oil product mobile route automatic planning, in addition to step S7:Web server, which will optimize, to be moved Processing route data-pushing gives Background control program, after data are parsed and are assembled into corresponding communication protocol packet by control program, Automation control system is sent to by OPC far calls or RS-485 again, automation control system is to choosing on processing route All devices carry out remote control in a designated order, realize automatically controlling for oil product mobile route.By to being related in path Equipment accurately switched in a designated order, start-stop control, the problems such as being avoided that the carelessness or error artificially planned.
The present embodiment oil depot oil product mobile route automatic planning, after oil product kind and target oil tank is determined, just The mobile route of oil product can be cooked up automatically, so that oil product mobile route plans simpler, oil product mobile route planning It is more efficient, and it is avoided that the problem of artificial planning processing route easily malfunctions.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with The present invention is described in detail good embodiment, it will be understood by those within the art that, can be to the skill of the present invention Art scheme is modified or equivalent substitution, and without departing from the objective and scope of technical solution of the present invention, it all should cover at this Among the right of invention.

Claims (2)

1. a kind of oil depot oil product mobile route automatic planning, comprises the following steps:
S1, for all types of equipment on oil product mobile route in the range of oil depot data model and graphical element model are established, and preserved Into database;
S2, on web interface by configuration mode, be that different oil products draw oil product mobile route process charts, group in oil depot Process chart data are combined into Json forms after the completion of state and are uploaded to Web server, and are saved in database;
Technological process diagram data is resolved to a digraph by S3, Web server, and the equipment in process chart has been conceptualized as Node into figure, pipeline are conceptualized as the line segment in figure, by corresponding to the attribute data of equipment corresponding to each node, each line segment The attribute data and node of pipeline attribute data corresponding with the annexation of line segment are saved in database simultaneously;
S4, all devices on the pipeline between two adjacent oil pipe nodes are created as to a unit pipe set, oil pipe node is i.e. not With the cross-connect unit of oil pipe, and it is stored in database;
S5, the Mesh nodes structure for creating single oil tank, the Mesh nodes structure is by single oil tank and connected all Oil pipe is formed, and it is saved as to the start point data and stop data of oil product mobile route in tables of data;
S6, the processing route to oil product to be moved are planned
A, Web server inquires digraph corresponding with oil product to be moved, start point data, stop number from database According to and digraph in each unit pipeline set sum state and weight;
The unit pipe set is three kinds by state demarcation:The set of normal cell pipeline, the set of deactivated cell pipeline and failure Unit pipe set, prioritizing selection oil product move in normal unit pipe set, secondly select oil product in the unit of deactivation Moved in pipeline set, do not select the unit pipe set of failure;The normal cell pipeline set is divided into two kinds by weight: The common elements pipeline set of high weight and the stand-by unit pipeline set of low weight, prioritizing selection oil product is in the conventional of high weight Moved in unit pipe set;
B, the unit pipe set selected is reformulated and treated according to state and weight selecting unit pipeline set by Web server The optimization moving process path of mobile oil product, and optimization moving process path data is combined into Json forms and is sent to user terminal Browser;
C, optimization moving process path profile is redrawn out by user terminal browser in a manner of graphical interfaces in Web page.
2. oil depot oil product mobile route automatic planning according to claim 1, it is characterised in that also including step S7:Web server will optimize moving process path data and be pushed to backstage platform control program, and control program parses data and group After dressing up corresponding communication protocol packet, then automation control system sent to by OPC far calls or RS-485, automation control System processed realizes the automatic of oil product mobile route to choosing all devices on processing route to carry out remote control in a designated order Control.
CN201710656078.2A 2017-08-03 2017-08-03 A kind of method that oil depot oil product mobile route is planned automatically Pending CN107451696A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710656078.2A CN107451696A (en) 2017-08-03 2017-08-03 A kind of method that oil depot oil product mobile route is planned automatically

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710656078.2A CN107451696A (en) 2017-08-03 2017-08-03 A kind of method that oil depot oil product mobile route is planned automatically

Publications (1)

Publication Number Publication Date
CN107451696A true CN107451696A (en) 2017-12-08

Family

ID=60490286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710656078.2A Pending CN107451696A (en) 2017-08-03 2017-08-03 A kind of method that oil depot oil product mobile route is planned automatically

Country Status (1)

Country Link
CN (1) CN107451696A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114545885A (en) * 2022-04-25 2022-05-27 浙江中控技术股份有限公司 Oil product movement control method and device based on upper computer and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101894301A (en) * 2009-05-21 2010-11-24 罗钢华 Visualized oil port process flow management system
CN104008431A (en) * 2014-05-30 2014-08-27 南京富岛信息工程有限公司 Crude oil tank farm scheduling method
CN106020155A (en) * 2016-07-12 2016-10-12 中国石油化工股份有限公司 Crude oil tank area oil transportation operation scheduling optimization method
CN106203835A (en) * 2016-07-12 2016-12-07 中国石油化工股份有限公司 A kind of tank field deployment work flow planing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101894301A (en) * 2009-05-21 2010-11-24 罗钢华 Visualized oil port process flow management system
CN104008431A (en) * 2014-05-30 2014-08-27 南京富岛信息工程有限公司 Crude oil tank farm scheduling method
CN106020155A (en) * 2016-07-12 2016-10-12 中国石油化工股份有限公司 Crude oil tank area oil transportation operation scheduling optimization method
CN106203835A (en) * 2016-07-12 2016-12-07 中国石油化工股份有限公司 A kind of tank field deployment work flow planing method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘运东: "油品移动自动化在西固油库的应用", 《自动化博览》 *
王魁生: "利用JSON进行网站客户端与服务器数据交互", 《软件导刊》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114545885A (en) * 2022-04-25 2022-05-27 浙江中控技术股份有限公司 Oil product movement control method and device based on upper computer and storage medium

Similar Documents

Publication Publication Date Title
CN101401070B (en) Method for handling different versions of an application, and an automation system
EP3318941A2 (en) Industrial automation system machine analytics for a connected enterprise
CN104865834A (en) Intelligent household Internet of things control system and method
CN110912923B (en) Self-adaptation method, self-adaptation unit and system for communication protocol of power distribution internet of things
CN109147788A (en) The update method and device in local voice library
CN104158686A (en) Configuration management method and system
CN204287908U (en) Flow computer
CN104318006A (en) Method for optimizing intelligent substation virtual terminal design
CN102298373A (en) Monitoring method and monitoring system of programmable logic controller (PLC)
CN102624557A (en) Method for automatic check, configuration and backup for client-side equipment configuration
CN104145222B (en) For the synchronous apparatus and method of control logic
CN104456868A (en) Air conditioner control system
CN113256095A (en) Draggable configured agile flow service construction method, system, device and medium
CN113515057A (en) System for industrial control scene simulation and corresponding method, device and medium
CN107451696A (en) A kind of method that oil depot oil product mobile route is planned automatically
CN106325233A (en) Visual programming logic distribution control system and implementation method
CN104660664B (en) Method and apparatus for managing storage system
CN109520069A (en) Control method of electronic device, device, electronic equipment and storage medium
CN105207799A (en) Batch command executing method and device
CN106971272A (en) Synchronous system and method is operated between a kind of dispatching automation main preparation system
EP1832089B1 (en) Method and circuit arrangement for carrying out initialisation and/or registration steps for a device, in particular a household appliance
CN111200524A (en) Switch configuration method and server
CN113194124B (en) Distributed real-time database-based DCS background multi-node directory synchronization method
CN103825769A (en) Network operation and maintenance management method and device
CN102576222B (en) For the method for operation site bus interface

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20191025

Address after: 310009 Hefangjie Street, Zhejiang, No. 58,

Applicant after: SINOPEC MARKETING COMPANY, ZHEJIANG PETROLEUM BRANCH

Address before: 310009 Hefangjie Street, Zhejiang, No. 58,

Applicant before: SINOPEC MARKETING COMPANY, ZHEJIANG PETROLEUM BRANCH

Applicant before: DIAMOND KEY TECHNOLOGY (BEIJING) CO.,LTD.

TA01 Transfer of patent application right
CB02 Change of applicant information

Address after: 310009 Hefangjie Street, Zhejiang, No. 58,

Applicant after: Zhejiang Petroleum Branch of Sinopec Sales Co.,Ltd.

Address before: 310009 Hefangjie Street, Zhejiang, No. 58,

Applicant before: SINOPEC MARKETING COMPANY, ZHEJIANG PETROLEUM BRANCH

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20200617

Address after: 100020 No. 22 North Main Street, Chaoyang District, Beijing, Chaoyangmen

Applicant after: China Petroleum & Chemical Corp.

Address before: 310009 Hefangjie Street, Zhejiang, No. 58,

Applicant before: Zhejiang Petroleum Branch of Sinopec Sales Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20171208

RJ01 Rejection of invention patent application after publication