CN107451341A - A kind of cross-system design method of the carpentery workshop product based on BIM - Google Patents

A kind of cross-system design method of the carpentery workshop product based on BIM Download PDF

Info

Publication number
CN107451341A
CN107451341A CN201710585627.1A CN201710585627A CN107451341A CN 107451341 A CN107451341 A CN 107451341A CN 201710585627 A CN201710585627 A CN 201710585627A CN 107451341 A CN107451341 A CN 107451341A
Authority
CN
China
Prior art keywords
carpentery workshop
bim
workshop product
carpentery
product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710585627.1A
Other languages
Chinese (zh)
Inventor
朱燕
秦涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DONGYI RISHENG DECORATION CORP
Original Assignee
DONGYI RISHENG DECORATION CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGYI RISHENG DECORATION CORP filed Critical DONGYI RISHENG DECORATION CORP
Priority to CN201710585627.1A priority Critical patent/CN107451341A/en
Publication of CN107451341A publication Critical patent/CN107451341A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of cross-system design method of the carpentery workshop product based on BIM, comprise the following steps:First coordinate information of the constructed wall in BIM systems is imported in carpentery workshop product design system;When according to first coordinate information, after completing carpentery workshop product design in the carpentery workshop product design system, the second coordinate information of the carpentery workshop product and the first coding information are imported into the BIM systems;Corresponding race's file in BIM systems is obtained according to first coding information, and race's file is arranged in BIM systems according to second coordinate information.The present invention can cross-system the processing dimension of carpentery workshop product is accurately provided, the size of carpentery workshop product is enabled accurately to agree with the size of actual wall, avoid the construction delay caused by dimensional problem, carpentery workshop texture and decorative effect truly can be presented in BIM systems simultaneously, improve the operating efficiency of designer and the satisfaction of customer.

Description

A kind of cross-system design method of the carpentery workshop product based on BIM
Technical field
The present invention relates to house ornamentation design field, more particularly to a kind of cross-system design method of the carpentery workshop product based on BIM.
Background technology
Carpentery workshop is the important component of house ornamentation, comprising carpentery workshop products such as timber, cabinet, storing cabinets, the texture of carpentery workshop, Style is also the annotation and displaying of house ornamentation style.Traditional house ornamentation needs hard dress part to terminate just carry out carpentery workshop product chi substantially Very little measurement is simultaneously designed, and the design process-cycle of carpentery workshop product is typically long, often delays construction period.
It is domestic gradually to start to contact BIM (Building Information Modeling, architecture information after 2002 Model) theory and technology, BIM is recognized as " architecture information in Eleventh Five-Year Plan as focus on research direction, and by the Ministry of Construction Best solution ".How to solve traditional house ornamentation design phase by technology and accurately determine asking for carpentery workshop Product processing size Topic, it is BIM technology in house ornamentation that carpentery workshop texture and decorative effect can truly be presented in the design phase and count the cost of carpentery workshop product One of the developing direction in field.
The content of the invention
The present invention can not accurately determine carpentery workshop Product processing size to traditional house ornamentation for prior art in the design phase The problem of causing construction delay is delayed in problem, carpentery workshop product size measurement, using secondary to BIM softwares based on building BIM technology Exploitation, there is provided a kind of cross-system design method of the carpentery workshop product based on BIM, realize depth of the BIM technology in house ornamentation field Using
The technical scheme that the present invention solves above-mentioned technical problem is as follows:A kind of cross-system of the carpentery workshop product based on BIM is set Meter method, comprises the following steps:
Step 1, by BIM systems constructed wall the first coordinate information import carpentery workshop product design system in;
Step 2, when according to first coordinate information, carpentery workshop product design is completed in the carpentery workshop product design system Afterwards, the second coordinate information of the carpentery workshop product and the first coding information are imported into the BIM systems;
Step 3, corresponding race's file in BIM systems is obtained according to first coding information, and sat according to described second Mark information arranges race's file in BIM systems.
The beneficial effects of the invention are as follows:Can cross-system the processing dimension of carpentery workshop product is accurately provided so that carpentery workshop product Size can accurately agree with the size of actual wall, avoid the construction delay caused by dimensional problem, while can be in BIM systems It is true that carpentery workshop texture and decorative effect is presented, improve the operating efficiency of designer and the satisfaction of customer.
On the basis of above-mentioned technical proposal, the present invention can also do following improvement.
Further, between the step 2 and step 3, in addition to:
The dimension information of each component of carpentery workshop product is imported into the BIM systems, so that producer is according to the component Dimensioned carpentery workshop product.
Further, between the step 2 and step 3, in addition to:
Second coding information of each component of carpentery workshop product and cost information are imported into the BIM systems;
The quotation information of carpentery workshop product is generated according to second coding information in the BIM systems.
Further, the BIM systems are Revit or SkethUp.
Further, the carpentery workshop product design system is 2020design.
Brief description of the drawings
Fig. 1 is a kind of flow chart of the carpentery workshop product cross-system design method based on BIM provided in an embodiment of the present invention;
Fig. 2 is the flow chart of another carpentery workshop product cross-system design method based on BIM provided in an embodiment of the present invention;
Fig. 3 is the flow chart of another carpentery workshop product cross-system design method based on BIM provided in an embodiment of the present invention.
Embodiment
The principle and feature of the present invention are described below in conjunction with accompanying drawing, the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the present invention.
Fig. 1 is a kind of flow chart of the cross-system design method of the carpentery workshop product based on BIM provided in an embodiment of the present invention, As shown in figure 1, this method comprises the following steps:
101st, the first coordinate information of the constructed wall in BIM systems is imported in carpentery workshop product design system;
102nd, when according to first coordinate information, carpentery workshop product design is completed in the carpentery workshop product design system Afterwards, the second coordinate information of the carpentery workshop product and the first coding information are imported into the BIM systems;
103rd, corresponding race's file in BIM systems is obtained according to first coding information, and according to second coordinate Information arranges race's file in BIM systems.
Specifically, being in during installing meter, carpentery workshop product needs the carpentery workshop design system of specialty, as 2020design enters Row designs and forms production order.BIM systems can use REVIT platforms or SketchUp platforms, by taking REVIT platforms as an example, After REVIT platforms carry out secondary development, the interior space wall coordinate information cross-system where carpentery workshop product can be exported to In professional carpentery workshop design system, the door and window hole of thickness of wall body, wall highly, on wall can be obtained by according to wall coordinate information Message ceases, and so as to ensure accurate carpentery workshop design size, site dimension has deviation not install after avoiding carpentery workshop production.Specially The carpentery workshop design system of industry by after the completion of carpentery workshop product design by with carpentery workshop product coordinate information, carpentery workshop product coding information File cross-system import REVIT secondary developing platforms, REVIT secondary developing platforms according to carpentery workshop product coding information automatically from Carpentery workshop product family file is simultaneously arranged automatically according to coordinate information corresponding to download in REVIT distributed file management system, very It is real that carpentery workshop texture and decorative effect is presented.
A kind of carpentery workshop product cross-system design method based on BIM provided by the invention, can cross-system wood is accurately provided Make the processing dimension of product so that the size of carpentery workshop product can accurately agree with the size of actual wall, avoid because of dimensional problem Construction delay is caused, while carpentery workshop texture and decorative effect truly can be presented in BIM systems, improves the operating efficiency of designer With the satisfaction of customer.
Alternatively, as one embodiment of the present of invention, as shown in Fig. 2 this method comprises the following steps:
201st, the first coordinate information of the constructed wall in BIM systems is imported in carpentery workshop product design system;
202nd, when according to first coordinate information, carpentery workshop product design is completed in the carpentery workshop product design system Afterwards, the dimension information of the second coordinate information of the carpentery workshop product, the first coding information and each component is imported into the BIM systems System;
Specifically, after carpentery workshop design system completes carpentery workshop product design, also by the text of the dimension information with each component Part cross-system imports REVIT secondary developing platforms, and REVIT can generate order and be supplied to producer, so that producer is according to listed by order Structure dimensioned carpentery workshop product.
203rd, corresponding race's file in BIM systems is obtained according to first coding information, and according to second coordinate Information arranges race's file in BIM systems.
Alternatively, as one embodiment of the present of invention, as shown in figure 3, this method comprises the following steps:
301st, the first coordinate information of the constructed wall in BIM systems is imported in carpentery workshop product design system;
302nd, when according to first coordinate information, carpentery workshop product design is completed in the carpentery workshop product design system Afterwards, by the second coordinate information of the carpentery workshop product, the first coding information, and the dimension information of each component, the second coding Information and cost information import the BIM systems;
303rd, the quotation information of carpentery workshop product is generated according to second coding information in the BIM systems.
Specifically, after carpentery workshop design system completes carpentery workshop product design, also by the coding information with each component and make The file cross-system of valency information imports REVIT secondary developing platforms, wherein, cost information is to be formulated by producer according to scantling Cost information, such as cabinet is made up of door-plate, backboard, diaphragm plate component, after the completion of carpentery workshop product design, carpentery workshop product The size of each component is also determined that, the calculating logic of each component has been preset in carpentery workshop design system, if door-plate is according to flat Rice calculates, this makes it possible to the cost for calculating each component of carpentery workshop product, in addition, each component of carpentery workshop product has correspondingly Coding, REVIT encodes according to corresponding to each component is added up to the cost for belonging to the component of same carpentery workshop product, i.e., The total cost of whole carpentery workshop product can be obtained.
304th, corresponding race's file in BIM systems is obtained according to first coding information, and according to second coordinate Information arranges race's file in BIM systems.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent substitution and improvements made etc., it should be included in the scope of the protection.

Claims (5)

1. a kind of cross-system design method of the carpentery workshop product based on BIM, it is characterised in that comprise the following steps:
Step 1, by BIM systems constructed wall the first coordinate information import carpentery workshop product design system in;
Step 2, when according to first coordinate information, after completing carpentery workshop product design in the carpentery workshop product design system, Second coordinate information of the carpentery workshop product and the first coding information are imported into the BIM systems;
Step 3, corresponding race's file in BIM systems is obtained according to first coding information, and believed according to second coordinate Breath arranges race's file in BIM systems.
A kind of 2. cross-system design method of carpentery workshop product based on BIM according to claim 1, it is characterised in that institute State between step 2 and step 3, in addition to:
The dimension information of each component of carpentery workshop product is imported into the BIM systems, so that producer is according to the scantling Process carpentery workshop product.
A kind of 3. cross-system design method of carpentery workshop product based on BIM according to claim 2, it is characterised in that institute State between step 2 and step 3, in addition to:
Second coding information of each component of carpentery workshop product and cost information are imported into the BIM systems;
The quotation information of carpentery workshop product is generated according to second coding information in the BIM systems.
A kind of 4. cross-system design method of carpentery workshop product based on BIM according to claim 1-3, it is characterised in that The BIM systems are Revit or SkethUp.
A kind of 5. cross-system design method of carpentery workshop product based on BIM according to claim 4, it is characterised in that institute It is 2020design to state carpentery workshop product design system.
CN201710585627.1A 2017-07-18 2017-07-18 A kind of cross-system design method of the carpentery workshop product based on BIM Pending CN107451341A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710585627.1A CN107451341A (en) 2017-07-18 2017-07-18 A kind of cross-system design method of the carpentery workshop product based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710585627.1A CN107451341A (en) 2017-07-18 2017-07-18 A kind of cross-system design method of the carpentery workshop product based on BIM

Publications (1)

Publication Number Publication Date
CN107451341A true CN107451341A (en) 2017-12-08

Family

ID=60487735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710585627.1A Pending CN107451341A (en) 2017-07-18 2017-07-18 A kind of cross-system design method of the carpentery workshop product based on BIM

Country Status (1)

Country Link
CN (1) CN107451341A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105279609A (en) * 2015-10-26 2016-01-27 中国十七冶集团有限公司 Construction method of BIM (Building Information Modeling)-based cross-high-speed bridge construction traffic control
CN105389301A (en) * 2015-11-11 2016-03-09 深圳市华阳国际工程设计股份有限公司 BIM data based method and system for generating operation and maintenance form
CN106126279A (en) * 2016-06-20 2016-11-16 中国建筑第八工程局有限公司 Automatically the method and system of interpolation BIM model race fileinfo

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105279609A (en) * 2015-10-26 2016-01-27 中国十七冶集团有限公司 Construction method of BIM (Building Information Modeling)-based cross-high-speed bridge construction traffic control
CN105389301A (en) * 2015-11-11 2016-03-09 深圳市华阳国际工程设计股份有限公司 BIM data based method and system for generating operation and maintenance form
CN106126279A (en) * 2016-06-20 2016-11-16 中国建筑第八工程局有限公司 Automatically the method and system of interpolation BIM model race fileinfo

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张建奇等: "基于BIM技术的家装设计系统设计与实施", 《土木建筑工程信息技术》 *

Similar Documents

Publication Publication Date Title
WO2023035592A1 (en) Interior design solution acquisition method and apparatus, computer device, and storage medium
CN107563628B (en) Method and system for establishing association relationship between BIM component and construction task
CN107590355A (en) Architectural design method, design system and electronic equipment based on BIM
CN106649938A (en) BIM-based fine decoration co-design method
CN111339591A (en) Engineering project intelligent computing method based on BIM and cloud database
CN109086495A (en) The method that BIM goes out hard-cover construction drawing
CN111027115A (en) Application method in residential building decoration project based on BIM technology
TW201616377A (en) Reorganizing and presenting data fields with erroneous inputs
CN111339656A (en) Cabinet production method and system and electronic equipment
CN107451341A (en) A kind of cross-system design method of the carpentery workshop product based on BIM
CN104615794B (en) For the mathematical model construction method in three-dimensional electric wiring software
WO2015196814A1 (en) Data center 3d modeling method, apparatus and storage medium
WO2023078353A1 (en) Generative design method for prefabricated concrete component
Zhao et al. Toward automatic calculation of construction quantity based on building information modeling
CN107480336A (en) A kind of timber floor dosage computational methods and system based on BIM
CN111460552A (en) Automatic design method between sample plates in toilet
CN101308518B (en) Topology element name corresponding method for copy type synergic modeling system
CN110704909A (en) BIM-based design method and system for fabricated PCF board
CN110147071A (en) Distributed type assemblies framework monitoring system and its building method based on WinCC
CN107330206B (en) Three-dimensional automatic labeling method based on feature mapping
CN103577563B (en) A kind of transformer station model moving method
Kim et al. Automated conversion of building information modeling (BIM) geometry data for Window thermal performance simulation
CN101398899B (en) System and method for auto- recognizing metal plate part edge type
Wu et al. The integration of procedural information in traditional architectural design
CN108446492A (en) BIM is calculated in the method for different software Internal conversion, reservoir and terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171208

RJ01 Rejection of invention patent application after publication