CN107419663A - A kind of bridge construction damping device - Google Patents
A kind of bridge construction damping device Download PDFInfo
- Publication number
- CN107419663A CN107419663A CN201710360069.9A CN201710360069A CN107419663A CN 107419663 A CN107419663 A CN 107419663A CN 201710360069 A CN201710360069 A CN 201710360069A CN 107419663 A CN107419663 A CN 107419663A
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- casing
- plate
- piston cylinder
- bridge construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 26
- 238000013016 damping Methods 0.000 title claims abstract description 25
- 230000000694 effects Effects 0.000 claims abstract description 18
- 239000007853 buffer solution Substances 0.000 claims abstract description 13
- 230000003028 elevating effect Effects 0.000 claims description 9
- 230000003139 buffering effect Effects 0.000 claims 1
- 238000000034 method Methods 0.000 claims 1
- 238000005096 rolling process Methods 0.000 claims 1
- 239000007787 solid Substances 0.000 claims 1
- 210000003739 neck Anatomy 0.000 description 7
- 238000005516 engineering process Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 241001080929 Zeugopterus punctatus Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Vibration Prevention Devices (AREA)
Abstract
The invention discloses a kind of bridge construction damping device, including bottom plate, both sides at the top of the bottom plate have been fixedly connected with piston cylinder, two relative sides of piston cylinder have been fixedly connected with casing, the casing is connected with piston cylinder by communicating pipe, the internal activity of the casing is connected with sliding panel, side of the sliding panel away from piston cylinder is fixedly connected with one end of sliding bar, the one end of the sliding bar away from sliding panel is through casing and extends to the outside of casing, the top slide connection of sliding bar bottom and bottom plate outside casing, the internal activity of the piston cylinder is connected with piston.The present invention passes through the buffer solution inside piston cylinder with box house, coordinate the spring between two fixed blocks simultaneously, and utilize the repulsive force between the first magnet piece and the second magnet piece, effectively top plate caused shaking force during bridge construction is buffered, damping effect is high, strong applicability, it is reliable high, it is convenient and practical.
Description
Technical field
The present invention relates to bridge technology field, specially a kind of bridge construction damping device.
Background technology
Bridge refers generally to be erected in rivers,lakes and seas, the structures for making traffic etc. smoothly to pass through.It is modern to adapt to
The transportation industry of high speed development, bridge be also extended to across mountain stream, unfavorable geology or meet other traffic needs and set up make
Current more easily building.Bridge is typically made up of superstructure, substructure, bearing and attached structure, top knot
Structure is also known as bridge span structure, is across the primary structure of obstacle;Substructure includes abutment, bridge pier and basis;Bearing is spanning knot
The load transfer device that the supporting place of structure and bridge pier or abutment is set;Attached structure then refer to transition slab at bridge head, truncated cone banking, shore protection,
Training works etc..
Damping device is usually needed to use during bridge construction, the generation shaking force in building course is avoided and causes
Bridge structure is damaged, and ensures the normal construction of bridge, but the mode of current bridge construction layered structure is all
Increase Rubber shock-absorbing pad simply by its bottom, such damping modes damping effect is poor, can only eliminate the vibrations of a part
Power, poor for applicability, reliability is low.
The content of the invention
It is an object of the invention to provide a kind of bridge construction damping device, to solve what is proposed in above-mentioned background technology
The mode of current bridge construction layered structure all increases Rubber shock-absorbing pad, such damping simply by its bottom
The problem of mode damping effect is poor, can only eliminate the shaking force of a part, poor for applicability, and reliability is low.
To achieve the above object, the present invention provides following technical scheme:A kind of bridge construction damping device, including bottom
Plate, the both sides at the top of the bottom plate have been fixedly connected with piston cylinder, and two relative sides of piston cylinder have been fixedly connected with casing,
The casing is connected with piston cylinder by communicating pipe, and the internal activity of the casing is connected with sliding panel, and the sliding panel is remote
The side of piston cylinder is fixedly connected with one end of sliding bar, and the one end of the sliding bar away from sliding panel is through casing and extends to
The outside of casing, the top slide connection of sliding bar bottom and bottom plate outside casing, the internal activity of the piston cylinder
Be connected with piston, the top of the piston is fixedly connected with one end of motion bar, the top of the motion bar through piston cylinder and
Extend to the top of piston cylinder, the motion bar extended at the top of piston cylinder is fixedly connected with the bottom of top plate, the piston cylinder and
The inside of casing is provided with buffer solution, and sleeve pipe, the top of described sleeve pipe inwall are fixedly connected with the center of the top plate bottom
Portion is fixedly connected with the second magnet plate, the inside of the described sleeve pipe and underside positioned at the second magnet plate is connected with and second
The first magnet plate that magnet plate is adapted, the bottom of first magnet plate at the top of elevating lever with being fixedly connected, the lifting
The bottom of bar is through sleeve pipe and extends to the bottom of sleeve pipe, the end of the sliding bar extended to outside casing and the side of fixed block
It is fixedly connected, is fixedly connected by spring between two fixed blocks, is installed with the top of the sliding bar outside casing
Rotating seat, the front surface of the rotating seat are fixedly connected with rotary shaft, the surface of the rotary shaft and one end activity of swingle
Connection, the surface activity connection of the swingle one end and column spinner away from rotary shaft, the back surface of the column spinner and position
It is fixedly connected in the front surface of the elevating lever of jacket exterior, the both sides of the bottom base plate offer roller groove, the roller
Groove is internally provided with mobile device.
Preferably, the buffer solution of the box house be located at side and casing of the sliding panel away from sliding bar inwall it
Between.
Preferably, the buffer solution inside the piston cylinder be located at side of the piston away from motion bar and the piston inside wall of cylinder it
Between.
Preferably, chute is offered at the center at the top of the bottom plate, the bottom of the sliding bar outside casing is fixed
The pulley being adapted with chute is installed.
Preferably, the magnetic at the top of first magnet plate is identical with the magnetic of the second magnet plate bottom.
Preferably, the mobile device includes fixed seat, and the fixed seat is fixedly mounted on one of pulley groove away from chute
On the inwall of side, rotary shaft is rotatably connected in the fixed seat, the surface of the rotary shaft is fixedly connected with one end of connecting rod,
The one end of the connecting rod away from rotary shaft is fixedly connected with roller plate, the top of the roller plate and the top of pulley groove inwall
Clamping, the one end of the roller plate away from connecting rod are fixedly connected with roller.
Preferably, neck is fixedly connected with the top of the roller plate, is fixedly connected with the top of the pulley groove inwall
The kelly being adapted with neck.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, the present invention is by piston cylinder inside and the buffer solution of box house, while coordinates the spring between two fixed blocks, and
Using the repulsive force between the first magnet piece and the second magnet piece, top plate caused shake during bridge construction has effectively been buffered
Power, damping effect is high, strong applicability, reliable high, convenient and practical.
2nd, the present invention is by opening up pulley groove in the bottom of bottom plate, and pulley groove is internally provided with mobile device, moves
Dynamic device goes out from the internal rotating of pulley groove when in use, can retract to the inside of pulley groove when not in use, effectively to moving
Dynamic device is protected, and extends the service life of mobile device.
3rd, mobile device of the present invention effectively prevent when not in use by the inwall clamping of neck and kelly and pulley groove
Mobile device rotates out of from pulley groove, and locking is firm, and clamping is stable, is convenient for people to use.
4th, sliding bar of the present invention both ensure that the horizontal progress of sliding bar by pulley and chute in the top slide of bottom plate
It is mobile, the sport efficiency of sliding bar is also improved, it is reliable and stable.
5th, the present invention is simple in construction, and swift to operate, both convenient use person carried out damping work in building course, also convenient
People carry, and reduce the use difficulty of user, time saving and energy saving.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention.
In figure:1 bottom plate, 2 piston cylinders, 3 casings, 4 communicating pipes, 5 sliding panels, 6 sliding bars, 7 pistons, 8 motion bars, 9 top plates,
10 sleeve pipes, 11 second magnet plates, 12 first magnet plates, 13 elevating levers, 14 fixed blocks, 15 springs, 16 rotating seats, 17 rotary shafts,
18 swingles, 19 column spinners, 20 pulley grooves, 21 mobile devices, 22 chutes, 23 pulleys, 24 fixed seats, 25 rotary shafts, 26 connections
Bar, 27 roller plates, 28 rollers, 29 necks, 30 kellies.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
Referring to Fig. 1, the present invention provides a kind of technical scheme:A kind of bridge construction damping device, including bottom plate(1),
Bottom plate(1)The both sides at top have been fixedly connected with piston cylinder(2), two piston cylinders(2)Relative side has been fixedly connected with case
Body(3), casing(3)With piston cylinder(2)Pass through communicating pipe(4)Connection, casing(3)Internal activity be connected with sliding panel(5), it is sliding
Dynamic plate(5)Away from piston cylinder(2)Side and sliding bar(6)One end be fixedly connected, sliding bar(6)Away from sliding panel(5)'s
Casing is run through in one end(3)And extend to casing(3)Outside, positioned at casing(3)Outside sliding bar(6)Bottom and bottom plate(1)
Top slide connection, bottom plate(1)Chute is offered at the center at top(22), positioned at casing(3)Outside sliding bar(6)'s
Bottom is installed with and chute(22)The pulley being adapted(23), sliding bar(6)Pass through pulley(23)And chute(22)The bottom of at
Plate(1)Slip, both ensure that sliding bar(6)Horizontal moves, and also improves sliding bar(6)Sport efficiency, it is stable
Reliably, piston cylinder(2)Internal activity be connected with piston(7), piston(7)Top and motion bar(8)One end be fixedly connected,
Motion bar(8)Top run through piston cylinder(2)And extend to piston cylinder(2)Top, extend to piston cylinder(2)The activity at top
Bar(8)With top plate(9)Bottom be fixedly connected, piston cylinder(2)And casing(3)Inside be provided with buffer solution, casing(3)It is interior
The buffer solution in portion is located at sliding panel(5)Away from sliding bar(6)Side and casing(3)Inwall between, piston cylinder(2)Internal
Buffer solution is located at piston(7)Away from motion bar(8)Side and piston cylinder(2)Between inwall, top plate(9)Consolidate at the center of bottom
Surely it is connected with sleeve pipe(10), sleeve pipe(10)The second magnet plate is fixedly connected with the top of inwall(11), sleeve pipe(10)Inside simultaneously
And it is located at the second magnet plate(11)Underside be connected with and the second magnet plate(11)The first magnet plate being adapted(12), the
One magnet plate(11)The magnetic at top and the second magnet plate(12)The magnetic of bottom is identical, according to magnetic pole identical charges repel each other different in nature phase
Knowable to the principle of suction, the first magnet plate(12)With the second magnet plate(11)Between repulsive force, the first magnet plate be present(12)Bottom
Portion and elevating lever(13)Top be fixedly connected, elevating lever(13)Bottom run through sleeve pipe(10)And extend to sleeve pipe(10)Bottom
Portion, extend to casing(3)Outside sliding bar(6)End and fixed block(14)Side be fixedly connected, two fixed blocks
(14)Between pass through spring(15)It is fixedly connected, positioned at casing(3)Outside sliding bar(6)Top be installed with rotating seat
(16), rotating seat(16)Front surface be fixedly connected with rotary shaft(17), rotary shaft(17)Surface and swingle(18)One
End is flexibly connected, swingle(18)Away from rotary shaft(17)One end and column spinner(19)Surface activity connection, column spinner
(19)Back surface and be located at sleeve pipe(10)Outside elevating lever(13)Front surface be fixedly connected, bottom plate(1)The both sides of bottom
Offer roller groove(20), roller groove(20)Be internally provided with mobile device(21), mobile device(21)Including fixed seat
(24), fixed seat(24)It is fixedly mounted on pulley groove(20)Away from chute(22)Side inwall on, fixed seat(24)Upper rotation
It is connected with rotary shaft(25), rotary shaft(25)Surface and connecting rod(26)One end be fixedly connected, connecting rod(26)It is remote to turn
Moving axis(25)One end and roller plate(27)It is fixedly connected, roller plate(27)Top and pulley groove(20)The top card of inwall
Connect, roller plate(27)Top be fixedly connected with neck(29), pulley groove(20)It is fixedly connected with the top of inwall and neck
(29)The kelly being adapted(30), mobile device(21)Pass through neck(29)And kelly(30)With pulley groove(20)Inwall card
Connect, effectively prevent mobile device when not in use(21)From pulley groove(20)Rotate out of, locking is firm, and clamping is stable, convenient
People use, roller plate(27)Away from connecting rod(26)One end be fixedly connected with roller(28), by bottom plate(1)Bottom
Open up pulley groove(20), and pulley groove(20)Be internally provided with mobile device(21), mobile device(21)When in use from
Pulley groove(20)Internal rotating go out, pulley groove can be retracted to when not in use(20)Inside, effectively to mobile device
(21)Protected, extend mobile device(21)Service life.
In summary, the bridge construction damping device, passes through piston cylinder(2)Internal and casing(3)Internal buffer solution,
Coordinate two fixed blocks simultaneously(14)Between spring(15), and utilize the first magnet piece(12)With the second magnet piece(11)Between
Repulsive force, effectively buffered top plate(9)The caused shaking force during bridge construction, damping effect is high, and strong applicability can
It is convenient and practical by height.
Secondly, simple in construction, swift to operate, both convenient use person carried out damping work in building course, also facilitated people
Carry, reduce the use difficulty of user, it is time saving and energy saving.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (8)
1. a kind of bridge construction damping device, including bottom plate(1), it is characterised in that:The bottom plate(1)The both sides at top are solid
Surely it is connected with piston cylinder(2), two piston cylinders(2)Relative side has been fixedly connected with casing(3), the casing(3)With work
Plug cylinder(2)Pass through communicating pipe(4)Connection, the casing(3)Internal activity be connected with sliding panel(5), the sliding panel(5)Far
From piston cylinder(2)Side and sliding bar(6)One end be fixedly connected, the sliding bar(6)Away from sliding panel(5)One end pass through
Wear casing(3)And extend to casing(3)Outside, positioned at casing(3)Outside sliding bar(6)Bottom and bottom plate(1)Top
It is slidably connected, the piston cylinder(2)Internal activity be connected with piston(7), the piston(7)Top and motion bar(8)'s
One end is fixedly connected, the motion bar(8)Top run through piston cylinder(2)And extend to piston cylinder(2)Top, extend to work
Plug cylinder(2)The motion bar at top(8)With top plate(9)Bottom be fixedly connected, the piston cylinder(2)And casing(3)Inside it is equal
It is provided with buffer solution, the top plate(9)Sleeve pipe is fixedly connected with the center of bottom(10), described sleeve pipe(10)The top of inwall
It is fixedly connected with the second magnet plate(11), described sleeve pipe(10)Inside and be located at the second magnet plate(11)Underside connect
It is connected to and the second magnet plate(11)The first magnet plate being adapted(12), first magnet plate(12)Bottom and elevating lever
(13)Top be fixedly connected, the elevating lever(13)Bottom run through sleeve pipe(10)And extend to sleeve pipe(10)Bottom, prolong
Extend casing(3)Outside sliding bar(6)End and fixed block(14)Side be fixedly connected, two fixed blocks(14)Between
Pass through spring(15)It is fixedly connected, positioned at casing(3)Outside sliding bar(6)Top be installed with rotating seat(16), institute
State rotating seat(16)Front surface be fixedly connected with rotary shaft(17), the rotary shaft(17)Surface and swingle(18)One
End is flexibly connected, the swingle(18)Away from rotary shaft(17)One end and column spinner(19)Surface activity connection, it is described
Column spinner(19)Back surface and be located at sleeve pipe(10)Outside elevating lever(13)Front surface be fixedly connected, the bottom plate(1)
The both sides of bottom offer roller groove(20), the roller groove(20)Be internally provided with mobile device(21).
A kind of 2. bridge construction damping device according to claim 1, it is characterised in that:The casing(3)Internal
Buffer solution is located at sliding panel(5)Away from sliding bar(6)Side and casing(3)Inwall between.
A kind of 3. bridge construction damping device according to claim 1, it is characterised in that:The piston cylinder(2)It is internal
Buffer solution be located at piston(7)Away from motion bar(8)Side and piston cylinder(2)Between inwall.
A kind of 4. bridge construction damping device according to claim 1, it is characterised in that:The bottom plate(1)Top
Chute is offered at center(22), positioned at casing(3)Outside sliding bar(6)Bottom be installed with and chute(22)Xiang Shi
The pulley matched somebody with somebody(23).
A kind of 5. bridge construction damping device according to claim 1, it is characterised in that:First magnet plate(11)
The magnetic at top and the second magnet plate(12)The magnetic of bottom is identical.
A kind of 6. bridge construction damping device according to claim 1-5, it is characterised in that:The mobile device(21)
Including fixed seat(24), the fixed seat(24)It is fixedly mounted on pulley groove(20)Away from chute(22)Side inwall on, institute
State fixed seat(24)On be rotatably connected to rotary shaft(25), the rotary shaft(25)Surface and connecting rod(26)One end fix
Connection, the connecting rod(26)Away from rotary shaft(25)One end and roller plate(27)It is fixedly connected, the roller plate(27)'s
Top and pulley groove(20)The top clamping of inwall, the roller plate(27)Away from connecting rod(26)One end be fixedly connected with rolling
Wheel(28).
A kind of 7. bridge construction damping device according to claim 1-6, it is characterised in that:The roller plate(27)'s
Top is fixedly connected with neck(29), the pulley groove(20)It is fixedly connected with the top of inwall and neck(29)The card being adapted
Bar(30).
A kind of 8. bridge construction shock-dampening method, it is characterised in that:By inside piston cylinder and box house buffer solution, simultaneously
Coordinate the spring between two fixed blocks, and utilize the repulsive force between the first magnet piece and the second magnet piece, effectively buffering
Top plate caused shaking force during bridge construction;Pulley groove is opened up in the bottom of bottom plate, and the inside of pulley groove is set
There is mobile device, mobile device goes out from the internal rotating of pulley groove when in use;Pass through neck and the inwall of kelly and pulley groove
Clamping, it effectively prevent mobile device when not in use and rotated out of from pulley groove;Slided by pulley and chute at the top of bottom plate
It is dynamic, it both ensure that sliding bar was horizontal and moved, and also improved the sport efficiency of sliding bar, it is reliable and stable.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710360069.9A CN107419663B (en) | 2017-05-20 | 2017-05-20 | A kind of bridge construction damping device |
CN201811017631.9A CN109024299B (en) | 2017-05-20 | 2017-05-20 | Working method of damping device for bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710360069.9A CN107419663B (en) | 2017-05-20 | 2017-05-20 | A kind of bridge construction damping device |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811017631.9A Division CN109024299B (en) | 2017-05-20 | 2017-05-20 | Working method of damping device for bridge construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107419663A true CN107419663A (en) | 2017-12-01 |
CN107419663B CN107419663B (en) | 2018-11-06 |
Family
ID=60425671
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710360069.9A Active CN107419663B (en) | 2017-05-20 | 2017-05-20 | A kind of bridge construction damping device |
CN201811017631.9A Active CN109024299B (en) | 2017-05-20 | 2017-05-20 | Working method of damping device for bridge construction |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811017631.9A Active CN109024299B (en) | 2017-05-20 | 2017-05-20 | Working method of damping device for bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN107419663B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108330804A (en) * | 2018-01-11 | 2018-07-27 | 旗舰集团有限公司 | A kind of damping bridge structure |
CN108468393A (en) * | 2018-04-12 | 2018-08-31 | 淄博正邦知识产权企划有限公司 | A kind of building pilum and its safeguard structure |
CN108468509A (en) * | 2018-01-17 | 2018-08-31 | 浙江建设职业技术学院 | A kind of ground construction high stable type drilling equipment |
CN108487454A (en) * | 2018-04-12 | 2018-09-04 | 淄博正邦知识产权企划有限公司 | A kind of building pilum and its safeguard structure |
CN108643059A (en) * | 2018-05-17 | 2018-10-12 | 庄跃东 | A kind of Hanging Basket of wider type bridge construction |
CN108643061A (en) * | 2018-05-17 | 2018-10-12 | 蔡东彬 | A kind of bridge strengthening device for municipal science of bridge building |
CN111055628A (en) * | 2019-12-19 | 2020-04-24 | 中山市唯信脚轮制造有限公司 | Shock-resistant universal caster |
CN114635347A (en) * | 2022-04-07 | 2022-06-17 | 郑州大学 | A public road bridge roof beam buffer for municipal bridge engineering |
CN115059729A (en) * | 2022-07-13 | 2022-09-16 | 杭州电子科技大学 | Hierarchical vibration damper based on electromagnetism and hydraulic damping |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109518613B (en) * | 2019-01-04 | 2020-10-23 | 嘉兴市金麟机械有限公司 | Vibration damper for bridge widening construction |
CN114771094A (en) * | 2022-03-04 | 2022-07-22 | 长兴力亿纺织有限公司 | Textile printing and dyeing equipment for producing textile cloth and production method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2330829Y (en) * | 1998-03-23 | 1999-07-28 | 陈恩利 | Impact damp attenuator |
JP2005146680A (en) * | 2003-11-17 | 2005-06-09 | Toyo Tire & Rubber Co Ltd | Laminated rubber bearing device including lead core material |
CN201795928U (en) * | 2010-08-20 | 2011-04-13 | 重庆仪表材料研究所 | Magnetorheological damper test stand capable of testing in low and high temperature environments |
CN103088751A (en) * | 2012-11-08 | 2013-05-08 | 北京工业大学 | Replaceable limiting and locking damping energy consumption device |
CN205259064U (en) * | 2015-12-30 | 2016-05-25 | 重庆三峡学院 | Novel bridge detects device |
CN205529865U (en) * | 2016-01-29 | 2016-08-31 | 赵艳 | Bridge bracing seat |
CN106284063A (en) * | 2016-10-18 | 2017-01-04 | 单国珠 | Curvilinear mold numerical expression damping vibration attenuation multi-directional deflection retractor device and method |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101457553B (en) * | 2007-12-14 | 2012-01-11 | 尹学军 | Spring stiffness adjustable tuning quality damper |
KR100908865B1 (en) * | 2009-01-15 | 2009-07-21 | 씨엠알기술연구원(주) | Reciprocal Pressure Spring Damper and Drop Preventing Device using thereof |
CN203066031U (en) * | 2012-12-28 | 2013-07-17 | 王永继 | Anticollision buffer |
CN204325901U (en) * | 2014-12-18 | 2015-05-13 | 张宇 | A kind of bridge aseismic devices |
CN204455874U (en) * | 2015-01-26 | 2015-07-08 | 郑州大学 | A kind of bridge bearing hydraulic support device |
CN205474809U (en) * | 2016-03-23 | 2016-08-17 | 青海省海西公路桥梁工程有限责任公司 | Shock -absorbing structure of bridge |
CN105972144B (en) * | 2016-06-06 | 2018-09-28 | 南京陶特思软件科技有限公司 | A kind of mechanical shock absorption means |
CN106012816A (en) * | 2016-06-17 | 2016-10-12 | 张献斌 | Overall bridge reinforcing device with damping supports |
CN206173785U (en) * | 2016-11-15 | 2017-05-17 | 周娟 | Public road bridge roof beam buffering damping device |
-
2017
- 2017-05-20 CN CN201710360069.9A patent/CN107419663B/en active Active
- 2017-05-20 CN CN201811017631.9A patent/CN109024299B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2330829Y (en) * | 1998-03-23 | 1999-07-28 | 陈恩利 | Impact damp attenuator |
JP2005146680A (en) * | 2003-11-17 | 2005-06-09 | Toyo Tire & Rubber Co Ltd | Laminated rubber bearing device including lead core material |
CN201795928U (en) * | 2010-08-20 | 2011-04-13 | 重庆仪表材料研究所 | Magnetorheological damper test stand capable of testing in low and high temperature environments |
CN103088751A (en) * | 2012-11-08 | 2013-05-08 | 北京工业大学 | Replaceable limiting and locking damping energy consumption device |
CN205259064U (en) * | 2015-12-30 | 2016-05-25 | 重庆三峡学院 | Novel bridge detects device |
CN205529865U (en) * | 2016-01-29 | 2016-08-31 | 赵艳 | Bridge bracing seat |
CN106284063A (en) * | 2016-10-18 | 2017-01-04 | 单国珠 | Curvilinear mold numerical expression damping vibration attenuation multi-directional deflection retractor device and method |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108330804B (en) * | 2018-01-11 | 2019-07-23 | 旗舰集团有限公司 | A kind of damping bridge structure |
CN108330804A (en) * | 2018-01-11 | 2018-07-27 | 旗舰集团有限公司 | A kind of damping bridge structure |
CN108468509B (en) * | 2018-01-17 | 2019-10-29 | 浙江建设职业技术学院 | A kind of ground construction high stable type drilling equipment |
CN108468509A (en) * | 2018-01-17 | 2018-08-31 | 浙江建设职业技术学院 | A kind of ground construction high stable type drilling equipment |
CN108487454A (en) * | 2018-04-12 | 2018-09-04 | 淄博正邦知识产权企划有限公司 | A kind of building pilum and its safeguard structure |
CN108468393A (en) * | 2018-04-12 | 2018-08-31 | 淄博正邦知识产权企划有限公司 | A kind of building pilum and its safeguard structure |
CN108643061A (en) * | 2018-05-17 | 2018-10-12 | 蔡东彬 | A kind of bridge strengthening device for municipal science of bridge building |
CN108643059A (en) * | 2018-05-17 | 2018-10-12 | 庄跃东 | A kind of Hanging Basket of wider type bridge construction |
CN111055628A (en) * | 2019-12-19 | 2020-04-24 | 中山市唯信脚轮制造有限公司 | Shock-resistant universal caster |
CN114635347A (en) * | 2022-04-07 | 2022-06-17 | 郑州大学 | A public road bridge roof beam buffer for municipal bridge engineering |
CN114635347B (en) * | 2022-04-07 | 2024-01-30 | 郑州大学 | Highway bridge buffer for municipal bridge engineering |
CN115059729A (en) * | 2022-07-13 | 2022-09-16 | 杭州电子科技大学 | Hierarchical vibration damper based on electromagnetism and hydraulic damping |
CN115059729B (en) * | 2022-07-13 | 2023-07-18 | 杭州电子科技大学 | Graded vibration damper based on electromagnetic and hydraulic damping |
Also Published As
Publication number | Publication date |
---|---|
CN109024299B (en) | 2020-04-21 |
CN109024299A (en) | 2018-12-18 |
CN107419663B (en) | 2018-11-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107419663A (en) | A kind of bridge construction damping device | |
US20230313615A1 (en) | Drilling device for geotechnical engineering investigation | |
CN109837833A (en) | A kind of bridge vibration absorber | |
CN209723058U (en) | Bridge ultra-high performance concrete protection against erosion denudes structure | |
CN205636607U (en) | Bridge is with water spray heat sink | |
CN107905090B (en) | A kind of municipal administration bridge earthquake resistance structure and construction method | |
CN205443966U (en) | Bridge structure of turning | |
CN106758795A (en) | Shock-absorbing bridge support | |
CN106758776B (en) | Damping due to rotation formula bridge aseismic devices | |
CN107642453B (en) | A kind of power generation module group and the power generator using the power generation module group, generating set | |
CN108487222B (en) | It is a kind of for tamping the weight of underwater dumped rockfill | |
CN204825626U (en) | Novel corner shock insulation rubber support by a wide margin | |
CN214532784U (en) | Lifting anchoring slope protection drilling machine | |
CN106894331A (en) | A kind of spacing bearing of the power consumption for carrying Viscous fluid damper | |
CN211281388U (en) | Wave ladder | |
CN206692288U (en) | The auxiliary arm of Multi-section retractable for drill jumbo | |
CN211368434U (en) | Swivel bridge with shock insulation function | |
CN108666961B (en) | Shore power transmission line floater | |
CN107150561A (en) | One kind can folding and unfolding suspension | |
CN201716246U (en) | Rotation abrasion testing device for support saddles of bridge | |
CN206573266U (en) | A kind of bridge structure real-time detection apparatus based on wireless sensor network | |
CN116289576A (en) | Guide beam back-drawing and turning method of transportation and frame integrated machine | |
CN113896101B (en) | Quick hoisting device of instrument for road and bridge construction | |
CN204849859U (en) | Bridge steel tube pile self -balance method load box test structure | |
CN213268030U (en) | Soil sampling device of large open caisson |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180920 Address after: 312352 Chengnan functional area, Dongguan Street, Shangyu District, Shaoxing, Zhejiang Applicant after: Zhejiang Haolong Fan Co., Ltd. Address before: 264025 School of civil engineering, Ludong University, No. 186 Hongqi Road, Zhifu District, Yantai, Shandong Applicant before: Dong Yingshan |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |