CN107420116A - A kind of inverted arch fills the improved equipment for leveling of vibrating - Google Patents

A kind of inverted arch fills the improved equipment for leveling of vibrating Download PDF

Info

Publication number
CN107420116A
CN107420116A CN201710823968.8A CN201710823968A CN107420116A CN 107420116 A CN107420116 A CN 107420116A CN 201710823968 A CN201710823968 A CN 201710823968A CN 107420116 A CN107420116 A CN 107420116A
Authority
CN
China
Prior art keywords
inverted arch
leveling
screed
full
improved equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710823968.8A
Other languages
Chinese (zh)
Inventor
王贺起
吕志强
黄明利
张志恩
王知远
张帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201710823968.8A priority Critical patent/CN107420116A/en
Publication of CN107420116A publication Critical patent/CN107420116A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Abstract

The invention discloses the improved equipment that a kind of inverted arch fills leveling of vibrating, including the filling of vibrator, screed, trestle girder steel, running gear, I-beam, elevating lever, inverted arch, middle adjustment camber, motor and screed.The beneficial effects of the invention are as follows:Full-automatic evener is added on the basis of fully automatic hydraulic inverted arch trestle, the equipment operation is simple, after inverted arch filling quick vibration compacting, leveling effect can be effectively improved well original fill concrete and vibrate the problems such as leakage, cross to shake be present.Conventional inverted arch is received face and carried out using hand fit's electric troweling machine, 12m inverted arch need to be equipped with 3 electric troweling machines, 2 people's used time about 2.5h, power consumption is 16.5 degree, and uses full-automatic evener, and 12m inverted arch need to be equipped with 1 full-automatic evener of the types of XDSZ 100, used time about 0.4h, power consumption is 1.3 degree, and then shortens the leveling time, reduces artificial input.

Description

A kind of inverted arch fills the improved equipment for leveling of vibrating
Technical field
The present invention relates to a kind of levelling means, specially a kind of inverted arch fills the improved equipment for leveling of vibrating, belongs to tunnel Engineering technology application field.
Background technology
East -Tianshan super long tunnel be G575 lines Barkol to Hami highway PPP construction project key projects, be to make " silk Road economy-zone " on strategic support point, accelerate " Silk Road economy-zone " to build, promote Xinjiang Autonomous Region economic society modern Change the needs of development;It is《National highway network planning is drawn》In important component, be one connection G30 even suddenly at a high speed, G7 capital it is new At a high speed, the important service channel of tetra- national trunk highways of G335, G312, the important north-south in Eastern Xinjiang one is turned into Main artey of communications, overall length 11.9km, using two-way four-lane Class I highway standard, desin speed 80km/h, therefore to sandhog Journey construction quality requires very high.
Inverted arch filling is generally divided into two kinds of packing materials of piece stone concrete and plain concrete, inverted arch filling quality control on construction Difficult point be that the control vibrated with surface smoothness and elevation of concrete.Fill concrete vibrates to use and manually shaken at present Tamper is vibrated, and situations such as leakage, cross to shake be present, and concrete solid has certain quality problems;Surface is filled using mark Chi is closed flat, but Surface layer's concrete missing is vibrated, and the horizontal stroke, longitudinal slope and flatness simultaneously for filling are difficult control.
The content of the invention
The purpose of the present invention is that to solve the above problems and provides the improvement that leveling is vibrated in a kind of inverted arch filling and set It is standby.
The present invention is achieved through the following technical solutions above-mentioned purpose, and a kind of inverted arch fills the improved equipment for leveling of vibrating, Including screed, vibrator is set above the screed, sets inverted arch to fill below the screed, the vibrator side Trestle girder steel is installed, the trestle girder steel side installs running gear, camber, institute are adjusted among the running gear side installation Middle adjustment camber side installation I-beam is stated, the I-beam side sets elevating lever.
When preferably, in order that the full-automatic evener of XDSZ-100 types is placed on the I-shaped beam orbit, ensure the equipment There is enough power, the equipment is equipped with motor described in 3.2KW, controls the screed movable up and down by Remote, Realize that the inverted arch filling pours rapid receipts face work, motor is installed in the I-beam side.
Preferably, in order that the running gear can walk along the I-beam, the running gear is arranged on described Inside I-beam.
Preferably, in order that the vibrator can provide enough power for the screed, the inverted arch is filled Leveling, the quantity of the vibrator is 4.
Preferably, in order that the I-beam is capable of the weight of load bearing equipment, the model 20B of the I-beam.
Preferably, in order that evener is in construction, screed height is walked forward along the steel wire that has drawn, can be Before unnecessary concrete is shifted onto, preferably to clear up, concrete surface leveling reaches construction reference, the motor lower section Screed is set.
The beneficial effects of the invention are as follows:Full-automatic evener is added on the basis of fully automatic hydraulic inverted arch trestle, should Equipment operation is simple, and quick vibration compacting, leveling effect can be effectively improved well original fill concrete after inverted arch filling Vibrate and the problems such as leakage, cross to shake be present.Conventional inverted arch is received face and carried out using hand fit's electric troweling machine, and 12m inverted arch need to be equipped with 3 Platform electric troweling machine (3 people operation), 2 people (adopting artificial leveling below inverted arch trestle) used time about 2.5h, power consumption is 16.5 degree, and Using full-automatic evener, 12m inverted arch need to be equipped with 1 full-automatic evener of XDSZ-100 types (1 people operation), used time about 0.4h (about 25 minutes), power consumption is 1.3 degree, and then shortens the leveling time, reduces artificial input.Meanwhile using full-automatic leveling Machine has the advantages of receipts face is comprehensive, and without dead angle when being flattened using full-automatic evener, and smearing effect is good.Full-automatic evener is adopted Moved up and down with remote control screed, there is enough operating spaces.
Brief description of the drawings
Fig. 1 is that inverted arch trestle increases full-automatic evener schematic diagram.
Fig. 2 is that inverted arch trestle increases full-automatic evener improvement figure.
Fig. 3 is that inverted arch trestle increases full-automatic evener improvement three-dimensional structure diagram.
In figure:1st, vibrator;2nd, screed;3rd, trestle girder steel;4th, running gear;5th, 20B I-beams;6th, elevating lever;7、 Inverted arch is filled;8th, middle adjustment camber;9th, motor;10th, screed.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
Refer to shown in Fig. 1-3, a kind of filling of inverted arch is vibrated the improved equipment of leveling, including screed 2, on screed 2 Side sets vibrator 1, and the lower section of screed 2 sets inverted arch filling 7, the side of vibrator 1 installation trestle girder steel 3, the side of trestle girder steel 3 Running gear 4 is installed, camber 8, centre adjustment camber 8 side installation I-beam 5, work are adjusted among the installation of the side of running gear 4 The side of word beam 5 sets elevating lever 6.
As a kind of technical optimization scheme of the present invention, the side of I-beam 5 installation motor 9.
As a kind of technical optimization scheme of the present invention, running gear 4 is arranged on inside I-beam 5.
As a kind of technical optimization scheme of the present invention, the quantity of vibrator 1 is 4.
As a kind of technical optimization scheme of the present invention, centre adjustment camber 8 is arranged on the centre position of screed 2.
As a kind of technical optimization scheme of the present invention, the lower section of motor 9 sets screed 10.
In the use of the present invention, first, two I-beams 5 (model 20B) are welded in inverted arch trestle bottom, as The walking track of the full-automatic evener of XDSZ-100 types, the full-automatic evener of XDSZ-100 types is placed on the track of I-beam 5, The equipment is equipped with 3.2KW motor 9, controls screed to be moved forward and backward about 10 by Remote, its upper and lower ultimate range is 12cm, front and rear longest distance are 1200cm, realize that inverted arch filling 7 pours rapid receipts face work, evener is fitted with a set of Screed 2, in construction, screed 2 height is walked forward along the steel wire drawn, unnecessary concrete can be shifted onto before, so as to Preferably cleaning, concrete surface leveling reach construction reference.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any reference in claim should not be considered as to the involved claim of limitation.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (6)

  1. The improved equipment of leveling 1. a kind of inverted arch filling is vibrated, including screed (2), it is characterised in that:On the screed (2) Side sets vibrator (1), sets inverted arch to fill (7) below the screed (2), trestle steel is installed in vibrator (1) side Beam (3), trestle girder steel (3) the side installation running gear (4), the middle adjustment camber of running gear (4) side installation (8), middle adjustment camber (8) side installation I-beam (5), I-beam (5) side sets elevating lever (6).
  2. The improved equipment of leveling 2. a kind of inverted arch filling according to claim 1 is vibrated, it is characterised in that:The I-beam (5) side installation motor (9).
  3. The improved equipment of leveling 3. a kind of inverted arch filling according to claim 1 is vibrated, it is characterised in that:The running part (4) are divided to be arranged on the I-beam (5) internal.
  4. The improved equipment of leveling 4. a kind of inverted arch filling according to claim 1 is vibrated, it is characterised in that:The vibrator (1) quantity is 4.
  5. The improved equipment of leveling 5. a kind of inverted arch filling according to claim 1 is vibrated, it is characterised in that:The I-beam (5) model 20B.
  6. The improved equipment of leveling 6. a kind of inverted arch filling according to claim 2 is vibrated, it is characterised in that:The motor (9) lower section sets screed (10).
CN201710823968.8A 2017-09-13 2017-09-13 A kind of inverted arch fills the improved equipment for leveling of vibrating Pending CN107420116A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710823968.8A CN107420116A (en) 2017-09-13 2017-09-13 A kind of inverted arch fills the improved equipment for leveling of vibrating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710823968.8A CN107420116A (en) 2017-09-13 2017-09-13 A kind of inverted arch fills the improved equipment for leveling of vibrating

Publications (1)

Publication Number Publication Date
CN107420116A true CN107420116A (en) 2017-12-01

Family

ID=60432873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710823968.8A Pending CN107420116A (en) 2017-09-13 2017-09-13 A kind of inverted arch fills the improved equipment for leveling of vibrating

Country Status (1)

Country Link
CN (1) CN107420116A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457672A (en) * 2018-02-01 2018-08-28 中铁十二局集团有限公司 A kind of machine automatization equipment of vibrating carries out inverted arch concrete construction technology
CN109458193A (en) * 2018-12-10 2019-03-12 中交公局桥隧工程有限公司 A kind of construction technology improving vcehicular tunnel inverted arch filling flatness

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203795868U (en) * 2014-03-24 2014-08-27 重庆工商职业学院 Vibration screeding device for building concrete
CN105952469A (en) * 2016-07-07 2016-09-21 唐山市星斗路桥机械有限公司 Full-automatic high-frequency vibrating leveling machine for tunnel inverted arch
CN205840890U (en) * 2016-08-04 2016-12-28 辽宁西北供水有限责任公司 Tunnel cast-in-place inverted arch concrete vibrating receives face device
CN106640135A (en) * 2016-12-08 2017-05-10 中铁十四局集团第二工程有限公司 Automatic vibrating system used in tunnel secondary lining concrete applying and vibrating method
CN207131420U (en) * 2017-09-13 2018-03-23 中交一公局桥隧工程有限公司 A kind of inverted arch fills the improved equipment for leveling of vibrating

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203795868U (en) * 2014-03-24 2014-08-27 重庆工商职业学院 Vibration screeding device for building concrete
CN105952469A (en) * 2016-07-07 2016-09-21 唐山市星斗路桥机械有限公司 Full-automatic high-frequency vibrating leveling machine for tunnel inverted arch
CN205840890U (en) * 2016-08-04 2016-12-28 辽宁西北供水有限责任公司 Tunnel cast-in-place inverted arch concrete vibrating receives face device
CN106640135A (en) * 2016-12-08 2017-05-10 中铁十四局集团第二工程有限公司 Automatic vibrating system used in tunnel secondary lining concrete applying and vibrating method
CN207131420U (en) * 2017-09-13 2018-03-23 中交一公局桥隧工程有限公司 A kind of inverted arch fills the improved equipment for leveling of vibrating

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457672A (en) * 2018-02-01 2018-08-28 中铁十二局集团有限公司 A kind of machine automatization equipment of vibrating carries out inverted arch concrete construction technology
CN109458193A (en) * 2018-12-10 2019-03-12 中交公局桥隧工程有限公司 A kind of construction technology improving vcehicular tunnel inverted arch filling flatness

Similar Documents

Publication Publication Date Title
CN204435179U (en) A kind of automatic leveling head of laser and evener
CN105648892B (en) Using foam concrete and the arch bridge structure and its construction method of corrugated steel
WO2019237678A1 (en) Structure of rigid frame bridge having abutments and construction method therefor
CN107419644A (en) It is a kind of to be used as Tourism Ecological road, the construction technology of rural highway by the use of soil body solidification
CN102839601A (en) Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure
CN104446156B (en) A kind of emulsified bitumen slurry mixture penetration type bituminous paving
CN107420116A (en) A kind of inverted arch fills the improved equipment for leveling of vibrating
CN206956481U (en) A kind of town road local stiffening structure
CN110273436A (en) Open trench tunnel utilizes support pile and bear down on one float Structure and its construction method of crown beam
CN105274912B (en) Construction method for hardening monolithic track bed of tramcar
CN207131420U (en) A kind of inverted arch fills the improved equipment for leveling of vibrating
CN106351077B (en) A kind of subway rail guidance tape basement construction equipment
CN107083726A (en) The plate-type fragment-free track slab self-compacting concretes four of CRTS III connect block constructing device and method
CN103276716B (en) A kind of changeover portion CFG stake and mattress layer composite foundation stabilization construction method
CN105804101B (en) Reduce off-loading supporting and retaining system system and construction method and the application of retaining structure stress
CN203795460U (en) Basic structure of ballasting tower crane
CN107059574A (en) A kind of method of concrete structure and its prefabricated assembled cement concrete pavement of leveling
CN206328641U (en) A kind of filling plate-type ballastless track of use emulsified asphalt slurry
CN206636582U (en) A kind of shield tunnel construction of central division wall chassis
CN107558324A (en) The Steel Fibre Concrete Pavement and its construction technology of a kind of tramcar and road usual friendship mouth
JP2003184025A (en) Method for constructing porous concrete slope face
CN107288013A (en) A kind of rapid construction based on Municipal Road Engineering is shaken leveling device
CN107794827A (en) A kind of rotatable rammer compacter of pavement construction
CN111519477A (en) Transition section structure of overhead pile plate structure and embankment and construction method thereof
CN205934613U (en) Tunnel railway roadbed construction operation fiddle with car

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Liu Lixin

Inventor after: Wang Heqi

Inventor after: Lv Zhiqiang

Inventor after: Huang Mingli

Inventor after: Zhang Zhien

Inventor after: Wang Zhiyuan

Inventor after: Zhang Shuai

Inventor before: Wang Heqi

Inventor before: Lv Zhiqiang

Inventor before: Huang Mingli

Inventor before: Zhang Zhien

Inventor before: Wang Zhiyuan

Inventor before: Zhang Shuai

CB03 Change of inventor or designer information
CB02 Change of applicant information

Address after: Room B901 and 916, No.10 Xinghuo Road, Science City, Fengtai District, Beijing

Applicant after: CCCC Central South Engineering Bureau Co.,Ltd.

Address before: Room B901 and 916, No.10 Xinghuo Road, Science City, Fengtai District, Beijing (Park)

Applicant before: BRIDGE & TUNNEL ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

CB02 Change of applicant information