CN107447919A - Cellular material herringbone beam sequential structure and its formation without purlin girder roof truss structure - Google Patents

Cellular material herringbone beam sequential structure and its formation without purlin girder roof truss structure Download PDF

Info

Publication number
CN107447919A
CN107447919A CN201610373965.4A CN201610373965A CN107447919A CN 107447919 A CN107447919 A CN 107447919A CN 201610373965 A CN201610373965 A CN 201610373965A CN 107447919 A CN107447919 A CN 107447919A
Authority
CN
China
Prior art keywords
herringbone beam
herringbone
roof truss
cellular material
joist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610373965.4A
Other languages
Chinese (zh)
Inventor
李殿义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610373965.4A priority Critical patent/CN107447919A/en
Publication of CN107447919A publication Critical patent/CN107447919A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

A kind of cellular material herringbone beam sequential structure and its formation without purlin girder roof truss structure, the lightweight herringbone beam prefabricated using the Structure Network muscle honeycomb concrete structure of lightweight substitutes the purlin girder structure of conventional art as the core component of formation sequence;Cellular material herringbone beam sequential structure is arranged to make up by the prefabricated multiple herringbone beams of Structure Network muscle honeycomb concrete structure, the herringbone beam has two oblique lateral margins being sloped downwardly on summit two, and the arch lower edge positioned at herringbone beam bottom side, the two-end-point that the herringbone beam stretches out have two stand-offs for being used for being erected on joist and matched with the joist support face;There is the spacing that can directly set up roof boarding between the herringbone beam of composition sequence;Roof truss of the cellular material herringbone beam sequential structure especially suitable for structure corridor type building, local-style dwelling houses or factory building.Accordingly, the structure technique for tradition being needed into site operation is prefabricated in the factory completion, makes site operation simpler, and reduce building cost.

Description

Cellular material herringbone beam sequential structure and its formation without purlin girder roof truss structure
Technical field
The present invention relates to building structure, particularly cellular material herringbone beam sequential structure and its formation without purlin girder roof truss structure.
Background technology
The roof truss structure that traditional purlin girder combines is applied in typical oriental architecture structure, and it is by being set up in building load-bearing The girder beam of column top forms load-bearing roof truss, then makes the generally robust stabilization of roof truss, simultaneously purlin and the branch as roofing by purlin Support beam.Put on a kind of typical hard mountain of individual layer of structure and work progress as disclosed by Chinese patent application publication number CN102936966A The steelframe of purlin masonry residence protects roof construction, and roof purlin, in addition to additional horizontal girder steel, additional longitudinal steel are provided with former roofing Beam, steel column, additional basis, roof truss beam and at least two oblique girder steels, described tiltedly interval welding is used for the V for setting purlin on girder steel Type groove;Two oblique chevron shaped docking of girder steel are set, V-groove clamping original roof purlin thereon, the bottom and room of the tiltedly girder steel Set a roof beam in place and be fixedly connected, three is collectively forming A types and reinforces steel roof truss, the A types reinforce steel roof truss be supported on additional horizontal girder steel, On the steelframe that additional longitudinal girder steel, additional steel column and additional basis are formed.
It can be seen that above-mentioned conventional art will not only build the beam column construction of complexity at the construction field (site), and need accurately construction technology.
Chinese patent application publication number CN2167141Y then discloses a kind of novel roof truss girder construction by welding formation, by oblique Beam, crossbeam, reinforcement, diagonal brace are formed:Each one end of two cant beams is connected with each other composition triangle, crossbeam both ends respectively with tiltedly The other end of beam is connected, and three forms closing triangle, and reinforcement is vertically fixed between cant beam, crossbeam, and diagonal brace is placed in two On the upper/lower terminal of adjacent said rib;Crossbeam has the radian that is bent upwards, because crossbeam is in upward arc, therefore pressure to The crossbeam both ends strong point disperses, therefore whole roof truss beam bearing capacity is high.But the roof truss beam is still formed using Metal Material Welding It is overall, still suffer from complex process, the defects of weight is excessive, it is necessary to reduce dosage and the globality of whole roof truss is carried out by purlin Connection.
The birth for the Structure Network muscle honeycomb concrete structure that the honeycomb building structural materials of lightweight, particularly the applicant are separately applied Raw, let us has an opportunity to merge the function of girder and purlin in the new structure of integration, produces the moderate knot of volume and weight Structure component, substitute function and the effect of traditional girder and purlin, the weight average of roofing is shared, reduce pressure of the structural weight per square meter to girder Power, building structure risk is reduced, and greatly facilitate the selection of room span.
The Structure Network muscle honeycomb concrete structure has following technical characteristic:
Its still using reinforcing bar and cement as primary building material, the Structure Network muscle that is formed by steel mesh piece or structure reinforcing bars and lightweight Honeycomb concrete is combined, and curable grip caused by said structure net muscle or structure reinforcing bars is formed using the honeycomb concrete of lightweight The thing of composite is made a concerted effort, and (bond stress of the concrete to framework of steel reinforcement is based primarily upon with the reinforced concrete structure on ordinary meaning To form the structural strength of building and stability) there is entirely different mechanics principle, in terms of lightweight and heat-insulating property all It can far superior to make structure that there is the load-carrying ability suitable with conventional steel bar concrete on the premise of conventional steel bar concrete structure, And there is excellent construction convenience simultaneously.The honeycomb concrete is including but not limited to by cement base-material, lightweight aggregate, os osseum The honeycomb porous material such as material and the lightweight concrete of additive composition, air entrained concrete.These New Building Materials are also convenient for leading to Cross rational mechanics and form firm structural support, such as the tongue and grooves such as tenon, tooth easily can be set directly on prefabricated components The defects of structure forms structural connectivity and overcomes traditional structure part only by weak mortar bonding connection.
The content of the invention
It is an object of the invention to provide a kind of cellular material herringbone beam sequential structure and its formation without purlin girder roof truss structure, with light Core component of the prefabricated lightweight herringbone beam of the Structure Network muscle honeycomb concrete structure of matter as formation sequence, substitutes conventional art Purlin girder structure form the present invention no purlin girder building structure claimed.
According to above-mentioned purpose, cellular material herringbone beam sequential structure of the present invention is by prefabricated multiple of Structure Network muscle honeycomb concrete structure Herringbone beam is arranged to make up, and the herringbone beam has two oblique lateral margins being sloped downwardly on summit two, and positioned at herringbone beam bottom side One arch lower edge, the two-end-point that the herringbone beam stretches out have be used for be erected on joist and with joist support face kissing Two stand-offs closed;There is the spacing that can directly set up roof boarding between the herringbone beam of composition sequence.
Further, the support that the stand-off is corniced to both sides extension with being formed.
Further, there are some groups of lacing wires for connecting each herringbone beam between the herringbone beam.
According to above-mentioned cellular material herringbone beam sequential structure composition without purlin girder roof truss structure, including as the vertical of roof truss structure basis Post, column top are provided with the joist for supporting herringbone beam both ends, and multiple herringbone beams are erected at the support with the stand-off at its both ends Herringbone beam's sequence is formed on beam, roof boarding is directly overlayed on the oblique lateral margin of the sequence herringbone beam.
Further, the roof truss is the roof truss of structure corridor type building.
Further, the roof truss is structure local-style dwelling houses or the roof truss of factory building.
Beneficial effect of the present invention:Tradition is needed site operation by the present invention by prefabricated honeycomb concrete herringbone beam's sequential structure Structure technique is prefabricated in the factory completion, although transport difficulty may be added, can obtain more reasonably structure and precision, makes existing Field construction is simpler;The appropriate intensive series arrangement of the herringbone girder construction of lighting, in addition to the effect for ideally playing traditional girder beam, Can directly as roof boarding support without setting purlin again.Meanwhile the cost that inclined roof is built is allowed to be dropped closer to flat-roofed house Low building cost, horn of plenty variety of house create condition.
Brief description of the drawings
Fig. 1 (A), it is the construction unit of type building in corridor of the present invention;
Fig. 1 (B), it is the corridor type building that construction unit shown in Fig. 1 is formed;
Fig. 2, it is Folk house structure roof truss schematic diagram of the present invention.
Description of reference numerals:Herringbone beam 1, oblique lateral margin 10, arch lower edge 11, stand-off 12, joist 2, roof boarding 3, cornices 4, lacing wire 5, column 6.
Embodiment
Shown in reference picture 1 (A), (B) and Fig. 2, the construction unit of type building in corridor of the present invention.The herringbone beam 1 is by Structure Network Muscle honeycomb concrete material is formed, and multiple herringbone beams are arranged to make up sequential structure, and herringbone beam 1 has to be sloped downwardly on summit two Two oblique lateral margins 10, the bottom side of herringbone beam 1 is an arch lower edge 11, and its mechanical structure is more reasonable relative to traditional girder beam, especially Suitable for the mill construction of large span, without setting multigroup column.The two-end-point that herringbone beam 1 stretches out, which has, to be used to set up Two stand-offs 12 on joist 2;Joist 2 is supported on roof truss column 6;Stand-off 12 has to match with the supporting surface of joist 2 Planform;There is the spacing that can directly set up roof boarding 3 between the herringbone beam 1 of composition sequence, without setting purlin again. Stand-off 12 can require to cornice 4 to extension outside two to support according to building structure;Between herringbone beam 1 in order to control spacing accuracy or Stability is improved, some groups of lacing wires 5 can be set.As the corridor type building as shown in Fig. 1 (B), such as Fig. 1 (A) can be passed through Shown corridor type building unit is spliced to form, to be flexibly applied to various terrain environments.
In addition to above-mentioned corridor type building, it is suitable for building the roof truss for local-style dwelling houses or factory building, as shown in Figure 2.

Claims (6)

1. a kind of cellular material herringbone beam sequential structure, it is characterised in that by prefabricated more of Structure Network muscle honeycomb concrete structure Individual herringbone beam (1) is arranged to make up, and the herringbone beam (1) has two oblique lateral margins (10) being sloped downwardly on summit two, and An arch lower edge (11) positioned at herringbone beam (1) bottom side;The two-end-point that the herringbone beam (1) stretches out, which has, to be used to set up Two stand-offs (12) to be matched on joist (2) and with the joist (2) supporting surface;Form sequence herringbone beam (1) it Between have and can directly set up the spacing of roof boarding (3).
2. cellular material herringbone beam sequential structure according to claim 1, it is characterised in that the stand-off (12) is to two Side extension is to form the support of (4) of cornicing.
3. cellular material herringbone beam sequential structure according to claim 1 or claim 2, it is characterised in that the herringbone beam (1) Between there are some groups of lacing wires (5) for connecting each herringbone beam (1).
4. according to the cellular material herringbone beam sequential structure as described in claims 1 to 3 form without purlin girder roof truss structure, its spy Sign is, including the column (6) as roof truss structure basis, and column (6) top is provided with for supporting herringbone beam (1) two The joist (2) at end, multiple herringbone beams (1) are erected on the joist (2) with the stand-off (12) at its both ends and form herringbone beam Sequence, roof boarding (3) are directly overlayed on the oblique lateral margin (10) of the sequence herringbone beam (1).
5. according to claim 4 without purlin girder roof truss structure, it is characterised in that the roof truss is structure corridor type building Roof truss.
6. according to claim 4 without purlin girder roof truss structure, it is characterised in that the roof truss is structure local-style dwelling houses or factory building Roof truss.
CN201610373965.4A 2016-06-01 2016-06-01 Cellular material herringbone beam sequential structure and its formation without purlin girder roof truss structure Pending CN107447919A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610373965.4A CN107447919A (en) 2016-06-01 2016-06-01 Cellular material herringbone beam sequential structure and its formation without purlin girder roof truss structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610373965.4A CN107447919A (en) 2016-06-01 2016-06-01 Cellular material herringbone beam sequential structure and its formation without purlin girder roof truss structure

Publications (1)

Publication Number Publication Date
CN107447919A true CN107447919A (en) 2017-12-08

Family

ID=60485730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610373965.4A Pending CN107447919A (en) 2016-06-01 2016-06-01 Cellular material herringbone beam sequential structure and its formation without purlin girder roof truss structure

Country Status (1)

Country Link
CN (1) CN107447919A (en)

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2287653Y (en) * 1997-04-11 1998-08-12 杨东升 Space pressure skeleton
CN1632252A (en) * 2005-01-18 2005-06-29 阴继庞 Light steel sealed column framework construction system
CN201258598Y (en) * 2008-08-23 2009-06-17 中冶天工建设有限公司 Light steel structure workshop of space plate seal system
CN201850793U (en) * 2010-11-05 2011-06-01 中国电力工程顾问集团西北电力设计院 1000kV GIS (gas insulated switchgear) room with corrugated steel arch roof structure
US8011147B2 (en) * 2006-09-11 2011-09-06 Hanlon John W Building system using modular precast concrete components
CN202039488U (en) * 2011-03-18 2011-11-16 姜兴胜 Concise energy-saving greenhouse
CN202866321U (en) * 2012-08-17 2013-04-10 雅致集成房屋股份有限公司 Slope roof lightweight steel construction mobile home
CN103061413A (en) * 2013-01-30 2013-04-24 建研科技股份有限公司 Herringbone roof truss component and roof truss constructed by same
CN103290969A (en) * 2013-04-25 2013-09-11 锦州鹏翔电力轻钢设备有限公司 Daylighting ventilating roof
CN203393900U (en) * 2013-06-19 2014-01-15 河南华泰建材开发有限公司 Light foam concrete hanging beam
CN103669564A (en) * 2012-09-07 2014-03-26 沈阳铝镁设计研究院有限公司 Device for connecting reinforced concrete bent frame column with steel beam instead of steel bracket
KR101509179B1 (en) * 2014-02-17 2015-04-14 주식회사 아이에스중공업 Welding beam for composition with concrete slab and column-beam joint structure using this beam
CN104563367A (en) * 2014-12-31 2015-04-29 李殿义 Construction tile for buildings
CN204804035U (en) * 2015-06-04 2015-11-25 雷海生 Individual layer factory building bent structure
CN205935403U (en) * 2016-06-01 2017-02-08 李殿义 Cellular material herringbone roof beam sequential structure and no purlin girder roof truss structure that forms thereof

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2287653Y (en) * 1997-04-11 1998-08-12 杨东升 Space pressure skeleton
CN1632252A (en) * 2005-01-18 2005-06-29 阴继庞 Light steel sealed column framework construction system
US8011147B2 (en) * 2006-09-11 2011-09-06 Hanlon John W Building system using modular precast concrete components
CN201258598Y (en) * 2008-08-23 2009-06-17 中冶天工建设有限公司 Light steel structure workshop of space plate seal system
CN201850793U (en) * 2010-11-05 2011-06-01 中国电力工程顾问集团西北电力设计院 1000kV GIS (gas insulated switchgear) room with corrugated steel arch roof structure
CN202039488U (en) * 2011-03-18 2011-11-16 姜兴胜 Concise energy-saving greenhouse
CN202866321U (en) * 2012-08-17 2013-04-10 雅致集成房屋股份有限公司 Slope roof lightweight steel construction mobile home
CN103669564A (en) * 2012-09-07 2014-03-26 沈阳铝镁设计研究院有限公司 Device for connecting reinforced concrete bent frame column with steel beam instead of steel bracket
CN103061413A (en) * 2013-01-30 2013-04-24 建研科技股份有限公司 Herringbone roof truss component and roof truss constructed by same
CN103290969A (en) * 2013-04-25 2013-09-11 锦州鹏翔电力轻钢设备有限公司 Daylighting ventilating roof
CN203393900U (en) * 2013-06-19 2014-01-15 河南华泰建材开发有限公司 Light foam concrete hanging beam
KR101509179B1 (en) * 2014-02-17 2015-04-14 주식회사 아이에스중공업 Welding beam for composition with concrete slab and column-beam joint structure using this beam
CN104563367A (en) * 2014-12-31 2015-04-29 李殿义 Construction tile for buildings
CN204804035U (en) * 2015-06-04 2015-11-25 雷海生 Individual layer factory building bent structure
CN205935403U (en) * 2016-06-01 2017-02-08 李殿义 Cellular material herringbone roof beam sequential structure and no purlin girder roof truss structure that forms thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
董晓峰: "《房屋建筑学》", 武汉理工大学出版社, pages: 414 *

Similar Documents

Publication Publication Date Title
CN101538896B (en) Construction method for jettied structure at high attitude of high-rise building
CN104712058A (en) Prestressed concrete groove-shaped plate with upper portion provided with flexural steel bars and frame structure system
CN107237398A (en) A kind of new multi and tall steel building assembled combined structure system
CN107905385A (en) The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure
CN107489090A (en) A kind of circle bamboo space truss bridge based on novel joint make
CN102418387A (en) Post-tensioning external prestressed steel beam and pre-tensioning prestressed superposed beam combined building structure system and construction technology thereof
CN207686092U (en) A kind of assembled overlapped hollow floor system
CN203961281U (en) Steel bar girder beam form frame and H section steel beam-cast-in-place concrete floor formwork system
CN106284644B (en) A kind of residential architecture structural system and its method of construction suitable for industrialized production
CN107419806A (en) A kind of grid solid beam-string structure system across X-type greatly and its construction method
CN104790299B (en) Internal-span unsupported convenient construction support and method for bridge cast-in-place box beam
CN106869390B (en) A kind of Hyperbolic vaulted roof plate girder construction of string formula
CN205935403U (en) Cellular material herringbone roof beam sequential structure and no purlin girder roof truss structure that forms thereof
CN109098423B (en) Full steel pipe scaffold structure for assembling annular suspended dome structure and construction method thereof
JP4614151B1 (en) Wooden truss beam structure
CN107447919A (en) Cellular material herringbone beam sequential structure and its formation without purlin girder roof truss structure
CN110056218A (en) A kind of single-storey factory building pumping column steel-frame structure
CN209602938U (en) A kind of composite structure bridge
CN207934292U (en) One kind is baroclined bar truss beam string composite structure
CN208167960U (en) A kind of assembled-type house
CN110468957A (en) A kind of two-way open-web truss structure system in space and its construction method
CN111485674A (en) Super-large span light steel roof truss and installation method thereof
CN204456655U (en) A kind of overlength composite steel concrete column batter post structure
CN210947342U (en) Assembly type building structure
CN210828320U (en) High braced system of floor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171208

RJ01 Rejection of invention patent application after publication