CN107443465A - A kind of bridge construction equipment - Google Patents

A kind of bridge construction equipment Download PDF

Info

Publication number
CN107443465A
CN107443465A CN201710816246.XA CN201710816246A CN107443465A CN 107443465 A CN107443465 A CN 107443465A CN 201710816246 A CN201710816246 A CN 201710816246A CN 107443465 A CN107443465 A CN 107443465A
Authority
CN
China
Prior art keywords
block
elastic component
fore
panel
cohesive frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710816246.XA
Other languages
Chinese (zh)
Other versions
CN107443465B (en
Inventor
陈宇翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Xingmin Intelligent Equipment Technology Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710816246.XA priority Critical patent/CN107443465B/en
Publication of CN107443465A publication Critical patent/CN107443465A/en
Application granted granted Critical
Publication of CN107443465B publication Critical patent/CN107443465B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D7/00Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D7/01Means for holding or positioning work
    • B26D7/02Means for holding or positioning work with clamping means

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Forests & Forestry (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jigs For Machine Tools (AREA)

Abstract

The invention discloses a kind of bridge construction equipment, including hollow housing, clamping block, transmission device, cohesive frame, panel, fore-set, tabletting and drive device, the outer inframe is provided with the clamping block, transmission device, cohesive frame and panel from front to back, the transmission device includes the first elastic component, drive block, the second elastic component, guide bar and guiding block, first elastic component is arranged between rear end and the drive block of clamping block, there is a restricted driving bar fore-set rear end, and a tabletting is fixedly installed in the fore-set front end.The present invention solves the technical barrier that gripping force is accurately controlled during the fragile material in the presence of bridge construction process is clamping.

Description

A kind of bridge construction equipment
Technical field
The present invention relates to bridge field, more particularly to a kind of bridge construction equipment.
Background technology
Floor tile, wall brick and glassware lamp are commonly used during bridge building operations, is cut to these articles Need to carry out it in process it is clamping, because floor tile, wall brick and glass etc. belong to fragile material, when gripping force is excessive, Then easily it is caught broken, gripping force is too small, and accident easily occurs in process, although can be in hydraulic system or baric systerm The middle size that gripping force is controlled using overflow valve etc., but adjust and not enough facilitate, and hydraulic system or baric systerm easily break down, And it is larger that difficulty is overhauled when breaking down.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of bridge construction equipment, and it can solve the problem that above-mentioned show in the art The problem of.
The used to achieve the above object technical scheme of the present invention is:A kind of bridge construction equipment, including it is hollow outer Frame, clamping block, transmission device, cohesive frame, panel, fore-set, tabletting and drive device, the outer inframe are installed from front to back State clamping block, transmission device, cohesive frame and panel, the transmission device include the first elastic component, drive block, the second elastic component, Guide bar and guiding block, the first elastic component are arranged between rear end and the drive block of clamping block, and the fore-set rear end has one Restricted driving bar, and a tabletting is fixedly installed in the fore-set front end, being circumferentially provided with for the clamping block is multiple for installing the top Post and the restricted driving hole being slidably matched with the restricted driving bar, the rear end midpoint of clamping block are provided with a spiral shell shape for being used to install guide bar Hole, the midpoint position of drive block are provided with a port, and the guide bar passes through the port, and guiding block midpoint position is provided with The one restricted driving hole for penetrating guide bar, second elastic component are arranged between drive block and guiding block and are sleeved on guide bar On, the cohesive frame is fixedly connected with guiding block, and cohesive frame midpoint position is provided with one and is used to install the logical of the drive device Mouthful, the middle panel is provided with one and is used for the port that cohesive frame penetrates, and panel is fixedly connected with housing.
The first elastic component external profile diameter is less than the diameter of a circle formed on the inside of 3 restricted driving bars.
It is connected by screw bolts between the panel and housing, between cohesive frame and guiding block.
Beneficial effects of the present invention are:Mechanism is ingenious, simple in construction, easy to use, in the second elastic component and the first elasticity Clamping to workpiece progress under part collective effect, workbench or other fixtures are withstood in the tabletting in fore-set front end, and fore-set is to transmission Block produces reaction force, and in the case where thickness of workpiece is certain, if drive device power continues to increase, fore-set produces to drive block Raw reaction force causes drive block can not continue to move to clamping block, so as to keep gripping force constant to avoid being caught broken fragility work Part.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the complete section schematic diagram of the present invention;
Fig. 3 is embodiments of the invention schematic diagram;
Fig. 4 is the right view in Fig. 1.
Embodiment
The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, apparent is clearly defined so as to be made to protection scope of the present invention.
As Figure 1-Figure 4, a kind of bridge construction equipment, including hollow housing 1, clamping block 2, transmission device, linking Frame 8, panel 9, fore-set 10, tabletting 11 and drive device 14, the clamping block 2, transmission are installed from front to back in the housing 1 Device, cohesive frame 8 and panel 9, the transmission device include the first elastic component 3, drive block 4, the second elastic component 5, the and of guide bar 6 Guiding block 7, the first elastic component 3 are arranged between rear end and the drive block 4 of clamping block 2, and there is a limit rear end of fore-set 10 Row bar, and a tabletting 11 is fixedly installed in the front end of the fore-set 10, being circumferentially provided with for the clamping block 2 is multiple described for installing Fore-set 10 and the restricted driving hole being slidably matched with the restricted driving bar, the rear end midpoint of clamping block 2 are provided with one and are used to install guide bar 6 Spiral shell shape hole, the midpoint position of drive block 4 is provided with a port, and the guide bar 6 passes through the port, the midpoint of guiding block 7 Position is provided with a restricted driving hole for being used to penetrate guide bar 6, and second elastic component 5 is arranged between drive block 4 and guiding block 7 And be sleeved on guide bar 6, the cohesive frame 8 is fixedly connected with guiding block 7, and the midpoint position of cohesive frame 8 is provided with one and is used to pacify The port of the drive device 14 is filled, the middle part of panel 9 is provided with one and is used for the port that cohesive frame 8 penetrates, panel 9 and housing 1 is fixedly connected, and during work, the tabletting 11 of the front end of fore-set 10, which is withstood in frame, is used for the mounting surface for placing workpiece.
The external profile diameter of first elastic component 3 is less than the diameter of a circle formed on the inside of 3 restricted driving bars.
It is connected by screw bolts between the panel 9 and housing 1, between cohesive frame 8 and guiding block 7.
As shown in figure 3, during work, drive device 14 drives cohesive frame 8 to promote guiding block 7 to be moved axially along guide bar 6, makes Second elastic component 5 produces compression, and drive block 4 is compressed the first elastic component 3, is promoted using the deformation of the first elastic component 3 Clamping block 2 presses to workpiece 15, and under the collective effect of workbench or other fixtures 16, certain gripping force is produced to workpiece, Meanwhile workbench or other fixtures 16 are withstood in the tabletting 11 in the front end of fore-set 10, fore-set 10 produces reaction to drive block 4 Power, in the case where the thickness of workpiece 15 is certain, if the power of drive device 14 continues to increase, fore-set 10 produces to drive block 4 Reaction force causes drive block 4 can not continue to move to clamping block 2, so as to keep gripping force constant to avoid being caught broken fragility work Part.
Beneficial effects of the present invention are:Mechanism is ingenious, simple in construction, easy to use, in the second elastic component and the first elasticity Clamping to workpiece progress under part collective effect, workbench or other fixtures are withstood in the tabletting in fore-set front end, and fore-set is to transmission Block produces reaction force, and in the case where thickness of workpiece is certain, if drive device power continues to increase, fore-set produces to drive block Raw reaction force causes drive block can not continue to move to clamping block, so as to keep gripping force constant to avoid being caught broken fragility work Part.
More than, be only the present invention embodiment, but protection scope of the present invention is not limited thereto, it is any without The change or replacement that creative work is expected are crossed, should be all included within the scope of the present invention.Therefore, protection of the invention Scope should be determined by the scope of protection defined in the claims.

Claims (3)

1. a kind of bridge construction equipment, including hollow housing, clamping block, transmission device, cohesive frame, panel, fore-set, tabletting and Drive device, the outer inframe are provided with the clamping block, transmission device, cohesive frame and panel, the transmission dress from front to back Put including the first elastic component, drive block, the second elastic component, guide bar and guiding block, the first elastic component is after clamping block Between end and the drive block, there is a restricted driving bar fore-set rear end, and a tabletting, the folder is fixedly installed in the fore-set front end Gu block is circumferentially provided with multiple restricted driving holes for installing the fore-set and being slidably matched with the restricted driving bar, after clamping block End midpoint is provided with a spiral shell shape hole for being used to install guide bar, and the midpoint position of drive block is provided with a port, the guide bar Through the port, guiding block midpoint position is provided with a restricted driving hole for being used to penetrate guide bar, the second elastic component peace Between drive block and guiding block and it is sleeved on guide bar, the cohesive frame is fixedly connected with guiding block, cohesive frame midpoint Position is provided with a port for being used to install the drive device, and the middle panel is provided with one and led to for what cohesive frame penetrated Mouthful, panel is fixedly connected with housing.
2. bridge construction equipment as claimed in claim 1, it is characterised in that:The first elastic component external profile diameter is less than 3 The diameter of a circle formed on the inside of the restricted driving bar.
3. bridge construction equipment as claimed in claim 1, it is characterised in that:Between the panel and housing, cohesive frame is with leading Draw and be connected by screw bolts between block.
CN201710816246.XA 2017-09-12 2017-09-12 A kind of bridge construction equipment Active CN107443465B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710816246.XA CN107443465B (en) 2017-09-12 2017-09-12 A kind of bridge construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710816246.XA CN107443465B (en) 2017-09-12 2017-09-12 A kind of bridge construction equipment

Publications (2)

Publication Number Publication Date
CN107443465A true CN107443465A (en) 2017-12-08
CN107443465B CN107443465B (en) 2018-11-09

Family

ID=60496227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710816246.XA Active CN107443465B (en) 2017-09-12 2017-09-12 A kind of bridge construction equipment

Country Status (1)

Country Link
CN (1) CN107443465B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2486270Y (en) * 2001-07-24 2002-04-17 区达光 Synchronous expansion and retraction clamp
CN2623411Y (en) * 2002-12-13 2004-07-07 富士康(昆山)电脑接插件有限公司 Pick-and-place device for electronic component
CN2627686Y (en) * 2003-06-03 2004-07-21 顺连电子股份有限公司 Electronic card connector
CN101295838A (en) * 2007-04-27 2008-10-29 曹玉刚 Magnetic slot mouth suction type safety socket, plug and switching plug
CN104924241A (en) * 2015-06-25 2015-09-23 佛山市普拉迪数控科技有限公司 Circuit board clamp capable of achieving rapid clamping
CN105388606A (en) * 2014-08-22 2016-03-09 松下知识产权经营株式会社 Socket, adaptor, and assembly jig

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2486270Y (en) * 2001-07-24 2002-04-17 区达光 Synchronous expansion and retraction clamp
CN2623411Y (en) * 2002-12-13 2004-07-07 富士康(昆山)电脑接插件有限公司 Pick-and-place device for electronic component
CN2627686Y (en) * 2003-06-03 2004-07-21 顺连电子股份有限公司 Electronic card connector
CN101295838A (en) * 2007-04-27 2008-10-29 曹玉刚 Magnetic slot mouth suction type safety socket, plug and switching plug
CN105388606A (en) * 2014-08-22 2016-03-09 松下知识产权经营株式会社 Socket, adaptor, and assembly jig
CN104924241A (en) * 2015-06-25 2015-09-23 佛山市普拉迪数控科技有限公司 Circuit board clamp capable of achieving rapid clamping

Also Published As

Publication number Publication date
CN107443465B (en) 2018-11-09

Similar Documents

Publication Publication Date Title
CN202097551U (en) Automatic drilling, chamfering and tapping machine
CN107443465A (en) A kind of bridge construction equipment
CN201559242U (en) Production equipment for wood-plastic board
CN108214961A (en) A kind of novel bridge construction equipment
CN203245472U (en) Copper pipe electrode jaw of numerical control electro discharge drilling machine
CN107336372A (en) A kind of novel bridge Architectural Equipment
CN108214962A (en) A kind of improved bridge Architectural Equipment
CN112643895A (en) Perforating device for glass processing
CN110877364A (en) Perforating device is used in new material processing
CN109623023A (en) A kind of safe cutting means of aluminium plate
CN205420182U (en) Supplementary piece device that closes of cavity glass
CN209831899U (en) Manual side hole drill capable of improving operation speed
CN108214959A (en) A kind of clamping device of modified Double-spring constant force control
CN107351111B (en) A kind of robots arm's hand
CN107334344A (en) A kind of novel water glass device
CN107415062A (en) A kind of clamping device of Double-spring constant force control
CN204194857U (en) A kind of automatic drilling machine
CN219469015U (en) Discharging machine with arrangement protection function for CCL production
CN214576855U (en) High-precision fishing tool for downhole drilling tool
CN108214960A (en) A kind of clamping device of novel Double-spring constant force control
CN107856046A (en) A kind of improved machine robot arm hand
CN103331637B (en) A kind of beveler automatic feeding
CN211073715U (en) Cutting device is used in plastics production
CN216613268U (en) Baffle electric mechanism after form advancing
CN205085504U (en) Bright chain mounting panel automatic tapping machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180928

Address after: 312300 Zhujiahe village, Dongguan Street, Shangyu District, Shaoxing, Zhejiang

Applicant after: ZHONGJIAN LUQIAO EQUIPMENT Co.,Ltd.

Address before: 134099 1985 building street, Dongchang District, Tonghua, Jilin

Applicant before: Chen Yuxiang

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211012

Address after: 271000 high end talent entrepreneurship base in the middle of Nantianmen street, high tech Zone, Tai'an City, Shandong Province

Patentee after: Taian Zhongquan Information Technology Co.,Ltd.

Address before: 312300 Zhujiahe village, Dongguan Street, Shangyu District, Shaoxing, Zhejiang

Patentee before: ZHONGJIAN LUQIAO EQUIPMENT Co.,Ltd.

Effective date of registration: 20211012

Address after: 271000 Taishan science and Technology Industrial Park, north of yitianmen street, high tech Zone, Tai'an City, Shandong Province

Patentee after: Taian wisdom Valley Industrial Park Operation Management Co.,Ltd.

Address before: 271000 high end talent entrepreneurship base in the middle of Nantianmen street, high tech Zone, Tai'an City, Shandong Province

Patentee before: Taian Zhongquan Information Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240114

Address after: 271000 Donghe North Village, Beijipo Office, High tech Zone, Tai'an City, Shandong Province

Patentee after: Shandong Xingmin Intelligent Equipment Technology Co.,Ltd.

Address before: 271000 Taishan science and Technology Industrial Park, north of yitianmen street, high tech Zone, Tai'an City, Shandong Province

Patentee before: Taian wisdom Valley Industrial Park Operation Management Co.,Ltd.