CN107449192A - Frequency adjustment method, device and the readable storage medium storing program for executing of frequency-changeable compressor - Google Patents

Frequency adjustment method, device and the readable storage medium storing program for executing of frequency-changeable compressor Download PDF

Info

Publication number
CN107449192A
CN107449192A CN201710637800.8A CN201710637800A CN107449192A CN 107449192 A CN107449192 A CN 107449192A CN 201710637800 A CN201710637800 A CN 201710637800A CN 107449192 A CN107449192 A CN 107449192A
Authority
CN
China
Prior art keywords
frequency
changeable compressor
weak magnetic
section
working
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710637800.8A
Other languages
Chinese (zh)
Other versions
CN107449192B (en
Inventor
黄招彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GD Midea Air Conditioning Equipment Co Ltd
Original Assignee
Guangdong Midea Refrigeration Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Midea Refrigeration Equipment Co Ltd filed Critical Guangdong Midea Refrigeration Equipment Co Ltd
Priority to CN201710637800.8A priority Critical patent/CN107449192B/en
Publication of CN107449192A publication Critical patent/CN107449192A/en
Application granted granted Critical
Publication of CN107449192B publication Critical patent/CN107449192B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • F25B49/022Compressor control arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • F25B2600/021Inverters therefor

Abstract

The invention discloses a kind of frequency adjustment method of frequency-changeable compressor, the frequency adjustment method of the frequency-changeable compressor includes:Obtain the current operation frequency of frequency-changeable compressor;Determine the frequency range in multiple working frequency sections corresponding to the frequency-changeable compressor;According to the current operation frequency and the frequency range in multiple working frequency sections, the working frequency section that the frequency-changeable compressor is currently at is determined;According to default working frequency section and the corresponding relation of frequency regulations speed, frequency regulations speed corresponding to the working frequency section that the frequency-changeable compressor is currently at is determined, and the running frequency of the frequency-changeable compressor is adjusted according to the frequency regulations speed.The invention also discloses a kind of frequency regulation arrangement of frequency-changeable compressor and computer-readable recording medium.The present invention improves the stability of frequency-changeable compressor operation.

Description

Frequency adjustment method, device and the readable storage medium storing program for executing of frequency-changeable compressor
Technical field
The present invention relates to air conditioner technical field, more particularly to a kind of frequency adjustment method of frequency-changeable compressor, device and Readable storage medium storing program for executing.
Background technology
With the development of science and technology, frequency-changeable compressor is widely applied in air conditioner.For convertible frequency air-conditioner, with ring The change of border temperature, frequency-changeable compressor need regulating frequency, with from non-weak magnetic workspace raising frequency to weak magnetic workspace, or from weak Magnetic workspace mixes down to non-weak magnetic workspace.Such as at low ambient temperatures, when convertible frequency air-conditioner runs heating mode, it is necessary to become Frequency compressor is run with high-frequency, works in weak magnetic state of a control;And in high temperature environments, when convertible frequency air-conditioner runs refrigeration mode When, it is necessary to frequency-changeable compressor is run with low frequency, work in non-weak magnetic state of a control.However, in frequency-changeable compressor running In, and not according to the workspace being presently in, targetedly enter line frequency regulation so that the stability of frequency-changeable compressor operation It is poor.
The content of the invention
It is a primary object of the present invention to propose a kind of frequency adjustment method of frequency-changeable compressor, device and readable storage medium Matter, it is intended to solve the technical problem of the stability difference of frequency-changeable compressor operation in the prior art.
To achieve the above object, the present invention provides a kind of frequency adjustment method of frequency-changeable compressor, the frequency-changeable compressor Frequency adjustment method comprise the following steps:
Obtain the current operation frequency of frequency-changeable compressor;
Determine the frequency range in multiple working frequency sections corresponding to the frequency-changeable compressor;
According to the current operation frequency and the frequency range in multiple working frequency sections, the frequency-changeable compressor is determined The working frequency section being currently at;
According to default working frequency section and the corresponding relation of frequency regulations speed, determine that the frequency-changeable compressor is current Frequency regulations speed corresponding to the working frequency section being in, and the frequency-changeable compressor is adjusted according to the frequency regulations speed Running frequency.
Preferably, the working frequency section includes weak magnetic working frequency section, non-weak magnetic working frequency section and mistake Frequency separation is crossed, described the step of determining the frequency range in multiple working frequency sections corresponding to the frequency-changeable compressor includes:
Calculate the weak magnetic critical frequency of the frequency-changeable compressor;
According to the weak magnetic critical frequency, weak magnetic working frequency section, non-weak magnetic corresponding to the frequency-changeable compressor are determined Working frequency section and the frequency range in transition frequency section.
Preferably, it is described according to the weak magnetic critical frequency, determine weak magnetic working frequency corresponding to the frequency-changeable compressor The step of frequency range in section, non-weak magnetic working frequency section and transition frequency section, includes:
The weak magnetic critical frequency and predeterminated frequency are subjected to read group total, first frequency corresponding to acquisition;
The weak magnetic critical frequency and the predeterminated frequency are carried out asking poor calculating, second frequency corresponding to acquisition;
According to the first frequency and the second frequency, weak magnetic working frequency area corresponding to the frequency-changeable compressor is determined Between, the frequency range in non-weak magnetic working frequency section and transition frequency section;Wherein, the first frequency is the weak magnetic work The lower limit critical frequency in working frequency section, the second frequency are the upper critical frequency in the non-weak magnetic working frequency section.
Preferably, the step of weak magnetic critical frequency of the calculating frequency-changeable compressor includes:
Obtain corresponding to the frequency-changeable compressor inductive voltage value between weak magnetic voltage threshold and line;
According to inductive voltage value between the weak magnetic voltage threshold and the line, calculate and obtain the weak magnetic critical frequency.
Preferably, it is described according to inductive voltage value between the weak magnetic voltage threshold and the line, calculate and obtain the weak magnetic The step of critical frequency, includes:
According to calculation formula Fc=V0/V1*K1, calculate and obtain the weak magnetic critical frequency;Wherein, described in the Fc is represented Weak magnetic critical frequency, the V0Represent the weak magnetic voltage threshold, the V1Represent inductive voltage value between the line, the K1Table Show the first constant parameter.
Preferably, described the step of obtaining weak magnetic voltage threshold corresponding to the frequency-changeable compressor, includes:
Obtain DC bus-bar voltage corresponding to the frequency-changeable compressor;
According to the DC bus-bar voltage, calculate and obtain the weak magnetic voltage threshold.
Preferably, described according to the DC bus-bar voltage, calculating the step of obtaining the weak magnetic voltage threshold includes:
According to calculation formula V0=V2/K2* λ, calculate and obtain the weak magnetic voltage threshold;Wherein, the V0Represent described weak Magnetic voltage threshold, the V2Represent the DC bus-bar voltage, the K2The second constant parameter is represented, the λ represents variable ginseng Number.
Preferably, it is described according to default working frequency section and the corresponding relation of frequency regulations speed, determine the change Include corresponding to the working frequency section that frequency compressor is currently at the step of frequency regulations speed:
When the frequency-changeable compressor is currently at non-weak magnetic working frequency section, according to the working frequency section and frequency The corresponding relation of rate regulations speed, it is first rate to determine the frequency regulations speed;
When the frequency-changeable compressor is currently at weak magnetic working frequency section, according to the working frequency section and frequency The corresponding relation of regulations speed, it is the second speed to determine the frequency regulations speed;
When the frequency-changeable compressor is currently at transition frequency section, adjusted according to the working frequency section and frequency The corresponding relation of speed, it is third speed to determine the frequency regulations speed;
Wherein, the first rate is more than second speed, and second speed is more than the third speed.
In addition, to achieve the above object, the present invention also proposes a kind of frequency regulation arrangement of frequency-changeable compressor, the frequency conversion The frequency regulation arrangement of compressor includes:Memory, processor and it is stored on the memory and can be on the processor The frequency-changeable compressor frequency regulation program of operation, the frequency-changeable compressor frequency are realized when adjusting program by the computing device Following steps:
Obtain the current operation frequency of frequency-changeable compressor;
Determine the frequency range in multiple working frequency sections corresponding to the frequency-changeable compressor;
According to the current operation frequency and the frequency range in multiple working frequency sections, the frequency-changeable compressor is determined The working frequency section being currently at;
According to default working frequency section and the corresponding relation of frequency regulations speed, determine that the frequency-changeable compressor is current Frequency regulations speed corresponding to the working frequency section being in, and the frequency-changeable compressor is adjusted according to the frequency regulations speed Running frequency.
In addition, to achieve the above object, the present invention also proposes a kind of computer-readable recording medium, described computer-readable Frequency-changeable compressor frequency regulation program is stored with storage medium, the frequency-changeable compressor frequency regulation program is executed by processor Shi Shixian following steps:
Obtain the current operation frequency of frequency-changeable compressor;
Determine the frequency range in multiple working frequency sections corresponding to the frequency-changeable compressor;
According to the current operation frequency and the frequency range in multiple working frequency sections, the frequency-changeable compressor is determined The working frequency section being currently at;
According to default working frequency section and the corresponding relation of frequency regulations speed, determine that the frequency-changeable compressor is current Frequency regulations speed corresponding to the working frequency section being in, and the frequency-changeable compressor is adjusted according to the frequency regulations speed Running frequency.
Scheme proposed by the present invention, by obtaining the current operation frequency of frequency-changeable compressor, and determine frequency-changeable compressor The frequency range in corresponding multiple working frequency sections, so that it is determined that the working frequency section that frequency-changeable compressor is currently at, so Afterwards according to default working frequency section and the corresponding relation of frequency regulations speed, the work that frequency-changeable compressor is currently at is determined Frequency regulations speed corresponding to frequency separation, the running frequency of frequency-changeable compressor is adjusted according to the frequency regulations speed, so as to real The working frequency section being currently at according to frequency-changeable compressor is showed, has targetedly been carried out using corresponding frequency regulations speed Frequency is adjusted, and this improves the stability of frequency-changeable compressor operation.
Brief description of the drawings
Fig. 1 is the structural representation of the hardware running environment for the air conditioner that scheme of the embodiment of the present invention is related to;
Fig. 2 is the schematic flow sheet of the frequency adjustment method first embodiment of frequency-changeable compressor of the present invention;
Fig. 3 is to determine that the frequency-changeable compressor is corresponding in the frequency adjustment method second embodiment of frequency-changeable compressor of the present invention Multiple working frequency sections frequency range refinement schematic flow sheet;
Fig. 4 is the schematic diagram of raising frequency speed corresponding to each working frequency section of frequency-changeable compressor of the present invention;
Fig. 5 is the schematic diagram of frequency reducing speed corresponding to each working frequency section of frequency-changeable compressor of the present invention.
The realization, functional characteristics and advantage of the object of the invention will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The solution of the embodiment of the present invention is mainly:By obtaining the current operation frequency of frequency-changeable compressor, and really The frequency range in multiple working frequency sections corresponding to frequency-changeable compressor is determined, so that it is determined that the work that frequency-changeable compressor is currently at Frequency separation, then according to default working frequency section and the corresponding relation of frequency regulations speed, determine that frequency-changeable compressor is worked as Frequency regulations speed corresponding to the preceding working frequency section being in, the operation of frequency-changeable compressor is adjusted according to the frequency regulations speed Frequency, it is achieved thereby that the working frequency section being currently at according to frequency-changeable compressor, targetedly using corresponding frequency Regulations speed enters line frequency regulation.By the technical scheme of the embodiment of the present invention, solves the stability that frequency-changeable compressor is run The problem of poor.
Reference picture 1, Fig. 1 are the structural representation of the hardware running environment for the convertible frequency air-conditioner that scheme of the embodiment of the present invention is related to Figure.
In follow-up description, the suffix using such as " module ", " part " or " unit " for representing element is only Be advantageous to the explanation of the present invention, itself there is no a specific meaning.Therefore, " module ", " part " or " unit " can mix Ground uses.
As shown in figure 1, the convertible frequency air-conditioner can include:Processor 1001, such as CPU, communication bus 1002, user interface 1003, network interface 1004, memory 1005.Wherein, communication bus 1002 is used to realize the connection communication between these components. User interface 1003 can include display screen (Display), input block such as keyboard (Keyboard), optional user interface 1003 can also include wireline interface, the wave point of standard.Network interface 1004 can optionally connect including the wired of standard Mouth, wave point (such as WI-FI interfaces).Memory 1005 can be high-speed RAM memory or stable memory (non-volatile memory), such as magnetic disk storage.Memory 1005 optionally can also be independently of aforementioned processor 1001 storage device.
It will be understood by those skilled in the art that the convertible frequency air-conditioner structure shown in Fig. 1 does not form the limit to convertible frequency air-conditioner It is fixed, it can include than illustrating more or less parts, either combine some parts or different parts arrangement.
As shown in figure 1, it can lead to as in a kind of memory 1005 of computer-readable storage medium including operating system, network Believe module, Subscriber Interface Module SIM and frequency-changeable compressor frequency regulation program.
Processor 1001, memory 1005 in convertible frequency air-conditioner of the present invention can be arranged on the frequency regulation of frequency-changeable compressor In device, the frequency regulation arrangement of the frequency-changeable compressor calls the frequency conversion pressure stored in memory 1005 by processor 1001 Contracting unit frequency adjusts program, and performs following operate:
Obtain the current operation frequency of frequency-changeable compressor;
Determine the frequency range in multiple working frequency sections corresponding to the frequency-changeable compressor;
According to the current operation frequency and the frequency range in multiple working frequency sections, the frequency-changeable compressor is determined The working frequency section being currently at;
According to default working frequency section and the corresponding relation of frequency regulations speed, determine that the frequency-changeable compressor is current Frequency regulations speed corresponding to the working frequency section being in, and the frequency-changeable compressor is adjusted according to the frequency regulations speed Running frequency.
Further, the working frequency section include weak magnetic working frequency section, non-weak magnetic working frequency section and Transition frequency section, processor 1001 can call the frequency-changeable compressor frequency stored in memory 1005 to adjust program, also hold Row is following to be operated:
Calculate the weak magnetic critical frequency of the frequency-changeable compressor;
According to the weak magnetic critical frequency, weak magnetic working frequency section, non-weak magnetic corresponding to the frequency-changeable compressor are determined Working frequency section and the frequency range in transition frequency section.
Further, processor 1001 can call the frequency-changeable compressor frequency stored in memory 1005 to adjust program, Also perform following operate:
The weak magnetic critical frequency and predeterminated frequency are subjected to read group total, first frequency corresponding to acquisition;
The weak magnetic critical frequency and the predeterminated frequency are carried out asking poor calculating, second frequency corresponding to acquisition;
According to the first frequency and the second frequency, weak magnetic working frequency area corresponding to the frequency-changeable compressor is determined Between, the frequency range in non-weak magnetic working frequency section and transition frequency section;Wherein, the first frequency is the weak magnetic work The lower limit critical frequency in working frequency section, the second frequency are the upper critical frequency in the non-weak magnetic working frequency section.
Further, processor 1001 can call the frequency-changeable compressor frequency stored in memory 1005 to adjust program, Also perform following operate:
Obtain corresponding to the frequency-changeable compressor inductive voltage value between weak magnetic voltage threshold and line;
According to inductive voltage value between the weak magnetic voltage threshold and the line, calculate and obtain the weak magnetic critical frequency.
Further, processor 1001 can call the frequency-changeable compressor frequency stored in memory 1005 to adjust program, Also perform following operate:
According to calculation formula Fc=V0/V1*K1, calculate and obtain the weak magnetic critical frequency;Wherein, described in the Fc is represented Weak magnetic critical frequency, the V0Represent the weak magnetic voltage threshold, the V1Represent inductive voltage value between the line, the K1Table Show the first constant parameter.
Further, processor 1001 can call the frequency-changeable compressor frequency stored in memory 1005 to adjust program, Also perform following operate:
Obtain DC bus-bar voltage corresponding to the frequency-changeable compressor;
According to the DC bus-bar voltage, calculate and obtain the weak magnetic voltage threshold.
Further, processor 1001 can call the frequency-changeable compressor frequency stored in memory 1005 to adjust program, Also perform following operate:
According to calculation formula V0=V2/K2* λ, calculate and obtain the weak magnetic voltage threshold;Wherein, the V0Represent described weak Magnetic voltage threshold, the V2Represent the DC bus-bar voltage, the K2The second constant parameter is represented, the λ represents variable ginseng Number.
Further, processor 1001 can call the frequency-changeable compressor frequency stored in memory 1005 to adjust program, Also perform following operate:
When the frequency-changeable compressor is currently at non-weak magnetic working frequency section, according to the working frequency section and frequency The corresponding relation of rate regulations speed, it is first rate to determine the frequency regulations speed;
When the frequency-changeable compressor is currently at weak magnetic working frequency section, according to the working frequency section and frequency The corresponding relation of regulations speed, it is the second speed to determine the frequency regulations speed;
When the frequency-changeable compressor is currently at transition frequency section, adjusted according to the working frequency section and frequency The corresponding relation of speed, it is third speed to determine the frequency regulations speed;
Wherein, the first rate is more than second speed, and second speed is more than the third speed.
The present embodiment by obtaining the current operation frequency of frequency-changeable compressor, and determines frequency conversion pressure by such scheme The frequency range in multiple working frequency sections corresponding to contracting machine, so that it is determined that the working frequency area that frequency-changeable compressor is currently at Between, then according to default working frequency section and the corresponding relation of frequency regulations speed, determine that frequency-changeable compressor is currently at Working frequency section corresponding to frequency regulations speed, according to the frequency regulations speed adjust frequency-changeable compressor running frequency, It is achieved thereby that the working frequency section being currently at according to frequency-changeable compressor, targetedly using corresponding frequency regulation speed Rate enters line frequency regulation, and this improves the stability of frequency-changeable compressor operation.
Based on above-mentioned hardware configuration, the frequency adjustment method embodiment of frequency-changeable compressor of the present invention is proposed.
Reference picture 2, Fig. 2 are the schematic flow sheet of the frequency adjustment method first embodiment of frequency-changeable compressor of the present invention.
In the first embodiment, the frequency adjustment method of the frequency-changeable compressor comprises the following steps:
Step S10, obtain the current operation frequency of frequency-changeable compressor;
Step S20, determine the frequency range in multiple working frequency sections corresponding to the frequency-changeable compressor;
Step S30, according to the current operation frequency and the frequency range in multiple working frequency sections, determine the change The working frequency section that frequency compressor is currently at;
Step S40, according to default working frequency section and the corresponding relation of frequency regulations speed, determine the frequency conversion pressure Frequency regulations speed corresponding to the working frequency section that contracting machine is currently at, and the change is adjusted according to the frequency regulations speed The running frequency of frequency compressor.
With the development of science and technology, frequency-changeable compressor is widely applied in air conditioner.For convertible frequency air-conditioner, with ring The change of border temperature, frequency-changeable compressor are needed from non-weak magnetic workspace raising frequency to weak magnetic workspace, or are dropped from weak magnetic workspace Frequency arrives non-weak magnetic workspace.Such as at low ambient temperatures, when convertible frequency air-conditioner run heating mode when, it is necessary to frequency-changeable compressor with High-frequency is run, and works in weak magnetic state of a control;And in high temperature environments, when convertible frequency air-conditioner runs refrigeration mode, it is necessary to become Frequency compressor is run with low frequency, works in non-weak magnetic state of a control.However, in frequency-changeable compressor running, not root According to the workspace being presently in, targetedly enter line frequency regulation so that the less stable of frequency-changeable compressor operation.
In order to improve the stability that frequency-changeable compressor enters line frequency regulation, the present invention proposes a kind of frequency of frequency-changeable compressor Rate adjusting method.In the present embodiment, by taking convertible frequency air-conditioner as an example, the frequency adjustment method of frequency-changeable compressor of the present invention is carried out in detail Explanation.
In the present embodiment, after convertible frequency air-conditioner is started shooting, in its frequency-changeable compressor running, convertible frequency air-conditioner in real time or Timing detects to the running frequency of frequency-changeable compressor, obtains the current operation frequency of frequency-changeable compressor.
Meanwhile convertible frequency air-conditioner determines the frequency range in multiple working frequency sections corresponding to frequency-changeable compressor.For example, in advance Working frequency section corresponding to setting frequency-changeable compressor includes weak magnetic working frequency section, non-weak magnetic working frequency section and mistake Frequency separation is crossed, then determines frequency range [A1, B1], non-weak magnetic working frequency section corresponding to weak magnetic working frequency section respectively Frequency range [A3, B3] corresponding to corresponding frequency range [A2, B2], transition frequency section.
It should be noted that the frequency range in each working frequency section can be according to the current operation feelings of frequency-changeable compressor Condition is determined, and for frequency-changeable compressor under different running situation, each working frequency section corresponds to different frequency ranges;Remove Beyond this, the frequency range in each working frequency section can also be pre-set fixed value.
So, according to the frequency range in each working frequency section, and the current operation frequency of frequency-changeable compressor, will become The current operation frequency of frequency compressor and the frequency range in each working frequency section are contrasted, it is possible to determine that frequency conversion is compressed The working frequency section that the current operation frequency of machine is in.For example, still by taking the above-mentioned example enumerated as an example, if frequency-changeable compressor Current operation frequency is located in the range of [A1, B1], it is determined that the current operation frequency of frequency-changeable compressor is in weak magnetic working frequency Section;If the current operation frequency of frequency-changeable compressor is located in the range of [A2, B2], it is determined that the current operation frequency of frequency-changeable compressor Rate is in non-weak magnetic working frequency section;If the current operation frequency of frequency-changeable compressor is located in the range of [A3, B3], it is determined that becomes The current operation frequency of frequency compressor is in transition frequency section.
In the present embodiment, the corresponding relation of working frequency section and frequency regulations speed is also previously provided with, wherein, it is different Working frequency section, corresponding different frequency regulations speed.For example, still by taking the above-mentioned example enumerated as an example, frequency-changeable compressor Corresponding working frequency section includes weak magnetic working frequency section, non-weak magnetic working frequency section and transition frequency section, weak Magnetic working frequency section respective frequencies regulations speed v1, non-weak magnetic working frequency section respective frequencies regulations speed v2, transition frequency Rate section respective frequencies regulations speed v3.
After the working frequency section that the current operation frequency that frequency-changeable compressor is determined is in, according to working frequency area Between corresponding relation with frequency regulations speed, determine that frequency corresponding to the working frequency section that current operation frequency is in is adjusted Speed.
For example, still by taking the above-mentioned example enumerated as an example, however, it is determined that the current operation frequency of frequency-changeable compressor is in weak magnetic work Working frequency section, then according to weak magnetic working frequency section respective frequencies regulations speed v1, determine that frequency-changeable compressor currently enters line frequency Frequency regulations speed corresponding to rate regulation is frequency regulations speed v1;If it is determined that the current operation frequency of frequency-changeable compressor is in non- Weak magnetic working frequency section, then according to non-weak magnetic working frequency section respective frequencies regulations speed v2, determine that frequency-changeable compressor is worked as Frequency regulations speed corresponding to the regulation of advance line frequency is frequency regulations speed v2;If it is determined that the current operation frequency of frequency-changeable compressor Rate is in transition frequency section, then according to transition frequency section respective frequencies regulations speed v3, determines frequency-changeable compressor when advance Frequency regulations speed corresponding to line frequency regulation is frequency regulations speed v3.
Afterwards, the frequency according to corresponding to the working frequency section that the current operation frequency of identified frequency-changeable compressor is in Regulations speed, the running frequency of frequency-changeable compressor is adjusted with the frequency regulations speed.Such as, however, it is determined that frequency-changeable compressor is worked as The working frequency section that preceding running frequency is in is weak magnetic working frequency section, and corresponding frequency regulations speed is frequency regulation speed Rate v1, then the running frequency of frequency-changeable compressor is adjusted according to frequency regulations speed v1;If it is determined that the current operation of frequency-changeable compressor The working frequency section that frequency is in is non-weak magnetic working frequency section, and corresponding frequency regulations speed is frequency regulations speed V2, then the running frequency of frequency-changeable compressor is adjusted according to frequency regulations speed v2;If it is determined that the current operation frequency of frequency-changeable compressor The working frequency section that rate is in is transition frequency section, and corresponding frequency regulations speed is frequency regulations speed v3, then basis Frequency regulations speed v3 adjusts the running frequency of frequency-changeable compressor.
The scheme that the present embodiment provides, by obtaining the current operation frequency of frequency-changeable compressor, and determine frequency conversion compression The frequency range in multiple working frequency sections corresponding to machine, so that it is determined that the working frequency section that frequency-changeable compressor is currently at, Then according to default working frequency section and the corresponding relation of frequency regulations speed, the work that frequency-changeable compressor is currently at is determined Frequency regulations speed corresponding to working frequency section, the running frequency of frequency-changeable compressor is adjusted according to the frequency regulations speed, so as to The working frequency section being currently at according to frequency-changeable compressor is realized, is targetedly entered using corresponding frequency regulations speed Line frequency is adjusted, and this improves the stability of frequency-changeable compressor operation.
Further, as shown in figure 3, proposing the frequency adjustment method the of frequency-changeable compressor of the present invention based on first embodiment Two embodiments, in the present embodiment, the working frequency section of frequency-changeable compressor include weak magnetic working frequency section, the work of non-weak magnetic Frequency separation and transition frequency section, the step S20 include:
Step S21, calculate the weak magnetic critical frequency of the frequency-changeable compressor;
Step S22, according to the weak magnetic critical frequency, determine weak magnetic working frequency area corresponding to the frequency-changeable compressor Between, the frequency range in non-weak magnetic working frequency section and transition frequency section.
In the present embodiment, in order to ensure that frequency-changeable compressor enters stability when line frequency is adjusted, it is determined that frequency-changeable compressor During the frequency range in corresponding multiple working frequency sections, the weak magnetic critical frequency of frequency-changeable compressor, Ran Hougen are calculated first According to the weak magnetic critical frequency of frequency-changeable compressor, to determine the weak magnetic working frequency section of frequency-changeable compressor, non-weak magnetic working frequency Section and the frequency range in transition frequency section.
Alternatively, the step S21 includes:
Step a, obtain corresponding to the frequency-changeable compressor inductive voltage value between weak magnetic voltage threshold and line;
Step b, according to inductive voltage value between the weak magnetic voltage threshold and the line, calculate and obtain the critical frequency of weak magnetic Rate.
During compressor operating, inductive voltage value between its corresponding weak magnetic voltage threshold and line is obtained, wherein, it is weak Magnetic voltage threshold is represented with phase voltage peak value, when output voltage exceedes weak magnetic voltage threshold, is added by reducing direct-axis current Deep weak magnetic, reduce output voltage;Induced voltage between line when inductive voltage value operates in 1000 revolutions per minute for frequency-changeable compressor between line Virtual value.
Alternatively, the step a includes:
Step a1, obtain DC bus-bar voltage corresponding to the frequency-changeable compressor;
Step a2, according to the DC bus-bar voltage, calculate and obtain the weak magnetic voltage threshold.
In order to obtain weak magnetic voltage threshold, in the present embodiment, it is necessary to obtain frequency conversion pressure in frequency-changeable compressor running DC bus-bar voltage corresponding to contracting machine, weak magnetic voltage threshold is obtained to calculate according to the DC bus-bar voltage.
Specifically, the step a2 includes:According to calculation formula V0=V2/K2* λ, calculate and obtain the weak magnetic voltage threshold Value;Wherein, the V0Represent the weak magnetic voltage threshold, the V2Represent the DC bus-bar voltage, the K2Represent that second is normal Parameter is measured, the λ represents variable parameter.
Assuming that weak magnetic voltage threshold V0Represent, DC bus-bar voltage V2Represent, getting corresponding to frequency-changeable compressor DC bus-bar voltage V2Afterwards, according to calculation formula V0=V2/K2* λ, calculate and obtain weak magnetic voltage threshold V0, wherein, K2Represent the One constant parameter, λ represent variable parameter.Preferably, K2Value is 31/2, λ spans are [0.90,1.05].
Getting between weak magnetic voltage threshold and line after inductive voltage value, sensing according between weak magnetic voltage threshold and line Magnitude of voltage, calculate and obtain weak magnetic critical frequency.
Specifically, the step b includes:According to calculation formula Fc=V0/V1*K1, calculate and obtain the critical frequency of weak magnetic Rate;Wherein, the Fc represents the weak magnetic critical frequency, the V0Represent the weak magnetic voltage threshold, the V1Represent the line Between inductive voltage value, the K1Represent the first constant parameter.
Assuming that weak magnetic critical frequency is represented with Fc, weak magnetic voltage threshold V0Represent, inductive voltage value V between line1Represent, Then getting weak magnetic voltage threshold V0And inductive voltage value V between line1Afterwards, according to calculation formula Fc=V0/V1*K1, calculating obtains Obtain weak magnetic critical frequency Fc.Wherein, K1Represent the first constant parameter, it is preferable that K1Value 20.41.
Alternatively, the step S22 includes:
Step c, the weak magnetic critical frequency and predeterminated frequency are subjected to read group total, first frequency corresponding to acquisition;
Step d, the weak magnetic critical frequency and the predeterminated frequency are carried out to ask poor calculating, the second frequency corresponding to acquisition Rate;
Step e, according to the first frequency and the second frequency, determine that weak magnetic corresponding to the frequency-changeable compressor works The frequency range of frequency separation, non-weak magnetic working frequency section and transition frequency section;Wherein, the first frequency is described The lower limit critical frequency in weak magnetic working frequency section, the second frequency are the upper critical in the non-weak magnetic working frequency section Frequency.
In the present embodiment, a predeterminated frequency Fr is also previously provided with, predeterminated frequency Fr concrete numerical value can be according to reality Situation is flexibly set, and is not restricted herein., will be weak after the weak magnetic critical frequency Fc for obtaining frequency-changeable compressor is calculated Magnetic critical frequency Fc and predeterminated frequency Fr carries out read group total, first frequency Fc+Fr corresponding to acquisition;And by weak magnetic critical frequency Fc and predeterminated frequency Fr carries out asking poor calculating, second frequency Fc-Fr corresponding to acquisition.Then, according to first frequency Fc+Fr and Two frequency Fc-Fr, first frequency Fc+Fr is defined as to the lower limit critical frequency and transition frequency in weak magnetic working frequency section The upper critical frequency in section;By second frequency Fc-Fr be defined as non-weak magnetic working frequency section upper critical frequency and The lower limit critical frequency in transition frequency section, so that it is determined that go out weak magnetic working frequency section, non-weak magnetic working frequency section and The frequency range in transition frequency section:
The frequency range in weak magnetic working frequency section is first frequency Fc+Fr to maximum running frequency;
The frequency range in non-weak magnetic working frequency section is 0Hz to second frequency Fc-Fr;
The frequency range in transition frequency section is second frequency Fc-Fr to first frequency Fc+Fr.
Alternatively, the step S40 includes:
Step f, when the frequency-changeable compressor is currently at non-weak magnetic working frequency section, according to the working frequency area Between corresponding relation with frequency regulations speed, it is first rate to determine the frequency regulations speed;
Step g, when the frequency-changeable compressor is currently at weak magnetic working frequency section, according to the working frequency section With the corresponding relation of frequency regulations speed, it is the second speed to determine the frequency regulations speed;
Step h, when the frequency-changeable compressor is currently at transition frequency section, according to the working frequency section and frequency The corresponding relation of rate regulations speed, it is third speed to determine the frequency regulations speed;
Wherein, the first rate is more than second speed, and second speed is more than the third speed.
In the present embodiment, in the corresponding relation of default working frequency section and frequency regulations speed, preset non- Frequency regulations speed corresponding to weak magnetic working frequency section is first rate, frequency regulation speed corresponding to weak magnetic working frequency section Rate is the second speed, and frequency regulations speed corresponding to transition frequency section is third speed.Wherein, first rate is more than the second speed Rate, and the second speed is more than third speed, namely first rate > the second speed > third speeds.
In the work it is determined that after the working frequency section that frequency-changeable compressor is currently at, being currently at according to frequency-changeable compressor Working frequency section, it is determined that corresponding frequency regulations speed.Specifically, when frequency-changeable compressor is currently at non-weak magnetic working frequency area Between when, according to working frequency section and the corresponding relation of frequency regulations speed, it is determined that corresponding frequency regulations speed is the first speed Rate;When frequency-changeable compressor is currently at weak magnetic working frequency section, according to working frequency section and pair of frequency regulations speed It should be related to, it is determined that corresponding frequency regulations speed is the second speed;When frequency-changeable compressor is currently at transition frequency section, root According to working frequency section and the corresponding relation of frequency regulations speed, it is determined that corresponding frequency regulations speed is third speed.Afterwards, According to identified frequency regulations speed, the running frequency of frequency-changeable compressor is adjusted.
It is understood that frequency regulations speed includes raising frequency speed and frequency reducing speed, in the present embodiment, for same For individual working frequency section, its corresponding raising frequency speed and frequency reducing speed can be identical rate value, or different Rate value.As shown in Figure 4 and Figure 5, in Fig. 4, raising frequency speed corresponding to non-weak magnetic working frequency section is the first raising frequency speed Rate, raising frequency speed corresponding to weak magnetic working frequency section are the second raising frequency speed, and raising frequency speed is corresponding to transition frequency section 3rd raising frequency speed.Wherein, the raising frequency speed of first raising frequency speed > the second raising frequency speed > the 3rd.In Figure 5, non-weak magnetic work Frequency reducing speed corresponding to frequency separation is the first frequency reducing speed, and frequency reducing speed corresponding to weak magnetic working frequency section is the second frequency reducing Speed, frequency reducing speed corresponding to transition frequency section are the 3rd frequency reducing speed.Wherein, first frequency reducing speed > the second frequency reducing speed The frequency reducing speed of > the 3rd.
It should be noted that the first raising frequency speed and the first frequency reducing speed can be identical value, or different value;Together Reason, the second raising frequency speed and the second frequency reducing speed can be identical value, or different value;3rd raising frequency speed and the 3rd drop Frequency speed can be identical value, or different value.
The scheme that the present embodiment provides, when it is determined that frequency-changeable compressor is currently at non-weak magnetic working frequency section, according to The running frequency of corresponding first rate regulation frequency-changeable compressor;When it is determined that frequency-changeable compressor is currently at weak magnetic working frequency area Between when, according to the running frequency of corresponding second rate adaptation frequency-changeable compressor;When it is determined that frequency-changeable compressor is currently at transition During frequency separation, the running frequency of frequency-changeable compressor is adjusted according to corresponding third speed, namely is realized in different work frequencies Rate section, the running frequency of frequency-changeable compressor is adjusted using different frequency regulations speeds, this improves frequency-changeable compressor The stability of operation.
In addition, the embodiment of the present invention also proposes a kind of computer-readable recording medium, the computer-readable recording medium On be stored with frequency-changeable compressor frequency regulation program, frequency-changeable compressor frequency regulation program is realized such as when being executed by processor Lower operation:
Obtain the current operation frequency of frequency-changeable compressor;
Determine the frequency range in multiple working frequency sections corresponding to the frequency-changeable compressor;
According to the current operation frequency and the frequency range in multiple working frequency sections, the frequency-changeable compressor is determined The working frequency section being currently at;
According to default working frequency section and the corresponding relation of frequency regulations speed, determine that the frequency-changeable compressor is current Frequency regulations speed corresponding to the working frequency section being in, and the frequency-changeable compressor is adjusted according to the frequency regulations speed Running frequency.
Further, the working frequency section include weak magnetic working frequency section, non-weak magnetic working frequency section and Transition frequency section, the frequency-changeable compressor frequency regulation program also realize following operation when being executed by processor:
Calculate the weak magnetic critical frequency of the frequency-changeable compressor;
According to the weak magnetic critical frequency, weak magnetic working frequency section, non-weak magnetic corresponding to the frequency-changeable compressor are determined Working frequency section and the frequency range in transition frequency section.
Further, following operation is also realized when the frequency-changeable compressor frequency regulation program is executed by processor:
The weak magnetic critical frequency and predeterminated frequency are subjected to read group total, first frequency corresponding to acquisition;
The weak magnetic critical frequency and the predeterminated frequency are carried out asking poor calculating, second frequency corresponding to acquisition;
According to the first frequency and the second frequency, weak magnetic working frequency area corresponding to the frequency-changeable compressor is determined Between, the frequency range in non-weak magnetic working frequency section and transition frequency section;Wherein, the first frequency is the weak magnetic work The lower limit critical frequency in working frequency section, the second frequency are the upper critical frequency in the non-weak magnetic working frequency section.
Further, following operation is also realized when the frequency-changeable compressor frequency regulation program is executed by processor:
Obtain corresponding to the frequency-changeable compressor inductive voltage value between weak magnetic voltage threshold and line;
According to inductive voltage value between the weak magnetic voltage threshold and the line, calculate and obtain the weak magnetic critical frequency.
Further, following operation is also realized when the frequency-changeable compressor frequency regulation program is executed by processor:
According to calculation formula Fc=V0/V1*K1, calculate and obtain the weak magnetic critical frequency;Wherein, described in the Fc is represented Weak magnetic critical frequency, the V0Represent the weak magnetic voltage threshold, the V1Represent inductive voltage value between the line, the K1Table Show the first constant parameter.
Further, following operation is also realized when the frequency-changeable compressor frequency regulation program is executed by processor:
Obtain DC bus-bar voltage corresponding to the frequency-changeable compressor;
According to the DC bus-bar voltage, calculate and obtain the weak magnetic voltage threshold.
Further, following operation is also realized when the frequency-changeable compressor frequency regulation program is executed by processor:
According to calculation formula V0=V2/K2* λ, calculate and obtain the weak magnetic voltage threshold;Wherein, the V0Represent described weak Magnetic voltage threshold, the V2Represent the DC bus-bar voltage, the K2The second constant parameter is represented, the λ represents variable ginseng Number.
Further, following operation is also realized when the frequency-changeable compressor frequency regulation program is executed by processor:
When the frequency-changeable compressor is currently at non-weak magnetic working frequency section, according to the working frequency section and frequency The corresponding relation of rate regulations speed, it is first rate to determine the frequency regulations speed;
When the frequency-changeable compressor is currently at weak magnetic working frequency section, according to the working frequency section and frequency The corresponding relation of regulations speed, it is the second speed to determine the frequency regulations speed;
When the frequency-changeable compressor is currently at transition frequency section, adjusted according to the working frequency section and frequency The corresponding relation of speed, it is third speed to determine the frequency regulations speed;
Wherein, the first rate is more than second speed, and second speed is more than the third speed.
It should be noted that herein, term " comprising ", "comprising" or its any other variant are intended to non-row His property includes, so that process, method, article or system including a series of elements not only include those key elements, and And also include the other element being not expressly set out, or also include for this process, method, article or system institute inherently Key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that including this Other identical element also be present in the process of key element, method, article or system.
The embodiments of the present invention are for illustration only, do not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases The former is more preferably embodiment.Based on such understanding, technical scheme is substantially done to prior art in other words Going out the part of contribution can be embodied in the form of software product, and the computer software product is stored in one as described above In storage medium (such as ROM/RAM, magnetic disc, CD), including some instructions to cause a station terminal equipment (can be mobile phone, Computer, server, or network equipment etc.) perform method described in each embodiment of the present invention.
The preferred embodiments of the present invention are these are only, are not intended to limit the scope of the invention, it is every to utilize this hair The equivalent structure or equivalent flow conversion that bright specification and accompanying drawing content are made, or directly or indirectly it is used in other related skills Art field, is included within the scope of the present invention.

Claims (10)

  1. A kind of 1. frequency adjustment method of frequency-changeable compressor, it is characterised in that the frequency adjustment method bag of the frequency-changeable compressor Include following steps:
    Obtain the current operation frequency of frequency-changeable compressor;
    Determine the frequency range in multiple working frequency sections corresponding to the frequency-changeable compressor;
    According to the current operation frequency and the frequency range in multiple working frequency sections, determine that the frequency-changeable compressor is current The working frequency section being in;
    According to default working frequency section and the corresponding relation of frequency regulations speed, determine that the frequency-changeable compressor is currently at Working frequency section corresponding to frequency regulations speed, and adjust according to the frequency regulations speed fortune of the frequency-changeable compressor Line frequency.
  2. 2. the frequency adjustment method of frequency-changeable compressor as claimed in claim 1, it is characterised in that the working frequency section bag Weak magnetic working frequency section, non-weak magnetic working frequency section and transition frequency section are included, it is described to determine the frequency-changeable compressor The step of frequency range in corresponding multiple working frequency sections, includes:
    Calculate the weak magnetic critical frequency of the frequency-changeable compressor;
    According to the weak magnetic critical frequency, weak magnetic working frequency section corresponding to the frequency-changeable compressor, the work of non-weak magnetic are determined Frequency separation and the frequency range in transition frequency section.
  3. 3. the frequency adjustment method of frequency-changeable compressor as claimed in claim 2, it is characterised in that described to be faced according to the weak magnetic Boundary's frequency, determine weak magnetic working frequency section corresponding to the frequency-changeable compressor, non-weak magnetic working frequency section and transition frequency The step of frequency range in rate section, includes:
    The weak magnetic critical frequency and predeterminated frequency are subjected to read group total, first frequency corresponding to acquisition;
    The weak magnetic critical frequency and the predeterminated frequency are carried out asking poor calculating, second frequency corresponding to acquisition;
    According to the first frequency and the second frequency, determine weak magnetic working frequency section corresponding to the frequency-changeable compressor, The frequency range in non-weak magnetic working frequency section and transition frequency section;Wherein, the first frequency works for the weak magnetic The lower limit critical frequency of frequency separation, the second frequency are the upper critical frequency in the non-weak magnetic working frequency section.
  4. 4. the frequency adjustment method of frequency-changeable compressor as claimed in claim 2, it is characterised in that described to calculate the frequency conversion pressure The step of weak magnetic critical frequency of contracting machine, includes:
    Obtain corresponding to the frequency-changeable compressor inductive voltage value between weak magnetic voltage threshold and line;
    According to inductive voltage value between the weak magnetic voltage threshold and the line, calculate and obtain the weak magnetic critical frequency.
  5. 5. the frequency adjustment method of frequency-changeable compressor as claimed in claim 4, it is characterised in that described according to weak magnetic electricity Inductive voltage value between threshold value and the line is pressed, calculating the step of obtaining the weak magnetic critical frequency includes:
    According to calculation formula Fc=V0/V1*K1, calculate and obtain the weak magnetic critical frequency;Wherein, the Fc represents the weak magnetic Critical frequency, the V0Represent the weak magnetic voltage threshold, the V1Represent inductive voltage value between the line, the K1Represent the One constant parameter.
  6. 6. the frequency adjustment method of frequency-changeable compressor as claimed in claim 4, it is characterised in that described to obtain the frequency conversion pressure Include corresponding to contracting machine the step of weak magnetic voltage threshold:
    Obtain DC bus-bar voltage corresponding to the frequency-changeable compressor;
    According to the DC bus-bar voltage, calculate and obtain the weak magnetic voltage threshold.
  7. 7. the frequency adjustment method of frequency-changeable compressor as claimed in claim 6, it is characterised in that described female according to the direct current Line voltage, calculating the step of obtaining the weak magnetic voltage threshold includes:
    According to calculation formula V0=V2/K2* λ, calculate and obtain the weak magnetic voltage threshold;Wherein, the V0Represent the weak magnetic electricity Press threshold value, the V2Represent the DC bus-bar voltage, the K2The second constant parameter is represented, the λ represents variable parameter.
  8. 8. the frequency adjustment method of the frequency-changeable compressor as described in claim any one of 2-7, it is characterised in that the basis is pre- If working frequency section and frequency regulations speed corresponding relation, determine the working frequency that the frequency-changeable compressor is currently at Include corresponding to section the step of frequency regulations speed:
    When the frequency-changeable compressor is currently at non-weak magnetic working frequency section, adjusted according to the working frequency section and frequency The corresponding relation of speed is saved, it is first rate to determine the frequency regulations speed;
    When the frequency-changeable compressor is currently at weak magnetic working frequency section, adjusted according to the working frequency section and frequency The corresponding relation of speed, it is the second speed to determine the frequency regulations speed;
    When the frequency-changeable compressor is currently at transition frequency section, according to the working frequency section and frequency regulations speed Corresponding relation, it is third speed to determine the frequency regulations speed;
    Wherein, the first rate is more than second speed, and second speed is more than the third speed.
  9. A kind of 9. frequency regulation arrangement of frequency-changeable compressor, it is characterised in that the frequency regulation arrangement bag of the frequency-changeable compressor Include:The frequency-changeable compressor frequency that memory, processor and being stored in can be run on the memory and on the processor is adjusted Program is saved, the frequency-changeable compressor frequency realizes following steps when adjusting program by the computing device:
    Obtain the current operation frequency of frequency-changeable compressor;
    Determine the frequency range in multiple working frequency sections corresponding to the frequency-changeable compressor;
    According to the current operation frequency and the frequency range in multiple working frequency sections, determine that the frequency-changeable compressor is current The working frequency section being in;
    According to default working frequency section and the corresponding relation of frequency regulations speed, determine that the frequency-changeable compressor is currently at Working frequency section corresponding to frequency regulations speed, and adjust according to the frequency regulations speed fortune of the frequency-changeable compressor Line frequency.
  10. 10. a kind of computer-readable recording medium, it is characterised in that frequency conversion pressure is stored with the computer-readable recording medium Contracting unit frequency adjusts program, and the frequency-changeable compressor frequency regulation program realizes following steps when being executed by processor:
    Obtain the current operation frequency of frequency-changeable compressor;
    Determine the frequency range in multiple working frequency sections corresponding to the frequency-changeable compressor;
    According to the current operation frequency and the frequency range in multiple working frequency sections, determine that the frequency-changeable compressor is current The working frequency section being in;
    According to default working frequency section and the corresponding relation of frequency regulations speed, determine that the frequency-changeable compressor is currently at Working frequency section corresponding to frequency regulations speed, and adjust according to the frequency regulations speed fortune of the frequency-changeable compressor Line frequency.
CN201710637800.8A 2017-07-28 2017-07-28 Frequency adjusting method and device of variable frequency compressor and readable storage medium Active CN107449192B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710637800.8A CN107449192B (en) 2017-07-28 2017-07-28 Frequency adjusting method and device of variable frequency compressor and readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710637800.8A CN107449192B (en) 2017-07-28 2017-07-28 Frequency adjusting method and device of variable frequency compressor and readable storage medium

Publications (2)

Publication Number Publication Date
CN107449192A true CN107449192A (en) 2017-12-08
CN107449192B CN107449192B (en) 2019-12-20

Family

ID=60489786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710637800.8A Active CN107449192B (en) 2017-07-28 2017-07-28 Frequency adjusting method and device of variable frequency compressor and readable storage medium

Country Status (1)

Country Link
CN (1) CN107449192B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173942A (en) * 2018-02-21 2019-08-27 松下知识产权经营株式会社 Refrigerating plant
CN111238099A (en) * 2018-11-28 2020-06-05 青岛海尔空调电子有限公司 Compressor flux weakening control device, air conditioner, method and storage medium
CN113294935A (en) * 2021-05-27 2021-08-24 广东纽恩泰新能源科技发展有限公司 Frequency adjusting method and device for heat pump frequency conversion unit
CN115468293A (en) * 2022-09-05 2022-12-13 宁波奥克斯电气股份有限公司 Compressor frequency segmented adjusting method and device and air conditioner

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4326066A1 (en) * 1993-07-27 1995-02-09 Lin Che Tzu Control for an electric car radiator fan
KR20000032662A (en) * 1998-11-17 2000-06-15 구자홍 Method of operating air conditioner
KR20010037409A (en) * 1999-10-16 2001-05-07 구자홍 Method for Compressor voltage control in inverter air conditioner
CN104266305A (en) * 2014-09-02 2015-01-07 广东美的集团芜湖制冷设备有限公司 Variable-frequency air conditioner control device and method and variable-frequency air conditioner
CN104676840A (en) * 2015-02-28 2015-06-03 广东美的制冷设备有限公司 Control method and control device for compressor in air conditioner
CN105091252A (en) * 2015-09-23 2015-11-25 广东美的制冷设备有限公司 Control method and system of PFC circuit in air conditioner and air conditioner
CN105610368A (en) * 2016-01-14 2016-05-25 广东美芝制冷设备有限公司 Weak magnetic control method and device of compressor and compressor control system
JP2016136820A (en) * 2015-01-23 2016-07-28 アスモ株式会社 Motor drive device
CN106452249A (en) * 2016-12-08 2017-02-22 海信(山东)空调有限公司 Perpetual magnet synchronous motor control method and control device and air conditioner
CN106712630A (en) * 2016-12-26 2017-05-24 广东美的制冷设备有限公司 Permanent magnetic synchronous motor system, field weakening control method thereof, and field weakening control device thereof
WO2017122264A1 (en) * 2016-01-12 2017-07-20 三菱電機株式会社 Air conditioner

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4326066A1 (en) * 1993-07-27 1995-02-09 Lin Che Tzu Control for an electric car radiator fan
KR20000032662A (en) * 1998-11-17 2000-06-15 구자홍 Method of operating air conditioner
KR20010037409A (en) * 1999-10-16 2001-05-07 구자홍 Method for Compressor voltage control in inverter air conditioner
CN104266305A (en) * 2014-09-02 2015-01-07 广东美的集团芜湖制冷设备有限公司 Variable-frequency air conditioner control device and method and variable-frequency air conditioner
JP2016136820A (en) * 2015-01-23 2016-07-28 アスモ株式会社 Motor drive device
CN104676840A (en) * 2015-02-28 2015-06-03 广东美的制冷设备有限公司 Control method and control device for compressor in air conditioner
CN105091252A (en) * 2015-09-23 2015-11-25 广东美的制冷设备有限公司 Control method and system of PFC circuit in air conditioner and air conditioner
WO2017122264A1 (en) * 2016-01-12 2017-07-20 三菱電機株式会社 Air conditioner
CN105610368A (en) * 2016-01-14 2016-05-25 广东美芝制冷设备有限公司 Weak magnetic control method and device of compressor and compressor control system
CN106452249A (en) * 2016-12-08 2017-02-22 海信(山东)空调有限公司 Perpetual magnet synchronous motor control method and control device and air conditioner
CN106712630A (en) * 2016-12-26 2017-05-24 广东美的制冷设备有限公司 Permanent magnetic synchronous motor system, field weakening control method thereof, and field weakening control device thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173942A (en) * 2018-02-21 2019-08-27 松下知识产权经营株式会社 Refrigerating plant
CN111238099A (en) * 2018-11-28 2020-06-05 青岛海尔空调电子有限公司 Compressor flux weakening control device, air conditioner, method and storage medium
US11480374B2 (en) 2018-11-28 2022-10-25 Qingdao Haier Air-Conditioning Electronic Co., Ltd. Device and method for field weakening control of compressor, air conditioner and storage medium
CN113294935A (en) * 2021-05-27 2021-08-24 广东纽恩泰新能源科技发展有限公司 Frequency adjusting method and device for heat pump frequency conversion unit
CN115468293A (en) * 2022-09-05 2022-12-13 宁波奥克斯电气股份有限公司 Compressor frequency segmented adjusting method and device and air conditioner

Also Published As

Publication number Publication date
CN107449192B (en) 2019-12-20

Similar Documents

Publication Publication Date Title
CN107449192A (en) Frequency adjustment method, device and the readable storage medium storing program for executing of frequency-changeable compressor
CN107314510A (en) Frequency adjustment method, device and the computer-readable recording medium of frequency-changeable compressor
CN104879888B (en) The automatic setting method and device of family's electrical parameter
CN107576016A (en) The control method and system of air-conditioning
CN105117184B (en) Connection control method and system for screen of vehicle and mobile phone
CN107507602A (en) Screen intensity Automatic adjustment method, terminal and storage medium
CN106292990A (en) The method of adjustment of CPU operational factor and terminal
CN107192179A (en) The control method and computer-readable recording medium of air conditioner and electric expansion valve
CN103982977A (en) Sleep temperature control method and device
CN110553349B (en) Control method of air conditioner, air conditioner and storage medium
CN108534314A (en) Control method, air conditioner and the computer readable storage medium of air conditioner
CN110425703A (en) A kind of starting method, storage medium and the air-conditioning of compressor of air conditioner
CN109579236A (en) Control method, air conditioner and the computer readable storage medium of air conditioner
CN107084556A (en) Control method, device and the computer-readable recording medium of condenser
CN107514751A (en) Control method, device and the air conditioner of air conditioner
CN105338448B (en) Audio controlling method and device
CN110940059A (en) Air conditioning equipment control method, device and equipment
CN108175332A (en) Dust catcher dust collection method, dust catcher and computer readable storage medium
CN108736788A (en) Switching method, air conditioner and the computer readable storage medium of pfc circuit
CN111880513A (en) Test circuit and test method of device to be tested
CN111524439A (en) Control method for simulation tool of compressor
CN105571080B (en) The control method and air conditioner of air conditioner
CN107575993A (en) The new blower control method of multiple, device and computer-readable recording medium
CN107421066A (en) Control method, device, computer-readable storage medium and the air-conditioning system of air-conditioning system
CN115395534A (en) Frequency droop control method and device for photovoltaic inverter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant