CN107389543A - Actively and under Passive deformation pattern anchor barricade dodge gate experimental rig and method - Google Patents

Actively and under Passive deformation pattern anchor barricade dodge gate experimental rig and method Download PDF

Info

Publication number
CN107389543A
CN107389543A CN201710624066.1A CN201710624066A CN107389543A CN 107389543 A CN107389543 A CN 107389543A CN 201710624066 A CN201710624066 A CN 201710624066A CN 107389543 A CN107389543 A CN 107389543A
Authority
CN
China
Prior art keywords
side plate
plate
bottom plate
connecting hole
dodge gate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710624066.1A
Other languages
Chinese (zh)
Inventor
宋修广
董行
张宏博
陈奇
万立尧
刘源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201710624066.1A priority Critical patent/CN107389543A/en
Publication of CN107389543A publication Critical patent/CN107389543A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N19/00Investigating materials by mechanical methods
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Immunology (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Pathology (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

Barricade dodge gate pilot model apparatus and method actively and under Passive deformation pattern are anchored the invention discloses a kind of, including support, including support, bolster model box and high-speed camera are distinguished on described two supports, the model box upper opening, model box bottom sets and fixes the first bottom plate and the second bottom plate, and first bottom plate and the second backplanes support set rigid baffle on support between the first bottom plate and the second bottom plate;The rigid baffle is supported jointly by pressure sensor, jack and base, observe pressure sensor readings and hierarchical loading and unloading are carried out to jack, high-speed camera is used for recording the displacement process of soil particle, and laser range finder is used for recording rigid baffle active and passive displacement.

Description

Actively and under Passive deformation pattern anchor barricade dodge gate experimental rig and method
Technical field
The invention belongs to " soil arching effect " to probe into experiment category, is related to a kind of New device structures and type of attachment, specifically Say, be that barricade dodge gate experimental rig and test method are anchored under a kind of new active and Passive deformation pattern, available for visiting Study carefully anchoring barricade principle and provide theoretical direction for side slope consolidation projects.
Background technology
At this stage, " soil arching effect " has considerable effect, therefore pile formula road for resistance to shear of soil transfer law The reinforcement techniques such as dike, sheet pile wall, friction pile, anchorage pile all deploy to study to it.In conventional Piled Embankments design method first The soil arching effect limit capacity of embankment filled soil is determined, reinforcement material is then determined according to the load for acting on reinforcement material top surface The pulling force and selected reinforcement material being subjected to.Pile plate wall dorsal part is due to the appearance of soil arching effect so that stake dorsal part and baffle plate dorsal part There is larger difference in load, soil arching effect generates significant impact to the mode of pile plate wall dorsal part soil pressure transmission. Soil arch presence change original stress state in the friction pile soil body, cause stresses re-distribution, act on soil arch on Pressure transmission is into steady soil around.Most of soil pressure after anchorage pile pile slab structure by soil body inhomogeneous deformation and The space soil arch of formation is directly delivered to anchor head, and the soil pressure of remainder is just delivered to anchor head again through pile slab structure.Fully Study the mechanism of action of " soil arching effect ", make full use of the characteristics of its stresses re-distribution to become main research direction.
For anchor Rods In Tied Double Retaining Walls structure, acted on by the sidewise restraint of anchor pole (anchor plate), uneven change can occur for wall body Shape, if wall rigidity Design is reasonable between anchor spacing and anchor, more obvious soil arching effect occurs, and play loading sharing work With highly beneficial to structure stress.But then, soil arching effect can also cause the redistribution of Wall back pressure, and with dynamic State evolution Feature, supporting construction stress characteristic is significantly changed, cause traditional design theory to be difficult to be applicable.Therefore, to make full use of Soil arching effect, structure safety is improved, reduces engineering cost, it is necessary to using pressure dispersing type retaining wall as research object, deeply Soil arching effect genesis mechanism is analyzed, discloses wall-soil interaction mechanism, establishes soil arching effect mechanical model, inquires into dynamic change Rule, build and be applicable geostatic shield model." soil arching effect " caused by supporting construction is that most critical is asked in underground engineering Topic, it is widely present in underground engineering, such as tunnel excavation, pattern foundation pit supporting structure engineering.Its essence is a kind of showing for stress transfer As.The transfer of this stress is due to that by external force inhomogeneous deformation is occurred for the soil body, is realized by the performance of shear strength.
The content of the invention
The purpose of the present invention is to overcome above-mentioned the deficiencies in the prior art, there is provided a kind of soil arching effect probes into model equipment And test method, simplified based on mechanics, ignore the influence of pressure dispersing type retaining wall vertical soil arching effect, considered between different anchors Away from and anchor between wall rigidity, with reference to PFC Micromechanics Analysis, the dodge gate experiment of design anchor tie wall, introduce advanced digital imaging technology Native arch thrust trajectory is sought, soil arching effect occurrence condition under different displacement models is studied and pattern be present, discloses wall-native phase Interaction mechanism, build soil arching effect two dimension basic mechanical model.
To achieve the above object, the present invention uses following technical proposals:
Barricade dodge gate experimental rig, including two supports actively and under Passive deformation pattern are anchored, wherein a branch Model box is installed on frame, high-speed camera is installed on another support, for clearly recording soil body active and Passive deformation pattern Under destructive process and soil particle displacement state;The described model box upper opening, model box bottom are fixed with One bottom plate and the second bottom plate, first bottom plate and the second backplanes support are set on support between the first bottom plate and the second bottom plate Put rigid baffle;The soil body that the bottom of the rigid baffle is provided with inside model box applies stressed jack, and described thousand The top installation pressure sensor of goldentop, the pressure sensor are used for the loading force for detecting jack;Described a thousand pieces of gold top installation On a base, and the laser range finder overlapped with the vertical plane of rigid baffle both sides is additionally provided with described base, it is described Laser range finder be used for record actively and Passive deformation displacement size.
Further, the model box also includes first side plate vertical with the first bottom plate, the second side plate, the 3rd side plate With the 4th side plate, first side plate and the second side plate are relative, and the 3rd side plate and the 4th side plate are relative, the first side plate, the second side Plate, the 3rd side plate and the 4th side plate surround box body.
Further, first side plate and the second side plate are fixedly connected with the first bottom plate, the first side plate and the second side Plate is fixedly connected with the second bottom plate.
Further, the 3rd side plate and the 4th side plate are fixedly connected with the first side plate, the 3rd side plate and the 4th side Plate is fixedly connected with the second side plate.
Further, first side plate and the second side plate bottom are fixed on support by the first connector.To prevent Model box topples.
Further, first side plate with the first bottom plate cooperation at the first connecting hole is set, on first bottom plate Second connecting hole is set, and the first connecting hole and the second connecting hole are connected by the second connector.
Preferably, second connecting hole is slotted hole.
Further, first side plate with the second bottom plate cooperation at the 3rd connecting hole is set, on second bottom plate 4th connecting hole is set, and the 3rd connecting hole and the 4th connecting hole are connected by the 3rd connector.
Preferably, the 4th connecting hole is slotted hole.
Further, second side plate with the first bottom plate cooperation at the 5th connecting hole is set, on first bottom plate 6th connecting hole is set, and the 5th connecting hole and the 6th connecting hole are connected by the 4th connector.
Preferably, the 6th connecting hole is slotted hole.
Further, second side plate with the second bottom plate cooperation at the 7th connecting hole is set, on second bottom plate 8th connecting hole is set, and the 7th connecting hole and the 8th connecting hole are connected by the 5th connector.
Preferably, the 8th connecting hole is slotted hole.
Further, first plate upper surface and the 3rd side plate lower surface flush, the first bottom plate lower surface and the The equal flush in the lower surface of side plate and the second side plate.
Further, second plate upper surface and the 4th side plate lower surface flush, the second bottom plate lower surface and the The equal flush in the lower surface of side plate and the second side plate.
Preferably, the cradle top fixes the first top plate and the second top plate, the first backplanes support on the first top plate, Second backplanes support is on the second top plate.
Further, the spacing between first top plate and the second top plate is more than between the first bottom plate and the second bottom plate Spacing.
Present invention also offers the experiment side that barricade dodge gate model equipment is anchored under a kind of active and Passive deformation pattern Method, comprise the following steps:
Step 1:According to the setting moisture content mix soil body, setting time is stood after mix;
Step 2:To set the embedding soil pressure sensor in interval in model box, the soil body after mix is compacted by setting 3 layers of degree point is filled to model box, wharf's pavement quality is carried out on every layer of contact surface, to ensure that earth stress is uniform;
Step 3:Open laser range finder and high-speed camera;
Step 4:Hierarchical loading is carried out to jack by observing pressure sensor readings, sent out with the soil body above dodge gate Raw passive failure terminates;
Step 5:Jack repeats step 1- steps 3, by observing pressure sensing by the way of load shedding Device reading carries out load shedding to jack, occurs actively to destroy with the soil body above dodge gate and terminates.
The present invention operation principle be:
The good soil sample of configured in advance is filled in model box for 3 layers according to certain compactness point, treats that sample fills completion Afterwards, the reading of pressure sensor is used for recording and controlling the size of active and passive earth pressure, and laser range finder is used for recording master Dynamic and Passive deformation displacement size, test the change of soil pressure by soil pressure cell, and high-speed camera records soil body master The dynamic and displacement state of the destructive process under Passive deformation pattern and soil particle.
Beneficial effects of the present invention are:
1st, the present invention, which proposes, anchors barricade dodge gate experimental rig and examination under a kind of new active and Passive deformation pattern Proved recipe method, probed into available for various soil mass " soil arching effect ", overcome existing " soil arching effect " laboratory test and probe into not Foot, can be that " soil arching effect " probes into offer new approaches.
2nd, mould processing of the present invention is convenient, is readily disassembled and carries, can reuse.
3rd, the present invention only realizes the active of the soil body and passive force modes by the loading and unloading of a jack, Material is saved, saves space, while be also easy to control.
4th, laser range finder of the present invention be used for record actively and Passive deformation displacement size, it is ensured that experiment it is accurate Property.
5th, the present invention is used as filler from suprasil sand, and high-speed camera is shot, and can clearly record soil body active And destructive process and the displacement state of soil particle under Passive deformation pattern.
6th, the first bottom plate and the second bottom plate top of the invention are concordant with the 3rd side plate and the 4th side plate bottom, the first bottom Plate and the second bottom plate bottom are concordant with the first side plate and the second side plate bottom, it is ensured that the globality of model box, in model box The soil body will not be dropped out by the gap of bottom plate and side plate.
Brief description of the drawings
The Figure of description for forming the part of the application is used for providing further understanding of the present application, the application's Schematic description and description is used to explain the application, does not form the improper restriction to the application.
Fig. 1 is the axonometric drawing of structure of the present invention;
Fig. 2 is structure base slab axonometric drawing of the present invention;
Fig. 3 is model box substructure axonometric drawing of the present invention;
Fig. 4 is left plate schematic diagram;
Fig. 5 is front side board schematic diagram;
In figure, 1, support, 2, bottom plate, 3, front side board, 4, left plate, 5, bolt hole, 6, back side panel, 7, angle steel, 8, right side Plate, 9, rigid baffle, 10, positioning bolt hole, 11, base, 12, laser range finder, 13, jack, 14, pressure sensor, 15th, the first bottom plate, the 16, second bottom plate, 17, high-speed camera, 18, connecting hole, the 19, first top plate, 20 second top plates, 21, Three top plates.
Embodiment
It is noted that described further below is all exemplary, it is intended to provides further instruction to the application.Unless Otherwise indicated, all technologies used herein and scientific terminology have and the application person of an ordinary skill in the technical field The identical meanings being generally understood that.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise odd number shape Formula is also intended to include plural form, additionally, it should be understood that, when in this manual use term "comprising" and/or During " comprising ", it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
As background technology is introduced, in the prior art for anchor Rods In Tied Double Retaining Walls structure, by anchor pole (anchor plate) Sidewise restraint acts on, and wall body can occur inhomogeneous deformation, if wall rigidity Design is reasonable between anchor spacing and anchor, occur more Obvious soil arching effect, and loading sharing effect is played, it is highly beneficial to structure stress.But then, soil arching effect also can Cause the redistribution of Wall back pressure, and there are Dynamic Evolution Characteristics, significantly change supporting construction stress characteristic, cause tradition Design theory is difficult to be applicable, and in order to solve technical problem as above, present applicant proposes a kind of new active and Passive deformation mould Barricade dodge gate experimental rig and test method are anchored under formula, is probed into available for various soil mass " soil arching effect ", is overcome existing There is the deficiency that " soil arching effect " laboratory test is probed into, can be that " soil arching effect " probes into offer new approaches.
The present invention is further described with reference to the accompanying drawings and examples.
As depicted in figs. 1 and 2, barricade dodge gate experimental rig, bag are anchored under a kind of new active and Passive deformation pattern Include by support 1, bottom plate 2, front side board 3 (i.e. the first side plate), left plate 4 (i.e. the 4th side plate), bolt hole 5, back side panel 6 (i.e. Two side plates), angle steel 7 (i.e. the first connector), right plate 8 (i.e. the 3rd side plate), rigid baffle 9, the grade of base 11 composition.Bottom plate 2nd, front side board 3, back side panel 6, right plate 8, base 11, support 1 can be made of steel plate, and left plate 4 is using transparent organic Glass plate is made, in order to the observation of high-speed camera.
Front side board 3, left plate 4, back side panel 6, right plate 8 are vertical with bottom plate 2, front side board 3, left plate 4, back side panel 6th, right plate 8 surrounds model box box body.Whole test model is placed on support 1, and model box is mainly left plate 4, right plate 8th, front side board 3, back side panel 6 etc. are spliced by bolt.
As shown in Figure 4 and Figure 5, left plate 4, leave drilling in the side wall of right plate 8, be respectively provided with front side board 3, back side panel 6 Bolt hole 5, left plate 4, right plate 8 may be contained between front side board 3, back side panel 6, will by penetrating bolt in bolt hole 5 Left plate 4, right plate 8 are fixedly connected with front side board 3, back side panel 6.By tightening front side board 3, the bolt on back side panel 6 come real The connection of existing front side board 3, back side panel 6 and left plate 4, right plate 8.
To prevent whole model from toppling over, front side board 3, back side panel 6 are stuck on support 1 by angle steel 7.
The first top plate 19 and the second top plate 20 are fixed in the top of support 1, and the first bottom plate 15 is supported on the first top plate 19, the Two bottom plates 16 are supported on the second top plate 20.Angle steel 7 is securable on the first top plate 19 and the second top plate 20.
Spacing between first top plate 19 and the second top plate 20 is more than or equal between the first bottom plate 15 and the second bottom plate 16 Spacing.
As Figure 2-Figure 5, model equipment bottom plate is combined by bottom plate 2, rigid baffle 9, model box upper opening, The bottom plate 2 of model box bottom is made up of the moveable bottom plate 16 of first bottom plate 15 and second, the first bottom plate 15 and the second bottom plate 16 Between set rigid baffle 9.The upper surface of first bottom plate 15 and the lower surface flush of left plate 4, the lower surface of the first bottom plate 15 is with before Side plate 3, the equal flush in the lower surface of back side panel 6.The upper surface of second bottom plate 16 and the lower surface flush of right plate 8, the second bottom plate 16 lower surfaces and front side board 3, the equal flush in the lower surface of back side panel 6.
Back side panel 6 is identical with the structure of front side board 3, and left plate 4 is identical with the structure of right plate 8 but material is different.Fig. 5 In, the two bottom sides of front side board 3 are respectively provided with connecting hole 18, likewise, the two bottom sides of back side panel 6 are respectively provided with connecting hole 18, the first bottom The bottom plate 16 of plate 15 and second is respectively provided with positioning bolt hole 10 (i.e. connecting hole), and positioning bolt hole 10 is slotted hole, the first bottom plate 15th, the second bottom plate 16 is connected with front side board 3, back side panel 6 by positioning bolt hole 10, connecting hole 18, passes through different connecting holes 18 and the connection of positioning bolt hole 10, or the connection of the diverse location of positioning bolt hole 10 and connecting hole 18, thus it is possible to vary the The position of one bottom plate 15 and the second bottom plate 16.
Laser range finder 12 is placed on base 11, is located at rigid baffle both sides on same vertical plane to record rigidity The displacement of baffle plate 9.High-speed camera is placed on support 1, and debugging guarantee can photograph complete filler displacement state.
As shown in figure 1, the distance of top plate 19, top plate 20 is more than or equal to the width of rigid baffle 9, in order to jack and swash The use of optar.
Barricade dodge gate test method actively and under Passive deformation pattern is anchored, is comprised the following steps that:
1) soil body is mixed and stirred according to certain moisture content, after the completion of mixing and stirring, be placed in bucket static 1 day;
2) to set the embedding soil pressure sensor in interval in model box, 3 are divided by setting compactness by the soil body after mix Layer is filled to model box, wharf's pavement quality is carried out on every layer of contact surface, to ensure that earth stress is uniform;
3) laser range finder and high-speed camera are opened;
4) hierarchical loading is carried out to jack by observing pressure sensor readings, quilt is occurred with the soil body above dodge gate Dynamic destruction terminates;
5) jack repeats step 1- steps 3 by the way of load shedding, is read by observing pressure sensor It is several that load shedding is carried out to jack, occur actively to destroy with the soil body above dodge gate and terminate;
6) different loads are recorded and combine video recording arrangement and the analyze data of high-speed camera.
Embodiment:
After suprasil sand is crossed into 5mm sieve apertures, uniform mixing is placed in sealing bucket, after standing 1 day, will be configured in bucket For the soil body of optimum moisture content 10.1%, 1 day is stood being placed into sealing bucket;Adjusting apparatus, make jack, pressure sensor, Rigid baffle contacts, and rigid baffle is stuck between first, second bottom plate;According to pre-set dimension arrangement soil pressure cell in the First, the second bottom plate, rigid baffle upper surface;Filled according to 80% point 3 layers, " plucking " disposal is carried out between each contact surface;Fill After completion, start high-speed camera and laser range finder;Jack hierarchical loading, classification record soil pressure cell data and Rigid baffle displacement, until damage of soil body;Carry out what is destroyed under the passive displacement model of the soil body according to the data of video recording and record Analysis.
As can be seen from the above description, the application the above embodiments realize following technique effect:
Mould processing of the present invention is convenient, is readily disassembled and carries, can reuse.
The present invention only realizes the active of the soil body and passive force modes by the loading and unloading of a jack, saves Material saving, space is saved, while be also easy to control.
Laser range finder of the present invention is used for recording the size of active and Passive deformation displacement, it is ensured that the accuracy of experiment.
The present invention is used as filler from suprasil sand, and high-speed camera is shot, can clearly record soil body active and The displacement state of destructive process and soil particle under Passive deformation pattern.
The first bottom plate and the second bottom plate top of the present invention is concordant with the 3rd side plate and the 4th side plate bottom, the first bottom plate It is concordant with the first side plate and the second side plate bottom with the second bottom plate bottom, it is ensured that the globality of model box, in model box The soil body will not be dropped out by the gap of bottom plate and side plate.
Although above-mentioned the embodiment of the present invention is described with reference to accompanying drawing, not the present invention is protected The limitation of scope, one of ordinary skill in the art should be understood that on the basis of technical scheme, people in the art Member need not pay the various modifications that creative work can make or deformation still within protection scope of the present invention.

Claims (10)

1. barricade dodge gate pilot model apparatus actively and under Passive deformation pattern is anchored, it is characterized in that, including two supports, Model box is installed on one of support, high-speed camera is installed on another support, for clearly record the soil body actively and by The displacement state of destructive process and soil particle under dynamic deformation pattern;The described model box upper opening, model box bottom Portion is fixed with the first bottom plate and the second bottom plate, and first bottom plate and the second backplanes support are on support, the first bottom plate and second Rigid baffle is set between bottom plate;The soil body that the bottom of the rigid baffle is provided with inside model box is applied stressed very heavy Top, the top installation pressure sensor on described a thousand pieces of gold top, the pressure sensor are used for the loading force for detecting jack;Described A thousand pieces of gold top is arranged on a base, and laser range finder is additionally provided with described base, and described laser range finder is used for remembering Record active and the size of Passive deformation displacement.
2. as claimed in claim 1 actively and under Passive deformation pattern anchor barricade dodge gate experimental rig, it is characterized in that, institute Stating model box also includes first side plate vertical with the first bottom plate, the second side plate, the 3rd side plate and the 4th side plate, first side Plate and the second side plate are relative, and the 3rd side plate and the 4th side plate are relative, the first side plate, the second side plate, the 3rd side plate and the 4th side plate Surround box body.
3. as claimed in claim 2 actively and under Passive deformation pattern anchor barricade dodge gate experimental rig, it is characterized in that, institute State the 3rd side plate and the 4th side plate is fixedly connected with the first side plate, the 3rd side plate and the 4th side plate are fixed with the second side plate and connected Connect;First side plate and the second side plate bottom are fixed on support by the first connector.
4. as claimed in claim 2 actively and under Passive deformation pattern anchor barricade dodge gate experimental rig, it is characterized in that, institute State the first side plate with the first bottom plate cooperation at multiple first connecting holes are set, the second connecting hole is set on first bottom plate, First connecting hole and the second connecting hole are connected by the second connector;Second connecting hole is slotted hole.
5. as claimed in claim 2 actively and under Passive deformation pattern anchor barricade dodge gate experimental rig, it is characterized in that, institute State the first side plate with the second bottom plate cooperation at multiple 3rd connecting holes are set, the 4th connecting hole is set on second bottom plate, 3rd connecting hole and the 4th connecting hole are connected by the 3rd connector;4th connecting hole is slotted hole.
6. as claimed in claim 2 actively and under Passive deformation pattern anchor barricade dodge gate experimental rig, it is characterized in that, institute State the second side plate with the first bottom plate cooperation at multiple 5th connecting holes are set, the 6th connecting hole is set on first bottom plate, 5th connecting hole and the 6th connecting hole are connected by the 4th connector;6th connecting hole is slotted hole.
7. as claimed in claim 2 actively and under Passive deformation pattern anchor barricade dodge gate experimental rig, it is characterized in that, institute State the second side plate with the second bottom plate cooperation at multiple 7th connecting holes are set, the 8th connecting hole is set on second bottom plate, 7th connecting hole and the 8th connecting hole are connected by the 5th connector;8th connecting hole is slotted hole.
8. as claimed in claim 2 actively and under Passive deformation pattern anchor barricade dodge gate experimental rig, it is characterized in that, institute State the first plate upper surface and the 3rd side plate lower surface flush, the first bottom plate lower surface with the first side plate and the second side plate The equal flush in surface;
Second plate upper surface and the 4th side plate lower surface flush, the second bottom plate lower surface and the first side plate and the second side The equal flush in lower surface of plate.
9. as claimed in claim 1 actively and under Passive deformation pattern anchor barricade dodge gate experimental rig, it is characterized in that, institute State cradle top and fix the first top plate and the second top plate, the first backplanes support is on the first top plate, and the second backplanes support is in second On top plate;Spacing between first top plate and the second top plate is more than the spacing between the first bottom plate and the second bottom plate.
10. anchoring barricade dodge gate experimental rig under the active and Passive deformation pattern as described in claim any one of 1-9 Test method, it is characterized in that, comprise the following steps:
Step 1:According to the setting moisture content mix soil body, setting time is stood after mix;
Step 2:To set the embedding soil pressure sensor in interval in model box, divide 3 by setting compactness by the soil body after mix Layer is filled to model box, wharf's pavement quality is carried out on every layer of contact surface, to ensure that earth stress is uniform;
Step 3:Open laser range finder and high-speed camera;
Step 4:Hierarchical loading is carried out to jack by observing pressure sensor readings, it is passive to occur with the soil body above dodge gate Destruction terminates;
Step 5:Jack repeats step 1- steps 3, by observing pressure sensor readings by the way of load shedding Load shedding is carried out to jack, occurs actively to destroy with the soil body above dodge gate and terminates.
CN201710624066.1A 2017-07-27 2017-07-27 Actively and under Passive deformation pattern anchor barricade dodge gate experimental rig and method Pending CN107389543A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710624066.1A CN107389543A (en) 2017-07-27 2017-07-27 Actively and under Passive deformation pattern anchor barricade dodge gate experimental rig and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710624066.1A CN107389543A (en) 2017-07-27 2017-07-27 Actively and under Passive deformation pattern anchor barricade dodge gate experimental rig and method

Publications (1)

Publication Number Publication Date
CN107389543A true CN107389543A (en) 2017-11-24

Family

ID=60342558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710624066.1A Pending CN107389543A (en) 2017-07-27 2017-07-27 Actively and under Passive deformation pattern anchor barricade dodge gate experimental rig and method

Country Status (1)

Country Link
CN (1) CN107389543A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110333017A (en) * 2019-07-29 2019-10-15 宿州市金鼎安全技术股份有限公司 A kind of coal mine tunnel top board monitor for stress based on fiber-optic grating sensor

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014153697A1 (en) * 2013-03-27 2014-10-02 山东大学 Device for measuring true triaxial creep of geotechnical engineering test block and method therefor
CN105040754A (en) * 2015-08-03 2015-11-11 浙江大学 Device for testing limited soil mass rigid retaining wall soil pressure model
CN105510219A (en) * 2015-11-30 2016-04-20 中国矿业大学 Circulating model test method capable of flexibly controlling lifting and spacing of bottom plate
CN105890991A (en) * 2016-04-28 2016-08-24 中国科学院武汉岩土力学研究所 Method for testing soil pressure relaxation effects with consideration of soil mass rheology
CN206095795U (en) * 2016-09-22 2017-04-12 中国地质大学(武汉) Retaining wall pressure model test device under different destruction modes
CN106908587A (en) * 2017-05-05 2017-06-30 山东大学 A kind of soil arching effect model test apparatus and test method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014153697A1 (en) * 2013-03-27 2014-10-02 山东大学 Device for measuring true triaxial creep of geotechnical engineering test block and method therefor
CN105040754A (en) * 2015-08-03 2015-11-11 浙江大学 Device for testing limited soil mass rigid retaining wall soil pressure model
CN105510219A (en) * 2015-11-30 2016-04-20 中国矿业大学 Circulating model test method capable of flexibly controlling lifting and spacing of bottom plate
CN105890991A (en) * 2016-04-28 2016-08-24 中国科学院武汉岩土力学研究所 Method for testing soil pressure relaxation effects with consideration of soil mass rheology
CN206095795U (en) * 2016-09-22 2017-04-12 中国地质大学(武汉) Retaining wall pressure model test device under different destruction modes
CN106908587A (en) * 2017-05-05 2017-06-30 山东大学 A kind of soil arching effect model test apparatus and test method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110333017A (en) * 2019-07-29 2019-10-15 宿州市金鼎安全技术股份有限公司 A kind of coal mine tunnel top board monitor for stress based on fiber-optic grating sensor

Similar Documents

Publication Publication Date Title
Chen et al. Model tests of geocell retaining structures
Zhou et al. Model studies on geogrid-or geocell-reinforced sand cushion on soft soil
Rahimi et al. Experimental and numerical investigation of the uplift capacity of plate anchors in geocell-reinforced sand
Nicks et al. Deformations of geosynthetic reinforced soil under bridge service loads
Suksiripattanapong et al. Pullout resistance of bearing reinforcement embedded in coarse-grained soils
El Sawwaf et al. The effect of deep excavation-induced lateral soil movements on the behavior of strip footing supported on reinforced sand
Zhan et al. Coupling instability mechanism and joint control technology of soft-rock roadway with a buried depth of 1336 m
Choudhary et al. Uplift capacity of horizontal anchor plate in geocell reinforced sand
Niroumand et al. The influence of soil reinforcement on the uplift response of symmetrical anchor plate embedded in sand
Al-Naddaf et al. Investigation of stability of soil arching under surface loading using trapdoor model tests
McVay et al. Centrifuge testing of fixed-head laterally loaded battered and plumb pile groups in sand
Ghaly et al. Model investigation of the performance of single anchors and groups of anchors
CN108505548A (en) A kind of Piled Embankments stake soil loading ratio experimental rig and test method
CN109269743A (en) A kind of ground seismic wave function lower bolt dynamic pull-out test device and test method
Kim et al. Load sharing characteristics of rigid facing walls with geogrid reinforced railway subgrade during and after construction
Grindheim et al. Small block model tests for the behaviour of a blocky rock mass under a concentrated rock anchor load
Enomoto et al. Seismic behaviour of reinforced embankments in dynamic centrifuge model tests
CN107389543A (en) Actively and under Passive deformation pattern anchor barricade dodge gate experimental rig and method
Liu et al. Experimental investigation on anti-sliding performance of grouted micro-pipe pile groups
CN107328710A (en) Soil arching effect probes into experimental rig and test method under a kind of Passive deformation pattern
Elwakil et al. Soil improvement using grout walls
Mollaei et al. Seismic evaluation of helical soil-nailed walls using shaking table testing
CN207036651U (en) Actively and under Passive deformation pattern anchor barricade dodge gate experimental rig
Samanta et al. Ground improvement using displacement type sand piles
Popik et al. Improving soil stiffness beneath pavements using polyurethane injection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination