CN107413852B - Preparation method for the pure titanium hollow billet of TA2 - Google Patents

Preparation method for the pure titanium hollow billet of TA2 Download PDF

Info

Publication number
CN107413852B
CN107413852B CN201710864190.5A CN201710864190A CN107413852B CN 107413852 B CN107413852 B CN 107413852B CN 201710864190 A CN201710864190 A CN 201710864190A CN 107413852 B CN107413852 B CN 107413852B
Authority
CN
China
Prior art keywords
hollow billet
preparation
pure titanium
heating
godet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710864190.5A
Other languages
Chinese (zh)
Other versions
CN107413852A (en
Inventor
冯庆
江健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Research Institute Co Ltd
Chengdu Advanced Metal Materials Industry Technology Research Institute Co Ltd
Original Assignee
Pangang Group Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Research Institute Co Ltd filed Critical Pangang Group Research Institute Co Ltd
Priority to CN201710864190.5A priority Critical patent/CN107413852B/en
Publication of CN107413852A publication Critical patent/CN107413852A/en
Application granted granted Critical
Publication of CN107413852B publication Critical patent/CN107413852B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B19/00Tube-rolling by rollers arranged outside the work and having their axes not perpendicular to the axis of the work
    • B21B19/02Tube-rolling by rollers arranged outside the work and having their axes not perpendicular to the axis of the work the axes of the rollers being arranged essentially diagonally to the axis of the work, e.g. "cross" tube-rolling ; Diescher mills, Stiefel disc piercers or Stiefel rotary piercers
    • B21B19/04Rolling basic material of solid, i.e. non-hollow, structure; Piercing, e.g. rotary piercing mills
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/74Temperature control, e.g. by cooling or heating the rolls or the product
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • B21B45/0203Cooling
    • B21B45/0209Cooling devices, e.g. using gaseous coolants
    • B21B45/0215Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • B21B45/0239Lubricating
    • B21B45/0245Lubricating devices
    • B21B45/0248Lubricating devices using liquid lubricants, e.g. for sections, for tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • B21B45/0203Cooling
    • B21B45/0209Cooling devices, e.g. using gaseous coolants
    • B21B45/0215Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes
    • B21B2045/0227Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes for tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • B21B45/0239Lubricating
    • B21B45/0245Lubricating devices
    • B21B45/0248Lubricating devices using liquid lubricants, e.g. for sections, for tubes
    • B21B2045/026Lubricating devices using liquid lubricants, e.g. for sections, for tubes for tubes

Abstract

The invention discloses a kind of preparation methods, especially disclose a kind of preparation method for the pure titanium hollow billet of TA2, belong to metal tube manufacturing process technical field.A kind of diameter that can effectively produce is provided greater than 100 ㎜, and can guarantee the preparation method for the pure titanium hollow billet of TA2 of the quality of production.The preparation method is based on ordinary carbon steel hollow billet oblique rolling perforated process, use the titanium base heated under micro-oxygenation atmospheric condition for blank, the pure titanium hollow billet that outer diameter is not less than 115 ㎜ is made by following piercing process parameters, it is 11%~13% that the piercing process parameter, which is overall diameter reduction ratio, and top front reduction ratio is 5.5%~7.5%, and oval coefficient is 1.16~1.22, feed angle is 8.5 °, rolling angle is 14.2 °, punching rate 0.20m/s, and godet speed is 0.60m/s.

Description

Preparation method for the pure titanium hollow billet of TA2
Technical field
The present invention relates to a kind of preparation methods to belong to gold more particularly, to a kind of preparation method for the pure titanium hollow billet of TA2 Belong to pipe manufacturing process technical field.
Background technique
Pure titanium is extremely active metal, is heated to 890 DEG C or more and is easy for reacting with O, N, H in air and generate Compound forms brittle layer, influences the defects of being plastically deformed or cracking after deforming.Due to contract and Equipment, early period Pure titanium hollow billet roll piercing mainly with barrel shaped roll roll piercing, specification also mostly in Φ 100mm hereinafter, rare Φ 200mm with On hollow billet preparation.As certain contract requirements of military project pipe and marine worker pipe occur, the pure titanium hollow billet of Φ 200mm or more is needed to be Cold rolling titanium tube provides blank, promotes to prepare pure titanium hollow billet using the roll piercing with rolling angle and possibility occurs.But due to oblique The pure titanium blank of perforation procedure is rolled by more complicated alternate stress, and the axial rolling that the strain of generation is more common is increasingly complex, rolling Process stability is poor, causes the above hollow billet preparation of Φ 200mm more difficult, fails effectively to carry out roll piercing always, also have no There is the report of bulk production.
It perforates relative to squeezing, the synthesis production cost of roll piercing is lower, and is able to produce equivalent specifications outer diameter condition The lower longer hollow billet of length, for this purpose, effectively realizing that pure titanium heavy caliber hollow billet oblique rolling perforated process just seems more necessary.
Summary of the invention
The technical problems to be solved by the present invention are: providing a kind of diameter that can effectively produce greater than 100 ㎜, and can guarantee The preparation method for the pure titanium hollow billet of TA2 of the quality of production.
Used technical solution is to solve above-mentioned technical problem: a kind of preparation method for the pure titanium hollow billet of TA2, institute The preparation method stated is based on ordinary carbon steel hollow billet oblique rolling perforated process, using the titanium base heated under micro-oxygenation atmospheric condition For blank, the pure titanium hollow billet that outer diameter is not less than 115 ㎜ is made by following piercing process parameters,
It is 11%~13% that the piercing process parameter, which is overall diameter reduction ratio, top front reduction ratio be 5.5%~ 7.5%, oval coefficient is 1.16~1.22, and feed angle is 8.5 °, and rolling angle is 14.2 °, punching rate 0.20m/s, godet Speed is 0.60m/s.
The beneficial effects of the present invention are: by using above-mentioned technological parameter provided by the present application, it can be with ordinary carbon steel Based on hollow billet oblique rolling perforated process, uses the titanium base heated under micro-oxygenation atmospheric condition that outer diameter is made for blank and be not less than The pure titanium hollow billet of 180 ㎜.And since titanium base blank is heated under micro-oxygenation atmospheric condition, it can also be ensured that A large amount of oxygen layer will not be generated in heating process, to guarantee the quality of the pure titanium hollow billet of production.
Further, first carrying out machine end to end in blank before carrying out the heating under micro-oxygenation atmospheric condition to titanium base Tool drilling centering.
The preferred mode of the above solution is that parameter is when carrying out machine drilling centering end to end to blank,
Head end centering bore dia d=50 ± 2mm, depth h=40 ± 2mm;Tail end centering bore dia d=50 ± 2mm, depth H=100 ± 2mm, and internal point bottom needs rounding off.
Further, coming directly towards when the blank completed to heating carries out roll piercing as in three small hole for water sprayings of band Water cooling top, top outer surface carry out hanging mould processing;Roll is cutting and the half new roll that annular knurl cutter trade is just ground off;It leads Disk is the half new godet that surface cutter trade is just ground off.
The preferred mode of the above solution is that cooling down operation process of interior water cooling top during apical pore is, water cooling mandril, Cooling water is opened when top is in state to be rolled, cooling water is closed when retracting in top, and cooling water pressure after booster pump is maintained at Between 0.7-1.0MPa.
Further: before perforation procedure, godet is first coated into special lube, to upper and lower godet in the operation of rolling It applies slip coating and keeps lubrication;It is secondary bite foundation after perforating roller cooling water is reached into big water state be lubricated and cool down;It leads Disk cooling water is opened again after the completion of perforation and is cooled down.
The preferred mode of the above solution is that being by following when being heated using micro-oxygenation atmospheric condition to titanium base What work step was operated,
Annular furnace bringing-up section burner is closed, only opens soaking zone burner, air-fuel ratio is kept micro-oxygenation atmosphere by 12:1;? The carbon steel stopper material of 2 same outer diameter scales of arrangement before and after titanium base, to guarantee that titanium base temperature is uniform;Annular furnace soaking zone instrument temperature Degree control is at 890~900 DEG C.
Further, each section of rotary heating furnace of heating temperature and heating time are as follows,
Specific embodiment
In order to solve the above technical problems existing in the prior art, diameter can effectively be produced the present invention provides a kind of Greater than 100 ㎜, and it can guarantee the preparation method for the pure titanium hollow billet of TA2 of the quality of production.The preparation method is with common carbon Based on steel wool pipe oblique rolling perforated process, use the titanium base heated under micro-oxygenation atmospheric condition for blank, by following perforation The pure titanium hollow billet that outer diameter is not less than 180 ㎜ is made in technological parameter, and it is 11% that the piercing process parameter, which is overall diameter reduction ratio, ~13%, top front reduction ratio is 5.5%~7.5%, and oval coefficient is 1.16~1.22, and feed angle is 8.5 °, and rolling angle is 14.2 °, punching rate 0.20m/s, godet speed is 0.60m/s.By using above-mentioned technological parameter provided by the present application, just The titanium base heated under micro-oxygenation atmospheric condition can be used for blank system based on ordinary carbon steel hollow billet oblique rolling perforated process Obtain the pure titanium hollow billet that outer diameter is not less than 180 ㎜.And since titanium base blank is heated under micro-oxygenation atmospheric condition, It can also guarantee that a large amount of oxygen layer will not be generated during heating, to guarantee the quality of the pure titanium hollow billet of production.
In above embodiment, in order to avoid pure titanium blank to generate oxide layer in heating process to greatest extent, using It when micro-oxygenation atmospheric condition heats titanium base, is operated by following work steps, closes annular furnace bringing-up section burner, Soaking zone burner is only opened, air-fuel ratio is kept micro-oxygenation atmosphere by 12:1;2 same outer diameter scales are arranged before and after titanium base Carbon steel stopper material, to guarantee that titanium base temperature is uniform;Annular furnace soaking zone instrument temperature is controlled at 890~900 DEG C;And annular adds The heating temperature and heating time that each section of hot stove are as follows,
In order to guarantee the quality of production of the pure titanium hollow billet of major diameter to greatest extent, this application provides further technique limits Determine parameter and first carries out machine drilling centering end to end in blank that is, before carrying out the heating under micro-oxygenation atmospheric condition to titanium base; Particularly, when carrying out machine drilling centering end to end to blank, parameter is, head end centering bore dia d=50 ± 2mm, depth h =40 ± 2mm;Tail end centering bore dia d=50 ± 2mm, depth h=100 ± 2mm, and internal point bottom needs rounding off. When the blank completed to heating carries out roll piercing, the interior water cooling top for three small hole for water sprayings of band is come directly towards, outer surface is come directly towards It carries out hanging mould processing;Roll is cutting and the half new roll that annular knurl cutter trade is just ground off;Godet is that surface cutter trade is rigid The half new godet ground off well;Cooling down operation process of interior water cooling top during apical pore is that water cooling mandril, top are in be rolled Open cooling water when state, cooling water is closed in top when retracting, cooling water pressure after booster pump be maintained at 0.7-1.0MPa it Between;Before perforation procedure, godet is first coated into special lube, slip coating is applied to upper and lower godet in the operation of rolling and keeps profit It is sliding;It is secondary bite foundation after perforating roller cooling water is reached into big water state be lubricated and cool down;Godet cooling water is being perforated Cheng Houzai opening is cooled down.
Embodiment
Specifically operating procedure is
The heating temperature and heating time that each section of rotary heating furnace
TA2 quickly arrives punch after coming out of the stove and perforates, and perforation is carried out by designed technological parameter.
Cooling water (cooling water is closed when retracting in top), cooling water warp are opened when water cooling mandril, top are in state to be rolled Pressure is maintained between 0.7-1.0MPa after booster pump.
With 340 adhesion resistant steel slip coatings (i.e. with 159 red oil+ink-consolidating agent 1:1 exchange), first godet is coated before perforation dedicated Lubricating oil applies slip coating to upper and lower godet in the operation of rolling and keeps lubrication;It is secondary bite foundation after perforating roller cooling water is opened To big water state, led to be lubricated and to cool down;Godet cooling water is opened again after the completion of perforation and is cooled down.
Embodiment 1
Roll piercing is the hollow billet of Φ 212 × 16 after the pure titanium blank heating of the TA2 of Φ 200.
Embodiment 2
Roll piercing is the hollow billet of Φ 179 × 18.5 after the pure titanium blank heating of the TA2 of Φ 160.
Embodiment 3
Roll piercing is the hollow billet of Φ 118 × 9.5 after the pure titanium blank heating of the TA2 of Φ 115.

Claims (4)

1. a kind of preparation method for the pure titanium hollow billet of TA2, it is characterised in that: the preparation method is oblique with ordinary carbon steel hollow billet Based on rolling piercing process, use the titanium base heated under micro-oxygenation atmospheric condition for blank, by following piercing process parameters The pure titanium hollow billet that outer diameter is not less than 115 ㎜ is made,
It is 11%~13% that the piercing process parameter, which is overall diameter reduction ratio, and top front reduction ratio is 5.5%~7.5%, ellipse Circle coefficient is 1.16~1.22, and feed angle is 8.5 °, and rolling angle is 14.2 °, punching rate 0.20m/s, and godet speed is 0.60m/s,
Before carrying out the heating under micro-oxygenation atmospheric condition to titanium base, machine drilling centering is first carried out end to end in blank,
When carrying out machine drilling centering end to end to blank, parameter is, head end centering bore dia d=50 ± 2mm, depth h=40 ± 2mm;Tail end centering bore dia d=50 ± 2mm, depth h=100 ± 2mm, and internal point bottom needs rounding off,
When the blank completed to heating carries out roll piercing, the interior water cooling top for three small hole for water sprayings of band is come directly towards, top is outer Surface carries out hanging mould processing;Roll is cutting and the half new roll that annular knurl cutter trade is just ground off;Godet is that surface processes trace The half new godet that mark is just ground off,
Cooling down operation process of interior water cooling top during apical pore is to open when water cooling mandril, top are in state to be rolled cold But cooling water is closed when retracting in water, top, and cooling water pressure after booster pump is maintained between 0.7-1.0MPa.
2. the preparation method according to claim 1 for the pure titanium hollow billet of TA2, it is characterised in that: before perforation procedure, first Godet is coated into special lube, slip coating is applied to upper and lower godet in the operation of rolling and keeps lubrication;Secondary general after biting foundation Perforating roller cooling water reaches big water state and is lubricated and cools down;Godet cooling water is opened again after the completion of perforation and is cooled down.
3. being used for the preparation method of the pure titanium hollow billet of TA2 described according to claim 1~any one of 2, it is characterised in that: adopting It when being heated with micro-oxygenation atmospheric condition to titanium base, is operated by following work steps,
Annular furnace bringing-up section burner is closed, only opens soaking zone burner, air-fuel ratio is kept micro-oxygenation atmosphere by 12:1;In titanium base The carbon steel stopper material of 2 same outer diameter scales is arranged in front and back, to guarantee that titanium base temperature is uniform;Annular furnace soaking zone instrument temperature control System is at 890~900 DEG C.
4. the preparation method according to claim 3 for the pure titanium hollow billet of TA2, it is characterised in that: each section of rotary heating furnace Heating temperature and heating time it is as follows,
Operation in furnace Heat-recovery section Preheating section One section of heating Two sections of heating Three sections of heating One section of soaking Two sections of soaking Heating temperature (DEG C) 730-800 750-800 780-830 830-880 830-880 890-900 890-900 Heating time (min) 48 36 36 54 54 50 20
CN201710864190.5A 2017-09-22 2017-09-22 Preparation method for the pure titanium hollow billet of TA2 Active CN107413852B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710864190.5A CN107413852B (en) 2017-09-22 2017-09-22 Preparation method for the pure titanium hollow billet of TA2

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710864190.5A CN107413852B (en) 2017-09-22 2017-09-22 Preparation method for the pure titanium hollow billet of TA2

Publications (2)

Publication Number Publication Date
CN107413852A CN107413852A (en) 2017-12-01
CN107413852B true CN107413852B (en) 2019-04-30

Family

ID=60433591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710864190.5A Active CN107413852B (en) 2017-09-22 2017-09-22 Preparation method for the pure titanium hollow billet of TA2

Country Status (1)

Country Link
CN (1) CN107413852B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101029348A (en) * 2007-03-27 2007-09-05 西部钛业有限责任公司 Process for heating titanium oblique perforating rod ingot
CN101708511A (en) * 2007-12-13 2010-05-19 攀钢集团四川长城特殊钢有限责任公司 Method for manufacturing pure titanium seamless tubes
CN103934269A (en) * 2014-03-31 2014-07-23 攀钢集团成都钢钒有限公司 TC4 titanium alloy seamless tube and production method thereof
CN104259206A (en) * 2014-08-29 2015-01-07 攀钢集团成都钢钒有限公司 Production method of titanium alloy seamless tubes used for tubing coupling

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6444204A (en) * 1987-08-10 1989-02-16 Sumitomo Metal Ind Production of seamless titanium pipe

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101029348A (en) * 2007-03-27 2007-09-05 西部钛业有限责任公司 Process for heating titanium oblique perforating rod ingot
CN101708511A (en) * 2007-12-13 2010-05-19 攀钢集团四川长城特殊钢有限责任公司 Method for manufacturing pure titanium seamless tubes
CN103934269A (en) * 2014-03-31 2014-07-23 攀钢集团成都钢钒有限公司 TC4 titanium alloy seamless tube and production method thereof
CN104259206A (en) * 2014-08-29 2015-01-07 攀钢集团成都钢钒有限公司 Production method of titanium alloy seamless tubes used for tubing coupling

Also Published As

Publication number Publication date
CN107413852A (en) 2017-12-01

Similar Documents

Publication Publication Date Title
CN109622659A (en) A kind of manufacturing method of heavy caliber TC4 titanium alloy thick-wall seamless material
CN103934269B (en) A kind of TC4 titanium alloy seamless tube and production method thereof
CN104259206B (en) A kind of production method of the titanium alloy seamless pipe for tubing coupling
CN101439350B (en) Method for producing seamless steel pipe for producing gas cylinder with heavy caliber for hauled vehicle
CN108160709B (en) Titanium alloy hot-rolled seamless pipe production system and production process thereof
CN104245170B (en) The manufacturing equipment of drilling/rolling top
CN103736734A (en) Process of preparing high-chromium alloy supper 13-Cr seamless steel tubes through CPE (cross-roll piercing and elongation) hot rolling mill
CN104139151A (en) Warming forging precision forming manufacture process for steering bearing ring of motorcycle
CN103464507B (en) A kind of method of producing high-precision austenite seamless steel pipe
CN104492850A (en) Production method of high-finish steel tube
CN110153189A (en) A method of utilizing steel pipe continuous rolling-tube unit parallel production zircaloy seamless pipe
CN109663831A (en) A method of producing small-bore Steel Pipe For Bearing
CN109434397A (en) A kind of preparation method of superalloy annular forging expanding die
CN105983578A (en) Production process of hot-rolled steel tubes
CN107413852B (en) Preparation method for the pure titanium hollow billet of TA2
CN108758142B (en) Main pipe reducing tee joint and production process thereof
CN207770461U (en) A kind of titanium alloy hot seamless tube production system
CN112680631B (en) Titanium alloy drill rod and production method thereof
CN111940537B (en) Hot extrusion pipe-making production method of S31254 seamless steel pipe
CN104841720A (en) Method for producing large-caliber and thick-wall Cr15 bushed bearing by using steel ingot
CN104525568A (en) Machining method of carburized bearing steel seamless steel tube
CN104227344B (en) Production method of GH5188 square exhaust nozzle used for aircraft engine
CN107716587A (en) A kind of processing method of thin-wall titanium alloy pipe
CN104368623B (en) A kind of production method of large-caliber stainless steel seamless pipe
CN105983592A (en) Cold-drawn seamless steel tube production technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220804

Address after: 610306 Chengdu City, Chengdu, Sichuan, China (Sichuan) free trade test zone, Chengdu City, Qingbaijiang District, xiangdao Boulevard, Chengxiang Town, No. 1509 (room 13, A District, railway port mansion), room 1319

Patentee after: Chengdu advanced metal material industry technology Research Institute Co.,Ltd.

Patentee after: PANGANG GROUP RESEARCH INSTITUTE Co.,Ltd.

Address before: 610000 Panzhihua Iron and Steel Group Research Institute Co.,Ltd.

Patentee before: PANGANG GROUP RESEARCH INSTITUTE Co.,Ltd.