CN107447754A CN201710734394.7A CN201710734394A CN107447754A CN 107447754 A CN107447754 A CN 107447754A CN 201710734394 A CN201710734394 A CN 201710734394A CN 107447754 A CN107447754 A CN 107447754A
Authority
CN
China
Prior art keywords
pile
prefabricated tubular
tubular pile
soil
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710734394.7A
Other languages
Chinese (zh)
Inventor
丁文智
董明达
陈强
何福渤
胡旭东
张晓滨
肖纪升
李伟
李文
张津
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN GANGHANG PILE INDUSTRY Co Ltd
Tianjin Port & Channel Engineering Co Ltd
Original Assignee
TIANJIN GANGHANG PILE INDUSTRY Co Ltd
Tianjin Port & Channel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN GANGHANG PILE INDUSTRY Co Ltd, Tianjin Port & Channel Engineering Co Ltd filed Critical TIANJIN GANGHANG PILE INDUSTRY Co Ltd
Priority to CN201710734394.7A priority Critical patent/CN107447754A/en
Publication of CN107447754A publication Critical patent/CN107447754A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/48Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses the new plant stake technique and pile body of a kind of prefabricated tubular pile, the step of planting stake work, is:By deep-layer stirring machinery in the range of prefabricated pile buries on the spot by undisturbed soil action of forced stirring, the prefabricated tubular pile of pre-buried slip casting passage is implanted into underground, suitable curing agent is injected by slip casting passage and outer-penetrating agent to specified stratum forms fixed soil to form the pile body being suitably applied in soft layer;The new plant stake technique of the prefabricated tubular pile is used for the implantation of prefabricated pile, injects curing agent in the soft layers such as muck soil, silty clay and saturability soil and outer-penetrating agent make it that consolidation effect is notable, can be come into operation quickly after processing, speed of application lifting;Pile side resistance and end resistance increase, pile body vertical bearing capacity are effectively lifted;Hammer piling is decreased or even eliminated in construction, reduces and pile body is destroyed;The pollution to environment is reduced, is reduced investment outlay.

Description

The new plant stake technique of prefabricated tubular pile and the pile body formed
Technical field
The present invention relates to foundation treatment technology field, the new plant stake technique of more particularly to a kind of prefabricated tubular pile and formed Pile body.
Background technology
Undisturbed soil also known as not disturbed soil, although its compared with disturbed soil without the change of physics and chemical composition, Maintain natural structure and natural moisture content;Therefore, for undisturbed soil in the case where not disturbing for a long time, its soil structures is relative It is stable, if piling, the soil body frictional force that pile body is subject to are relatively large.
Slurry injection technique is a kind of slurries to be sent into crack, fault belt or the building of structure foundation connecing in itself Construction technology in seam, crack.The impermeability and globality for being filled stratum or building can be improved by slip casting, improves ground Condition, ensure hydraulic structure safe operation.
Because pile body mainly undertakes vertical load in actual condition, it is therefore desirable to ensure that its satisfaction in soil layer is certain The requirement of vertical bearing capacity.But for such as soft layer of the type such as muck soil, silty clay and saturability soil, Then need to be necessary to be improved pile body structure and construction technology, the ground extruding to inter-pile soil realized during stake is planted, Give full play to and the potential bearing capacity using foundation soil, the problem of to efficiently solve load-carrying capacity of soft soil foundation deficiency.
The content of the invention
It is an object of the invention to provide one kind to be applied to soft layer, effectively lifts pile body vertical bearing capacity, while can Reduce the new plant stake technique of the prefabricated tubular pile destroyed to pile body.
It is a further object of the present invention to provide the pile body that a kind of new plant stake technique using above-mentioned prefabricated tubular pile is formed.
Therefore, technical solution of the present invention is as follows:
A kind of new plant stake technique of prefabricated tubular pile, step are as follows:
S1, by prefabricated tubular pile bury in the range of undisturbed soil disturbed soil is formed by action of forced stirring, action of forced stirring is a diameter of 1.1~1.2 times of prefabricated tubular pile diameter;
S2, pre-buried a plurality of slip casting passage and it is opened in multiple in prefabricated tubular pile side wall in the prefabrication process of prefabricated tubular pile Correspond respectively with every slip casting passage and the grout outlet of insertion, make prefabricated tubular pile bury in the range of each layer of soft layer The interior at least one grout outlet of correspondence, prefabricated tubular pile stake end are provided with a grout outlet;
S3, by prefabricated tubular pile conduct oneself with dignity sink, static pressure sink or low order number vibration-sunk by way of be implanted into underground;
S4, by slip casting passage to purpose soil layer inject by 7%~15wt.% curing agent, 1%~10wt.% it is outer Slurries, the solidification of agent and the water configuration of surplus are mixed, after making cured dose of prefabricated tubular pile vicinity soil layer and outer-penetrating agent mixing cured Form the compacted soil that unconfined compressive strength is 0.3~2MPa.
It is preferred that in step s 2, slip casting passage is the disposable Grouting Pipe being embedded in prefabricated tubular pile, its internal diameter is 8mm; External diameter is 12mm;Id tolerance is ± 0.3mm.The disposable Grouting Pipe can be directly bought from commercially available prod.
In step S4, cement can be selected in curing agent;Outer-penetrating agent then selects a kind of corresponding addition according to soil concrete condition Agent or the mixture of multiple additives, such as early strength agent, retarder, water reducer;Then it is the outer of 1%~10wt.% by total amount Mix agent, 7%~15wt.% cement and surplus water it is well mixed after form slurries slip casting.
In addition, during step S4 slip casting, when soft layer is decomposed rock, unsaturated clay or silt, note Slurry pressure is 3~10Mpa;When soft layer is saturation soil layer, grouting pressure is 1.2~4Mpa;The slip casting stream of slip casting process Measure as 20~75L/min.
The art of this patent scheme also includes the pile body formed using the new plant stake technique of above-mentioned prefabricated tubular pile.
The new plant stake technique of the prefabricated tubular pile is used for the implantation of prefabricated pile, in muck soil, silty clay and saturability Curing agent is injected in the soft layers such as soil and outer-penetrating agent make it that consolidation effect is notable, can be come into operation quickly after processing, is constructed Speed is lifted;Pile side resistance and end resistance increase, pile body vertical bearing capacity are effectively lifted;Hammer is decreased or even eliminated in construction Stake is sunk, reduces and pile body is destroyed, reduce the pollution to environment, comprising noise pollution and water pollution, reduce investment outlay.
Brief description of the drawings
Fig. 1 is the structural representation of pile tube alleged by the new plant stake technique of the prefabricated tubular pile of the present invention.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment the present invention is described further, but following embodiments are absolutely not to this hair It is bright to have any restrictions.
The pile body prepared as shown in Figure 1 for a kind of new plant stake technique using prefabricated tubular pile.The pile body include value stake in Prefabricated tubular pile 3 in soft layer is formed at three with an end and prefabricated tubular pile 3 is formed in soft layer opening position located underground The fixed soil body 5, to increase the resistance at stake end and stake side, further enhances the vertical bearing capacity of pile body.
The new plant stake technique of the prefabricated tubular pile comprises the following steps that:
S1, by prefabricated tubular pile 3 bury in the range of undisturbed soil by deep-layer stirring machinery action of forced stirring be chesson, i.e., Form disturbed soil;Wherein, the diameter of a diameter of prefabricated tubular pile 3 of the disturbed soil of the formation after action of forced stirring is carried out to undisturbed soil 1.1~1.2 times;
In step sl, by, on the spot by weak soil action of forced stirring, making undisturbed soil disturbance turn into plasticity stronger in earth formation deep Disturbed soil, to reduce the construction of the soil body frictional force, i.e. lifting step S2 pile driving process that need to overcome in stake sinking watching Efficiency;
S2, due in the range of being buried in prefabricated tubular pile 3 altogether comprising two layer depths be about 2000mm soft layer 2, because This, accordingly, three disposable Grouting Pipes are embedded in three slip castings of formation in pile tube in its prefabrication process and led to by prefabricated tubular pile 3 Road 4, while three offered in the side wall of prefabricated tubular pile 3 are corresponded respectively with every slip casting passage 4 and what is penetrated goes out Mouth is starched, for after pile sinking, slip casting to be carried out to purpose stratum by slip casting passage 4;
Specifically, open up in three grout outlets in the side wall of prefabricated tubular pile 3, a grout outlet is opened in Adjacent Pile end In the pile tube side wall of (i.e. the bottom of prefabricated tubular pile 3), position that two other grout outlet opens up corresponds to prefabricated tubular pile 3 and buried respectively In the range of two soft layers 2 at and at the intermediate depth of each soft layer 2, will for subsequently in step s 4 Slip casting is injected separately into pile-end soil layer and two soft layers 2;Wherein, the disposable Grouting Pipe being embedded in prefabricated tubular pile 3 Internal diameter be 8mm, external diameter 12mm, id tolerance is ± 0.3mm.
S3, by prefabricated tubular pile 3 using deadweight sink, static pressure sink or low order number vibration-sunk by the way of be implanted into underground;Tool Body, due to carrying out mechanical agitation to the undisturbed soil at pile sinking in step sl, disturbed soil is formed it into, therefore in piling construction In can by directly using deadweight sink or static pressure sink in a manner of, can also be used according to the actual soil layer situation of soft layer 2 The mode that low order number vibration (i.e. the number of hammer piling is no more than 5 times) is sunk, realizes and hammering is decreased or even eliminated in construction Pile sinking, with reduce destruction to pile body and it is corresponding caused by environment pollution, such as noise pollution and water pollution;
S4, by slip casting passage 4 to purpose soil layer inject by 15wt.% cement, 8wt.% early strength water-reducing agents and surplus Water forms and is well mixed the slurry formed, is allowed to penetrate into purpose stratum and tool is formed with stratum soil and after 90 days cure cycles There is the compacted soil 5 of certain unconfined compressive strength;Wherein, because two soft layers 2 in the stratum are unsaturation stickiness Soil, therefore grouting pressure is set as 10Mpa, flow rate of grouting 70L/min.
After tested, take the identical soil body and the slurry of identical proportioning with sub-surface identical experimental situation, the soil body and Slurry is by blending and unconfined compressive strength after fixed line 90 days is 0.3~2MPa;By theoretical calculation, it is correspondingly formed in stake Fixed soil 5 at end and stake side, makes pile side resistance and end resistance effectively increase, relative to individually prefabricated tubular pile 3 is sunk The vertical bearing capacity of the post-job pile body of stake, the vertical bearing capacity for the pile body that the new plant stake technique is formed at least increase 20%.
It is above-mentioned that one pile body prepared using the new plant stake technique of disclosure prefabricated tubular pile is carried out with reference to embodiment Detailed description, be illustrative rather than limited, can include several embodiments according to limited scope, thus Changing and modifications under present general inventive concept is not departed from, should be belonged within protection scope of the present invention.

Claims (4)

1. the new plant stake technique of a kind of prefabricated tubular pile, it is characterised in that step is as follows:
S1, by prefabricated tubular pile bury in the range of undisturbed soil disturbed soil is formed by action of forced stirring, action of forced stirring is a diameter of prefabricated 1.1~1.2 times of pile tube diameter;
S2, pre-buried a plurality of slip casting passage and the multiple difference being opened in prefabricated tubular pile side wall in the prefabrication process of prefabricated tubular pile Corresponded with every slip casting passage and the grout outlet of insertion, make prefabricated tubular pile bury in the range of each layer of soft layer in it is right At least one grout outlet is answered, prefabricated tubular pile stake end is provided with a grout outlet;
S3, by prefabricated tubular pile conduct oneself with dignity sink, static pressure sink or low order number vibration-sunk by way of be implanted into underground;
S4, injected to purpose soil layer by the outer-penetrating agent of 7%~15wt.% curing agent, 1%~10wt.% by slip casting passage Slurries, solidification with the water configuration of surplus, make to be formed after cured dose of prefabricated tubular pile vicinity soil layer and outer-penetrating agent are mixing cured Unconfined compressive strength is 0.3~2MPa compacted soil.
2. the new plant stake technique of prefabricated tubular pile according to claim 1, it is characterised in that the slip casting passage in step S2 To be embedded in the disposable Grouting Pipe in prefabricated tubular pile, its internal diameter is 8mm;External diameter is 12mm;Id tolerance is ± 0.3mm.
3. the new plant stake technique of prefabricated tubular pile according to claim 1, it is characterised in that in step S4 slip casting process In, when soft layer is decomposed rock, unsaturated clay or silt, grouting pressure is 3~10Mpa;When soft layer is saturation Soil layer, grouting pressure are 1.2~4Mpa;The flow rate of grouting of slip casting process is 20~75L/min.
A kind of 4. pile body formed according to the new plant stake technique of prefabricated tubular pile according to any one of claims 1 to 3.
CN201710734394.7A 2017-08-24 2017-08-24 The new plant stake technique of prefabricated tubular pile and the pile body formed Pending CN107447754A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710734394.7A CN107447754A (en) 2017-08-24 2017-08-24 The new plant stake technique of prefabricated tubular pile and the pile body formed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710734394.7A CN107447754A (en) 2017-08-24 2017-08-24 The new plant stake technique of prefabricated tubular pile and the pile body formed

Publications (1)

Publication Number Publication Date
CN107447754A true CN107447754A (en) 2017-12-08

Family

ID=60494027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710734394.7A Pending CN107447754A (en) 2017-08-24 2017-08-24 The new plant stake technique of prefabricated tubular pile and the pile body formed

Country Status (1)

Country Link
CN (1) CN107447754A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115467322A (en) * 2021-05-28 2022-12-13 上海同人里岩土工程技术有限公司 Precast pile grouting after stirring and implanting into pile end and construction method thereof
CN116397687A (en) * 2023-05-26 2023-07-07 上海勘测设计研究院有限公司 Composite pile foundation
WO2024113201A1 (en) * 2022-11-28 2024-06-06 中交建筑集团有限公司 Prestressed pile and reinforcing construction method for prestressed pile used for deep muddy-soil foundation pit

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1598167A (en) * 2004-08-30 2005-03-23 江苏东达工程机械股份有限公司 Original soil strengthen pile sinking method and its construction apparatus
CN2714628Y (en) * 2004-07-28 2005-08-03 河海大学岩土工程科学研究所 Grouting device for improving bearing capacity of cast-in-situ concrete thin wall pipe pile
CN1837501A (en) * 2005-03-24 2006-09-27 曹兴明 Grouted screw pile ,construction method therefor and grouting arrangement employing same
CN101748728A (en) * 2008-10-10 2010-06-23 上海强劲基础工程有限公司 Soil cement expanding uplift pile
CN201649075U (en) * 2010-01-26 2010-11-24 中国建筑第四工程局有限公司 Deep well cast-in-place pile of reverse construction board wall of expanded head
CN102505684A (en) * 2011-11-02 2012-06-20 河海大学 Hollow stiffness-core slurry-solidified discrete material pile and construction method thereof
CN202543906U (en) * 2012-03-27 2012-11-21 浙江大学城市学院 Precast pile with reserved grouting pipes

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2714628Y (en) * 2004-07-28 2005-08-03 河海大学岩土工程科学研究所 Grouting device for improving bearing capacity of cast-in-situ concrete thin wall pipe pile
CN1598167A (en) * 2004-08-30 2005-03-23 江苏东达工程机械股份有限公司 Original soil strengthen pile sinking method and its construction apparatus
CN1837501A (en) * 2005-03-24 2006-09-27 曹兴明 Grouted screw pile ,construction method therefor and grouting arrangement employing same
CN101748728A (en) * 2008-10-10 2010-06-23 上海强劲基础工程有限公司 Soil cement expanding uplift pile
CN201649075U (en) * 2010-01-26 2010-11-24 中国建筑第四工程局有限公司 Deep well cast-in-place pile of reverse construction board wall of expanded head
CN102505684A (en) * 2011-11-02 2012-06-20 河海大学 Hollow stiffness-core slurry-solidified discrete material pile and construction method thereof
CN202543906U (en) * 2012-03-27 2012-11-21 浙江大学城市学院 Precast pile with reserved grouting pipes

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115467322A (en) * 2021-05-28 2022-12-13 上海同人里岩土工程技术有限公司 Precast pile grouting after stirring and implanting into pile end and construction method thereof
WO2024113201A1 (en) * 2022-11-28 2024-06-06 中交建筑集团有限公司 Prestressed pile and reinforcing construction method for prestressed pile used for deep muddy-soil foundation pit
CN116397687A (en) * 2023-05-26 2023-07-07 上海勘测设计研究院有限公司 Composite pile foundation

Similar Documents

Publication Publication Date Title
CN105386433B (en) A kind of microorganism soil-fixing CFG pile composite foundations and construction method
CN105887837B (en) A kind of construction method of field ground stirring concrete earth pile
CN106368214B (en) A kind of casing formula cement mixing method at pile operation method
TR201807541T4 (en) Hybrid basic structure and the method for constructing this structure.
CN100501011C (en) Hole drilling mudjack pile construction method
CN103233454A (en) Processing method of soaking, vacuum preloading and slurry injecting for sand piles of collapsible loess foundation
CN107417182B (en) Expansion type high polymer cement slurry, grouting reinforcement device and grouting reinforcement method
CN104499479A (en) Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN103184734A (en) Implanted and grouted compound pile and construction method
CN105625294A (en) Composite foundation and construction method thereof
CN102877470B (en) Combined soil nailing construction method for supporting
CN106907157B (en) A kind of shield machine normal pressure opens the cabin operation construction method
CN107513994A (en) One kind segmentation becomes supporting rotary digging stake and its construction method without leave
CN107447754A (en) The new plant stake technique of prefabricated tubular pile and the pile body formed
CN107740434A (en) It is a kind of to be used for sandy gravel, the construction method of dolomite crushed zone dam foundation ditch water protecting curtain
CN107587502A (en) A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method
CN101649614A (en) Variable-diameter multi-direction anchor pile
CN105484270B (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN106245641A (en) PHC pile tube post grouting construction technique and PHC pile tube composite pile
CN106567382B (en) A kind of pit curtain construction method in metalling
RU2303102C1 (en) Method for cast-in-place pile erection
CN110318392A (en) A kind of major diameter cement earth pile method of construction
CN206625207U (en) A kind of collapsible loess foundation rubble frame structure reinforcement system
CN206052770U (en) A kind of use cast-in-situ bored pile combines the retaining wall of compaction grouting
CN205062809U (en) End support type screw thread core composite pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171208