CN107426818A - A kind of method for transmitting signals, base station, terminal device and system - Google Patents

A kind of method for transmitting signals, base station, terminal device and system Download PDF

Info

Publication number
CN107426818A
CN107426818A CN201610350265.3A CN201610350265A CN107426818A CN 107426818 A CN107426818 A CN 107426818A CN 201610350265 A CN201610350265 A CN 201610350265A CN 107426818 A CN107426818 A CN 107426818A
Authority
CN
China
Prior art keywords
control signal
transmission frame
base station
downlink transmission
uplink
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610350265.3A
Other languages
Chinese (zh)
Other versions
CN107426818B (en
Inventor
潘成康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Communications Group Co Ltd
China Mobile Communications Co Ltd
Original Assignee
China Mobile Communications Group Co Ltd
China Mobile Communications Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Communications Group Co Ltd, China Mobile Communications Co Ltd filed Critical China Mobile Communications Group Co Ltd
Priority to CN201610350265.3A priority Critical patent/CN107426818B/en
Publication of CN107426818A publication Critical patent/CN107426818A/en
Application granted granted Critical
Publication of CN107426818B publication Critical patent/CN107426818B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/0446Resources in time domain, e.g. slots or frames
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/54Allocation or scheduling criteria for wireless resources based on quality criteria
    • H04W72/541Allocation or scheduling criteria for wireless resources based on quality criteria using the level of interference

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Quality & Reliability (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a kind of method for transmitting signals, base station, terminal device and system, wherein method includes:Downlink transmission frame is chosen, determines the first guard period GP in the downlink transmission frame;At least one downstream signal is set in the first GP;The downlink transmission frame is sent to terminal device.

Description

A kind of method for transmitting signals, base station, terminal device and system
Technical field
The present invention relates to the transfer management technology in the communications field, more particularly to a kind of method for transmitting signals, base station, terminal Equipment and system.
Background technology
3GPP will clearly start 5G standardization effort in 2016, and preliminary project submitted 3 kinds in 2019 to ITU The technical solution of 5G typical scenes.In order to effectively solve the multifarious demand of 5G business, at present, some companies of industry propose A kind of frame structure (Self_contain:It is self-contained), it is illustrated in fig. 1 shown below, namely controlled in a TTI comprising up-downgoing, its Middle data division can be flexibly upstream data or downlink data.Frame structure shown in Fig. 1, pass through dynamic transmission time interval (TTI) following low time delay, the demand of long delay business, can effectively be solved;By in upload control resource transmission ACK/NACK, having Effect shortens the HARQ times, further lifts business transmission time;By in upload control resource transmission detection reference signal (SRS), ensure demand of the extensive antenna technology to pilot resources, lift the precision of extensive antenna technology.But existing skill There is presently no the mode of the transmission of the temporal signatures adjustment information based on downstream transmission frame in art, net can not be further lifted Network efficiency of transmission and guarantee network reliability.
The content of the invention
In view of this, it is an object of the invention to provide a kind of method for transmitting signals, base station, terminal device and system, energy At least solves the above-mentioned problems in the prior art.
To reach above-mentioned purpose, the technical proposal of the invention is realized in this way:
The embodiments of the invention provide a kind of method for transmitting signals, including:
Downlink transmission frame is chosen, determines the first guard period GP in the downlink transmission frame;
At least one downstream signal is set in the first GP;
The downlink transmission frame is sent to terminal device.
The embodiments of the invention provide a kind of method for transmitting signals, methods described includes:
Receive the downlink transmission frame that base station is sent;
Parsing obtains at least one downgoing control signal from the first GP of the downlink transmission frame;
At least one downgoing control signal obtained based on parsing is handled.
The embodiments of the invention provide a kind of base station, the base station includes:
First processing units, downlink transmission frame is arrived for choosing, determines the first guard period in the downlink transmission frame GP;
Setting unit, for setting at least one downstream signal in the first GP;
First transmitting element, for the downlink transmission frame to be sent to receiving terminal.
The embodiments of the invention provide a kind of terminal device, the terminal device includes:
Receiving unit, the downlink transmission frame sent for receiving base station;
Resolution unit, at least one downgoing control signal is obtained for being parsed from the first GP of the downlink transmission frame;
Second processing unit, at least one downgoing control signal for being obtained based on parsing are handled.
The embodiments of the invention provide a kind of signal transmission system, the system includes:
Base station, downlink transmission frame is arrived for choosing, determines the first guard period GP in the downlink transmission frame;First At least one downstream signal is set in GP;The downlink transmission frame is sent to terminal device;
Terminal device, the downlink transmission frame sent for receiving base station;Solved from the first GP of the downlink transmission frame Analysis obtains at least one downgoing control signal;At least one downgoing control signal obtained based on parsing is handled.
The embodiments of the invention provide a kind of method for transmitting signals, base station, terminal device and system, by downlink transfer The first guard period without uplink interference is determined in frame, at least one downstream signal is set in the first guard period.In this way, avoid Signal in downstream transmission frame mutually produces interference, so as to improving the stability of network, ensure that the information of network passes Defeated efficiency.
Brief description of the drawings
Fig. 1 is frame structure schematic diagram in the prior art;
Fig. 2 is method for transmitting signals of embodiment of the present invention schematic flow sheet one;
Fig. 3 is the structural representation for the downstream transmission frame that the embodiment of the present invention is based on;
Fig. 4 is method for transmitting signals of embodiment of the present invention schematic flow sheet two;
Fig. 5 is that the embodiment of the present invention forms structural representation without base station;
Fig. 6 is that the embodiment of the present invention forms structural representation for equipment;
Fig. 7 is that system of the embodiment of the present invention forms structural representation.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment the present invention is further described in more detail.
Embodiment one,
The embodiments of the invention provide a kind of method for transmitting signals, applied to base station, as shown in Fig. 2 methods described includes:
Step 201:Downlink transmission frame is chosen, determines the first guard period (GP, Guard in the downlink transmission frame Period);
Step 202:At least one downstream signal is set in the first GP;
Step 203:The downlink transmission frame is sent to terminal device.
The basic thought of this motion is that, for the GP1 in above-mentioned downlink transmission frame, the GP2 in uplink transmission frame, these are exempted from Jamming resource carries out particular design.Can be specifically, it is contemplated that downgoing control signal, such as descending solution preferentially are set in GP1 Call reference signal (DMRS, Demodulation Reference Signal), CSI-RS, nonopiate etc. more sensitive to disturbing Earth signal is transmitted, it is contemplated that up DMRS, uplink control signal, nonopiate etc. are preferentially carried out on GP2 to disturbing more sensitively Signal transmits.
Further, it is contemplated that the modulating-coding grade of institute's carrying signal on lifting downlink transfer GP1, uplink GP2, With further lifting system efficiency.
It is described that at least one downstream signal is set in the first GP, including:
Downgoing control signal is set in the first GP, and sets upload control to believe in the downgoing control signal Number resource instructions field.The downgoing control signal can be down control channel (PDCCH).
Wherein, it is described in the downgoing control signal set uplink control signal resource instructions field, including it is following it One:
Indicate that the resource of the uplink control signal is arranged at frequency band both sides in the downgoing control signal;
Indicate that the resource of the uplink control signal is arranged at the second of uplink transmission frame in the downgoing control signal In GP;Wherein, the 2nd GP separates with the first GP in time domain;
Indicate that the resource of the uplink control signal is arranged at upload control resource in the downgoing control signal.
Based on above-mentioned scene, first implementation example of the present embodiment is as follows:
As shown in Figure 3, it is known that as network dynamic TTI, downlink transfer GP1, the glitch-free feelings of uplink GP2 be present Condition.Define a kind of new DCI or strengthen traditional DCI0, for indicating PUCCH bearing mode, traditional is carried on frequency band Both ends, upload control resource is either carried in GP2 or be carried on, share 2bit instructions.
A up PUCCH resource instructions field, 2 bits are included in PDCCH;
UE receives the PDCCH in descending control domain;
UE is parsed with the C-RNTI of oneself to PDCCH, finds the downlink resource of oneself;
If resource instructions field in PDCCH for " 00 ", then it represents that PUCCH should be carried on the frequency band two of uplink transmission resource Side;If resource instructions field in PDCCH for " 01 ", then it represents that PUCCH should be carried in the GP2 of uplink;If PDCCH In resource instructions field for " 10 ", then it represents that PUCCH should be carried in upload control resource.
It is described that at least one downstream signal is set in the first GP on the basis of above-mentioned processing scene, it can also include:
Downgoing control signal is set in the first GP, and downlink control is set in the downgoing control signal Information processed is with indication signal modulation system.
Based on described above, second example that the present embodiment provides is as follows:
As shown in Figure 3, it is known that as network dynamic TTI, downlink transfer GP1, the glitch-free feelings of uplink GP2 be present Condition, accordingly it is contemplated that in the nonopiate information of these localized transmissions, for further lifting system reliability, efficiency.If terminal again Know it oneself is non-orthogonal mode transmission, i.e., the apparent transmission location of oneself, then need not can accurately inform its resource location of UE, Further reduce control channel expense.
A kind of novel descending DCI is defined, compared with existing DCI, it does not include resource more specific location information, but it must be with Non orthogonal transmissions mode binding.
Network distributes special RNTI, such as non-orthogonal RNTI to non orthogonal transmissions user, for nonopiate The user of transmission characterizes identity;
User is parsed, so as to confirm the resource location of oneself according to the RNTI of oneself in downlink transfer GP1;
PDCCH sends new DCI, such as DCI6, modulation system, adjustment grade of user etc. is informed, with existing DCI phases Than it does not indicate that the resource location of user's distribution;
User carries out the data demodulation of oneself according to positional information and modulation system parsed etc..
Further, the present embodiment also provides more signals, described to set at least one downstream signal in the first GP, Including:
Be provided in the first GP indicate base station pilot pattern, and/or, the detecting pilot frequency of instruction terminal equipment Pattern control signal.
Based on described above, it is as follows that the present embodiment provides the 3rd example:
In traditional approach, the pilot frequency information of neighbor cell, shifting thinking is taken to realize disappearing for inter-cell interference Remove, and DMRS is more dispersed in TTI.It is and as shown in Figure 3, it is known that as network dynamic TTI, downlink transfer GP1, up to be present The glitch-free situations of GP2 are transmitted, accordingly it is contemplated that in these localized transmissions pilot frequency informations, and it is contemplated that the frequency domain of increase pilot tone Density.
Flow is as follows:
Base station is according to system configuration information, and confirmation now uses dynamic TTI, and UE distributes new RNTI into cell, than Such as eimta-RNTI;
Base station indicates the new pilot tone pattern in the base station or pilot tone pattern of terminal by broadcasting either PDCCH.
It can be seen that by using such scheme, it becomes possible to by determining the first guarantor without uplink interference in downlink transmission frame During shield, at least one downstream signal is set in the first guard period.In this way, the signal avoided in downstream transmission frame is mutual Interference is produced, so as to improve the stability of network, ensure that the information transfer efficiency of network.
Embodiment two,
The embodiments of the invention provide a kind of method for transmitting signals, applied to terminal device, as shown in figure 4, methods described Including:
Step 401:Receive the downlink transmission frame that base station is sent;
Step 402:Parsing obtains at least one downgoing control signal from the first GP of the downlink transmission frame;
Step 403:At least one downgoing control signal obtained based on parsing is handled.
On the basis of above-mentioned handling process, how the present embodiment is further for terminal device based on receiving down Row transmission frame carries out subsequent treatment:
Parsing obtains at least one downstream signal in the first GP from the downlink transmission frame, including:
Based on Cell Radio Network Temporary Identifier/Identity, Cell-RNTI, parsed from the first GP of the downlink transmission frame and obtain the up control The resource instructions field of signal processed;
Wherein, in the resource instructions field of the uplink control signal, including:
Indicate that the resource of the uplink control signal is arranged in the 2nd GP of uplink transmission frame;Wherein, the 2nd GP Separated with the first GP in time domain.
Further, methods described also includes:When the resource instructions field of the uplink control signal is described for indicating When the resource of row control signal is arranged at two GP of uplink transmission frame, controls and set upload control to believe in the 2nd GP Number;It is sent in and the uplink transmission frame of uplink control signal is provided with the 2nd GP to base station.
It should be noted that the present embodiment terminal device is except can be true according to the instruction in the first GP of downlink transmission frame It is scheduled on outside being transmitted in the 2nd GP, can also be determined to be transmitted on frequency band both sides either on default according to instruction Upstream signals are transmitted at row transfer resource.
Based on above-mentioned scene, first implementation example of the present embodiment is as follows:
As shown in Figure 3, it is known that as network dynamic TTI, downlink transfer GP1, the glitch-free feelings of uplink GP2 be present Condition.Define a kind of new DCI or strengthen traditional DCI0, for indicating PUCCH bearing mode, traditional is carried on frequency band Both ends, upload control resource is either carried in GP2 or be carried on, share 2bit instructions.
A up PUCCH resource instructions field, 2 bits are included in PDCCH;
UE receives the PDCCH in descending control domain;
UE is parsed with the C-RNTI of oneself to PDCCH, finds the downlink resource of oneself;
If resource instructions field in PDCCH for " 00 ", then it represents that PUCCH should be carried on the frequency band two of uplink transmission resource Side;If resource instructions field in PDCCH for " 01 ", then it represents that PUCCH should be carried in the GP2 of uplink;If PDCCH In resource instructions field for " 10 ", then it represents that PUCCH should be carried in upload control resource.
Further, parsing obtains the money of the uplink control signal in the first GP from the downlink transmission frame After the instructions field of source, methods described also includes:
Parsing obtains the modulating-coding grade in down link control information from the first GP;Compiled based on the modulation Code grade carries out the data demodulation of downlink transmission frame.
Based on described above, second example that the present embodiment provides is as follows:
As shown in Figure 3, it is known that as network dynamic TTI, downlink transfer GP1, the glitch-free feelings of uplink GP2 be present Condition, accordingly it is contemplated that in the nonopiate information of these localized transmissions, for further lifting system reliability, efficiency.If terminal again Know it oneself is non-orthogonal mode transmission, i.e., the apparent transmission location of oneself, then need not can accurately inform its resource location of UE, Further reduce control channel expense.
A kind of novel descending DCI is defined, compared with existing DCI, it does not include resource more specific location information, but it must be with Non orthogonal transmissions mode binding.
Network distributes special RNTI, such as non-orthogonal RNTI to non orthogonal transmissions user, for nonopiate The user of transmission characterizes identity;
User is parsed, so as to confirm the resource location of oneself according to the RNTI of oneself in downlink transfer GP1;
PDCCH sends new DCI, such as DCI6, modulation system, adjustment grade of user etc. is informed, with existing DCI phases Than it does not indicate that the resource location of user's distribution;
User carries out the data demodulation of signal according to positional information and modulation system, adjustment grade etc. for parsing.
Finally, on the basis of above-mentioned scene, the present embodiment methods described also includes:
From the first GP in the downlink transfer parsing obtain pilot pattern for indicating base station, and/or, refer to Show the control signal of the pattern of the detecting pilot frequency of terminal device;
Based on the pilot pattern for being used to indicate base station, and/or, the control of the pattern of the detecting pilot frequency of instruction terminal equipment Signal processed, receive the pilot tone of base station and/or send detecting pilot frequency to base station.
Based on described above, it is as follows that the present embodiment provides the 3rd example:
In traditional approach, the pilot frequency information of neighbor cell, shifting thinking is taken to realize disappearing for inter-cell interference Remove, and DMRS is more dispersed in TTI.It is and as shown in Figure 3, it is known that as network dynamic TTI, downlink transfer GP1, up to be present The glitch-free situations of GP2 are transmitted, accordingly it is contemplated that in these localized transmissions pilot frequency informations, and it is contemplated that the frequency domain of increase pilot tone Density.
Flow is as follows:
Base station is according to system configuration information, and confirmation now uses dynamic TTI, and UE distributes new RNTI into cell, than Such as eimta-RNTI;
Base station indicates the new pilot tone pattern in the base station or pilot tone pattern of terminal by broadcasting either PDCCH.
It can be seen that by using such scheme, it becomes possible to by determining the first guarantor without uplink interference in downlink transmission frame During shield, at least one downstream signal is set in the first guard period.In this way, the signal avoided in downstream transmission frame is mutual Interference is produced, so as to improve the stability of network, ensure that the information transfer efficiency of network.
Embodiment three,
The embodiments of the invention provide a kind of base station, as shown in figure 5, the base station includes:
First processing units 51, downlink transmission frame is arrived for choosing, determines the first protection period in the downlink transmission frame Between GP;
Setting unit 52, for setting at least one downstream signal in the first GP;
First transmitting element 53, for the downlink transmission frame to be sent to receiving terminal.
The basic thought of this motion is that, for the GP1 in above-mentioned downlink transmission frame, the GP2 in uplink transmission frame, these are exempted from Jamming resource carries out particular design.Can be specifically, it is contemplated that downgoing control signal, such as descending solution preferentially are set in GP1 Call reference signal (DMRS, Demodulation Reference Signal), CSI-RS, nonopiate etc. more sensitive to disturbing Earth signal is transmitted, it is contemplated that up DMRS, uplink control signal, nonopiate etc. are preferentially carried out on GP2 to disturbing more sensitively Signal transmits.
Further, it is contemplated that the modulating-coding grade of institute's carrying signal on lifting downlink transfer GP1, uplink GP2, With further lifting system efficiency.
The setting unit, for setting downgoing control signal in the first GP, and in the descending control letter The resource instructions field of uplink control signal is set in number.
The downgoing control signal can be down control channel (PDCCH).
Wherein, the setting unit, at least it is used to indicate the uplink control signal in the downgoing control signal Resource is arranged in the 2nd GP of uplink transmission frame;Wherein, the 2nd GP separates with the first GP in time domain.
Based on above-mentioned scene, first implementation example of the present embodiment is as follows:
As shown in Figure 3, it is known that as network dynamic TTI, downlink transfer GP1, the glitch-free feelings of uplink GP2 be present Condition.Define a kind of new DCI or strengthen traditional DCI0, for indicating PUCCH bearing mode, traditional is carried on frequency band Both ends, upload control resource is either carried in GP2 or be carried on, share 2bit instructions.
A up PUCCH resource instructions field, 2 bits are included in PDCCH;
UE receives the PDCCH in descending control domain;
UE is parsed with the C-RNTI of oneself to PDCCH, finds the downlink resource of oneself;
If resource instructions field in PDCCH for " 00 ", then it represents that PUCCH should be carried on the frequency band two of uplink transmission resource Side;If resource instructions field in PDCCH for " 01 ", then it represents that PUCCH should be carried in the GP2 of uplink;If PDCCH In resource instructions field for " 10 ", then it represents that PUCCH should be carried in upload control resource.
On the basis of above-mentioned processing scene, the setting unit, for setting descending control letter in the first GP Number, and down link control information is set to indicate modulating-coding grade in the downgoing control signal.
Based on described above, second example that the present embodiment provides is as follows:
As shown in Figure 3, it is known that as network dynamic TTI, downlink transfer GP1, the glitch-free feelings of uplink GP2 be present Condition, accordingly it is contemplated that in the nonopiate information of these localized transmissions, for further lifting system reliability, efficiency.If terminal again Know it oneself is non-orthogonal mode transmission, i.e., the apparent transmission location of oneself, then need not can accurately inform its resource location of UE, Further reduce control channel expense.
A kind of novel descending DCI is defined, compared with existing DCI, it does not include resource more specific location information, but it must be with Non orthogonal transmissions mode binding.
Network distributes special RNTI, such as non-orthogonal RNTI to non orthogonal transmissions user, for nonopiate The user of transmission characterizes identity;
User is parsed, so as to confirm the resource location of oneself according to the RNTI of oneself in downlink transfer GP1;
PDCCH sends new DCI, such as DCI6, modulation system, adjustment grade of user etc. is informed, with existing DCI phases Than it does not indicate that the resource location of user's distribution;
User carries out the data demodulation of oneself according to positional information and modulation system parsed etc..
Further, the present embodiment also provides more signals, the setting unit, for being set in the first GP For indicate base station pilot pattern, and/or, the control signal of the pattern of the detecting pilot frequency of instruction terminal equipment.
Based on described above, it is as follows that the present embodiment provides the 3rd example:
In traditional approach, the pilot frequency information of neighbor cell, shifting thinking is taken to realize disappearing for inter-cell interference Remove, and DMRS is more dispersed in TTI.It is and as shown in Figure 3, it is known that as network dynamic TTI, downlink transfer GP1, up to be present The glitch-free situations of GP2 are transmitted, accordingly it is contemplated that in these localized transmissions pilot frequency informations, and it is contemplated that the frequency domain of increase pilot tone Density.
Flow is as follows:
Base station is according to system configuration information, and confirmation now uses dynamic TTI, and UE distributes new RNTI into cell, than Such as eimta-RNTI;
Base station indicates the new pilot tone pattern in the base station or pilot tone pattern of terminal by broadcasting either PDCCH.
It can be seen that by using such scheme, it becomes possible to by determining the first guarantor without uplink interference in downlink transmission frame During shield, at least one downstream signal is set in the first guard period.In this way, the signal avoided in downstream transmission frame is mutual Interference is produced, so as to improve the stability of network, ensure that the information transfer efficiency of network.
Example IV,
The embodiments of the invention provide a kind of terminal device, as shown in fig. 6, the terminal device includes:
Receiving unit 61, the downlink transmission frame sent for receiving base station;
Resolution unit 62, at least one descending control letter is obtained for being parsed from the first GP of the downlink transmission frame Number;
Second processing unit 63, at least one downgoing control signal for being obtained based on parsing are handled.
On the basis of above-mentioned handling process, how the present embodiment is further for terminal device based on receiving down Row transmission frame carries out subsequent treatment:
The resolution unit, for based on Cell Radio Network Temporary Identifier/Identity, Cell-RNTI, from the first GP of the downlink transmission frame Parsing obtains the resource instructions field of the uplink control signal;
Wherein, in the resource instructions field of the uplink control signal, comprise at least:
Indicate that the resource of the uplink control signal is arranged in the 2nd GP of uplink transmission frame;Wherein, the 2nd GP Separated with the first GP in time domain.
Further, the terminal device also includes:
Second transmitting element 64, the uplink transmission frame of uplink control signal is provided with extremely for being sent in the 2nd GP Base station;
Accordingly, the second processing unit 63, for being used to indicate when the resource instructions field of the uplink control signal When the resource of the uplink control signal is arranged at two GP of uplink transmission frame, controls and up control is set in the 2nd GP Signal processed.
It should be noted that the present embodiment terminal device is except can be true according to the instruction in the first GP of downlink transmission frame It is scheduled on outside being transmitted in the 2nd GP, can also be determined to be transmitted on frequency band both sides either on default according to instruction Upstream signals are transmitted at row transfer resource.
Further, the resolution unit, obtained for being parsed from the first GP in down link control information Modulating-coding grade;
Accordingly, the second processing unit, for carrying out the data of downlink transmission frame based on the modulating-coding grade Demodulation.
The resolution unit, obtained for being parsed from the first GP in the downlink transfer for indicating base station Pilot pattern, and/or, the control signal of the pattern of the detecting pilot frequency of instruction terminal equipment;It is used to indicate base station based on described Pilot pattern, and/or, the control signal of the pattern of the detecting pilot frequency of instruction terminal equipment, control receiving unit receives base station Pilot tone and/or the second transmitting element of control send detecting pilot frequency to base station.
It can be seen that by using such scheme, it becomes possible to by determining the first guarantor without uplink interference in downlink transmission frame During shield, at least one downstream signal is set in the first guard period.In this way, the signal avoided in downstream transmission frame is mutual Interference is produced, so as to improve the stability of network, ensure that the information transfer efficiency of network.
Embodiment five,
The embodiments of the invention provide a kind of signal transmission system, as shown in fig. 7, the system includes:
Base station 71, downlink transmission frame is arrived for choosing, determines the first guard period GP in the downlink transmission frame; At least one downstream signal is set in one GP;The downlink transmission frame is sent to terminal device;
Terminal device 72, the downlink transmission frame sent for receiving base station;From the first GP of the downlink transmission frame Parsing obtains at least one downgoing control signal;At least one downgoing control signal obtained based on parsing is handled.
Each functional module in the base station of the present embodiment offer and terminal device is identical with previous embodiment, herein not Repeated again.
If the module integrated described in the embodiment of the present invention is realized in the form of software function module and is used as independent production Product are sold or in use, can also be stored in a computer read/write memory medium.It is real based on such understanding, the present invention The part that the technical scheme of example substantially in other words contributes to prior art is applied to embody in the form of software product Come, the computer software product is stored in a storage medium, including some instructions are make it that a computer equipment (can To be personal computer, the network equipment or network equipment etc.) perform whole or the portion of each embodiment methods described of the present invention Point.And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only Memory), deposit at random Access to memory (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store program codes. So, the embodiment of the present invention is not restricted to any specific hardware and software combination.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the scope of the present invention.

Claims (21)

1. a kind of method for transmitting signals, applied to base station, it is characterised in that methods described includes:
Downlink transmission frame is chosen, determines the first guard period GP in the downlink transmission frame;
At least one downstream signal is set in the first GP;
The downlink transmission frame is sent to terminal device.
2. according to the method for claim 1, it is characterised in that it is described that at least one downstream signal is set in the first GP, Including:
Downgoing control signal is set in the first GP, and uplink control signal is set in the downgoing control signal Resource instructions field.
3. according to the method for claim 2, it is characterised in that described that upload control is set in the downgoing control signal The resource instructions field of signal, is comprised at least:
Indicate that the resource of the uplink control signal is arranged in the 2nd GP of uplink transmission frame in the downgoing control signal; Wherein, the 2nd GP separates with the first GP in time domain.
4. method according to claim 1 or 2, it is characterised in that described that at least one descending letter is set in the first GP Number, including:
Downgoing control signal is set in the first GP, and sets downlink to control letter in the downgoing control signal Cease to indicate modulating-coding grade.
5. according to the method for claim 1, it is characterised in that it is described that at least one downstream signal is set in the first GP, Including:
Be provided for indicating in the first GP base station pilot pattern, and/or, the sample of the detecting pilot frequency of instruction terminal equipment The control signal of formula.
6. a kind of method for transmitting signals, applied to terminal device, it is characterised in that methods described includes:
Receive the downlink transmission frame that base station is sent;
Parsing obtains at least one downgoing control signal from the first GP of the downlink transmission frame;
At least one downgoing control signal obtained based on parsing is handled.
7. according to the method for claim 6, it is characterised in that parsed in the first GP from the downlink transmission frame To at least one downstream signal, including:
Based on Cell Radio Network Temporary Identifier/Identity, Cell-RNTI, parsed from the first GP of the downlink transmission frame and obtain the upload control letter Number resource instructions field;
Wherein, in the resource instructions field of the uplink control signal, comprise at least:
Indicate that the resource of the uplink control signal is arranged in the 2nd GP of uplink transmission frame;Wherein, the 2nd GP and institute The first GP is stated to separate in time domain.
8. according to the method for claim 7, it is characterised in that methods described also includes:
When the resource instructions field of the uplink control signal is used to indicate that the resource of the uplink control signal is arranged at up biography During two GP of defeated frame, control and uplink control signal is set in the 2nd GP;
It is sent in and the uplink transmission frame of uplink control signal is provided with the 2nd GP to base station.
9. according to the method for claim 7, it is characterised in that parsed in the first GP from the downlink transmission frame To after the resource instructions field of the uplink control signal, methods described also includes:
Parsing obtains the modulating-coding grade in down link control information from the first GP;
The data demodulation of downlink transmission frame is carried out based on the modulating-coding grade.
10. according to the method for claim 6, it is characterised in that methods described also includes:
From the first GP in the downlink transfer parsing obtain pilot pattern for indicating base station, and/or, instruction eventually The control signal of the pattern of the detecting pilot frequency of end equipment;
Based on the pilot pattern for being used to indicate base station, and/or, the control letter of the pattern of the detecting pilot frequency of instruction terminal equipment Number, receive the pilot tone of base station and/or send detecting pilot frequency to base station.
11. a kind of base station, it is characterised in that the base station includes:
First processing units, downlink transmission frame is arrived for choosing, determines the first guard period GP in the downlink transmission frame;
Setting unit, for setting at least one downstream signal in the first GP;
First transmitting element, for the downlink transmission frame to be sent to receiving terminal.
12. base station according to claim 11, it is characterised in that the setting unit, for being set in the first GP Downgoing control signal is put, and the resource instructions field of uplink control signal is set in the downgoing control signal.
13. base station according to claim 12, it is characterised in that the setting unit, be at least used in the descending control Indicate that the resource of the uplink control signal is arranged in the 2nd GP of uplink transmission frame in signal processed;Wherein, the 2nd GP Separated with the first GP in time domain.
14. the base station according to claim 11 or 12, it is characterised in that the setting unit, in the first GP Middle setting downgoing control signal, and down link control information is set to indicate modulating-coding in the downgoing control signal Grade.
15. base station according to claim 11, it is characterised in that the setting unit, for being set in the first GP Put pilot pattern for indicating base station, and/or, the control signal of the pattern of the detecting pilot frequency of instruction terminal equipment.
16. a kind of terminal device, it is characterised in that the terminal device includes:
Receiving unit, the downlink transmission frame sent for receiving base station;
Resolution unit, at least one downgoing control signal is obtained for being parsed from the first GP of the downlink transmission frame;
Second processing unit, at least one downgoing control signal for being obtained based on parsing are handled.
17. terminal device according to claim 16, it is characterised in that the resolution unit, for wireless based on cell Network Temporary Identifier, parsed from the first GP of the downlink transmission frame and obtain the resource instructions field of the uplink control signal;
Wherein, in the resource instructions field of the uplink control signal, comprise at least:
Indicate that the resource of the uplink control signal is arranged in the 2nd GP of uplink transmission frame;Wherein, the 2nd GP and institute The first GP is stated to separate in time domain.
18. terminal device according to claim 17, it is characterised in that the terminal device also includes:
Second transmitting element, the uplink transmission frame of uplink control signal is provided with the 2nd GP for being sent in base station;
Accordingly, the second processing unit, it is described for indicating for the resource instructions field when the uplink control signal When the resource of row control signal is arranged at two GP of uplink transmission frame, controls and set upload control to believe in the 2nd GP Number.
19. terminal device according to claim 17, it is characterised in that the resolution unit, for from the first GP Middle parsing obtains the modulating-coding grade in down link control information;
Accordingly, the second processing unit, for carrying out the data demodulation of downlink transmission frame based on the modulating-coding grade.
20. terminal device according to claim 16, it is characterised in that the resolution unit, for from the descending biography In the first GP in defeated parsing obtain pilot pattern for indicating base station, and/or, the detecting pilot frequency of instruction terminal equipment Pattern control signal;Based on the pilot pattern for being used to indicate base station, and/or, the detecting pilot frequency of instruction terminal equipment Pattern control signal, control receiving unit receive base station pilot tone and/or control the second transmitting element to base station send visit Survey pilot tone.
21. a kind of signal transmission system, it is characterised in that the system includes:
Base station, downlink transmission frame is arrived for choosing, determines the first guard period GP in the downlink transmission frame;In the first GP At least one downstream signal is set;The downlink transmission frame is sent to terminal device;
Terminal device, the downlink transmission frame sent for receiving base station;Parsed from the first GP of the downlink transmission frame To at least one downgoing control signal;At least one downgoing control signal obtained based on parsing is handled.
CN201610350265.3A 2016-05-24 2016-05-24 Signal transmission method, base station, terminal equipment and system Active CN107426818B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610350265.3A CN107426818B (en) 2016-05-24 2016-05-24 Signal transmission method, base station, terminal equipment and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610350265.3A CN107426818B (en) 2016-05-24 2016-05-24 Signal transmission method, base station, terminal equipment and system

Publications (2)

Publication Number Publication Date
CN107426818A true CN107426818A (en) 2017-12-01
CN107426818B CN107426818B (en) 2020-05-01

Family

ID=60422791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610350265.3A Active CN107426818B (en) 2016-05-24 2016-05-24 Signal transmission method, base station, terminal equipment and system

Country Status (1)

Country Link
CN (1) CN107426818B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101931456A (en) * 2010-08-09 2010-12-29 中兴通讯股份有限公司 Wireless frame of mobile communication system and sending method of measurement reference signal
CN102811191A (en) * 2011-05-31 2012-12-05 华为技术有限公司 Data transmission method and device
US20140086112A1 (en) * 2012-09-26 2014-03-27 Interdigital Patent Holdings, Inc. Methods for dynamic tdd uplink/downlink configuration
CN104243387A (en) * 2014-09-03 2014-12-24 京信通信系统(中国)有限公司 Channel correction method and device of OFDM system
CN104468433A (en) * 2013-09-25 2015-03-25 华为技术有限公司 Correction signal transmitting method and base station

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101931456A (en) * 2010-08-09 2010-12-29 中兴通讯股份有限公司 Wireless frame of mobile communication system and sending method of measurement reference signal
US20130039233A1 (en) * 2010-08-09 2013-02-14 Zte Corporation Radio frame and sounding reference signal sending method in mobile communication system
CN102811191A (en) * 2011-05-31 2012-12-05 华为技术有限公司 Data transmission method and device
US20140086112A1 (en) * 2012-09-26 2014-03-27 Interdigital Patent Holdings, Inc. Methods for dynamic tdd uplink/downlink configuration
CN104468433A (en) * 2013-09-25 2015-03-25 华为技术有限公司 Correction signal transmitting method and base station
CN104243387A (en) * 2014-09-03 2014-12-24 京信通信系统(中国)有限公司 Channel correction method and device of OFDM system

Also Published As

Publication number Publication date
CN107426818B (en) 2020-05-01

Similar Documents

Publication Publication Date Title
US10708027B2 (en) Method and apparatus for transmitting and receiving data
CN102804868B (en) Mobile station apparatus, base station apparatus, wireless communications method and integrated circuit
CN104012061B (en) Method and wireless device for monitoring control channel
KR102351999B1 (en) Terminal device, communication method and integrated circuit
US9407405B2 (en) Method of receiving downlink data and wireless device using the method
CN104170501B (en) Terminal installation, base station apparatus and communication means
EP3361811A1 (en) Method, apparatus, and system for accessing channel in unlicensed band
CN104040920B (en) For the method and wireless device of receiving data
CN108768599A (en) Sending, receiving method and device, storage medium, the electronic equipment of uplink signal
CN105763307B (en) Downlink data transmission method and device and downlink data acquisition device
CN108135028A (en) A kind of Poewr control method, device and communication node
CN112640349B (en) Reference signal sequence identification in wireless communications
KR20180039685A (en) DEVICE AND METHOD IN A WIRELESS COMMUNICATION SYSTEM
CN102395206A (en) Transmission method and equipment for downside control information
CN104170496A (en) Terminal device, base station device, and integrated circuit
CN104170500A (en) Terminal device, base station device, and integrated circuit
CN103891166A (en) Multipoint transmission in wireless communication
CN105393624A (en) Terminal device, base station device, communications method, and integrated circuit
CN108540255A (en) Base station apparatus, terminal installation and integrated circuit
EP3567815A1 (en) Base station device, terminal device, and communication method for base station device and terminal device
CN103517432B (en) Channel resource indicating method and device
EP3379751B1 (en) Base station operation method and device for supporting d2d signal transmission in wireless communication system
CN104067682A (en) Mobile station device, base station device, communication method, integrated circuit, and communication system
CN107211324A (en) The system and method for accommodating special user equipment
CN106465475A (en) Base-station device, terminal device, and communication method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant