CN107419714A - A kind of modular offshore anemometer tower platform and its installation, method for dismounting - Google Patents

A kind of modular offshore anemometer tower platform and its installation, method for dismounting Download PDF

Info

Publication number
CN107419714A
CN107419714A CN201710478702.4A CN201710478702A CN107419714A CN 107419714 A CN107419714 A CN 107419714A CN 201710478702 A CN201710478702 A CN 201710478702A CN 107419714 A CN107419714 A CN 107419714A
Authority
CN
China
Prior art keywords
connecting plate
transition
pedestal
base frame
fixed base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710478702.4A
Other languages
Chinese (zh)
Other versions
CN107419714B (en
Inventor
陆军
吴平平
张帅君
李光远
张静波
马振军
陈�峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jing Yin Ocean Engineering Co Ltd
Original Assignee
Guangdong Jing Yin Ocean Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jing Yin Ocean Engineering Co Ltd filed Critical Guangdong Jing Yin Ocean Engineering Co Ltd
Priority to CN201710478702.4A priority Critical patent/CN107419714B/en
Publication of CN107419714A publication Critical patent/CN107419714A/en
Application granted granted Critical
Publication of CN107419714B publication Critical patent/CN107419714B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Wind Motors (AREA)
  • Indicating Or Recording The Presence, Absence, Or Direction Of Movement (AREA)

Abstract

The invention discloses a kind of modular offshore anemometer tower platform and its installation, method for dismounting, including center housing, transition pedestal and fixed base frame, the transition pedestal is arranged between the center housing and fixed base frame;The mounting pin of the transition pedestal and the connecting plate clamping of the side of the center housing, the mounting pin of the fixed base frame and the connecting plate clamping of transition pedestal.Production when can simultaneously production center pedestal, transition pedestal and fixed base frame, shorten the production cycle;In transport, center housing, transition pedestal and fixed base frame can be placed independently, not only can also be transported over land by water-borne transport;When in use, the quantity of center housing, transition pedestal and fixed base frame according to different demands and environmental aspect, can be increased and decreased, can independently be deposited, reduce space-consuming.

Description

A kind of modular offshore anemometer tower platform and its installation, method for dismounting
Technical field
The present invention relates to Oversea wind power generation field, more particularly to a kind of modular offshore anemometer tower platform and its peace Dress, method for dismounting.
Background technology
At sea, it is necessary to offshore anemometer tower be built in the marine site of proposed wind power plant, to reach real before construction wind power plant Wind-resources data and relevant weather data are surveyed, so that it is determined that the marine site is if appropriate for construction marine wind electric field.Offshore anemometer tower leads to Often including mounting platform, pylon and fixed mount, mounting platform is supported on sea bed, and pylon is fixed on the middle part of mounting platform, Gu Determine frame to be fixed on the surrounding of mounting platform and connect with pylon by cable wire.Existing mounting platform is non-removable integral type Structure, volume is big, complicated, and manufacture precision prescribed is high, production cycle length, can only pass through water-borne transport, haulage time length.
The content of the invention
A kind of detachable, using flexible, convenient transportation it is an object of the invention to propose, reduce the modularization of production difficulty Offshore anemometer tower platform and its installation, method for dismounting.
To use following technical scheme up to this purpose, the present invention:
A kind of modular offshore anemometer tower platform, including center housing, transition pedestal and fixed base frame, the transition seat Body is arranged between the center housing and fixed base frame;
Each side of the center housing is provided with connecting plate slot, the side towards fixed base frame of the transition pedestal Provided with connecting plate slot;
Also include multiple connecting plates and multiple mounting pins, the connecting plate is inserted in the connecting plate slot, the transition The opposite side towards center housing of pedestal is provided with mounting pin, and the side towards transition pedestal of the fixed base frame is provided with installation Pin;
The mounting pin of the transition pedestal and the connecting plate clamping of the side of the center housing, the peace of the fixed base frame The connecting plate clamping of dress pin and transition pedestal.
Preferably, the connecting plate includes a main paragraph and two are returned hook section, and time hook section is arranged at described described in one One end of main paragraph, another described close end for returning hook section and being arranged at the other end of the main paragraph, and returned described in two Hook the side that section may be contained within the main paragraph;
Connection neck is formed between the described time inner side for hooking section and the main paragraph, the connection neck for hooking section is returned described in two Towards the other end of the main paragraph;
The opposite side of the main paragraph is towards the bottom of the connecting plate slot during installation.
Preferably, one end of the main paragraph is provided with mobile through hole.
Preferably, the mounting pin includes a shank installation sheet, a banking stop and two selling sheets, a selling sheet The side of the shank installation sheet is installed on, and two selling sheets are connected by the banking stop;
The banking stop is arranged at the middle part of two selling sheets, so as to form mounting groove between two selling sheets;
The mounting pin and returning for the connecting plate hook section one-to-one corresponding, and the hook section of returning of the connecting plate inserts the installation Groove, while another described selling sheet inserts the connection neck of the connecting plate.
Preferably, in addition to multiple shank retainer rings, the shank retainer ring are arranged at the top of the connecting plate slot;
The mounting pin is inserted after the shank retainer ring and the connecting plate clamping.
Preferably, the top of the connecting plate slot is engraved structure.
Preferably, in addition to fixed mount, the fixed mount are installed on the top of the fixed base frame;
Run through the fixed mount and fixed base frame provided with the installation through-hole;
The opposite side of the remote transition pedestal of the fixed base frame sets the connecting plate slot.
Preferably, in addition to tower body mounting seat, the tower body mounting seat are installed on the top of center housing.
Preferably, the installation method of the modular offshore anemometer tower platform, comprises the following steps:
Central platform and transition platform number of assembling steps, the side of the transition pedestal and the side pair of the center housing Together, connecting plate, the then transition described in connecting plate slot pull-up of the mobile through hole from the center housing are then passed through The shank retainer ring corresponding to the mounting pin insertion of pedestal, finally pushes back the connecting plate in the connecting plate slot, and Returning for the connecting plate is set to hook the mounting groove that section inserts the mounting pin;
Transition platform and fixed body panel number of assembling steps, the opposite side of the transition pedestal and the side of the fixed base frame Alignment, it is then described solid then by connecting plate described in connecting plate slot pull-up of the mobile through hole from the transition pedestal The shank retainer ring corresponding to the mounting pin insertion of reservation body, finally pushes back the connecting plate in the connecting plate slot, And returning for the connecting plate is set to hook the mounting groove that section inserts the mounting pin.
Preferably, the method for dismounting of the modular offshore anemometer tower platform, comprises the following steps:
Central platform and transition platform demounting procedure, the connecting plate slot by the mobile through hole from the center housing Connecting plate described in pull-up, the then transition pedestal and center housing separation, the mounting pin of the transition pedestal is from the shank Retainer ring is extracted out, finally pushes back the connecting plate in the connecting plate slot;
Transition platform and fixed body panel demounting procedure, are inserted by the connecting plate of the mobile through hole from the transition pedestal Connecting plate described in groove pull-up, the then transition pedestal and fixed base frame separation, the mounting pin of the transition pedestal is from the pin Body retainer ring is extracted out, finally pushes back the connecting plate in the connecting plate slot.
The modular offshore anemometer tower platform is by dismountable center housing, transition pedestal and fixed base frame are assembled and Into.So as to which compared with existing non-removable integral type anemometer tower platform, the modular offshore anemometer tower platform is in life During production can simultaneously production center pedestal, transition pedestal and fixed base frame, shorten the production cycle;Center housing, transition in transport Pedestal and fixed base frame can be placed independently, not only can also be transported over land by water-borne transport;When in use, may be used According to different demands and environmental aspect, the quantity of increase and decrease center housing, transition pedestal and fixed base frame, and the center housing Each side be equipped with connecting plate slot, therefore the transition pedestal can connect with any one side of the center housing Connect, improve using flexible;The modular offshore anemometer tower platform can be dismantled, be taken apart after surveying wind Center housing, transition pedestal and fixed base frame can be deposited independently, reduce space-consuming.
Brief description of the drawings
The present invention will be further described for accompanying drawing, but the content in accompanying drawing does not form any limitation of the invention.
Fig. 1 is the offshore anemometer tower platform structure schematic diagram of the one of embodiment of the present invention;
Fig. 2 is the center housing structural representation of the one of embodiment of the present invention;
Fig. 3 is the transition pedestal structural representation of the one of embodiment of the present invention;
Fig. 4 is the transition seat body side surface structural representation of the one of embodiment of the present invention;
Fig. 5 is the fixed base frame structural representation of the one of embodiment of the present invention;
Fig. 6 is the fixed base frame side structure schematic diagram of the one of embodiment of the present invention;
Fig. 7 is the connecting board structure schematic diagram of the one of embodiment of the present invention;
Fig. 8 is the connecting plate side block diagram of the one of embodiment of the present invention;
Fig. 9 is the mounting pin structural representation of the one of embodiment of the present invention;
Figure 10 is the assembled state schematic enlarged-scale view of the one of embodiment of the present invention.
Wherein:Center housing 1;Transition pedestal 2;Fixed base frame 3;Connecting plate slot 11;Connecting plate 4;Mounting pin 5;Main body Section 41;Return and hook section 42;Connect neck 43;Mobile through hole 44;Shank installation sheet 51;Banking stop 52;Selling sheet 53;Mounting groove 54;Pin Body retainer ring 6;Fixed mount 31;Installation through-hole 32;Tower body mounting seat 12.
Embodiment
Further illustrate technical scheme below in conjunction with the accompanying drawings and by embodiment.
The modular offshore anemometer tower platform of the present embodiment, as shown in figure 1, including center housing 1, the and of transition pedestal 2 Fixed base frame 3, the transition pedestal 2 are arranged between the center housing 1 and fixed base frame 3;
As shown in Fig. 2 each side of the center housing 1 is provided with connecting plate slot 11, as shown in figure 3, the transition The side towards fixed base frame 3 of pedestal 2 is provided with connecting plate slot 11;
As shown in Fig. 7, Fig. 9, in addition to multiple connecting plates 4 and multiple mounting pins 5, as shown in figure 4, the connecting plate 4 is inserted Enter in the connecting plate slot 11, the opposite side towards center housing 1 of the transition pedestal 2 is provided with mounting pin 5, such as Fig. 5 institutes Show, the side towards transition pedestal 2 of the fixed base frame 3 is provided with mounting pin 5;
The mounting pin 5 of the transition pedestal 2 and the clamping of connecting plate 4 of the side of the center housing 1, the fixed base frame 3 mounting pin 5 and the clamping of connecting plate 4 of transition pedestal 2.
The modular offshore anemometer tower platform is spelled by dismountable center housing 1, transition pedestal 2 and fixed base frame 3 Dress forms.So that compared with existing non-removable integral type anemometer tower platform, the modular offshore anemometer tower platform Production when can simultaneously production center pedestal 1, transition pedestal 2 and fixed base frame 3, shorten the production cycle;The centre mount in transport Body 1, transition pedestal 2 and fixed base frame 3 can be placed independently, not only can also be transported over land by water-borne transport; In use, the quantity of center housing 1, transition pedestal 2 and fixed base frame 3 according to different demands and environmental aspect, can be increased and decreased, and Each side of the center housing 1 is equipped with connecting plate slot 11, therefore the transition pedestal 2 can be with the center housing 1 Any one side connection, improve using flexible;The modular offshore anemometer tower platform can be entered after surveying wind Row dismounting, center housing 1, transition pedestal 2 and the fixed base frame 3 taken apart can be deposited independently, reduce space-consuming.
Preferably, as shown in figure 1, the cross section of the center housing 1 is hexagon, the transition pedestal 2 and fixed seat The cross section of body 3 is square.One center housing 1 is set, and three transition pedestals 2 and three fixed base frames 3 form Y type knots The offshore anemometer tower platform of structure, pylon are arranged in the center housing 1, and fixed mount 31 is arranged on the fixed base frame 3, institute State fixed mount 31 to connect with pylon by cable wire to reinforce anemometer tower, reduce pylon rocking under wind wave action, y-type structure makes Pylon is obtained to be more uniformly distributed positioned at the center of three fixed mounts 31, stress.Transition between the center housing 1 and fixed base frame 3 The quantity of pedestal 2 can be increased and decreased on demand, improve adaptability and flexibility.And the fixed base frame 3 of each branch can be exchanged arbitrarily, The transition pedestal 2 of each branch also can be exchanged arbitrarily, and assembling is more convenient, versatile, is easily changed.
Preferably, as shown in Figure 7, Figure 8, the connecting plate 4 includes a main paragraph 41 and two are gone back to hook section 42, an institute State back and hook one end that section 42 is arranged at the main paragraph 41, another described hook section 42 of returning is arranged at the another of the main paragraph 41 The close end at end, and returned described in two and hook the side that section 42 may be contained within the main paragraph 41;
Connection neck 43 is formed between the described time inner side for hooking section 42 and the main paragraph 41, is returned described in two and hooks section 42 Neck 43 is connected towards the other end of the main paragraph 41;
The opposite side of the main paragraph 41 is towards the bottom of the connecting plate slot 11 during installation.
Two of the connecting plate 4 return when hook section 42 is used to install and the clamping of the mounting pin 5.First from the company during installation Fishplate bar slot 11 smokes the connecting plate 4, in order to which the mounting pin 5 inserts the connecting plate slot 11, the now installation Pin 5 towards the main paragraph 41 that the lower section of section 42 is hooked positioned at described go back to, avoid the mounting pin 5 and hook for described time section 42 offset and can not Insert the connecting plate slot 11;Then, the connecting plate 4 is pushed back, described return is hooked section 42 and the clamping of the mounting pin 5.Institute State connecting plate slot 11 and position-limiting action is played to the connecting plate 4, to ensure that described time hook section 42 and the mounting pin 5 are blocked completely Connect, improve assembling reliability.The head and the tail both ends of connecting plate 4 set described return to hook section 42, to block respectively with two mounting pins 5 Connect, increase the tie point between platform, it is preferable that described return can be set to hook section 42 at the middle part of main paragraph 41, further improved Degree of being connected firmly.
Preferably, as shown in fig. 7, one end of the main paragraph 42 is provided with mobile through hole 44.It can lead to during assembly and disassembly Cross and move through hole 44 and smoke the connecting plate 4, provide fulcrum to smoke the connecting plate 4, be easy to assembly and disassembly.
Preferably, as shown in figure 9, the mounting pin 5 includes 51, banking stops 52 of a shank installation sheet and two pins Piece 53, a selling sheet 53 is installed on the side of the shank installation sheet 51, and two selling sheets 53 pass through the limit Bit slice 52 connects;
The banking stop 52 is arranged at the middle part of two selling sheets 53, so as to form installation between two selling sheets 53 Groove 54;
As shown in Figure 10, the mounting pin 5 and the hook section 42 of returning of the connecting plate 4 correspond, and the connecting plate 4 returns Hook section 42 and insert the mounting groove 54, while another described selling sheet 53 inserts the connection neck 43 of the connecting plate 4.
The banking stop 52 is provided between two selling sheets 53, forms a sunk mounting groove 54, the when institute so as to install Time hook section 42 and two selling sheets 53 for stating connecting plate 4 interlock, and two selling sheets 53, time hook section 42 and main paragraph 41 are mutually close to, from And connectivity robustness is improved, prevent from being shifted over or loosening between the adjacent pedestal of wind wave action.
Preferably, as shown in Fig. 2, Fig. 3, Fig. 6, in addition to multiple shank retainer rings 6, the shank retainer ring 6 are arranged at The top of the connecting plate slot 11;The mounting pin 5 is inserted after the shank retainer ring 6 and the clamping of connecting plate 4.It is described Shank retainer ring 6 plays position-limiting action to the mounting pin 5, prevent assembling when the mounting pin 5 shift and with described time 42 incomplete clamping of section is hooked, improves assembling reliability.
Preferably, as shown in Fig. 2, Fig. 3, Fig. 6, the top of the connecting plate slot 11 is engraved structure, to the connection Plate 4 plays spacing fixation, prevents the connecting plate 4 from dropping, and also allows for connecting plate 4 described in operating personnel's current check.
Preferably, as shown in figure 1, also including fixed mount 31, the fixed mount 31 is installed on the top of the fixed base frame 3 Portion;As shown in fig. 6, run through the fixed mount 31 and fixed base frame 3 provided with the installation through-hole 32;As shown in fig. 6, the fixation The opposite side of the remote transition pedestal 2 of pedestal 3 sets the connecting plate slot 11.The fixed mount 31 is arranged on the fixed seat On body 3, the fixed mount 31 is connected by cable wire with anemometer tower to reinforce anemometer tower, reduces anemometer tower shaking under wind wave action Shake.Run through the fixed mount 31 and fixed base frame 3 provided with the installation through-hole 32, so as to which the modular offshore anemometer tower is put down Platform can be connected to be fixed on sea by the installation through-hole 32 with spud leg.Described in the opposite side of the fixed base frame 3 is set Connecting plate slot 11, in order to increase other function pedestals in the future.
Preferably, as shown in Figure 1 and Figure 2, in addition to tower body mounting seat 12, the tower body mounting seat 12 are installed on centre mount The top of body 1, the tower body mounting seat 12 are used for erection tower.
Preferably, the installation method of the modular offshore anemometer tower platform, comprises the following steps:
Central platform and transition platform number of assembling steps, the side of the transition pedestal 2 and the side pair of the center housing 1 Together, then by connecting plate 4 described in the pull-up of connecting plate slot 11 of the mobile through hole 44 from the center housing 1, then institute The mounting pin 5 for stating transition pedestal 2 inserts the corresponding shank retainer ring 6, and the connecting plate 4 finally is pushed back into the connecting plate In slot 11, and returning for the connecting plate 4 is set to hook the mounting groove 54 that section 42 inserts the mounting pin 5;
Transition platform and fixed body panel number of assembling steps, the opposite side of the transition pedestal 2 and the one of the fixed base frame 3 Side is alignd, and then by connecting plate 4 described in the pull-up of connecting plate slot 11 of the mobile through hole 44 from the transition pedestal 2, is connect The mounting pin 5 for the fixed base frame 3 inserts the corresponding shank retainer ring 6, and the connecting plate 4 finally is pushed back into the company In fishplate bar slot 11, and returning for the connecting plate 4 is set to hook the mounting groove 54 that section 42 inserts the mounting pin 5.
The connecting plate 4 is smoked by mobile through hole 44, fulcrum is provided to smoke the connecting plate 4, is easy to assemble.Installation Pin 5 inserts the corresponding shank retainer ring 6, and position-limiting action is played to the mounting pin 5, the mounting pin 5 when preventing from assembling Shift and assemble reliability with described time hook 42 incomplete clamping of section, raising.Returning for the connecting plate 4 hooks the insertion of section 42 institute The mounting groove 54 of mounting pin 5 is stated, mutually fastening, so as to improve connectivity robustness, prevent from sending out between the adjacent pedestal of wind wave action Raw displacement loosens.The installation method of the modular offshore anemometer tower platform is convenient and swift, and and can ensures the company between pedestal Connect fastness.
Preferably, the method for dismounting of the modular offshore anemometer tower platform, comprises the following steps:
Central platform and transition platform demounting procedure, the connecting plate by the mobile through hole 44 from the center housing 1 Connecting plate 4 described in the pull-up of slot 11, then the transition pedestal 2 and center housing 1 separate, the mounting pin 5 of the transition pedestal 2 Extract out from the shank retainer ring 6, finally push back the connecting plate 4 in the connecting plate slot 11;
Transition platform and fixed body panel demounting procedure, the connection by the mobile through hole 44 from the transition pedestal 2 Connecting plate 4 described in the pull-up of plate slot 11, then the transition pedestal 2 and fixed base frame 3 separate, the installation of the transition pedestal 2 Pin 5 is extracted out from the shank retainer ring 6, finally pushes back the connecting plate 4 in the connecting plate slot 11.
The connecting plate 4 is smoked by mobile through hole 44, fulcrum is provided to smoke the connecting plate 4, it is easy to disassemble.It is described Connecting plate 4, which is smoked, just makes returning for the connecting plate 4 hook section 42 and the corresponding mounting pin 5 and separate, so as to realize between pedestal Separation.The method for dismounting of the modular offshore anemometer tower platform is convenient and swift, time saving and energy saving.
The technical principle of the present invention is described above in association with specific embodiment.These descriptions are intended merely to explain the present invention's Principle, and limiting the scope of the invention can not be construed in any way.Based on explanation herein, the technology of this area Personnel would not require any inventive effort the other embodiments that can associate the present invention, and these modes are fallen within Within protection scope of the present invention.

Claims (10)

  1. A kind of 1. modular offshore anemometer tower platform, it is characterised in that:Including center housing, transition pedestal and fixed base frame, The transition pedestal is arranged between the center housing and fixed base frame;
    Each side of the center housing is provided with connecting plate slot, and the side towards fixed base frame of the transition pedestal is provided with Connecting plate slot;
    Also include multiple connecting plates and multiple mounting pins, the connecting plate is inserted in the connecting plate slot, the transition pedestal The opposite side towards center housing be provided with mounting pin, the side towards transition pedestal of the fixed base frame is provided with mounting pin;
    The mounting pin of the transition pedestal and the connecting plate clamping of the side of the center housing, the mounting pin of the fixed base frame With the connecting plate clamping of transition pedestal.
  2. 2. modular offshore anemometer tower platform according to claim 1, it is characterised in that:The connecting plate includes one Main paragraph and two times hook sections, are returned described in one and hook one end that section is arranged at the main paragraph, and another described time hook section is set Returned in the close end of the other end of the main paragraph, and described in two and hook the side that section may be contained within the main paragraph;
    Connection neck is formed between the described time inner side for hooking section and the main paragraph, the equal court of connection neck for hooking section is gone back to described in two To the other end of the main paragraph;
    The opposite side of the main paragraph is towards the bottom of the connecting plate slot during installation.
  3. 3. modular offshore anemometer tower platform according to claim 2, it is characterised in that:One end of the main paragraph is set There is mobile through hole.
  4. 4. modular offshore anemometer tower platform according to claim 3, it is characterised in that:The mounting pin includes one Shank installation sheet, a banking stop and two selling sheets, a selling sheet are installed on the side of the shank installation sheet, and two The individual selling sheet is connected by the banking stop;
    The banking stop is arranged at the middle part of two selling sheets, so as to form mounting groove between two selling sheets;
    The mounting pin and returning for the connecting plate hook section one-to-one corresponding, and the hook section of returning of the connecting plate inserts the mounting groove, Another described selling sheet inserts the connection neck of the connecting plate simultaneously.
  5. 5. modular offshore anemometer tower platform according to claim 4, it is characterised in that:Also fixed including multiple shanks Ring, the shank retainer ring are arranged at the top of the connecting plate slot;
    The mounting pin is inserted after the shank retainer ring and the connecting plate clamping.
  6. 6. modular offshore anemometer tower platform according to claim 1, it is characterised in that:The top of the connecting plate slot Portion is engraved structure.
  7. 7. modular offshore anemometer tower platform according to claim 1, it is characterised in that:Also include fixed mount, it is described Fixed mount is installed on the top of the fixed base frame;
    Run through the fixed mount and fixed base frame provided with the installation through-hole;
    The opposite side of the remote transition pedestal of the fixed base frame sets the connecting plate slot.
  8. 8. modular offshore anemometer tower platform according to claim 1, it is characterised in that:Also include tower body mounting seat, The tower body mounting seat is installed on the top of center housing.
  9. 9. the installation method of modular offshore anemometer tower platform according to claim 5, it is characterised in that including following Step:
    Central platform and transition platform number of assembling steps, the side of the transition pedestal and the side alignment of the center housing, so Afterwards by connecting plate described in connecting plate slot pull-up of the mobile through hole from the center housing, the then transition pedestal The shank retainer ring corresponding to mounting pin insertion, finally pushes back the connecting plate in the connecting plate slot, and makes described Returning for connecting plate hooks the mounting groove that section inserts the mounting pin;
    Transition platform and fixed body panel number of assembling steps, the opposite side of the transition pedestal and the side pair of the fixed base frame Together, connecting plate, the then fixation described in connecting plate slot pull-up of the mobile through hole from the transition pedestal are then passed through The shank retainer ring corresponding to the mounting pin insertion of pedestal, finally pushes back the connecting plate in the connecting plate slot, and Returning for the connecting plate is set to hook the mounting groove that section inserts the mounting pin.
  10. 10. the method for dismounting of modular offshore anemometer tower platform according to claim 5, it is characterised in that including with Lower step:
    Central platform and transition platform demounting procedure, the connecting plate slot pull-up by the mobile through hole from the center housing The connecting plate, then the transition pedestal and center housing separation, the mounting pin of the transition pedestal are fixed from the shank Lottery of lotteries goes out, and finally pushes back the connecting plate in the connecting plate slot;
    Transition platform and fixed body panel demounting procedure, drawn by the mobile through hole from the connecting plate slot of the transition pedestal The connecting plate is played, then transition pedestal and the fixed base frame separation, the mounting pin of the transition pedestal are consolidated from the shank Determine lottery of lotteries to go out, finally push back the connecting plate in the connecting plate slot.
CN201710478702.4A 2017-06-22 2017-06-22 A kind of modular offshore anemometer tower platform and its installation, method for dismounting Active CN107419714B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710478702.4A CN107419714B (en) 2017-06-22 2017-06-22 A kind of modular offshore anemometer tower platform and its installation, method for dismounting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710478702.4A CN107419714B (en) 2017-06-22 2017-06-22 A kind of modular offshore anemometer tower platform and its installation, method for dismounting

Publications (2)

Publication Number Publication Date
CN107419714A true CN107419714A (en) 2017-12-01
CN107419714B CN107419714B (en) 2019-02-12

Family

ID=60427595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710478702.4A Active CN107419714B (en) 2017-06-22 2017-06-22 A kind of modular offshore anemometer tower platform and its installation, method for dismounting

Country Status (1)

Country Link
CN (1) CN107419714B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115783179A (en) * 2022-11-24 2023-03-14 广东精铟海洋工程股份有限公司 Prefabricated modular foundation platform and assembling method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202248995U (en) * 2011-07-28 2012-05-30 电联工程技术有限公司 Rapid integration communication device suitable for mountainous regions
US20150189988A1 (en) * 2012-08-02 2015-07-09 Big Foot Systems Limited Modular framework support systems
CN106087929A (en) * 2016-07-28 2016-11-09 青岛海西重机有限责任公司 A kind of lock catch type platform for lining modular connection and attaching method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202248995U (en) * 2011-07-28 2012-05-30 电联工程技术有限公司 Rapid integration communication device suitable for mountainous regions
US20150189988A1 (en) * 2012-08-02 2015-07-09 Big Foot Systems Limited Modular framework support systems
CN106087929A (en) * 2016-07-28 2016-11-09 青岛海西重机有限责任公司 A kind of lock catch type platform for lining modular connection and attaching method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115783179A (en) * 2022-11-24 2023-03-14 广东精铟海洋工程股份有限公司 Prefabricated modular foundation platform and assembling method thereof
CN115783179B (en) * 2022-11-24 2023-07-21 广东精铟海洋工程股份有限公司 Prefabricated modularized foundation platform and assembly method thereof

Also Published As

Publication number Publication date
CN107419714B (en) 2019-02-12

Similar Documents

Publication Publication Date Title
CN101680227B (en) Halo/spider, full-moment, column/beam connection in a building frame
WO2018129471A1 (en) Modular offshore wind turbine foundation and modular substructure with suction caissons
CN102135077B (en) Stretched type multi-segment concrete wind power tower frame
CN107419714A (en) A kind of modular offshore anemometer tower platform and its installation, method for dismounting
CN202065134U (en) Sectional type concrete wind power tower
CN205100104U (en) Foldable landing stage decking
CN105545023A (en) Swimming pool bottom cushion layer
CN113875468B (en) Construction method of double-layer sunshade net arched shed for crop planting
CN106504674A (en) Billboard
KR20130121529A (en) Block type jacket structure
CN101844604A (en) Integral hoisting and positioning method for pipe frame structure
CN211776030U (en) Aluminum pavilion hip plug-in type hip joint structure
CN208950197U (en) A kind of portable pin-connected panel ladder for swimming pool
CN209924560U (en) Communication tower fixing base for information engineering
CN106460801A (en) An equipment compartment frame of a power control module of a wind power turbine and methods related thereto
CN206681667U (en) Novel electric power overhauls climbing ladder apparatus
CN218061119U (en) Assembled building stair
CN207714905U (en) A kind of prefabrication construction safety protection fence
CN219565407U (en) Modularized ocean leisure platform
CN109113284A (en) A kind of portable pin-connected panel ladder for swimming pool
CN213269283U (en) Novel protective fence for vegetable planting
CN216713096U (en) Retaining wall that can splice
CN218150220U (en) Municipal administration guardrail convenient to installation
CN202933421U (en) Jumping stand structure for long jump
CN220737967U (en) Wet electrostatic precipitator bearing structure of easy to assemble