CN107433306A - A kind of forming method of banjo axle for vehicle - Google Patents

A kind of forming method of banjo axle for vehicle Download PDF

Info

Publication number
CN107433306A
CN107433306A CN201610355960.9A CN201610355960A CN107433306A CN 107433306 A CN107433306 A CN 107433306A CN 201610355960 A CN201610355960 A CN 201610355960A CN 107433306 A CN107433306 A CN 107433306A
Authority
CN
China
Prior art keywords
steel pipe
seamless steel
bulging
finished product
otch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610355960.9A
Other languages
Chinese (zh)
Inventor
郑再象
刘军
张振越
王凯强
陆秋懿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Co-Power Science & Technology Co Ltd
Original Assignee
Wuxi Co-Power Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Co-Power Science & Technology Co Ltd filed Critical Wuxi Co-Power Science & Technology Co Ltd
Priority to CN201610355960.9A priority Critical patent/CN107433306A/en
Publication of CN107433306A publication Critical patent/CN107433306A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D53/00Making other particular articles
    • B21D53/88Making other particular articles other parts for vehicles, e.g. cowlings, mudguards
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)

Abstract

The invention provides a kind of forming method of the banjo axle for vehicle, including:Blanking, intercept seamless steel pipe;First bulging, seamless steel pipe is placed in semi-finished product mould, superhigh pressure liquid medium is injected into seamless steel pipe, the seamless steel pipe is expanded outwardly to the outer wall of the seamless steel pipe and is bonded with the inwall of the semi-finished product mould, then made annealing treatment;Punching, makes a call to a pair of symmetrical holes at a distance in the middle part of seamless steel pipe;Otch, otch is carried out along the axial direction of the seamless steel pipe between a pair of symmetrical holes;Final bulging, seamless steel pipe is placed in finished product die, and supporter is inserted into the cavity of seamless steel pipe, the outer wall of incision dilatating and deformable to the seamless steel pipe of seamless steel pipe is bonded with the inwall of the finished product die, so as to obtain the banjo axle.The integral rigidity and intensity of axle housing of the present invention can be more preferable, reduce a large amount of welding job amounts, internal stress is small, and the fatigue resistance of workpiece greatly enhances.

Description

A kind of forming method of banjo axle for vehicle
Technical field
The present invention relates to the forming method of technical field of vehicle, especially a kind of banjo axle for vehicle.
Background technology
With the rapid development of auto manufacturing of China, automobile will gradually adopt that intensity is high, in light weight, manufacturer Just axle housing.
At present, domestic and international automobile axle housing substantially uses two kinds of structures, and one kind is segmented, and another kind is overall Formula.Separable housing is structurally characterized in that:Center section is bolted by axle housing, Qiao Gai, two casting, Both ends axle tube is respectively pressed into axle housing, Qiao Gai, then soldering.However, separable housing has several drawbacks in that: 1. whole axle housing is made up of two casting and seamless steel pipe, manufacturing procedure is complicated, it is necessary to equipment is more, processing capacity Greatly, productivity ratio is low.2. axle housing, Qiao Gai, axle tube are processed respectively, then equipment combination, easily causes accumulation Error.Overall precision is not easy to ensure.3. the weight of whole axle housing is larger.
Publication No. CN2032167U discloses a kind of Integral type bridge shell for automobile, and it is by the nothing after scalable Seam butt welding of steel tube, which closes, to be formed, scalable to refer to pass through the shrinkage block draw in the both ends of one section of steel pipe, one end, and another One end through tube cavity be put into hard rubber mold block pressurization after, make steel pipe by glue mold block deformation and dilatating and deformable. The result weld seam of the axle housing is short, and strength and stiffness are high, it is ensured that the precision of axle housing, while extend making for axle housing Use the life-span.Need to do however, elongation percentage is inadequate when the interlude of above-mentioned banjo axle is due to punching press, during butt welding Triangle reinforced welding, both ends bridge tube have twice cross weld with interlude soldering, easily cause cumulative errors, overall Precision is not easy to ensure.
The content of the invention
It is an object of the invention to provide a kind of banjo axle for reducing welding capacity and technique and being simply to vehicle Moulding process.
The technical scheme that the present invention solves above-mentioned technical problem is as follows:
A kind of moulding process of banjo axle for vehicle, comprises the following steps:
Blanking, according to the length of required banjo axle, intercept seamless steel pipe;
First bulging, the seamless steel pipe is placed in semi-finished product mould, injects superelevation into the seamless steel pipe Press liquid medium, the seamless steel pipe is set to expand outwardly to the outer wall of the seamless steel pipe and the semi-finished product mould Inwall fitting, then made annealing treatment, so as to obtain the seamless steel pipe after first bulging;
Punch, a pair of symmetrical holes are made a call at a distance in the middle part of the seamless steel pipe after the first bulging;
Otch, otch is carried out along the axial direction of the seamless steel pipe between the pair of symmetrical holes, after obtaining otch Seamless steel pipe;
Final bulging, the seamless steel pipe after the otch is placed in finished product die, to seamless after the otch Insertion supporter in the cavity of steel pipe, make the incision dilatating and deformable of the seamless steel pipe to the seamless steel pipe Outer wall is bonded with the inwall of the finished product die, so as to obtain the banjo axle.
On the basis of above-mentioned technical proposal, the present invention can also do following improvement:
Alternatively, in blanking step, the length of the seamless steel pipe of interception is 1000mm-1500mm.
Alternatively, the first bulging step is specifically to be injected using extra high voltage system into described seamless steel pipe Superhigh pressure liquid medium, the middle cross section of the seamless steel pipe after the first bulging is square.
Alternatively, the final bulging step is to fill in rubber into the cavity of the seamless steel pipe after the otch Capsule, and high-pressure liquid medium is injected into the rubber bag tank, while apply axially to the both ends of the seamless steel pipe Load, to cause outer wall and the finished product of the incision dilatating and deformable of the seamless steel pipe to the seamless steel pipe The inwall fitting of mould.
Alternatively, the final bulging step is to insert polyurethane into the inner chamber of the seamless steel pipe after the otch Rod applies axial load to produce pressure at the both ends of the seamless steel pipe, makes cutting for the seamless steel pipe The outer wall of dilatating and deformable to the seamless steel pipe is bonded with the inwall of the finished product die at mouthful.
Alternatively, for the banjo axle obtained after bulging step, in addition to its two tip cut-off processing more than The step of amount.
Alternatively, the first bulging step and the final bulging step are cold machine-shaping.
Alternatively, in blanking step, the cross section of the seamless steel pipe is circular or square.
Alternatively, in first bulging step, the both ends of the seamless steel pipe are sealings.
Alternatively, for the banjo axle obtained after excision allowance step, the step welded is included Suddenly, the welding step is that oil sump and shrouding is respectively welded in both sides at the seamless steel pipe intermediate openings.
Beneficial effects of the present invention:
When carrying out first bulging step, 1. seamless steel pipe will not internally damage the present invention in structure and in performance Bad, the integral rigidity and intensity of axle housing can be more preferable, reduce a large amount of welding job amounts, and internal stress is small, workpiece it is anti-tired Labor intensity greatly enhances;
2. the stock utilization of the present invention is higher, the waste of excess stock is not had;
3. the process of the present invention is few, processing efficiency is higher;
4. the present invention utilizes cooling effect of the superhigh pressure liquid in forming process, make workpiece is cooled to strengthen, obtain The workpiece strength higher than general punch process.
Brief description of the drawings
Fig. 1 is the process chart of the moulding process of the banjo axle for vehicle of the present invention;
Fig. 2 is the change that the cross section in the middle part of the seamless steel pipe in process chart shown in Fig. 1 in step 5 elapses over time Change figure.
Embodiment
The principle and feature of the present invention are described below in conjunction with accompanying drawing, example is served only for explaining this hair It is bright, it is not intended to limit the scope of the present invention.
When carrying out first bulging step, seamless steel pipe will not internally be damaged the present invention in structure and in performance, The integral rigidity and intensity of axle housing can be more preferable, reduce a large amount of welding job amounts, and internal stress is small, workpiece it is antifatigue strong Degree greatly enhances;
The stock utilization of the present invention is higher, does not have the waste of excess stock;
The process of the present invention is few, and processing efficiency is higher;
The present invention utilizes cooling effect of the superhigh pressure liquid in forming process, makes workpiece is cooled to strengthen, obtains than one As the higher workpiece strength of punch process.
The invention provides a kind of moulding process of the banjo axle for vehicle, using seamless steel pipe as pre- Product.Fig. 1 is the process chart of the moulding process of the banjo axle for vehicle of the present invention.Referring to Fig. 1, bag Include following steps:
Step 1, blanking:From the seamless steel pipe of certain size, the length of needs is intercepted, is generally 1000mm-1500mm.Wherein, the cross section of seamless steel pipe both can be square or circular.
Step 2, first bulging:The seamless steel pipe is placed in semi-finished product mould, into the seamless steel pipe Superhigh pressure liquid medium is injected, the seamless steel pipe is expanded outwardly to the outer wall and described half of the seamless steel pipe The inwall fitting of finished product die, is then made annealing treatment, so as to obtain the seamless steel pipe after first bulging.
The concrete operations of first bulging are as follows:The seamless steel pipe is placed in the lower mould of semi-finished product mould, on Mould is descending, and after matched moulds, superhigh pressure liquid medium is injected into described seamless steel pipe using extra high voltage system, It is produced high pressure, while also apply axial thrust at the both ends of pipe, carry out feed supplement, be situated between in superhigh pressure liquid In the presence of matter and axial thrust, seamless steel pipe material is plastically deformed, and finally interior with semi-finished product mould Wall is bonded.
Wherein, superhigh pressure liquid medium can be emulsion, resistance to force feed or water, and its pressure general control is In the range of 200-400Mpa.Extra high voltage system can be pressurized cylinder or super-pressure pump.
The middle cross section of seamless steel pipe after the first bulging is square.If in blanking step, interception The cross section of seamless steel pipe is circle, then the cross-sectional deformation at the middle part of seamless steel pipe is side after first bulging Shape.If in blanking step, the cross section of the seamless steel pipe of interception is square, then seamless after first bulging The cross-sectional deformation at the middle part of steel pipe fits square for the inwall with the semi-finished product mould.
It is to eliminate the residual stress after first bulging to take annealing herein.
Step 3, punching:Made a call at a distance in the middle part of seamless steel pipe after the middle part expander a pair it is symmetrical Hole.Pitch of holes between a pair of symmetrical holes determines according to the arc length among axle housing.
Step 4, otch:Cut between the pair of symmetrical holes along the axial direction of the seamless steel pipe, form one The individual otch being axially distributed.
Step 5, final bulging:Seamless steel pipe after the otch is placed in finished product die, to the otch Insertion supporter in the cavity of seamless steel pipe afterwards, make the incision dilatating and deformable of the seamless steel pipe to the nothing The outer wall of seam steel pipe is bonded with the inwall of the finished product die, so as to obtain the banjo axle.
In a preferred embodiment, the final bulging step is the cavity to the seamless steel pipe after the otch In fill in rubber bag tank, and high-pressure liquid medium is injected into the rubber bag tank, while to the two of the seamless steel pipe End applies axial load, to cause the incision dilatating and deformable of the seamless steel pipe to the outer wall of the seamless steel pipe It is bonded with the inwall of the finished product die.
Wherein, high-pressure liquid medium can also be emulsion, resistance to force feed or water, and its Stress control is in 100- In the range of 300Mpa.
In a further advantageous embodiment, the final bulging step is into the seamless steel pipe after the otch Polyurethane rod is inserted in chamber to produce pressure, while applies axial load at the both ends of the seamless steel pipe, makes institute Incision dilatating and deformable to the outer wall of the seamless steel pipe and the inwall of the finished product die for stating seamless steel pipe pastes Close.
Fig. 2 is that the cross section in the middle part of the seamless steel pipe in process chart shown in Fig. 1 in step 5 pushes away over time The variation diagram of shifting.Referring to Fig. 2, wherein, a is the signal of cross section of time when being 2.5s in the middle part of seamless steel pipe Figure, b are the schematic diagrames of cross section of time when being 14.5s in the middle part of seamless steel pipe, c be the time when being 25s without The schematic diagram of the cross section in the middle part of steel pipe is stitched, d is the signal of cross section of time when being 35s in the middle part of seamless steel pipe Figure.It can be seen that over time, the cross section in the middle part of seamless steel pipe constantly swells until and mould Has the fitting of die cavity inwall.
Step 6, excision allowance:To two tip cut-off allowance of seamless steel pipe, so that its length meets Required length.
Step 7, welding:The welding step is that both sides are respectively welded at the seamless steel pipe intermediate openings Oil sump and shrouding, to form complete banjo axle.
So far, it is possible to obtain required banjo axle.
It should be noted that the final bulging step in first bulging step and step 5 in step 2 is Cold machine-shaping.
Embodiment 1:
Step 1, blanking:From the seamless steel pipe of certain size, 1000mm therein is intercepted.Wherein, nothing The cross section for stitching steel pipe is square.
Step 2, first bulging:The seamless steel pipe is placed in the lower mould of semi-finished product mould, under mold OK, after matched moulds, superhigh pressure liquid medium is injected into described seamless steel pipe using extra high voltage system, makes its production Raw high pressure, while also apply axial thrust at the both ends of pipe, feed supplement is carried out, in superhigh pressure liquid medium and axle To in the presence of thrust, seamless steel pipe material is plastically deformed, and finally the inwall with semi-finished product mould pastes Close.
Step 3, punching:In the middle part of seamless steel pipe after the middle part expander it is separated by a distance make a call to a pair it is symmetrical Hole.
Step 4, otch:Cut between the pair of symmetrical holes along the axial direction of the seamless steel pipe, form one The individual otch being axially distributed.
Step 5, final bulging:Fill in rubber bag tank into the cavity of the seamless steel pipe after the otch, and to institute State and high-pressure liquid medium is injected in rubber bag tank, while apply axial load to the both ends of the seamless steel pipe, so that The seamless steel pipe incision dilatating and deformable to the outer wall of the seamless steel pipe and the inwall of the finished product die Fitting.
Step 6, excision allowance:To two tip cut-off allowance of seamless steel pipe, so that its length meets Required length.So far, it is possible to obtain required banjo axle.
Step 7, welding:The welding step is that both sides are respectively welded at the seamless steel pipe intermediate openings Oil sump and shrouding.
So far, it is possible to obtain required banjo axle.
Embodiment 2:
Step 1, blanking:From the seamless steel pipe of certain size, 1500mm therein is intercepted.Wherein, nothing The cross section for stitching steel pipe is circle.
Step 2, first bulging:The seamless steel pipe is placed in the lower mould of semi-finished product mould, under mold OK, after matched moulds, superhigh pressure liquid medium is injected into described seamless steel pipe using extra high voltage system, makes its production Raw high pressure, while also apply axial thrust at the both ends of pipe, feed supplement is carried out, in superhigh pressure liquid medium and axle To in the presence of thrust, seamless steel pipe material is plastically deformed, and finally the inwall with semi-finished product mould pastes Close.
Step 3, punching:In the middle part of seamless steel pipe after the middle part expander it is separated by a distance make a call to a pair it is symmetrical Hole.
Step 4, otch:Cut between the pair of symmetrical holes along the axial direction of the seamless steel pipe, form one The individual otch being axially distributed.
Step 5, final bulging:Polyurethane rod is inserted into the inner chamber of the seamless steel pipe after the otch to produce Pressure, while apply axial load at the both ends of the seamless steel pipe, expand the incision of the seamless steel pipe The outer wall for being deformed into the seamless steel pipe is bonded with the inwall of the finished product die.
Step 6, excision allowance:To two tip cut-off allowance of seamless steel pipe, so that its length meets Required length.
Step 7, welding:The welding step is that both sides are respectively welded at the seamless steel pipe intermediate openings Oil sump and shrouding.
So far, it is possible to obtain required banjo axle.
Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, all essences in the present invention God any modification, equivalent substitution and improvements made etc., should be included in the protection of the present invention with principle Within the scope of.

Claims (10)

1. the forming method of a kind of banjo axle for vehicle, it is characterised in that comprise the following steps:
Blanking, according to the length of required banjo axle, intercept seamless steel pipe;
First bulging, the seamless steel pipe is placed in semi-finished product mould, injects superelevation into the seamless steel pipe Press liquid medium, the seamless steel pipe is set to expand outwardly to the outer wall of the seamless steel pipe and the semi-finished product mould Inwall fitting, then made annealing treatment, so as to obtain the seamless steel pipe after first bulging;
Punch, a pair of symmetrical holes are made a call at a distance in the middle part of the seamless steel pipe after the middle part expander;
Otch, otch is carried out along the axial direction of the seamless steel pipe between the pair of symmetrical holes, after obtaining otch Seamless steel pipe;
Final bulging, the seamless steel pipe after the otch is placed in finished product die, to seamless after the otch Insertion supporter in the cavity of steel pipe, make the incision dilatating and deformable of the seamless steel pipe to the seamless steel pipe Outer wall is bonded with the inwall of the finished product die, so as to obtain the banjo axle.
2. the forming method of the banjo axle according to claim 1 for vehicle, its feature exist In in blanking step, the length of the seamless steel pipe of interception is 1000mm-1500mm.
3. the forming method of the banjo axle according to claim 1 or 2 for vehicle, its feature It is, the first bulging step is specifically to inject super-pressure into described seamless steel pipe using extra high voltage system Liquid medium, the middle cross section of the seamless steel pipe after the first bulging is square.
4. the forming method of the banjo axle for vehicle according to any one of right 1-3, it is special Sign is that the final bulging step is that rubber bag tank is filled in into the cavity of the seamless steel pipe after the otch, and High-pressure liquid medium is injected into the rubber bag tank, while applies axial load to the both ends of the seamless steel pipe, To cause outer wall and the finished product die of the incision dilatating and deformable of the seamless steel pipe to the seamless steel pipe Inwall is bonded.
5. the forming method of the banjo axle for vehicle according to any one of right 1-3, it is special Sign is, the final bulging step be inserted into the inner chamber of the seamless steel pipe after the otch polyurethane rod with Pressure is produced, while applies axial load at the both ends of the seamless steel pipe, makes the incision of the seamless steel pipe The outer wall of dilatating and deformable to the seamless steel pipe is bonded with the inwall of the finished product die.
6. the forming method of the banjo axle for vehicle according to any one of claim 1-5, Characterized in that, for the banjo axle obtained after bulging step, in addition to more than the processing of its two tip cut-off The step of amount.
7. the forming method of the banjo axle for vehicle according to any one of claim 1-6, Characterized in that, the first bulging step and the final bulging step are cold machine-shaping.
8. the forming method of the banjo axle for vehicle according to any one of claim 1-7, Characterized in that, in blanking step, the cross section of the seamless steel pipe is circular or square.
9. the forming method of the banjo axle for vehicle according to any one of claim 1-8, Characterized in that, in first bulging step, the both ends of the seamless steel pipe are sealings.
10. the shaping side of the banjo axle for vehicle according to any one of claim 6-9 Method, it is characterised in that for the banjo axle obtained after excision allowance step, in addition to weld Step, the welding step are that oil sump and envelope is respectively welded in both sides at the seamless steel pipe intermediate openings Plate.
CN201610355960.9A 2016-05-25 2016-05-25 A kind of forming method of banjo axle for vehicle Pending CN107433306A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610355960.9A CN107433306A (en) 2016-05-25 2016-05-25 A kind of forming method of banjo axle for vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610355960.9A CN107433306A (en) 2016-05-25 2016-05-25 A kind of forming method of banjo axle for vehicle

Publications (1)

Publication Number Publication Date
CN107433306A true CN107433306A (en) 2017-12-05

Family

ID=60454240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610355960.9A Pending CN107433306A (en) 2016-05-25 2016-05-25 A kind of forming method of banjo axle for vehicle

Country Status (1)

Country Link
CN (1) CN107433306A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108838270A (en) * 2018-08-27 2018-11-20 广东思豪内高压科技有限公司 A kind of water swelling moulding process of universal joint for automobile
CN110153264A (en) * 2019-04-22 2019-08-23 秦皇岛通桥科技有限公司 The integral forming method of coaxial-type electric automobile drive axle axle housing
CN112453238A (en) * 2020-11-17 2021-03-09 燕山大学 Stamping forming method of integral axle housing bridge package
CN114789217A (en) * 2022-04-27 2022-07-26 广东轻量科技发展有限责任公司 Automobile axle housing, automobile axle housing mold and forming method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1228362A (en) * 1998-10-28 1999-09-15 辽源市重型机器厂 Vehicle rear axle shell hydraulic expanding-forming process
JP2003211236A (en) * 2002-01-21 2003-07-29 Nippon Steel Corp Hydroforming method
JP2007245180A (en) * 2006-03-15 2007-09-27 Jfe Steel Kk Method and apparatus for hydroforming metallic tube
CN102527875A (en) * 2011-08-22 2012-07-04 张志平 Processing method of whole automobile axle housing with shaft head
CN102886458A (en) * 2012-09-24 2013-01-23 重庆科技学院 Overall composite inner high-pressure flow type bulging process for car drive axle
CN103084460A (en) * 2013-01-19 2013-05-08 张家港合瑞车桥有限公司 Monolithic molding method of light duty truck weldless axle case
CN103317053A (en) * 2013-06-20 2013-09-25 重庆科技学院 Integrally compound multi-bulging process for automobile drive axle

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1228362A (en) * 1998-10-28 1999-09-15 辽源市重型机器厂 Vehicle rear axle shell hydraulic expanding-forming process
JP2003211236A (en) * 2002-01-21 2003-07-29 Nippon Steel Corp Hydroforming method
JP2007245180A (en) * 2006-03-15 2007-09-27 Jfe Steel Kk Method and apparatus for hydroforming metallic tube
CN102527875A (en) * 2011-08-22 2012-07-04 张志平 Processing method of whole automobile axle housing with shaft head
CN102886458A (en) * 2012-09-24 2013-01-23 重庆科技学院 Overall composite inner high-pressure flow type bulging process for car drive axle
CN103084460A (en) * 2013-01-19 2013-05-08 张家港合瑞车桥有限公司 Monolithic molding method of light duty truck weldless axle case
CN103317053A (en) * 2013-06-20 2013-09-25 重庆科技学院 Integrally compound multi-bulging process for automobile drive axle

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108838270A (en) * 2018-08-27 2018-11-20 广东思豪内高压科技有限公司 A kind of water swelling moulding process of universal joint for automobile
CN108838270B (en) * 2018-08-27 2021-01-26 广东思豪内高压科技有限公司 Water expansion forming process of universal joint for automobile
CN110153264A (en) * 2019-04-22 2019-08-23 秦皇岛通桥科技有限公司 The integral forming method of coaxial-type electric automobile drive axle axle housing
CN112453238A (en) * 2020-11-17 2021-03-09 燕山大学 Stamping forming method of integral axle housing bridge package
CN112453238B (en) * 2020-11-17 2023-06-16 燕山大学 Stamping forming method of integral axle housing and axle package
CN114789217A (en) * 2022-04-27 2022-07-26 广东轻量科技发展有限责任公司 Automobile axle housing, automobile axle housing mold and forming method

Similar Documents

Publication Publication Date Title
CN107433306A (en) A kind of forming method of banjo axle for vehicle
KR100286623B1 (en) Metal tube hydraulic bulging processing method and apparatus
US8171769B2 (en) Method of forming a flanged tubular member in hydroforming
CN103084460B (en) Monolithic molding method of light duty truck weldless axle case
US7337641B1 (en) Hydroformed tubular members and method of hydroforming tubular members for vehicles
CN109078994B (en) Axial-radial Splicing Mechanism manufacturing process of the wide flange stud cylindrical member of thin-walled
CN101947721B (en) Processing method of hollow shaft with small orifices and large inner holes
CN106133342A (en) Self-punching rivet
JP2001321846A (en) Manufacturing method for cylindrical body with deformed cross section and axle beam for torsion beam
CN105312372A (en) Car auxiliary frame and forming method
CN107639144B (en) Hydraulic forming method for driving axle housing by adopting high-strength welded pipe and without annealing
CN108723162A (en) A kind of method that Fluid pressure induction shapes tangential non-close variable cross-section tubular member
CN102616278A (en) Vehicle front fingerboard and forming method thereof
CN107755512A (en) A kind of tubular member moulding process
CN105172902B (en) Heavy truck rear guard support and processing method
CN106670296B (en) A kind of manufacturing process for the internal high pressure forming mold for shaping hierarchic structure pipe fitting
CN100577319C (en) Shape-expanding method of butt welding tube
JP2008119723A (en) Hydroforming apparatus for metallic plate, hydroforming method, and product manufactured using the same apparatus
CN108687153B (en) Axial-radial Splicing Mechanism shaping dies of the wide flange stud cylindrical member of thin-walled
JP5136995B2 (en) Manufacturing method of diffuser
CN103568724B (en) Automobile axle housing and automobile axle housing shaping dies and automobile axle housing manufacturing process thereof
CN206215732U (en) A kind of internal high pressure forming mould for shaping hierarchic structure pipe fitting
CN102380545A (en) Automobile suspension arm compound forming process and compound forming system utilizing same
JP2009045672A (en) Method of hydroforming hollow aluminum extruded material
CN203124520U (en) Automobile axle case forming die

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171205

RJ01 Rejection of invention patent application after publication