CN107448000A - A kind of construction plaster board wall surface remove device - Google Patents

A kind of construction plaster board wall surface remove device Download PDF

Info

Publication number
CN107448000A
CN107448000A CN201710738938.7A CN201710738938A CN107448000A CN 107448000 A CN107448000 A CN 107448000A CN 201710738938 A CN201710738938 A CN 201710738938A CN 107448000 A CN107448000 A CN 107448000A
Authority
CN
China
Prior art keywords
plate
chain band
burst
shovel
plasterboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710738938.7A
Other languages
Chinese (zh)
Other versions
CN107448000B (en
Inventor
程丽娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Kejinzhong High Tech Transfer Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710738938.7A priority Critical patent/CN107448000B/en
Publication of CN107448000A publication Critical patent/CN107448000A/en
Application granted granted Critical
Publication of CN107448000B publication Critical patent/CN107448000B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • E04G23/082Wrecking of buildings using shears, breakers, jaws and the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of construction plaster board wall surface remove device, belongs to building plasterboard metope and removes field.A kind of construction plaster board wall surface remove device, including plate is adjacent to, described be adjacent on plate is fixedly connected with symmetrically firm slide bar, and clear operation plate is slidably connected on the firm slide bar.It can realize that being adjacent to plate is adjacent on gypsum, sprocket wheel on clear operation plate drives chain band plate quick rotation, the dynamic cutting gear piece quick rotation of chain band plate belt, clear operation strip is moved chain band plate and moved to plasterboard, pushing guide wheel ensure that chain band plate moves steadily simultaneously, so as to drive cutting gear piece cutting plasterboard and crack, burst is shoveled in installation on chain band plate after cracking, the dynamic shovel burst movement of chain band plate belt, shovel burst splits tip and inserted between plasterboard and metope, so that plasterboard separates from metope is stable, enable to plasterboard monoblock is smooth to be removed from wall, scale removal process is simple, and it is easy to transport.

Description

A kind of construction plaster board wall surface remove device
Technical field
The present invention relates to building plasterboard metope to remove field, more specifically to a kind of construction plasterboard Metope remove device.
Background technology
Plasterboard is using plaster of Paris as a kind of material made of primary raw material.It is that one kind is in light weight, intensity is higher, thick Spend that relatively thin, easy to process and sound insulation is adiabatic and the construction material plasterboard of better performances such as fire prevention is widely used in house, done The internal partition wall of the various buildings such as public building, shop, hotel and industrial premises, wall cladding boards, need to remove for workmen When equipment is fitted up again, in family's remodeling or repair procedures, it is necessary to old plasterboard is pulled down from wall.
At present, it is to remove plasterboard by breaking wall piece sledgehammer or other blunts mostly to remove the plasterboard on metope, or Plasterboard is pried open by a crowbar, a crowbar concentrates strength on being applied to a point, causes gypsum to be easily broken, and cause The different fragment of a large amount of shape sizes, scale removal process is become complicated, be not easy to transport.
The content of the invention
1. technical problems to be solved
Easily it is broken for gypsum present in prior art, and causes the different fragment of a large amount of shape sizes, makes to clear up Journey becomes complicated, is not easy to transport problem, is removed and filled with plaster board wall surface it is an object of the invention to provide a kind of construction Put, it can realize that plasterboard monoblock is smooth and be removed from wall that scale removal process is simple, and be easy to transport.
2. technical scheme
To solve the above problems, the present invention adopts the following technical scheme that.
A kind of construction plaster board wall surface remove device, including be adjacent to plate, described be adjacent on plate are fixedly connected with pair The firm slide bar claimed, clear operation plate is slidably connected on the firm slide bar, offers and consolidates on the clear operation plate Slide opening is consolidated corresponding to slide bar, two firm slide bars are fixedly linked away from the one end for being adjacent to plate by operating hand lever, described Operating lever is rotatably connected on operation hand lever, the operating lever short end is connected with catch bar, and the catch bar is away from operation One end of lever is fixedly connected on clear operation plate, and symmetrical upper drive shaft is rotatablely connected on the clear operation plate with Drive shaft, offers installation through-hole and lower installation through-hole on the clear operation plate, fixed cover in the upper drive shaft Driven gear is connected to, and upper driven gear is located in upper installation through-hole, and the first drive is fixedly connected with the clear operation plate Dynamic motor, the second motor, accelerator and decelerator, the first motor output end and accelerator input end stationary phase Company, the accelerator output end are fixedly connected with the upper driving gear engaged with upper driven gear, consolidated in the lower drive shaft Surely lower driven gear is socketed with, the second motor output end is fixedly linked with decelerator input, and the decelerator is defeated Go out end and be fixedly connected with the lower driving gear engaged with lower driven gear, the clear operation plate rear and front end offers symmetrically Elongated hole is installed, the upper drive shaft both ends fixed cover is connected to symmetrical upper sprocket wheel, and the lower drive shaft both ends are fixedly sleeved There is symmetrical lower sprocket, the upper sprocket wheel and lower sprocket are respectively positioned in installation elongated hole, and the upper sprocket wheel and lower sprocket pass through chain belt Plate is connected, and two chain band plates are fixedly connected with multiple cutting gear pieces positioned at plate both sides are adjacent on the outside of the chain band plate, described Clear operation plate bottom side is rotatably connected to by connecting plate pushes guide wheel, and pushes guide wheel with being offseted on the inside of chain band plate, two institutes Shovel burst substrate is connected between stating on the inside of chain band plate, the shovel burst substrate both ends are fixedly connected with flexible short Bar, the one end of the flexible quarter butt away from shovel burst substrate are fixedly connected with limited location plate, bullet are socketed with the flexible quarter butt Spring, the both ends of the spring are connected on shovel burst substrate and spacing plate, are offered on the inside of the chain band plate and are inserted with spacing Spacing socket corresponding to plate, the shovel burst substrate shovel point narrow end are fixedly connected with multiple shovels and divide blade, remove the stone on metope During cream plate, it is adjacent to plate and is adjacent on gypsum, the sprocket wheel on clear operation plate drives chain band plate quick rotation, and chain band plate belt is dynamic to be cut Gear piece quick rotation is cut, clear operation strip is moved chain band plate and moved to plasterboard, while pushes guide wheel and ensure that chain band plate is steady Mobile, so as to drive cutting gear piece cutting plasterboard and crack, burst, the dynamic shovel of chain band plate belt are shoveled in installation on chain band plate after cracking Burst moves, and shovel burst splits tip and inserted between plasterboard and metope, so that plasterboard separates from metope is stable, can Removed so that plasterboard monoblock is smooth from wall, scale removal process is simple, and is easy to transport.
Preferably, sliding block is connected with the catch bar, and chute corresponding with sliding block is connected with operating lever, is easy to Operating lever promotes catch bar, so as to which catch bar is easy to promote clear operation plate, is easy to cutting to separate.
Preferably, the quantity of the flexible quarter butt is 3-5, and it is evenly distributed on shovel burst substrate, multiple flexible Side pole ensures that stable pulling splits substrate.
Preferably, the shovel trapezoidal structure in burst substrate cross section, facilitates insertion between plasterboard and metope, is easy to tear open Point.
Preferably, transparent protective shield is fixedly connected with the left of the installation elongated hole, and transparent protective shield parcel chain band plate is left Side, transparent protective shield play safeguard protection effect, it is ensured that user safely and fast carries out cutting fractionation, is convenient for operating.
Preferably, the cutting gear piece is made using high-speed cutting tool steel SKD materials, high-speed cutting tool steel SKD materials have higher intensity, toughness and anti-wear performance, good cutting effect.
3. beneficial effect
Compared to prior art, the advantage of the invention is that:
(1)When removing the plasterboard on metope, it is adjacent to plate and is adjacent on gypsum, the sprocket wheel on clear operation plate drives chain band plate Quick rotation, the dynamic cutting gear piece quick rotation of chain band plate belt, clear operation strip are moved chain band plate and moved to plasterboard, pushed simultaneously Guide wheel ensure that chain band plate moves steadily, so as to drive cutting gear piece cutting plasterboard and crack, pacify after cracking on chain band plate Dress shovel burst, the dynamic shovel burst movement of chain band plate belt, shovel burst splits tip and inserted between plasterboard and metope, so that gypsum Plate separates from metope is stable, enables to plasterboard monoblock is smooth to be removed from wall, scale removal process is simple, and is easy to transport.
(2)Sliding block is connected with catch bar, and chute corresponding with sliding block, lever easy to operation are connected with operating lever Catch bar is promoted, so as to which catch bar is easy to promote clear operation plate, is easy to cutting to separate.
(3)The quantity of flexible quarter butt is 3-5, and it is evenly distributed on shovel burst substrate, and multiple flexible side poles ensure Stable pulling splits substrate.
(4)The trapezoidal structure in burst substrate cross section is shoveled, facilitates insertion between plasterboard and metope, is easy to split.
(5)Transparent protective shield plays safeguard protection effect, it is ensured that user safely and fast carries out cutting fractionation, is convenient for Operation.
(6)High-speed cutting tool steel SKD materials have higher intensity, toughness and anti-wear performance, good cutting effect.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural principle simplified schematic diagram of the present invention;
Fig. 3 is the fractionation chip architecture schematic diagram of the present invention;
Fig. 4 is one of clear operation plate structure schematic diagram of the present invention;
Fig. 5 is one of clear operation plate structure schematic diagram of the present invention;
Fig. 6 is the attachment structure schematic diagram for splitting piece and chain band plate of the present invention.
Label declaration in figure:
1 clear operation plate, 2 accelerators, installation through-hole on 3,4 are adjacent to plate, 5 upper sprocket wheels, drive shaft, 7 chain band plates, 8 cuttings on 6 Gear piece, 9 push guide wheel, 10 installation elongated holes, 11 lower sprockets, 12 times drive shafts, 13 times installation through-holes, 14 times driving gears, 15 Decelerator, 16 second motors, 17 catch bars, 18 sliding blocks, 19 chutes, 20 firm slide bars, 21 firm slide openings, 22 manipulators Bar, driving tooth on 23,24 first motors, 25 operating levers, driven gear, 27 times driven gears, 28 split pieces, 29 on 26 Spacing socket, 30 split blade, 31 fractionation plate bases, 32 spacing plates, 33 flexible quarter butts, 34 springs.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention;Technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes;Obviously;Described embodiment is only part of the embodiment of the present invention;Rather than whole embodiment.It is based on Embodiment in the present invention;Those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment;Belong to the scope of protection of the invention.
Embodiment 1:
Fig. 1-6, a kind of construction plaster board wall surface remove device are referred to, including is adjacent to plate 4, is adjacent on plate 4 fixed company Be connected to symmetrically firm slide bar 20, clear operation plate 1 slidably connected on firm slide bar 20, offered on clear operation plate 1 with Slide opening 21 is consolidated corresponding to firm slide bar 20, two firm slide bars 20 are fixed away from the one end for being adjacent to plate 4 by operating hand lever 22 It is connected, operates and be rotatably connected to operating lever 25 on hand lever 22, the short end of operating lever 25 is connected with catch bar 17, and catch bar 17 is remote One end from operating lever 25 is fixedly connected on clear operation plate 1, and symmetrical upper driving is rotatablely connected on clear operation plate 1 and is turned Axle 6 and lower drive shaft 12, offer installation through-hole 3 and lower installation through-hole 13 on clear operation plate 1, in upper drive shaft 6 Fixed cover is connected to driven gear 26, and upper driven gear 26 is located in upper installation through-hole 3, is fixedly connected on clear operation plate 1 There are the first motor 24, the second motor 16, accelerator 2 and decelerator 15, the output end of the first motor 24 is with accelerating The input of device 2 is fixedly linked, and the output end of accelerator 2 is fixedly connected with the upper driving gear 23 engaged with upper driven gear 26, under Fixed cover is connected to lower driven gear 27, the output end of the second motor 16 and the input stationary phase of decelerator 15 in drive shaft 12 Even, the output end of decelerator 15 is fixedly connected with the lower driving gear 14 engaged with lower driven gear 27, two before and after clear operation plate 1 End offers symmetrical installation elongated hole 10, and the upper both ends fixed cover of drive shaft 6 is connected to symmetrical upper sprocket wheel 5, lower drive shaft 12 Both ends fixed cover is connected to symmetrical lower sprocket 11, and upper sprocket wheel 5 and lower sprocket 11 are respectively positioned in installation elongated hole 10, and upper sprocket wheel 5 is with Sprocket wheel 11 is connected by chain band plate 7, and two chain band plates 7 are fixedly connected with multiple cut positioned at the both sides of plate 4, the outside of chain band plate 7 is adjacent to Gear piece 8 is cut, the bottom side of clear operation plate 1 is rotatably connected to by connecting plate pushes guide wheel 9, and pushes guide wheel 9 and the inner side of chain band plate 7 Offset, shovel burst substrate 31 is connected between two inner sides of chain band plate 7, the both ends of shovel burst substrate 31 are fixedly connected with Flexible quarter butt 33, the one end of flexible quarter butt 33 away from shovel burst substrate 31 are fixedly connected with limited location plate 32, stretched on quarter butt 33 Spring 34 is socketed with, the both ends of spring 34 are connected on shovel burst substrate 31 and spacing plate 32, and the inner side of chain band plate 7 offers Spacing socket 29 corresponding with spacing plate 32, the shovel point narrow end of shovel burst substrate 31 are fixedly connected with multiple shovels and divide blade 30, clearly During except plasterboard on metope, it is adjacent to plate 4 and is adjacent on gypsum, the sprocket wheel 5 on clear operation plate 1 drives chain band plate 7 quick Rotate, chain band plate 7 drives the cutting quick rotation of gear piece 8, and clear operation plate 1 drives chain band plate 7 to be moved to plasterboard, pushed simultaneously Guide wheel 9 ensure that chain band plate 7 moves steadily, so as to drive cutting gear piece 8 to cut plasterboard and crack, in chain band plate 7 after cracking Upper installation shovel burst 28, chain band plate 7 drive shovel burst 28 to move, and shovel burst 28 splits tip and inserted between plasterboard and metope, So that plasterboard separates from metope is stable, enable to plasterboard monoblock is smooth to be removed from wall, scale removal process is simple, And it is easy to transport.
Sliding block 18 is connected with catch bar 17, and chute 19 corresponding with sliding block 18 is connected with operating lever 25, is easy to Operating lever 25 promotes catch bar 17, so as to which catch bar 17 is easy to promote clear operation plate 1, is easy to cutting to separate.
The quantity of flexible quarter butt 33 is 3-5, and it is evenly distributed on shovel burst substrate 31, and multiple flexible side poles 31 are true Protect stable pulling and split substrate 31.
The trapezoidal structure in cross section of burst substrate 31 is shoveled, facilitates insertion between plasterboard and metope, is easy to split.
The left side of installation elongated hole 10 is fixedly connected with transparent protective shield, and the left side of transparent protective shield parcel chain band plate 7, transparent guarantor Shield plays safeguard protection effect, it is ensured that user safely and fast carries out cutting fractionation, is convenient for operating.
Cutting gear piece 8 is made using high-speed cutting tool steel SKD materials, high-speed cutting tool steel SKD materials have compared with High intensity, toughness and anti-wear performance, good cutting effect.
Operation principle:When removing the plasterboard on metope, piece 28 will be split and split down from chain band plate 7, pass through operation first Hand lever 22 will be adjacent to plate 4 and laterally be adjacent on gypsum, be adjacent to plate 4 and be adjacent on gypsum, increasing friction force, it is therefore prevented that crack When the present apparatus produce movement, it is ensured that working stability, start the first motor 24, the first motor 24 passes through the band of accelerator 2 The dynamic upper quick rotation of driving gear 23, so as to which upper driving gear 23 drives upper drive shaft 6 quickly to turn by upper driven gear 26 Dynamic, upper drive shaft 6 drives the quick rotation of chain band plate 7 by upper sprocket wheel 5, and chain band plate 7 drives the cutting quick rotation of gear piece 8, from And cut gear piece 8 and cut plasterboard, the operating lever 25 on rotating operation hand lever 22, operating lever 25 is around 22 turns of operating lever Dynamic, so as to which the lower end of operating lever 22 promotes catch bar 17, catch bar 17 is steady in the presence of firm slide bar 20 and firm slide opening 21 Fixed promotion clear operation plate 1 moves to plasterboard, so as to clear operation plate 1 drive upper sprocket wheel 5 and lower sprocket 11 it is stable to Plasterboard moves, so as to which chain band plate 7 drives the 8 casees plasterboard movements of cutting gear piece, simultaneously because the bottom side of clear operation plate 1 pushes Guide wheel 9 offsets with chain band plate 7, so as to be moved steadily to plasterboard pushing the stable promotion chain band plate 7 of guide wheel 9, is cut so as to drive Cut gear piece 8 to cut plasterboard and crack, after cracking, will be adjacent to plate 4 again by operation hand lever 22 and vertically be adjacent on gypsum, Carry out vertical, after vertically cracking, will split between substrate 31 is moved to two chain band plates 7 of the bottom side of clear operation plate 1, and will split The spacing plate 32 at the both ends of substrate 31 inserts spacing socket 29, causes to split substrate in the presence of spring 34 and flexible side pole 33 31 stabilizations are arranged on chain band plate 7, the installation shovel burst 28 on chain band plate 7, then start the second motor 16, second drives Dynamic motor 16 drives lower driving gear 14 slowly to rotate by decelerator 15, so as to which lower driving gear 14 passes through lower driven gear 27 Slowly lower sprocket 11 is driven to rotate, so as to which lower sprocket 11 drives chain band plate 7 slowly to move, chain band plate 7 drives slowly shovel burst 28 Mobile, shovel burst 28 splits tip and inserted between plasterboard and metope, and shovel burst 28 slowly splits plasterboard, so that gypsum Plate separates from metope is stable, enables to plasterboard monoblock is smooth to be removed from wall, scale removal process is simple, and is easy to transport.
It is described above;Preferable embodiment only of the invention;But protection scope of the present invention is not limited thereto; Any one skilled in the art the invention discloses technical scope in;Technique according to the invention scheme and its Improve design and be subject to equivalent substitution or change;It should all cover within the scope of the present invention.

Claims (6)

  1. A kind of 1. construction plaster board wall surface remove device, it is characterised in that:Including being adjacent to plate(4), it is described to be adjacent to plate(4) On be fixedly connected with symmetrically firm slide bar(20), the firm slide bar(20)On slidably connect clear operation plate(1), it is described Clear operation plate(1)On offer and firm slide bar(20)Corresponding firm slide opening(21), two firm slide bars(20)Far From being adjacent to plate(4)One end by operating hand lever(22)It is fixedly linked, the operation hand lever(22)On be rotatably connected to operation thick stick Bar(25), the operating lever(25)Short end is connected with catch bar(17), the catch bar(17)Away from operating lever(25)'s One end is fixedly connected on clear operation plate(1)On, the clear operation plate(1)The upper symmetrical upper drive shaft of rotation connection(6) With lower drive shaft(12), the clear operation plate(1)On offer installation through-hole(3)With lower installation through-hole(13), it is described Upper drive shaft(6)Upper fixed cover is connected to driven gear(26), and upper driven gear(26)Positioned at upper installation through-hole(3)In, The clear operation plate(1)On be fixedly connected with the first motor(24), the second motor(16), accelerator(2)With subtract Fast device(15), first motor(24)Output end and accelerator(2)Input is fixedly linked, the accelerator(2)It is defeated Go out end to be fixedly connected with and upper driven gear(26)The upper driving gear of engagement(23), the lower drive shaft(12)Upper fixed cover It is connected to lower driven gear(27), second motor(16)Output end and decelerator(15)Input is fixedly linked, described Decelerator(15)Output end is fixedly connected with and lower driven gear(27)The lower driving gear of engagement(14), the clear operation plate (1)Rear and front end offers symmetrical installation elongated hole(10), the upper drive shaft(6)Both ends fixed cover is connected to symmetrical cochain Wheel(5), the lower drive shaft(12)Both ends fixed cover is connected to symmetrical lower sprocket(11), the upper sprocket wheel(5)And lower sprocket (11)It is respectively positioned on installation elongated hole(10)In, the upper sprocket wheel(5)And lower sprocket(11)Pass through chain band plate(7)It is connected, described in two Chain band plate(7)Positioned at being adjacent to plate(4)Both sides, the chain band plate(7)Outside is fixedly connected with multiple cutting gear pieces(8), it is described clear Division operation plate(1)Bottom side is rotatably connected to by connecting plate and pushes guide wheel(9), and push guide wheel(9)With chain band plate(7)Inner side phase Support, two chain band plates(7)Fractionation piece is connected between inner side(28), the fractionation piece(28)Including shoveling burst substrate (31), the shovel burst substrate(31)Both ends are fixedly connected with flexible quarter butt(33), the flexible quarter butt(33)Away from shovel Burst substrate(31)One end be fixedly connected with limited location plate(32), the flexible quarter butt(33)On be socketed with spring(34), institute State spring(34)Both ends are connected to shovel burst substrate(31)With spacing plate(32)On, the chain band plate(7)Inner side opens up Have and spacing plate(32)Corresponding spacing socket(29), the shovel burst substrate(31)A shovel point narrow end is fixedly connected with multiple shovels Divide blade(30).
  2. A kind of 2. construction plaster board wall surface remove device according to claim 1, it is characterised in that:The promotion Bar(17)On be connected with sliding block(18), and operating lever(25)On be connected with and sliding block(18)Corresponding chute(19).
  3. A kind of 3. construction plaster board wall surface remove device according to claim 1, it is characterised in that:It is described flexible Quarter butt(33)Quantity be 3-5, and it is evenly distributed on shovel burst substrate(31)On.
  4. A kind of 4. construction plaster board wall surface remove device according to claim 1 or 3, it is characterised in that:It is described Shovel burst substrate(31)The trapezoidal structure in cross section.
  5. A kind of 5. construction plaster board wall surface remove device according to claim 1, it is characterised in that:The installation Elongated hole(10)Left side is fixedly connected with transparent protective shield, and transparent protective shield parcel chain band plate(7)Left side.
  6. A kind of 6. construction plaster board wall surface remove device according to claim 1, it is characterised in that:The cutting Gear piece(8)It is made using high-speed cutting tool steel SKD materials.
CN201710738938.7A 2017-08-25 2017-08-25 A kind of construction plaster board wall surface remove device Active CN107448000B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710738938.7A CN107448000B (en) 2017-08-25 2017-08-25 A kind of construction plaster board wall surface remove device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710738938.7A CN107448000B (en) 2017-08-25 2017-08-25 A kind of construction plaster board wall surface remove device

Publications (2)

Publication Number Publication Date
CN107448000A true CN107448000A (en) 2017-12-08
CN107448000B CN107448000B (en) 2019-04-12

Family

ID=60493691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710738938.7A Active CN107448000B (en) 2017-08-25 2017-08-25 A kind of construction plaster board wall surface remove device

Country Status (1)

Country Link
CN (1) CN107448000B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111069241A (en) * 2019-12-24 2020-04-28 深圳大视野志远科技有限公司 Method for removing silicone adhesive for repairing display screen
CN113219548A (en) * 2021-04-29 2021-08-06 广东新达测绘科技有限公司 Digital underground pipeline detecting instrument with stable structure
CN113356629A (en) * 2021-05-10 2021-09-07 上海建工四建集团有限公司 Construction method for automatic slotting of brick wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4969269A (en) * 1988-12-19 1990-11-13 Armando Dominguez Electrical outlet cutter for walls panels
JPH07195355A (en) * 1993-12-28 1995-08-01 Sho Bond Constr Co Ltd Cutter device
CN2825821Y (en) * 2005-10-10 2006-10-11 刘国忠 Dual-blade V-shaped wall grooving machine
CN2861365Y (en) * 2005-12-31 2007-01-24 中国矿业大学 Device for digging hole in wall
CN201195356Y (en) * 2008-01-28 2009-02-18 朱建彬 Cutting machine for rectifying and reforming wall
CN201507104U (en) * 2009-07-17 2010-06-16 王凤文 Dust-free wall groove cutting machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4969269A (en) * 1988-12-19 1990-11-13 Armando Dominguez Electrical outlet cutter for walls panels
JPH07195355A (en) * 1993-12-28 1995-08-01 Sho Bond Constr Co Ltd Cutter device
CN2825821Y (en) * 2005-10-10 2006-10-11 刘国忠 Dual-blade V-shaped wall grooving machine
CN2861365Y (en) * 2005-12-31 2007-01-24 中国矿业大学 Device for digging hole in wall
CN201195356Y (en) * 2008-01-28 2009-02-18 朱建彬 Cutting machine for rectifying and reforming wall
CN201507104U (en) * 2009-07-17 2010-06-16 王凤文 Dust-free wall groove cutting machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111069241A (en) * 2019-12-24 2020-04-28 深圳大视野志远科技有限公司 Method for removing silicone adhesive for repairing display screen
CN113219548A (en) * 2021-04-29 2021-08-06 广东新达测绘科技有限公司 Digital underground pipeline detecting instrument with stable structure
CN113356629A (en) * 2021-05-10 2021-09-07 上海建工四建集团有限公司 Construction method for automatic slotting of brick wall

Also Published As

Publication number Publication date
CN107448000B (en) 2019-04-12

Similar Documents

Publication Publication Date Title
CN107448000A (en) A kind of construction plaster board wall surface remove device
JP6827623B1 (en) Groove construction equipment for construction sites
JP6719698B1 (en) Orbital snow removal device
CN107419881A (en) A kind of old ceramic tile demolition machine of metope
CN108204139A (en) One kind builds a building dismounting concrete wall surface trimming carrier
CN105643730A (en) Waste timber recycling device
CN108273945B (en) A kind of building iron for building is from isometric cutting equipment of advancing
CN201411730Y (en) Soil cutting device
CN207608916U (en) A kind of Pile Foundation of Highrise Building filling concrete protective plate automatic disassembling robot
CN204626489U (en) Geosyncline excavator
CN108532424A (en) A kind of town road blueness common brick is not necessarily to deflecting interval installation apparatus
CN208184275U (en) One kind builds a building wall dismounting robot
CN102094437A (en) Chain type trenching machine
CN107815947A (en) A kind of road construction laying water baffle plate device
CN113580394A (en) Stone cutting equipment for external wall building
CN106583004A (en) Efficient breaking device for cement bags used in construction site
CN209323325U (en) Brick paving machine dredges brick device
CN202516976U (en) Portable automatic hydraulic steel bar bending machine
CN214725384U (en) Cutting equipment is used in gypsum board processing
CN106553271B (en) A kind of stone curtain wall making stone cutting device
CN214362687U (en) Be applied to false seam dowel bar dispenser of airport pavement
CN215210376U (en) Transformer substation's road basic unit nick device
CN220005809U (en) Reinforcing steel bar cutting device
CN110685311A (en) Double-wheel-driven efficient grooving machine for cable laying
KR20070011898A (en) Remte controllable mobile wire saw independent car

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190311

Address after: 443103 No. 27 Pingyun Road, Xiaoxi Taping Lake Community, Yiling District, Yichang City, Hubei Province

Applicant after: Yichang Yong Dong Construction Engineering Co., Ltd.

Address before: 246313 No. 48 North Street, Yujing Town, Qianshan County, Anqing City, Anhui Province

Applicant before: Cheng Lina

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200430

Address after: Room 103-16, Building 5, 656 Qixing Road, Wuxing District, Huzhou City, Zhejiang Province, 313028

Patentee after: Huzhou Peiyou Incubator Co.,Ltd.

Address before: 443103 No. 27 Pingyun Road, Xiaoxi Taping Lake Community, Yiling District, Yichang City, Hubei Province

Patentee before: YICHANG YONGDONG CONSTRUCTION ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211229

Address after: 317500 No. 808, 810 and 812, Wanchang Middle Road, Chengdong street, Wenling City, Taizhou City, Zhejiang Province (room 319, south of the third floor of Qingshang building)

Patentee after: Taizhou kejinzhong high tech transfer Co.,Ltd.

Address before: Room 103-16, building 5, 656 Qixing Road, Wuxing District, Huzhou City, Zhejiang Province

Patentee before: Huzhou Peiyou Incubator Co.,Ltd.