CN107420644A - Aluminium alloy cable support - Google Patents

Aluminium alloy cable support Download PDF

Info

Publication number
CN107420644A
CN107420644A CN201710713835.5A CN201710713835A CN107420644A CN 107420644 A CN107420644 A CN 107420644A CN 201710713835 A CN201710713835 A CN 201710713835A CN 107420644 A CN107420644 A CN 107420644A
Authority
CN
China
Prior art keywords
plate
standing groove
screwed pipe
threaded rod
ball bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710713835.5A
Other languages
Chinese (zh)
Inventor
张荣华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhong Yangzi Aluminium Processing Co Ltd
Original Assignee
Yangzhong Yangzi Aluminium Processing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhong Yangzi Aluminium Processing Co Ltd filed Critical Yangzhong Yangzi Aluminium Processing Co Ltd
Priority to CN201710713835.5A priority Critical patent/CN107420644A/en
Publication of CN107420644A publication Critical patent/CN107420644A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/02Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing
    • F16L3/06Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing with supports for wires

Abstract

The present invention relates to the technical field of cable support device, and more particularly to a kind of aluminium alloy cable support, it improves adaptability and fixed effect;Including geometrical clamp and support frame, geometrical clamp includes anchor ear, front connecting piece, rear connecting piece and connecting bolt;Support frame includes bottom plate, rotating shaft, middle plate, four groups of connecting plates, screwed pipe under four groups, threaded rod and top plate under four groups, bottom plate is connected with anchor ear, bottom plate top is provided with lower standing groove, lower ball bearing is provided with lower standing groove, four groups of connecting plate tops are provided with middle standing groove, and middle ball bearing is provided with middle standing groove;Also include lower side, bottom right side plate, lower-left screwed pipe, lower-left threaded rod, lower-left semicircle clamp, bottom right screwed pipe, bottom right threaded rod and bottom right semicircle clamp, lower side right-hand member is provided with lower-left standing groove, and lower-left ball bearing is provided with the standing groove of lower-left, bottom right side plate left end is provided with bottom right standing groove, and bottom right ball bearing is provided with the standing groove of bottom right.

Description

Aluminium alloy cable support
Technical field
The present invention relates to the technical field of cable support device, more particularly to a kind of aluminium alloy cable support.
Background technology
It is well known that aluminium alloy cable support is the servicing unit that a kind of aluminium alloy system is used for cable support, it is in municipal administration It is widely used with the work of power wiring, and by the extensive favor of associative operation personnel;Existing aluminium alloy electric Cable support includes geometrical clamp and support frame, and support frame is arranged on geometrical clamp, and geometrical clamp is fixed with electric pole;This aluminium alloy electric Cable support using when cable is placed on geometrical clamp, found in its use, it is poor with the fixed effect of electric pole, and And it can not carry out the height and angular adjustment that cable coordinates installation, its adaptability is poor.
The content of the invention
In order to solve the above technical problems, the present invention provides a kind of raising adaptability and the aluminium alloy cable branch of fixed effect Frame.
The aluminium alloy cable support of the present invention, including geometrical clamp and support frame, the geometrical clamp include anchor ear, preceding connection Piece, rear connecting piece and connecting bolt, the front connecting piece and rear connecting piece are connected with anchor ear, and front connecting piece and rear connection Piece is connected by connecting bolt;Support frame as described above include bottom plate, rotating shaft, middle plate, four groups of connecting plates, screwed pipe under four groups, four groups Lower threaded rod and top plate, the bottom plate are connected with anchor ear, and bottom plate top is provided with lower standing groove, and is provided with lower standing groove Lower ball bearing, the bottom of the rotating shaft are inserted into lower ball bearing, and middle plate is arranged on the top of rotating shaft, four groups of connecting plate bottoms End is connected with middle plate top front left side, forward right side, left rear side and right lateral side respectively, and four groups of connecting plate tops are provided with middle placement Groove, and ball bearing in being provided with middle standing groove, screwed pipe bottom is inserted into ball axle in four groups respectively under described four groups In holding, threaded rod bottom is inserted respectively under four groups and spiral shell is filled under four groups inside screwed pipe top, threaded rod top point under four groups It is not connected with top plate bottom front left side, forward right side, left rear side and right lateral side;Also include lower side, bottom right side plate, lower-left screw thread Pipe, lower-left threaded rod, lower-left semicircle clamp, bottom right screwed pipe, bottom right threaded rod and bottom right semicircle clamp, the lower side and Bottom right side plate bottom is connected with top plate top left hand and right side respectively, and lower side right-hand member is provided with lower-left standing groove, and on a left side Lower-left ball bearing is provided with lower standing groove, the lower-left screwed pipe left end is inserted into the ball bearing of lower-left, lower-left screw thread Simultaneously spiral shell is filled to inside the screwed pipe right-hand member of lower-left the insertion of bar left end, and lower-left threaded rod right-hand member is connected with lower-left semicircle clamp, lower right side Plate left end is provided with bottom right standing groove, and bottom right ball bearing is provided with the standing groove of bottom right, the bottom right screwed pipe right-hand member It has been inserted into lower ball bearing, simultaneously spiral shell is filled to inside the screwed pipe left end of bottom right the insertion of bottom right threaded rod right-hand member, bottom right threaded rod Left end is connected with bottom right semicircle clamp.
The present invention aluminium alloy cable support, in addition to upper left side plate, upper right side plate, upper left screwed pipe, upper left threaded rod, Upper left semicircle clamp, upper right screwed pipe, upper right threaded rod, upper right semicircle clamp and placement plate, the upper left side plate and upper right side Plate bottom is connected with placing plate top left hand and right side respectively, and lower side and bottom right side plate top are respectively with placing a plate bottom left side Side connects with right side, and upper left side plate right-hand member is provided with upper left standing groove, and upper left ball bearing is provided with the standing groove of upper left, The upper left screwed pipe left end is inserted into the ball bearing of upper left, and simultaneously spiral shell is filled to the upper left screwed pipe right side to the insertion of upper left threaded rod left end End is internal, and upper left threaded rod right-hand member is connected with upper left semicircle clamp, and upper right side plate left end is provided with upper right standing groove, and in upper right Upper right ball bearing is provided with standing groove, the upper right screwed pipe right-hand member is inserted into upper right ball bearing, upper right threaded rod Simultaneously spiral shell is filled to inside upper right screwed pipe left end for right-hand member insertion, and upper right threaded rod left end is connected with upper right semicircle clamp.
The aluminium alloy cable support of the present invention, in addition to lower support column, support spring and upper support column, the lower support column Bottom is connected with middle plate top, and upper support column top contacts with top plate bottom, and support spring bottom is connected with lower support top end, Support spring top is connected with upper support column bottom.
The aluminium alloy cable support of the present invention, in addition to left support post and right support post, the left support post and right support Top end is connected with middle plate bottom, and the left support post and right support post are located at the left side and right side of rotating shaft, institute respectively The bottom for stating left support post and right support post is provided with pulley, and the tip contact of the bottom of the pulley and bottom plate.
Beneficial effects of the present invention are compared with prior art:By above-mentioned setting, can be reached by turning shaft design The effect of integral-rotation regulation, the height that top plate can be carried out by the rotation of the manual synchronization of screwed pipe under four groups are adjusted, passed through Lower-left screwed pipe and bottom right screwed pipe can be manually rotated the clamping regulation that can carry out lower-left semicircle clamp and bottom right semicircle clamp, carry Height uses ability, and reduction uses limitation.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the overlooking the structure diagram of anchor ear.
Embodiment
With reference to the accompanying drawings and examples, the embodiment of the present invention is described in further detail.Implement below Example is used to illustrate the present invention, but is not limited to the scope of the present invention.
As depicted in figs. 1 and 2, aluminium alloy cable support of the invention, including geometrical clamp and support frame, geometrical clamp include embracing Hoop 1, front connecting piece 2, rear connecting piece 3 and connecting bolt 4, front connecting piece and rear connecting piece are connected with anchor ear, and preceding connection Piece is connected with rear connecting piece by connecting bolt;Support frame includes spiral shell under bottom plate 5, rotating shaft 6,7, four groups of middle plate, 8, four groups of connecting plate Threaded rod 10 and top plate 11 under 9, four groups of line pipe, bottom plate is connected with anchor ear, and bottom plate top is provided with lower standing groove, and in lower placement Lower ball bearing 12 is provided with groove, the bottom of rotating shaft is inserted into lower ball bearing, middle plate be arranged on rotating shaft top, four groups Connecting plate bottom is connected with middle plate top front left side, forward right side, left rear side and right lateral side respectively, and four groups of connecting plate tops are respectively provided with There is middle standing groove, and a ball bearing in being provided with middle standing groove, screwed pipe bottom is inserted into four groups respectively under four groups rolls In pearl bearing, threaded rod bottom is inserted respectively under four groups and spiral shell is filled under four groups inside screwed pipe top, threaded rod top under four groups End is connected with top plate bottom front left side, forward right side, left rear side and right lateral side respectively;Also include lower side 13, bottom right side plate, a left side Lower screwed pipe 14, lower-left threaded rod 15, lower-left semicircle clamp 16, bottom right screwed pipe, bottom right threaded rod and bottom right semicircle clamp, it is left Lower side panel and bottom right side plate bottom are connected with top plate top left hand and right side respectively, and lower side right-hand member is provided with lower-left placement Groove, and lower-left ball bearing is provided with the standing groove of lower-left, lower-left screwed pipe left end is inserted into the ball bearing of lower-left, lower-left Simultaneously spiral shell is filled to inside the screwed pipe right-hand member of lower-left the insertion of threaded rod left end, and lower-left threaded rod right-hand member is connected with lower-left semicircle clamp, right Lower side panel left end is provided with bottom right standing groove, and bottom right ball bearing 17 is provided with the standing groove of bottom right, and bottom right screwed pipe is right End has been inserted into lower ball bearing, and simultaneously spiral shell is filled to inside the screwed pipe left end of bottom right the insertion of bottom right threaded rod right-hand member, bottom right screw thread Bar left end is connected with bottom right semicircle clamp;By above-mentioned setting, the effect that can reach integral-rotation by turning shaft design and adjust Fruit, the height that top plate can be carried out by the rotation of the manual synchronization of screwed pipe under four groups are adjusted, pass through lower-left screwed pipe and bottom right Screwed pipe can be manually rotated the clamping regulation that can carry out lower-left semicircle clamp and bottom right semicircle clamp, and raising uses ability, reduced Use limitation.
The aluminium alloy cable support of the present invention, in addition to upper left side plate, upper right side plate 18, upper left screwed pipe, upper left screw thread Bar, upper left semicircle clamp, upper right screwed pipe 19, upper right threaded rod, upper right semicircle clamp 20 and placement plate 21, upper left side plate and the right side Epipleural bottom is connected with placing plate top left hand and right side respectively, and lower side and bottom right side plate top are respectively with placing plate bottom End left side connects with right side, and upper left side plate right-hand member is provided with upper left standing groove, and upper left ball is provided with the standing groove of upper left Bearing, upper left screwed pipe left end are inserted into the ball bearing of upper left, and simultaneously spiral shell is filled to upper left screwed pipe to the insertion of upper left threaded rod left end Inside right-hand member, upper left threaded rod right-hand member is connected with upper left semicircle clamp, and upper right side plate left end is provided with upper right standing groove, and on the right side Upper right ball bearing is provided with upper standing groove, upper right screwed pipe right-hand member is inserted into upper right ball bearing, and upper right threaded rod is right Simultaneously spiral shell is filled to inside upper right screwed pipe left end for end insertion, and upper right threaded rod left end is connected with upper right semicircle clamp.
The aluminium alloy cable support of the present invention, in addition to lower support column 22, support spring 23 and upper support column 24, lower support Post bottom is connected with middle plate top, and upper support column top contacts with top plate bottom, and support spring bottom connects with lower support top end Connect, support spring top is connected with upper support column bottom.
The aluminium alloy cable support of the present invention, in addition to left support post and right support post 25, left support post and right support post Top is connected with middle plate bottom, and left support post and right support post are located at the left side and right side of rotating shaft, left support post respectively Pulley 26, and the tip contact of the bottom of pulley and bottom plate are provided with the bottom of right support post.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, some improvement and modification can also be made, these improvement and modification Also it should be regarded as protection scope of the present invention.

Claims (4)

1. a kind of aluminium alloy cable support, including geometrical clamp and support frame, it is characterised in that the geometrical clamp includes anchor ear, preceding Connection sheet, rear connecting piece and connecting bolt, the front connecting piece and rear connecting piece are connected with anchor ear, and front connecting piece is with after Connection sheet is connected by connecting bolt;Support frame as described above include bottom plate, rotating shaft, middle plate, four groups of connecting plates, screwed pipe under four groups, Threaded rod and top plate under four groups, the bottom plate are connected with anchor ear, and bottom plate top is provided with lower standing groove, and is set in lower standing groove Lower ball bearing is equipped with, the bottom of the rotating shaft is inserted into lower ball bearing, and middle plate is arranged on the top of rotating shaft, four groups of connections Plate bottom is connected with middle plate top front left side, forward right side, left rear side and right lateral side respectively, during four groups of connecting plate tops are provided with Standing groove, and ball bearing in being provided with middle standing groove, screwed pipe bottom is inserted into four groups respectively under described four groups rolls In pearl bearing, threaded rod bottom is inserted respectively under four groups and spiral shell is filled under four groups inside screwed pipe top, threaded rod top under four groups End is connected with top plate bottom front left side, forward right side, left rear side and right lateral side respectively;Also include lower side, bottom right side plate, lower-left Screwed pipe, lower-left threaded rod, lower-left semicircle clamp, bottom right screwed pipe, bottom right threaded rod and bottom right semicircle clamp, the lower left side Plate and bottom right side plate bottom are connected with top plate top left hand and right side respectively, and lower side right-hand member is provided with lower-left standing groove, and Lower-left ball bearing is provided with the standing groove of lower-left, the lower-left screwed pipe left end is inserted into the ball bearing of lower-left, lower-left Simultaneously spiral shell is filled to inside the screwed pipe right-hand member of lower-left the insertion of threaded rod left end, and lower-left threaded rod right-hand member is connected with lower-left semicircle clamp, right Lower side panel left end is provided with bottom right standing groove, and bottom right ball bearing is provided with the standing groove of bottom right, the bottom right screwed pipe Right-hand member has been inserted into lower ball bearing, and simultaneously spiral shell is filled to inside the screwed pipe left end of bottom right the insertion of bottom right threaded rod right-hand member, bottom right spiral shell Rasp bar left end is connected with bottom right semicircle clamp.
2. aluminium alloy cable support as claimed in claim 1, it is characterised in that also including upper left side plate, upper right side plate, upper left Screwed pipe, upper left threaded rod, upper left semicircle clamp, upper right screwed pipe, upper right threaded rod, upper right semicircle clamp and placement plate, institute State upper left side plate and upper right side plate bottom to be connected with placing plate top left hand and right side respectively, lower side and bottom right side plate top It is connected respectively with placing on the left of plate bottom with right side, upper left side plate right-hand member is provided with upper left standing groove, and in the standing groove of upper left Upper left ball bearing is provided with, the upper left screwed pipe left end is inserted into the ball bearing of upper left, the insertion of upper left threaded rod left end And spiral shell is filled to inside the screwed pipe right-hand member of upper left, upper left threaded rod right-hand member is connected with upper left semicircle clamp, and upper right side plate left end is set There is upper right standing groove, and upper right ball bearing is provided with upper right standing groove, the upper right screwed pipe right-hand member is inserted into upper right In ball bearing, simultaneously spiral shell is filled to inside upper right screwed pipe left end the insertion of upper right threaded rod right-hand member, upper right threaded rod left end and upper right Semicircle clamp connects.
3. aluminium alloy cable support as claimed in claim 2, it is characterised in that also including lower support column, support spring and on Support column, the lower support column bottom are connected with middle plate top, and upper support column top contacts with top plate bottom, support spring bottom It is connected with lower support top end, support spring top is connected with upper support column bottom.
4. aluminium alloy cable support as claimed in claim 3, it is characterised in that also including left support post and right support post, institute Left support post and right support top end is stated to be connected with middle plate bottom, and the left support post and right support post respectively positioned at turn The left side and right side of axle, the bottom of the left support post and right support post are provided with pulley, and the bottom of the pulley with The tip contact of bottom plate.
CN201710713835.5A 2017-08-18 2017-08-18 Aluminium alloy cable support Pending CN107420644A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710713835.5A CN107420644A (en) 2017-08-18 2017-08-18 Aluminium alloy cable support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710713835.5A CN107420644A (en) 2017-08-18 2017-08-18 Aluminium alloy cable support

Publications (1)

Publication Number Publication Date
CN107420644A true CN107420644A (en) 2017-12-01

Family

ID=60434740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710713835.5A Pending CN107420644A (en) 2017-08-18 2017-08-18 Aluminium alloy cable support

Country Status (1)

Country Link
CN (1) CN107420644A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108582020A (en) * 2018-03-31 2018-09-28 沧州德跃机械科技有限公司 A kind of aluminium frame upper ledge manipulator
CN109280947A (en) * 2018-09-06 2019-01-29 福铂斯(天津)科技有限公司 A kind of cable bearer composite alloy material and preparation method thereof
CN110159837A (en) * 2018-04-10 2019-08-23 江山海维科技有限公司 A kind of quick tuning pipeline support frame

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008017874A1 (en) * 2008-04-09 2009-10-15 Fischerwerke Gmbh & Co. Kg Pipe clamp, has chamfer of detent pressing detent at counter bearing during closing of clamp, and spring element provided at side of detent and counter bearing and loading detent in engagement at counter bearing
CN205029266U (en) * 2015-10-12 2016-02-10 石家庄华友电子有限公司 Lead wire support
CN206102079U (en) * 2016-07-27 2017-04-19 衢州圣荣电子科技有限公司 Aluminum alloy supporter
CN106824326A (en) * 2017-03-02 2017-06-13 刘靖 Chemical experimental unit
CN106898212A (en) * 2017-03-02 2017-06-27 王书扬 Physical Experiment operating desk

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008017874A1 (en) * 2008-04-09 2009-10-15 Fischerwerke Gmbh & Co. Kg Pipe clamp, has chamfer of detent pressing detent at counter bearing during closing of clamp, and spring element provided at side of detent and counter bearing and loading detent in engagement at counter bearing
CN205029266U (en) * 2015-10-12 2016-02-10 石家庄华友电子有限公司 Lead wire support
CN206102079U (en) * 2016-07-27 2017-04-19 衢州圣荣电子科技有限公司 Aluminum alloy supporter
CN106824326A (en) * 2017-03-02 2017-06-13 刘靖 Chemical experimental unit
CN106898212A (en) * 2017-03-02 2017-06-27 王书扬 Physical Experiment operating desk

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108582020A (en) * 2018-03-31 2018-09-28 沧州德跃机械科技有限公司 A kind of aluminium frame upper ledge manipulator
CN110159837A (en) * 2018-04-10 2019-08-23 江山海维科技有限公司 A kind of quick tuning pipeline support frame
CN110159837B (en) * 2018-04-10 2020-11-24 宝应县金运开发有限公司 Quick direction-adjusting pipeline support frame
CN109280947A (en) * 2018-09-06 2019-01-29 福铂斯(天津)科技有限公司 A kind of cable bearer composite alloy material and preparation method thereof
CN109280947B (en) * 2018-09-06 2019-11-19 福铂斯(天津)科技有限公司 A kind of cable bearer composite alloy material and preparation method thereof

Similar Documents

Publication Publication Date Title
CN206475090U (en) Automobile chair frame fixture
CN107420644A (en) Aluminium alloy cable support
CN206445276U (en) Steel pipe cutting device
CN206792177U (en) Automobile chair frame show stand
CN206425671U (en) Carbon dioxide welding basic part mounting table
CN206650619U (en) A kind of telescopic solar panels support
CN206712366U (en) Insulated communication anchor ear
CN106898212A (en) Physical Experiment operating desk
CN207041231U (en) Ideological and politics teaching lectern
CN206382655U (en) Multi-angle Self-tapping apparatus
CN205888812U (en) Corrosion resistant plate burring device
CN206789394U (en) Removable transformer base
CN106788163A (en) A kind of solar cell plate bracing frame
CN206925670U (en) Metalwork burr removes auxiliary equipment
CN206628101U (en) A kind of English teaching complementary education instrument
CN206379008U (en) A kind of board for teaching mathematics
CN107260491A (en) A kind of medical rehabilitation is with stand-type arm rotary torso machine structure
CN107335883A (en) Continuous vacuum soldering oven supports apparatus for placing
CN207971340U (en) Tin sticky cutter holder turns round line apparatus
CN202941310U (en) Double-fort connecting piece used for supporting fishing rod support
CN207279217U (en) Security protection camera link
CN208685444U (en) New road bridge pad detection device
CN206439580U (en) Monitoring camera supports rack
CN206586455U (en) Dress designing support cloth support
CN206837419U (en) Table tennis training table tennis table retention device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171201