CN107449138A - Heat chamber structure and integral type water heater arrangement - Google Patents

Heat chamber structure and integral type water heater arrangement Download PDF

Info

Publication number
CN107449138A
CN107449138A CN201710657200.8A CN201710657200A CN107449138A CN 107449138 A CN107449138 A CN 107449138A CN 201710657200 A CN201710657200 A CN 201710657200A CN 107449138 A CN107449138 A CN 107449138A
Authority
CN
China
Prior art keywords
plate
heating
chamber
intermediate cavity
heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710657200.8A
Other languages
Chinese (zh)
Inventor
何成鹏
邹柳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Xinxin Heating Technology Co Ltd
Original Assignee
Wuhan Xinxin Heating Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Xinxin Heating Technology Co Ltd filed Critical Wuhan Xinxin Heating Technology Co Ltd
Priority to CN201710657200.8A priority Critical patent/CN107449138A/en
Publication of CN107449138A publication Critical patent/CN107449138A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/18Water-storage heaters
    • F24H1/20Water-storage heaters with immersed heating elements, e.g. electric elements or furnace tubes
    • F24H1/201Water-storage heaters with immersed heating elements, e.g. electric elements or furnace tubes using electric energy supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/02Casings; Cover lids; Ornamental panels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/16Arrangements for water drainage 
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/18Arrangement or mounting of grates or heating means
    • F24H9/1809Arrangement or mounting of grates or heating means for water heaters
    • F24H9/1818Arrangement or mounting of electric heating means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2014Arrangement or mounting of control or safety devices for water heaters using electrical energy supply
    • F24H9/2021Storage heaters

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Resistance Heating (AREA)

Abstract

The invention discloses one kind heating chamber structure and integral type water heater arrangement, it is related to water circulation technical field, it includes heater and the warehouse being arranged on fixed support, warehouse is set in low dip after preceding height, heater is arranged in warehouse, and upper hang plate raises up to form hollow boss close to the position of front end;Left clapboard and right clapboard are vertically arranged with warehouse, left clapboard offers the water inlet pod apertures for connecting left chamber and intermediate cavity, and left plate is provided with the water inlet pipe connected with left chamber;Right clapboard offers the water outlet pod apertures for connecting right chamber room and intermediate cavity, and the position on close right side is provided with the outlet pipe with right chamber at the top of boss;Have between right clapboard and the inner roof wall of bubble collecting chamber and connect bubble collecting chamber and the spaced slot of right chamber room;Lower hang plate is provided with sewage draining exit close to the position of lower end;The swash plate that leans forward part corresponding with intermediate cavity is provided with opening, and heater is inserted into intermediate cavity by the opening.

Description

Heat chamber structure and integral type water heater arrangement
Technical field
The present invention relates to water circulation technical field, is specifically a kind of heating chamber structure and integral type water heater arrangement.
Background technology
With the development of the society, people also increase to the demand in market.State-of-the-art concentrate in countries in the world is used for reference to supply Thermal technology and experience, it is contemplated that various boiler types, end use application situation, properties of product, design, product is supporting to be chosen, Control of product mode etc. factor, while amenity is ensured, product energy consumption is reduced to greatest extent.Matched Damage and maintenance are accomplished ultimate attainment.It is also most simple, intuitive that the identification of one top commodity, which is got up, and it must allow people one to hope i.e. Know product, there need to be higher technique attainment.Such special-shaped heating cabinet product is generated immediately
The above is only used for the technical scheme that auxiliary understands patent of the present invention, does not represent and recognizes that the above is existing Technology.
The content of the invention
For defect present in prior art, it is an object of the invention to provide one kind heating chamber structure and integral type heat Hydrophone equipment, its space availability ratio is set to reach maximization the alteration of form of heating cabinet according to heat form, so as to greatly improve The space utilization rate of heating cabinet.This heating cabinet is arranged in the heating cabinet in fever tablet with modularization, and after-sales service is more square Just, the clean of inside can be reached after incrustation scale is removed directly by bottom switch..
To achieve the above objectives, the present invention adopts the technical scheme that:One kind heating chamber structure, including heater and set The warehouse on fixed support is put, the warehouse is set in low dip after preceding height, is by upper hang plate, lower hang plate, top rake The rectangular parallelepiped structure that plate, hypsokinesis swash plate, left plate, right plate surround, the heater are arranged in warehouse, the upper inclination Plate raises up to form hollow boss close to the position of front end;Left clapboard and right clapboard are vertically arranged with the warehouse, will Left chamber, intermediate cavity and right chamber room are divided into inside warehouse, and the part that intermediate cavity is located in boss is collected as bubble Chamber;The left clapboard offers the water inlet pod apertures for connecting left chamber and intermediate cavity, and left plate is provided with and left chamber The water inlet pipe of room connection;The right clapboard offers the water outlet pod apertures for connecting right chamber room and intermediate cavity, and boss top Portion is provided with the outlet pipe with right chamber close to the position on right side;Between the inner roof wall of right clapboard and the bubble collecting chamber With spaced slot, the spaced slot is used to connect bubble collecting chamber and right chamber room;The lower hang plate is close to the position of lower end It is provided with sewage draining exit;The swash plate that leans forward is corresponding with intermediate cavity to be partly provided with opening, and the heater is opened by this Mouth is inserted into intermediate cavity.
On the basis of above-mentioned technical proposal, the heater includes heating plate group, middle connecting plate connects with bottom Plate, wherein, the rear end of heating plate group is inserted into intermediate cavity, and the front end of heating plate group passes opening;The middle connecting plate Sequentially pass through the front end of heating plate group from the front to the back with bottom connecting plate, and be fixedly connected with the swash plate that leans forward.
On the basis of above-mentioned technical proposal, the middle connecting plate is provided with some first connecting holes, and the swash plate that leans forward is set It is equipped with some first screws corresponding with the first connecting hole;The middle connecting plate is connected by some first screws through first Hole is connect, spinning is in the first screw to lean forward on swash plate.
On the basis of above-mentioned technical proposal, the bottom connecting plate is provided with some second connecting holes, middle connecting plate It is provided with some second screws corresponding with the second connecting hole;The bottom connecting plate passes through second by some second screws Connecting hole, spinning is in the second screw on middle connecting plate.
On the basis of above-mentioned technical proposal, each heating plate in the heating plate group is arranged in array.
On the basis of above-mentioned technical proposal, the heater also includes being arranged on some of bottom connecting plate leading flank Press strip, each press strip are used for the leading section for compressing fixed heating plate group.
On the basis of above-mentioned technical proposal, the lateral surface of the swash plate that leans forward is installed along opening edge along a circle is offered Groove, sealing ring is provided with mounting groove.
On the basis of above-mentioned technical proposal, the angle of inclination of the heating plate group is consistent with the angle of inclination of warehouse.
On the basis of above-mentioned technical proposal, the lateral surface of the swash plate that leans forward offers mounting hole, and temperature inductor leads to Cross the lateral surface that the mounting hole is fixed on the swash plate that leans forward.
Invention additionally discloses a kind of integral type water heater arrangement, including water tank and electrical control cubicles, it is provided with and adds in the electrical control cubicles Hot chamber structure and power water pump body, pump head is provided with the power water pump body, the pump head passes through pipe fitting and connected with heating chamber structure Connect, the heating chamber structure is any of the above-described heating chamber structure.
The beneficial effects of the present invention are:
1st, in the present invention, lower hang plate is provided with sewage draining exit close to the position of lower end;Swash plate and the intermediate cavity of leaning forward Corresponding part is provided with opening, and the heater is inserted into intermediate cavity by the opening.When the water in intermediate cavity After heated generation incrustation scale, it can directly unload installed in the heater to lean forward on swash plate, heating cabinet is directly cleaned by opening Inside, then by sewage draining exit blowdown, it can so prevent heating cabinet because of impurity blocking water channel caused by fouling.
2nd, in the present invention, heater includes heating plate group, middle connecting plate and bottom connecting plate, wherein, heating plate group Rear end be inserted into intermediate cavity, the front end of heating plate group passes opening;The middle connecting plate and bottom connecting plate are by preceding The front end of heating plate group is sequentially passed through backward, and is fixedly connected with the swash plate that leans forward.Will all heating plates be all gathered in one Reheated after playing composition heating plate group, so increase water application efficiency, in addition, such a mode have in after-sales service it is very big excellent Gesture, it when one of fever tablet breaks down, can at any time change, accomplish efficient and convenient whenever and wherever possible.
3rd, in the present invention, there is spaced slot, the spaced slot is used between the inner roof wall of right clapboard and bubble collecting chamber Connect bubble collecting chamber and right chamber room;When the fever tablet group heating in intermediate cavity, caused bubble rises to bubble automatically In collecting chamber, then enter right chamber room through spaced slot with current, then discharged from outlet pipe.
4th, in the present invention, left clapboard offers the water inlet pod apertures for connecting left chamber and intermediate cavity, and right clapboard is opened Provided with the water outlet pod apertures for connecting right chamber room and intermediate cavity., can be with by setting water inlet pod apertures and water outlet pod apertures Water conservancy diversion is carried out to the current for flowing into/flowing out intermediate cavity so that the efficiency of fever tablet, which utilizes, reaches maximization.
5th, in the present invention, the angle of inclination of heating plate group is consistent with the angle of inclination of warehouse.I.e. heating plate group respectively with it is upper Hang plate, lower hang plate keeping parallelism state, can now ensure fever tablet by water inlet rinse when ensure a direction and Even radiating.
6th, in the present invention, the lateral surface for the swash plate that leans forward offers mounting hole, and temperature inductor is fixed on by the mounting hole Lean forward the lateral surface of swash plate.Water temperature inside heating cabinet can be measured by temperature inductor, greatly reducing other installations Workpiece and follow-up cumbersome thermometric, it is safe and efficient when greatly improving use.
7th, in the present invention, the lateral surface for the swash plate that leans forward is provided with along opening edge along a circle mounting groove is offered in mounting groove Sealing ring.Middle connecting plate is provided with some first connecting holes, and the swash plate that leans forward is provided with some corresponding with the first connecting hole First screw;The middle connecting plate passes through the first connecting hole by some first screws, and spinning is leaning forward first on swash plate In screw.By sealing ring with middle connecting plate and lean forward swash plate pick up come then it is directly connected with screw, form one Individual complete heated sealed warehouse, avoids the generation of drainage.
Brief description of the drawings
Fig. 1 is the stereogram that chamber structure is heated in the embodiment of the present invention;
Fig. 2 is the explosive view that chamber structure is heated in the embodiment of the present invention;
Fig. 3 is the sectional view that chamber structure is heated in the embodiment of the present invention;
Fig. 4 is the structural representation of heating plate group and middle connecting plate in the embodiment of the present invention;
Fig. 5 is the stereogram of middle warehouse of the embodiment of the present invention;
Fig. 6 is that Fig. 5 removes the structural representation after the swash plate that leans forward;
Fig. 7 is the stereogram at another visual angle of middle warehouse of the embodiment of the present invention;
Fig. 8 is the front view of middle warehouse of the embodiment of the present invention;
Fig. 9 is Fig. 8 right view;
Figure 10 is Fig. 8 left view;
Figure 11 is Fig. 8 rearview;
Figure 12 be Figure 11 in D-D to sectional view;
Figure 13 is the enlarged diagram of E parts in Figure 12;
Figure 14 is the stereogram of integral type water heater arrangement in the embodiment of the present invention.
Reference:
1- warehouses;
100- leans forward swash plate;101- is open;102- sealing rings;The screws of 103- first;104- mounting holes;105- temperature senses Device;
110- hypsokinesis swash plates;
The upper hang plates of 120-;
Hang plate under 130-;131- sewage draining exits;
140- left plates;141- left clapboards;142- left chamber;143- water inlet pod apertures;144- water inlet pipes;
150- right plates;151- right clapboards;152- right chambers room;153- water outlet pod apertures;154- spaced slots;
160- intermediate cavities;
170- boss;171- bubble collecting chambers;172- outlet pipes.
2- heaters;
200- middle connecting plates;The connecting holes of 201- first;The screws of 202- second;
210- heating plate groups;
220- bottom connecting plates;The connecting holes of 221- second;
230- press strips.
3- fixed supports;4- electrical control cubicles;5- water tanks.
Embodiment
Embodiments of the invention are described below in detail, described embodiment example is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or the element with same or like function.
In the description of the invention, it is necessary to which explanation, for the noun of locality, " " center ", " laterally (X) ", " is indulged if any term To (Y) ", " vertical (Z) ", " length ", " width ", " thickness ", " on ", " under ", "front", "rear", "left", "right", " vertical ", The indicating position such as " level ", " top ", " bottom ", " interior ", " outer ", " clockwise ", " counterclockwise " and position relationship is based on accompanying drawing institutes The orientation or position relationship shown, it is for only for ease of the narration present invention and simplifies description, rather than instruction or the dress for implying meaning Put or element there must be specific orientation, be constructed and operated with particular orientation, it is impossible to be interpreted as the specific guarantor of the limitation present invention Protect scope.
In addition, be only used for describing purpose if any term " first ", " second ", and it is not intended that indicating or implying relatively heavy The property wanted or the implicit quantity for indicating technical characteristic.Thus, " first " is defined, " second " feature can be expressed or implicit include One or more this feature, in the present description, " several ", " some " are meant that two or more, unless separately There is clearly specific limit.
In the present invention, except as otherwise clear stipulaties and restriction, should make if any term " assembling ", " connected ", " connection " term Broad sense is gone to understand, for example, it may be being fixedly connected or being detachably connected, or is integrally connected;Can also be that machinery connects Connect;Can be joined directly together or be connected by intermediary, can be that two element internals are connected.For ability For the those of ordinary skill of domain, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
With reference to the accompanying drawing of specification, by being further described to the embodiment of the present invention, make this hair Bright technical scheme and its advantage is clearer, clear and definite.It is exemplary, purport to describe embodiment below with reference to accompanying drawing The present invention is being explained, and is being not considered as limiting the invention.
Chamber structure, including heater 2 and setting are heated referring to shown in Fig. 1 and Fig. 2, the embodiments of the invention provide one kind Warehouse 1 on fixed support 3, the present embodiment middle warehouse 1 are made up of stainless steel welded, have both enhanced the intensity of heating cabinet, again It can prevent heating cabinet internal rust from causing iron rust to block pipeline.
Referring to shown in Fig. 8, Fig. 9 and Figure 10, warehouse 1 is set in low dip after preceding height, is by upper hang plate 120, lower inclination The rectangular parallelepiped structure that plate 130, the swash plate 100 that leans forward, hypsokinesis swash plate 110, left plate 140, right plate 150 surround, it is preferred that have a down dip Horizontal segment is provided between swash plate 130 and hypsokinesis swash plate 110, the horizontal segment coordinates fixed support 3 to increase heating chamber structure Stability.Heater 2 is arranged in warehouse 1, upper hang plate 120 raised up close to the position of front end to be formed it is hollow convex Platform 170;Left clapboard 141 and right clapboard 151 are vertically arranged with warehouse 1, left chamber 142, intermediate cavity will be divided into inside warehouse 1 Room 160 and right chamber room 152, and intermediate cavity 160 is located at part in boss 170 as bubble collecting chamber 171;
Referring to shown in Fig. 5, Fig. 6 and Fig. 7, left clapboard 141 is offered for connecting left chamber 142 and intermediate cavity 160 Intake pod apertures 143, pod apertures 143 of intaking in the present embodiment be square opening, and pod apertures 143 of intaking are slotting with heating plate group 210 The part for entering intermediate cavity 160 is corresponding;Left plate 140 is provided with the water inlet pipe 144 connected with left chamber 142;Preferably, should Water inlet pipe 144 is located at the middle part of left plate 140, and it is corresponding to insert the part of intermediate cavity 160 with heating plate group 210, energy during water inlet Enough in all heating plates are flushed to, the heat of all fever tablets is set fully to be discharged.
Right clapboard 151 offers the water outlet pod apertures 153 for connecting right chamber room 152 and intermediate cavity 160, the present embodiment Middle water outlet pod apertures 153 are square opening, and water outlet pod apertures 153 are relative with the part of the insertion intermediate cavity 160 of heating plate group 210 Should;By setting water inlet pod apertures and water outlet pod apertures, water conservancy diversion can be carried out to the current for flowing into/flowing out intermediate cavity so that The efficiency of fever tablet, which utilizes, reaches maximization.The top of boss 170 is provided with to go out with what right chamber room 152 connected close to the position on right side Water pipe 172, outlet pipe 172 is 90 degree of bend pipes in the present embodiment, and the direction of its delivery port can to the left can also be to the right;
Referring to shown in Figure 11, Figure 12 and Figure 13, there is interval between the inner roof wall of right clapboard 151 and bubble collecting chamber 171 Gap 154, the spaced slot 154 are used to connect bubble collecting chamber 171 and right chamber room 152;In the present embodiment, spaced slot 154 Size be 3mm, when in intermediate cavity fever tablet group heating when, caused bubble rises in bubble collecting chamber automatically, so Enter right chamber room through spaced slot with current afterwards, then discharged from outlet pipe.
Lower hang plate 130 is provided with sewage draining exit 131 close to the position of lower end;The swash plate 100 that leans forward is corresponding with intermediate cavity 160 Part be provided with opening 101, heater 2 is inserted into intermediate cavity 160 by the opening 101.When in intermediate cavity After the heated generation incrustation scale of water, it can directly unload installed in the heater to lean forward on swash plate, heating is directly cleaned by opening Inside storehouse, then by sewage draining exit blowdown, it can so prevent heating cabinet because of impurity blocking water channel caused by fouling.
Referring to shown in Fig. 3 and Fig. 4, heater 2 includes heating plate group 210, middle connecting plate 200 and bottom connecting plate 220, wherein, the rear end of heating plate group 210 is inserted into intermediate cavity 160, and the front end of heating plate group 210 passes opening 101;In Between connecting plate 200 and bottom connecting plate 220 sequentially pass through the front end of heating plate group 210 from the front to the back, it is and solid with the swash plate 100 that leans forward Fixed connection.Heating plate that will be all flocks together and reheated after composition heating plate group, so increases water application efficiency, separately Outside, such a mode has very big advantage in after-sales service, can at any time more when one of fever tablet breaks down Change, accomplish efficient and convenient whenever and wherever possible.The way in common heating storehouse is that heating plate is individually mounted in heating cabinet, and in the present invention For all fever tablets are all combined, the form as portion's dress exists the way of heating cabinet, thus can be with It is fabricated separately with miscellaneous part, reduces manufacture difficulty.
Specifically, the lateral surface for the swash plate 100 that leans forward offers a circle mounting groove along the edge of opening 101, set in mounting groove There is sealing ring 102.Middle connecting plate 200 is provided with some first connecting holes 201, and the swash plate 100 that leans forward is provided with some with first The first corresponding screw 103 of connecting hole 201;Middle connecting plate 200 passes through the first connecting hole 201 by some first screws, Spinning is in the first screw 103 to lean forward on swash plate 100.Sealing ring is picked up come and then used with middle connecting plate and the swash plate that leans forward Screw is directly connected, forms a complete heated sealed warehouse, avoids the generation of drainage.
Specifically, bottom connecting plate 220 is provided with some second connecting holes 221, middle connecting plate 200 be provided with it is some with The second corresponding screw 202 of second connecting hole 221;Bottom connecting plate 220 passes through the second connecting hole by some second screws 221, spinning is in the second screw 202 on middle connecting plate 200.
Shown in Figure 4, each heating plate in heating plate group 210 is arranged in array.Specifically, heater 2 also includes Some press strips 230 of the leading flank of bottom connecting plate 220 are arranged on, each press strip 230 is used for the front end for compressing fixed heating plate group 210 Portion, can prevent heating plate because in storehouse pressure it is excessive and overflow outward.
Shown in Figure 3, the angle of inclination of heating plate group 210 is consistent with the angle of inclination of warehouse 1.I.e. heating plate group is distinguished With upper hang plate, lower hang plate keeping parallelism state, it can now ensure that fever tablet ensures a direction when being rinsed by water inlet And Homogeneouslly-radiating.
Mounting hole 104 is offered referring to the lateral surface for the swash plate 100 that shown in Fig. 1 and Fig. 5, leans forward, temperature inductor 105 passes through The mounting hole 104 is fixed on the lateral surface for the swash plate 100 that leans forward.Water temperature inside heating cabinet can be measured by temperature inductor, Other installation workpiece and follow-up cumbersome thermometric are greatly reducing, it is safe and efficient when greatly improving use.In addition, should The lateral surface of swash plate 100 that leans forward can also be arranged as required to pressure gauge and/or flow inductor.
It is shown in Figure 14, a kind of integral type water heater arrangement, including water tank 5 and electrical control cubicles 4, the electrical control cubicles 4 are interior to be set There are heating chamber structure and power water pump body, pump head is provided with power water pump body, the pump head is connected by pipe fitting and heating chamber structure Connect, heating chamber structure is any of the above-described heating chamber structure.
Power water pump body provides required power, and pipe fitting provides conduction, and heating chamber structure provides heating for recirculated water. Hot water after being heated by heating cabinet is recycled in water tank by the pump housing, and water tank is a carrier, and the hot water heated is in water tank Middle storage.The hot water in water tank directly is released into can when user needs to use water to use.When the water in water tank is used to one When determining degree, enter through piping in water tank, then pass through heating cabinet heat cycles water.Can be with by the hot water of this heating cabinet 0~2000L hot water amount is brought, can thus meet the needs of general customer, it is in after-sales service and extremely convenient.
Because this integral type water heater arrangement employs whole technical schemes of above-mentioned all embodiments, therefore at least have All beneficial effects caused by the technical scheme of above-described embodiment, this is no longer going to repeat them.
In the description of specification, reference term " one embodiment ", " preferably ", " example ", " specific example " or " one The description of a little examples " etc. means to combine specific features, structure, material or the feature that the embodiment or example describe, is contained in In at least one embodiment or example of the present invention, not necessarily referred in this manual for the schematic representation of above-mentioned term It is identical embodiment or example.Moreover, specific features, structure, material or the feature of description can in any one or Combined in a suitable manner in multiple embodiments or example.
The present invention is not limited to the above-described embodiments, for those skilled in the art, is not departing from On the premise of the principle of the invention, some improvements and modifications can also be made, these improvements and modifications are also considered as the protection of the present invention Within the scope of.The content not being described in detail in this specification belongs to prior art known to professional and technical personnel in the field.

Claims (10)

1. one kind heating chamber structure, including heater (2) and the warehouse (1) that is arranged on fixed support (3), the warehouse (1) set in low dip after preceding height, be by upper hang plate (120), lower hang plate (130), the swash plate that leans forward (100), hypsokinesis swash plate (110), the rectangular parallelepiped structure that left plate (140), right plate (150) surround, the heater (2) are arranged in warehouse (1), It is characterized in that:The upper hang plate (120) raises up to form hollow boss (170) close to the position of front end;The storehouse Left clapboard (141) and right clapboard (151) are vertically arranged with body (1), left chamber (142), centre will be divided into inside warehouse (1) Chamber (160) and right chamber room (152), and intermediate cavity (160) is located at part in boss (170) as bubble collecting chamber (171);
The left clapboard (141) offers the water inlet pod apertures (143) for connecting left chamber (142) and intermediate cavity (160), And left plate (140) is provided with the water inlet pipe (144) connected with left chamber (142);
The right clapboard (151) offers the water outlet pod apertures (153) for connecting right chamber room (152) and intermediate cavity (160), And the position at the top of boss (170) close to right side is provided with the outlet pipe (172) connected with right chamber room (152);The right clapboard (151) there is spaced slot (154) between the inner roof wall of bubble collecting chamber (171), the spaced slot (154) is used to connect gas Steep collecting chamber (171) and right chamber room (152);
The lower hang plate (130) is provided with sewage draining exit (131) close to the position of lower end;
The swash plate that leans forward (100) is corresponding with intermediate cavity (160) to be partly provided with opening (101), the heater (2) It is inserted into by the opening (101) in intermediate cavity (160).
2. heating chamber structure as claimed in claim 1, it is characterised in that:The heater (2) includes heating plate group (210), middle connecting plate (200) and bottom connecting plate (220), wherein, the rear end of heating plate group (210) is inserted into intermediate cavity (160) in, the front end of heating plate group (210) passes opening (101);The middle connecting plate (200) and bottom connecting plate (220) The front end of heating plate group (210) is sequentially passed through from the front to the back, and is fixedly connected with the swash plate that leans forward (100).
3. heating chamber structure as claimed in claim 2, it is characterised in that:The middle connecting plate (200) is provided with some One connecting hole (201), the swash plate that leans forward (100) are provided with some first screws (103) corresponding with the first connecting hole (201); The middle connecting plate (200) passes through the first connecting hole (201) by some first screws, and spinning is on the swash plate that leans forward (100) The first screw (103) in.
4. heating chamber structure as claimed in claim 2, it is characterised in that:The bottom connecting plate (220) is provided with some Two connecting holes (221), middle connecting plate (200) are provided with some second screws corresponding with the second connecting hole (221) (202);The bottom connecting plate (220) passes through the second connecting hole (221) by some second screws, and spinning is in middle connecting plate (200) in the second screw (202) on.
5. heating chamber structure as claimed in claim 2, it is characterised in that:Each heating plate in the heating plate group (210) is in Array arrangement.
6. heating chamber structure as claimed in claim 2, it is characterised in that:The heater (2) also includes being arranged on bottom Some press strips (230) of connecting plate (220) leading flank, each press strip (230) are used for the front end for compressing fixed heating plate group (210) Portion.
7. heating chamber structure as claimed in claim 1, it is characterised in that:The lateral surface of the swash plate that leans forward (100) is along opening (101) edge offers a circle mounting groove, and sealing ring (102) is provided with mounting groove.
8. heating chamber structure as claimed in claim 1, it is characterised in that:The angle of inclination and storehouse of the heating plate group (210) The angle of inclination of body (1) is consistent.
9. heating chamber structure as claimed in claim 1, it is characterised in that:The lateral surface of the swash plate that leans forward (100) offers Mounting hole (104), temperature inductor (105) are fixed on the lateral surface of the swash plate that leans forward (100) by the mounting hole (104).
10. a kind of integral type water heater arrangement, including water tank (5) and electrical control cubicles (4), the electrical control cubicles (4) are interior to be provided with heating cabinet Structure and power water pump body, pump head is provided with the power water pump body, the pump head is connected by pipe fitting with heating chamber structure, its It is characterised by:The heating chamber structure is any heating chamber structure in claim 1~9.
CN201710657200.8A 2017-08-03 2017-08-03 Heat chamber structure and integral type water heater arrangement Withdrawn CN107449138A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710657200.8A CN107449138A (en) 2017-08-03 2017-08-03 Heat chamber structure and integral type water heater arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710657200.8A CN107449138A (en) 2017-08-03 2017-08-03 Heat chamber structure and integral type water heater arrangement

Publications (1)

Publication Number Publication Date
CN107449138A true CN107449138A (en) 2017-12-08

Family

ID=60490235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710657200.8A Withdrawn CN107449138A (en) 2017-08-03 2017-08-03 Heat chamber structure and integral type water heater arrangement

Country Status (1)

Country Link
CN (1) CN107449138A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112178748A (en) * 2020-10-09 2021-01-05 徐松 Electric heating device using semiconductor ceramic

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08247689A (en) * 1995-03-13 1996-09-27 Nippondenso Co Ltd Heat exchanger for two-wheeled vehicle
CN201561569U (en) * 2009-09-30 2010-08-25 石家庄市桑迪实业有限公司 Thermostatic water tank for water heater
CN203940598U (en) * 2014-06-20 2014-11-12 河北科技大学 Energy-saving electric water heater
CN205279417U (en) * 2016-01-20 2016-06-01 程潮 Intelligent water heater
CN206320919U (en) * 2016-07-28 2017-07-11 上海荣威塑胶工业有限公司 Ptc liquid heater

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08247689A (en) * 1995-03-13 1996-09-27 Nippondenso Co Ltd Heat exchanger for two-wheeled vehicle
CN201561569U (en) * 2009-09-30 2010-08-25 石家庄市桑迪实业有限公司 Thermostatic water tank for water heater
CN203940598U (en) * 2014-06-20 2014-11-12 河北科技大学 Energy-saving electric water heater
CN205279417U (en) * 2016-01-20 2016-06-01 程潮 Intelligent water heater
CN206320919U (en) * 2016-07-28 2017-07-11 上海荣威塑胶工业有限公司 Ptc liquid heater

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112178748A (en) * 2020-10-09 2021-01-05 徐松 Electric heating device using semiconductor ceramic

Similar Documents

Publication Publication Date Title
CN206645851U (en) Heating tank and water purifier
CN204881326U (en) Plate heat exchanger that can automatic scale removal
CN107449138A (en) Heat chamber structure and integral type water heater arrangement
CN110353599A (en) Dish-washing machine heat recovery apparatus
CN208350154U (en) A kind of harnessing the river for strong applicability uses water meter structure
CN210772728U (en) Domestic gas water heater
KR101917713B1 (en) Steam generator
CN201196536Y (en) Bath wastewater exhaust heat recovery apparatus
CN210197672U (en) High-temperature boiler for dish washer
CN208590204U (en) A kind of emergency DTRO control cabinet radiator
CN201611162U (en) Vertical electrically heated boiler
CN207317270U (en) A kind of attemperater of hot-water heating system
CN201104036Y (en) Wall-hanging type solar water heater
CN206160462U (en) Little kitchen is precious
CN2655076Y (en) Electro-heater
JP3852795B2 (en) Water supply direct solar system
CN211876353U (en) Inner container of water heater
CN216308685U (en) Energy-saving heat exchange device of heat pump
CN217236564U (en) Energy-saving environment-friendly water-cooling heat radiator
CN212430809U (en) Anti-scaling steam generating device
CN216481224U (en) Guardrail type stainless steel radiator
CN208901636U (en) Air source heat pump hot-water supply system
CN210727688U (en) Heat recovery device of dish washer
CN216481627U (en) Ultrapure water heating device for water-based cleaning agent
CN2802354Y (en) Electric water heater structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20171208

WW01 Invention patent application withdrawn after publication