CN107447662B - A kind of bridge side poling constructing device - Google Patents

A kind of bridge side poling constructing device Download PDF

Info

Publication number
CN107447662B
CN107447662B CN201710829620.XA CN201710829620A CN107447662B CN 107447662 B CN107447662 B CN 107447662B CN 201710829620 A CN201710829620 A CN 201710829620A CN 107447662 B CN107447662 B CN 107447662B
Authority
CN
China
Prior art keywords
hollow pipe
bridge side
rack
sliding rack
retarder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710829620.XA
Other languages
Chinese (zh)
Other versions
CN107447662A (en
Inventor
陈在铁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shazhou Professional Institute of Technology
Original Assignee
Shazhou Professional Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shazhou Professional Institute of Technology filed Critical Shazhou Professional Institute of Technology
Priority to CN201710829620.XA priority Critical patent/CN107447662B/en
Publication of CN107447662A publication Critical patent/CN107447662A/en
Application granted granted Critical
Publication of CN107447662B publication Critical patent/CN107447662B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/106Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges

Abstract

The invention discloses a kind of bridge side poling constructing devices, it include: mounting plate, hollow pipe, track, pulley, sliding rack, lift fixing seat, retarder and rack gear, the mounting plate is arranged at intervals on the top of hollow pipe, the track is separately positioned on the two sides of hollow pipe, the pulley is respectively set in orbit, the sliding rack is located at below hollow pipe and two sides are connected with pulley respectively, the retarder is arranged in sliding rack, the lifting fixing seat is arranged below sliding rack, the rack gear is axially disposed within the bottom of hollow pipe, the gear being engaged with rack is provided on the output shaft of the retarder.Through the above way, bridge side poling constructing device of the present invention, mounting plate is fixed on bridge two sides, the laying of public lighting circuit is carried out by hollow pipe, loading frame is mounted below lifting fixing seat, after rotation using retarder with moving gear, with rack gear cooperation, driving sliding rack is moved axially along hollow pipe.

Description

A kind of bridge side poling constructing device
Technical field
The present invention relates to technical field of bridge construction, more particularly to a kind of bridge side poling constructing device.
Background technique
The later period of bridge construction needs to carry out two sides perfect, the especially laying of the installation of street lamp and sewer pipe.It is existing Have under technical conditions, generally use hanging basket and construct, hanging basket extends to two sides above bridge, and construction personnel is facilitated to grasp Make, but the volume of hanging basket is big, it is mobile inconvenient, affect the efficiency of construction.
In addition, bridge is after use, pipeline needs are periodically overhauled and are safeguarded, and bridge is higher, generallys use lifting Ladder send construction personnel to bridge side, and Partial Bridges are located on the water surface, and operation difficulty is bigger, needs to improve.
Summary of the invention
The invention mainly solves the technical problem of providing a kind of bridge side poling constructing devices, carry out the paving of route If facilitating pipeline construction and the maintenance of bridge two sides.
In order to solve the above technical problems, one technical scheme adopted by the invention is that: a kind of bridge side poling is provided and is applied Tooling is set, comprising: mounting plate, hollow pipe, track, pulley, sliding rack, lifting fixing seat, retarder and rack gear, the mounting plate It is arranged at intervals on the top of hollow pipe, the track is separately positioned on the two sides of hollow pipe, and the pulley is separately positioned on track On, the sliding rack is located at below hollow pipe and two sides are connected with pulley respectively, and the retarder is arranged in sliding rack, institute It states lifting fixing seat to be arranged below sliding rack, the rack gear is axially disposed within the bottom of hollow pipe, the output of the retarder The gear being engaged with rack is provided on axis.
In a preferred embodiment of the present invention, riser is provided between the mounting plate and hollow pipe to be connected.
In a preferred embodiment of the present invention, sliding slot corresponding with pulley is provided on the track.
In a preferred embodiment of the present invention, the sliding rack is C-shaped bent plate.
In a preferred embodiment of the present invention, column is provided between lifting fixing seat and the sliding rack to be connected.
In a preferred embodiment of the present invention, it is provided on the sliding rack corresponding with the output shaft end of retarder Bracket is provided with corresponding bearing on the bracket.
In a preferred embodiment of the present invention, electricity corresponding with the input terminal of retarder is provided on the sliding rack Machine.
In a preferred embodiment of the present invention, the winder connecting with electromechanical linear is provided on the sliding rack.
In a preferred embodiment of the present invention, threading opening is provided at the top of the hollow pipe.
In a preferred embodiment of the present invention, hanging ring and mounting hole are provided in the lifting fixing seat.
The beneficial effects of the present invention are: a kind of bridge side poling constructing device that the present invention points out, when bridge construction, peace Loading board is fixed on bridge two sides, and the laying of public lighting circuit is carried out by hollow pipe, and loading frame is mounted below lifting fixing seat, benefit After rotation with retarder with moving gear, with rack gear cooperation, driving sliding rack is moved axially along hollow pipe, facilitates the construction of pipeline Easy to operate with maintenance, work efficiency is high.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing, in which:
Fig. 1 is a kind of structural schematic diagram of one preferred embodiment of bridge side poling constructing device of the present invention.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation Example is only a part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common Technical staff's all other embodiment obtained without making creative work belongs to the model that the present invention protects It encloses.
Referring to Fig. 1, the embodiment of the present invention includes:
A kind of bridge side poling constructing device, comprising: mounting plate 1, hollow pipe 14, track 13, pulley 3, sliding rack 4, Lift fixing seat 8, retarder 5 and rack gear 16, the mounting plate 1 is arranged at intervals on the top of hollow pipe 14, the mounting plate 1 with It is provided with riser 2 between hollow pipe 14 to be connected, sound construction, mounting plate 1 is fixed on bridge two sides, spreads along bridge length direction If the installation of mounting plate 1, convenient construction can be carried out using pre-embedded bolt.
The track 13 is separately positioned on the two sides of hollow pipe 14, and the pulley 3 is separately positioned on track 13, the rail It is provided with sliding slot corresponding with pulley 3 on road 13, improves the run stability of pulley 3.The sliding rack 4 is located at hollow pipe 14 Lower section and two sides are connected with pulley 3 respectively facilitates the movement of sliding rack 4, and the retarder 5 is arranged in sliding rack 4, described It lifts fixing seat 8 to be arranged below sliding rack 4, the rack gear 16 is axially disposed within the bottom of hollow pipe 14, the retarder 5 It is provided on output shaft 7 and 16 meshed gears 10 of rack gear.The rotation driving sliding rack 4 of retarder 5 is along 14 length side of hollow pipe To movement, flexibility is good.
The sliding rack 4 is C-shaped bent plate, and stable structure is provided with column between the lifting fixing seat 8 and sliding rack 4 It is connected, so that lifting fixing seat 8 and 4 synchronizing moving of sliding rack.It is provided with hanging ring 9 and mounting hole in the lifting fixing seat 8, Facilitate the installation of loading frame fixed and the connection of personnel safety band.
It is provided with bracket 12 corresponding with 7 end of output shaft of retarder 5 on the sliding rack 4, is set on the bracket 12 It is equipped with corresponding bearing, promotes the stability of strutting system of output shaft 7.
It is provided with motor 6 corresponding with the input terminal of retarder 5 on the sliding rack 4, is driven using motor 6, the cunning The winder 11 with 6 linearly connected of motor is provided in moving frame 4, as sliding rack 4 is mobile, winder 11 carries out retractable cable, has Conducive to the power supply of motor 6.
Threading opening 15 is provided at the top of the hollow pipe 14, threading opening 15 facilitates the laying of circuit, carries out the peace of street lamp Dress.
In conclusion a kind of bridge side poling constructing device that the present invention points out, facilitate the construction of public lighting circuit with And the construction and maintenance of drainage pipeline, it is mobile flexible, it is easy to operate, it is highly-safe, improve the efficiency of work.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright description is applied directly or indirectly in other relevant technology necks Domain is included within the scope of the present invention.

Claims (10)

1. a kind of bridge side poling constructing device characterized by comprising mounting plate, hollow pipe, track, pulley, sliding Frame, lifting fixing seat, retarder and rack gear, the mounting plate are arranged at intervals on the top of hollow pipe, and the track is respectively set In the two sides of hollow pipe, the pulley is respectively set in orbit, the sliding rack be located at below hollow pipe and two sides respectively with Pulley is connected, and the retarder is arranged in sliding rack, and the lifting fixing seat is arranged below sliding rack, the rack shaft To the bottom that hollow pipe is arranged in, the gear being engaged with rack is provided on the output shaft of the retarder.
2. bridge side poling constructing device according to claim 1, which is characterized in that the mounting plate and hollow pipe it Between be provided with riser and be connected.
3. bridge side poling constructing device according to claim 1, which is characterized in that be provided with and slide on the track Take turns corresponding sliding slot.
4. bridge side poling constructing device according to claim 1, which is characterized in that the sliding rack is C-shaped bent plate.
5. bridge side poling constructing device according to claim 1, which is characterized in that the lifting fixing seat and sliding Column is provided between frame to be connected.
6. bridge side poling constructing device according to claim 1, which is characterized in that be provided on the sliding rack with The output shaft end corresponding bracket of retarder is provided with corresponding bearing on the bracket.
7. bridge side poling constructing device according to claim 1, which is characterized in that be provided on the sliding rack with The corresponding motor of the input terminal of retarder.
8. bridge side poling constructing device according to claim 7, which is characterized in that be provided on the sliding rack around Line device, winding is provided with the supply lines being connected to motor on the winder.
9. bridge side poling constructing device according to claim 1, which is characterized in that be provided at the top of the hollow pipe Threading opening.
10. bridge side poling constructing device according to claim 1, which is characterized in that set in the lifting fixing seat It is equipped with hanging ring and mounting hole.
CN201710829620.XA 2017-09-15 2017-09-15 A kind of bridge side poling constructing device Active CN107447662B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710829620.XA CN107447662B (en) 2017-09-15 2017-09-15 A kind of bridge side poling constructing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710829620.XA CN107447662B (en) 2017-09-15 2017-09-15 A kind of bridge side poling constructing device

Publications (2)

Publication Number Publication Date
CN107447662A CN107447662A (en) 2017-12-08
CN107447662B true CN107447662B (en) 2018-12-11

Family

ID=60496542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710829620.XA Active CN107447662B (en) 2017-09-15 2017-09-15 A kind of bridge side poling constructing device

Country Status (1)

Country Link
CN (1) CN107447662B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114150584B (en) * 2021-12-10 2024-01-19 江苏长江水务股份有限公司 Bridge lower web in-situ installation method for water supply pipeline

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3936198A1 (en) * 1988-11-02 1990-05-17 Raimund Hoellein Carolinenhuet Suspended hanger brackets for fixing service pipes to bridges - have facilities for each horizontal and vertical adjustment to suit alignment
JP3145017B2 (en) * 1995-10-11 2001-03-12 株式会社クボタ Water pipe bridge with walkway
CN204042181U (en) * 2014-08-19 2014-12-24 淮安自来水有限公司 Large-diameter steel pipe range distance through bridge constructing device
CN204224987U (en) * 2014-11-13 2015-03-25 中建六局土木工程有限公司 A kind of continuous girder bridge multiple pipeline installation structure
CN105908634B (en) * 2016-06-18 2018-06-22 申清章 The double driving devices and method of a kind of automatic tube-penetrating
CN206396643U (en) * 2016-12-26 2017-08-11 山西四建集团有限公司 A kind of bridge side duct installs removable job platform

Also Published As

Publication number Publication date
CN107447662A (en) 2017-12-08

Similar Documents

Publication Publication Date Title
CN205351085U (en) Bridge street lamp
CN106064798A (en) A kind of electric power overhaul hoistable platform
CN103790114A (en) Hydraulic dragging and idler wheel walking combination cable carrying crane and walking method thereof
CN108083195A (en) A kind of municipal construction road cellar well lid rapid installation device
CN107447662B (en) A kind of bridge side poling constructing device
CN201778284U (en) Inspection vehicle for bridge with steel truss
CN201195958Y (en) Numerical control circulation well type multi-storied garage
CN203729212U (en) Cable loading crane with hydraulic traction and idler wheel walking combined
CN102588915B (en) Foldable streetlamp pole easy to maintain
CN101905923A (en) Overwater-installed submersible water impeller
CN208011554U (en) A kind of LED street lamp of maintenance easy to assemble
CN201914825U (en) Arrangement structure with an underlying machinery house for automatic staircase
CN207034958U (en) A kind of extension type solar panel street lamp
CN202981870U (en) Winding type telescopic platform for window cleaning machine
CN205070312U (en) Cable kinking device
CN2853989Y (en) Structure of one-cylinder hydraulic multi-storey garage
CN209413392U (en) A kind of tridimensional parking equipment transmission device and the carrier with the device
CN207673088U (en) The garage hoisting system of convenient release
CN201031512Y (en) Hydraulic double cylinder direct-acting platform parking device
CN109826477A (en) A kind of device for vertical parking for being suitble to park oversize vehicle
CN107587423A (en) A kind of bridge railing is affiliated to running gear
CN109519601A (en) A kind of natural gas line laying apparatus
CN204847642U (en) Construction elevator stop device
CN205740478U (en) A kind of aerator lifting device
CN220227299U (en) Novel multifunctional water pump mounting rack

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181025

Address after: 215600 Fuxin Road, Zhangjiagang, Suzhou, Jiangsu 1

Applicant after: Shazhou Vocational Polytechnical College

Address before: 215600 1 Fuxin Road, Yang Shi Town, Zhangjiagang, Suzhou, Jiangsu

Applicant before: ZHANGJIAGANG SHAGONG TECHNOLOGY SERVICES CO., LTD.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant