CN107389341A - The instantaneous Frequency Estimation method examined based on Prewitt operators and t - Google Patents

The instantaneous Frequency Estimation method examined based on Prewitt operators and t Download PDF

Info

Publication number
CN107389341A
CN107389341A CN201710608108.2A CN201710608108A CN107389341A CN 107389341 A CN107389341 A CN 107389341A CN 201710608108 A CN201710608108 A CN 201710608108A CN 107389341 A CN107389341 A CN 107389341A
Authority
CN
China
Prior art keywords
mean curve
instantaneous frequency
moment
prewitt
estimation method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710608108.2A
Other languages
Chinese (zh)
Other versions
CN107389341B (en
Inventor
林近山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong kangjinuo Technology Co.,Ltd.
Original Assignee
Weifang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang University filed Critical Weifang University
Priority to CN201710608108.2A priority Critical patent/CN107389341B/en
Publication of CN107389341A publication Critical patent/CN107389341A/en
Application granted granted Critical
Publication of CN107389341B publication Critical patent/CN107389341B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts
    • G01M13/02Gearings; Transmission mechanisms
    • G01M13/028Acoustic or vibration analysis

Landscapes

  • Physics & Mathematics (AREA)
  • Acoustics & Sound (AREA)
  • General Physics & Mathematics (AREA)
  • Image Analysis (AREA)
  • Measurement Of Mechanical Vibrations Or Ultrasonic Waves (AREA)

Abstract

The invention discloses the instantaneous Frequency Estimation method based on Prewitt operators and t inspections.Primary signal is converted to time-frequency spectrum by this method using Short Time Fourier Transform, more vallate bands are obtained using Prewitt detection algorithms, the exceptional value excluded per vallate band is examined using t, by being superimposed one synthesis ridge band with complete sharp edge of structure, the exceptional value for excluding synthesis ridge band is examined using t, calculate the Mean curve of synthesis ridge band, Mean curve is smoothed, calculate the confidential interval of the smooth Mean curve in 95% confidence level, smooth Mean curve and its confidential interval are mapped on target crestal line, obtain the reference line of target crestal line and the local region of search, target crestal line is extracted using non-delayed cost function.The present invention is suitable for estimating the instantaneous frequency of complicated multi -components frequency variation signal, overcomes conventional method in the defects of mechanical oscillation signal instantaneous Frequency Estimation, and the accuracy and precision of estimated result is high, is easy to engineer applied.

Description

The instantaneous Frequency Estimation method examined based on Prewitt operators and t
Technical field
The present invention relates to condition monitoring for rotating machinery and fault diagnosis field, and in particular to is examined based on Prewitt operators and t The instantaneous Frequency Estimation method tested.
Background technology
Due to the complexity of working environment, rotating machinery is often operated under Variable Velocity Condition.Instantaneous Frequency Estimation is to assess Running state of rotating machine and the important prerequisite for carrying out fault diagnosis.Currently used instantaneous Frequency Estimation method is a step cost Function method(one-step cost function).One step cost function method can search for ridge point in the range of local frequencies, but It is that the central point of local frequencies scope depends on the position of a upper ridge point, this causes a step cost function, and there is delay.This Outside, the width of local frequencies scope is rule of thumb arbitrarily set, and width at any time is all fixed, it is impossible to The time changes, and this causes a step cost function to lack enough adaptivitys.Drawbacks described above causes a step cost function Method accuracy and precision when estimating instantaneous frequency is relatively low.
The content of the invention
The problem to be solved in the present invention is the deficiency for more than, proposes the instantaneous frequency based on Prewitt operators and t inspections Method of estimation.Compared with the conventional method, reference line of the present invention using the smooth Mean curve after mapping as target crestal line, will reflect Local Search section of the confidential interval as target crestal line after penetrating, therefore the central point of local frequencies hunting zone is independent of upper The position of one ridge point, without any delay, local frequencies hunting zone can be set automatically, and search bandwidth can be over time Change and change automatically, the accuracy and precision of instantaneous Frequency Estimation result is high.
To solve above technical problem, the present invention provides the instantaneous Frequency Estimation side examined based on Prewitt operators and t Method, it is characterised in that comprise the following steps:
Step 1:Using Short Time Fourier Transform algorithm by signal x(k)(k=1, 2, …,N)Time-frequency spectrum is converted to, N is represented The length of signal;
Step 2:One piece of regional area having compared with high s/n ratio is chosen from time-frequency spectrum, will using Prewitt detection algorithms The regional area is converted into bianry image, and bianry image includes more vallate bands;Regional area refers to comprise at least two vallate bands, believed Make an uproar than the region more than 80dB;
Step 3:Excluded using t check algorithms per exceptional value of the vallate with lower edges;
Step 4:Above-mentioned more vallate bands are most complete according to the mutual kinematics proportionate relationship wherein profile that is added to Ridge band on, structure one have complete sharp edge synthesis ridge band;Kinematics proportionate relationship refers to the machine corresponding to ridge band Gearratio between device part;
Step 5:Above-mentioned exceptional value of the synthesis ridge with lower edges is excluded using t check algorithms;
Step 6:Calculate the Mean curve of above-mentioned synthesis ridge band, using 5 points three times smoothing algorithm Mean curve is smoothly located Reason, obtains smooth Mean curve, calculates the confidential interval of the smooth Mean curve in 95% confidence level;
Step 7:By above-mentioned smooth Mean curve and its confidential interval according between smooth Mean curve and target crestal line to be estimated Kinematics proportionate relationship be mapped on target crestal line;
Step 8:Reference line using the smooth Mean curve after mapping as target crestal line, using the confidential interval after mapping as mesh Mark the Local Search section of crestal line;
Step 9:Ridge point is searched in the Local Search section corresponding to each moment using non-delayed cost function, it is determined that each Instantaneous frequency corresponding to moment, finally obtain the instantaneous frequency on whole time interval.
Further, Short Time Fourier Transform algorithm comprises the following steps in the step 1:
1)To signal x(k)Carry out Short Time Fourier Transform:
,
TF (t, f) representation signal x(k)Short Time Fourier Transform result, t represents time factor, and f represents scale factor, function W (z) represents window function of the independent variable as z;
2)Calculate signal x(k)Time-frequency spectrum:
,
Spectrogram (t, f) represents x(k)Time-frequency spectrum.
Further, Prewitt detection algorithms comprise the following steps in the step 2:
1) if f (x, y) represents original image, the time point of x representative images, the Frequency point of y representative images, Gx(x, y) generation The derivatives of table f (x, y) in the horizontal direction, Gy(x, y) represents the derivatives of f (x, y) in vertical direction:
,,
Symbol * represents convolutional calculation;
2) the Grad G (x, y) of gradation of image is calculated:
3) a suitable threshold value is set, if the Grad G (x, y) of some point (x, y) is more than the threshold value on image, It is edge then to judge the point;In the present invention, threshold value is arranged to 3.11 × 10-6
Further, t check algorithms comprise the following steps in the step 3:
1)Estimate signal xn(n=1, 2, …,N)Standard deviation,
,
Representative sample average, σ representative sample standard deviations, N representative sample length;
2)If, then x is rejectedn;tσ(N-1) standard deviation is represented as σ, the free degree For(N-1)T distribution.
Further, non-delayed cost function comprises the following steps in the step 9:
1)Local Search section FB corresponding to k-th of momentkIt is defined as
,
fk(pmc) value of the smooth Mean curve after mapping k-th of moment is represented,It is bent to represent the smooth average after mapping For line confidential interval in the half of k-th of moment width, m represents the length of target crestal line;
2)Non-delayed cost function CF corresponding to k-th of momentkIt is defined as:
,
,
fk(i) represent in FBkIn the range of the frequency values that are taken, TF (tk, fk) represent values of the TF (t, f) k-th of moment, tk Represent values of the t k-th of moment, fkRepresent values of the f k-th of moment, ekRepresent weight factor.
Further, relative error≤0.691%, average relative error≤0.063%.
The present invention uses above technical scheme, and compared with prior art, the present invention has advantages below:
1) present invention has real-time:The present invention is mapped as reference line to synthesize the smooth Mean curve of ridge band, can determine immediately The central point of current time local frequencies hunting zone, avoids the dependence to previous ridge point, eliminates time delay, have Real-time.
2) present invention has adaptivity:The present invention is carried using the smooth Mean curve confidential interval mapping of ridge band is synthesized The subrange of confession, adaptive can should determine that the local frequencies hunting zone corresponding to each moment, and search bandwidth can be with The change of time and change automatically, it is not necessary to by virtue of experience set search bandwidth, produced so as to eliminate due to artificial origin Error.
3) test result indicates that:Maximum between the instantaneous Frequency Estimation value and measured value that are obtained by the present invention is relative by mistake Difference is 0.691%, average relative error 0.063%;Compared with the result of a step cost function method, maximum relative error reduces 95.78%, average relative error reduces by 97.06%.
The present invention will be further described with reference to the accompanying drawings and examples.
Brief description of the drawings
Accompanying drawing 1 is the flow based on Prewitt operators and t the instantaneous Frequency Estimation method examined in the embodiment of the present invention Figure;
Accompanying drawing 2 is epicyclic gearbox vibration signal in the embodiment of the present invention;
Accompanying drawing 3 is the time-frequency spectrum of epicyclic gearbox vibration signal in the embodiment of the present invention;
Accompanying drawing 4 is the regional area with high s/n ratio chosen in the embodiment of the present invention from time-frequency spectrum;
Accompanying drawing 5 is the edge of the local image region detected in the embodiment of the present invention by Prewitt algorithms;
Accompanying drawing 6 is to be eliminated in the embodiment of the present invention using t check algorithms per vallate with the result after abnormity point;
Accompanying drawing 7 is the synthesis ridge band being formed by stacking in the embodiment of the present invention using the kinematics proportionate relationship between ridge band(It is most lower The ridge band of layer is to synthesize ridge band);
Accompanying drawing 8 is to eliminate synthesis ridge with the result after abnormity point using t check algorithms in the embodiment of the present invention;
Accompanying drawing 9 is the mean value smoothing curve and its 95% confidential interval that ridge band is synthesized in the embodiment of the present invention;
Accompanying drawing 10 is mean value smoothing curve and its confidential interval for mapping to obtain in the embodiment of the present invention;
Accompanying drawing 11 is instantaneous Frequency Estimation value in the embodiment of the present invention.
Embodiment
Embodiment, as shown in figure 1, the instantaneous Frequency Estimation method examined based on Prewitt operators and t, including following step Suddenly:
Step 1:Using Short Time Fourier Transform algorithm by signal x(k)(k=1, 2, …,N)Time-frequency spectrum is converted to, N is represented The length of signal;
Step 2:One piece of regional area having compared with high s/n ratio is chosen from time-frequency spectrum, will using Prewitt detection algorithms The regional area is converted into bianry image, and bianry image includes more vallate bands;Regional area refers to comprise at least two vallate bands, believed Make an uproar than the region more than 80dB;
Step 3:Excluded using t check algorithms per exceptional value of the vallate with lower edges;
Step 4:Above-mentioned more vallate bands are most complete according to the mutual kinematics proportionate relationship wherein profile that is added to Ridge band on, structure one have complete sharp edge synthesis ridge band;Kinematics proportionate relationship refers to the machine corresponding to ridge band Gearratio between device part;
Step 5:Above-mentioned exceptional value of the synthesis ridge with lower edges is excluded using t check algorithms;
Step 6:Calculate the Mean curve of above-mentioned synthesis ridge band, using 5 points three times smoothing algorithm Mean curve is smoothly located Reason, obtains smooth Mean curve, calculates the confidential interval of the smooth Mean curve in 95% confidence level;
Step 7:By above-mentioned smooth Mean curve and its confidential interval according between smooth Mean curve and target crestal line to be estimated Kinematics proportionate relationship be mapped on target crestal line;
Step 8:Reference line using the smooth Mean curve after mapping as target crestal line, using the confidential interval after mapping as mesh Mark the Local Search section of crestal line;
Step 9:Ridge point is searched in the Local Search section corresponding to each moment using non-delayed cost function, it is determined that each Instantaneous frequency corresponding to moment, finally obtain the instantaneous frequency on whole time interval.
Short Time Fourier Transform algorithm comprises the following steps in step 1:
1)To signal x(k)Carry out Short Time Fourier Transform:
,
TF (t, f) representation signal x(k)Short Time Fourier Transform result, t represents time factor, and f represents scale factor, function W (z) represents window function of the independent variable as z;
2)Calculate signal x(k)Time-frequency spectrum:
,
Spectrogram (t, f) represents x(k)Time-frequency spectrum.
Prewitt detection algorithms comprise the following steps in step 2:
1) if f (x, y) represents original image, the time point of x representative images, the Frequency point of y representative images, Gx(x, y) generation The derivatives of table f (x, y) in the horizontal direction, Gy(x, y) represents the derivatives of f (x, y) in vertical direction:
,,
Symbol * represents convolutional calculation;
2) the Grad G (x, y) of gradation of image is calculated:
3) a suitable threshold value is set, if the Grad G (x, y) of some point (x, y) is more than the threshold value on image, It is edge then to judge the point;In the present invention, threshold value is arranged to 3.11 × 10-6
T check algorithms comprise the following steps in step 3:
1)Estimate signal xn(n=1, 2, …,N)Standard deviation,
,
Representative sample average, σ representative sample standard deviations, N representative sample length;
2)If, then x is rejectedn;tσ(N-1) standard deviation is represented as σ, and the free degree is(N- 1)T distribution.
Non-delayed cost function comprises the following steps in step 9:
1)Local Search section FB corresponding to k-th of momentkIt is defined as
,
fk(pmc) value of the smooth Mean curve after mapping k-th of moment is represented,It is bent to represent the smooth average after mapping For line confidential interval in the half of k-th of moment width, m represents the length of target crestal line;
2)Non-delayed cost function CF corresponding to k-th of momentkIt is defined as:
,
,
fk(i) represent in FBkIn the range of the frequency values that are taken, TF (tk, fk) represent values of the TF (t, f) k-th of moment, tk Represent values of the t k-th of moment, fkRepresent values of the f k-th of moment, ekRepresent weight factor.
The performance of algorithm of the present invention is verified using blower fan turbine epicyclic gearbox vibration data.
Vibration data gathers from the gearbox-case of epicyclic train, data length N=2736825, sample frequency fs= 5000 Hz。
The epicyclic gearbox vibration data collected is as shown in Figure 2.
Epicyclic gearbox vibration data shown in Fig. 2 is converted to by time-frequency spectrum using Short Time Fourier Transform algorithm, obtained The time-frequency spectrum arrived is as shown in Figure 3.
The regional area with high s/n ratio, obtained regional area such as Fig. 4 institutes are chosen from the time-frequency spectrum shown in Fig. 3 Show.
Rim detection is carried out to regional area as shown in Figure 4 using Prewitt detection algorithms, obtained image border is such as Shown in Fig. 5.
The abnormity point of each vallate band in Fig. 5 is eliminated using t check algorithms, obtained result is as shown in Figure 6.
Each vallate band is added to the most complete ridge band of a wherein profile according to the kinematics proportionate relationship between ridge band On, constructed synthesis ridge band is as shown in Figure 7(Undermost ridge band is to synthesize ridge band).
The abnormity point of synthesis ridge band is eliminated using t check algorithms, as a result as shown in Figure 8.
The smooth Mean curve and its 95% confidential interval of synthesis ridge band are calculated, as a result as shown in Figure 9.
According to the kinematics proportionate relationship between smooth Mean curve and target crestal line by smooth Mean curve and its confidence Interval Maps are on target crestal line, as a result as shown in Figure 10.
Using the ridge point of non-delayed cost function search target crestal line, obtained instantaneous frequency profile is as shown in figure 11.
Show through many experiments, the maximum relative error between the instantaneous Frequency Estimation value and measured value that are obtained by the present invention For 0.691%, average relative error 0.063%, and use the instantaneous Frequency Estimation value that a step cost function method obtains and actual measurement Maximum relative error between value is 16.39%, and average relative error 2.14%, maximum relative error of the present invention reduces 95.78%, average relative error reduces by 97.06%.
According to experimental result, think after analysis:
1) a traditional step cost function it is determined that current search section central point when need rely on a ridge point position Put, there is time delay phenomenon, the present invention can determine to work as immediately by the use of the smooth Mean curve after mapping as reference line The center of the preceding region of search, completely independent of a upper ridge point, therefore there is real-time.
2) a traditional step cost function method lacks adaptivity, it is necessary to artificially set the region of search, and search width It is fixed, thus inevitably brings error, the present invention is using the smooth Mean curve confidential interval after mapping come automatic Local Search section is determined, the change that bandwidth can be over time is searched for and changes automatically, it is not necessary to it is artificial to participate in, therefore have Adaptivity.
3) compared with a traditional step cost function method, accuracy of the present invention and the degree of accuracy are high.
One skilled in the art would recognize that above-mentioned embodiment is exemplary, it is in order that ability Field technique personnel can be better understood from present invention, should not be understood as limiting the scope of the invention, as long as According to technical solution of the present invention improvements introduced, protection scope of the present invention is each fallen within.

Claims (6)

1. the instantaneous Frequency Estimation method examined based on Prewitt operators and t, it is characterised in that comprise the following steps:
Step 1:Using Short Time Fourier Transform algorithm by signal x(k)(k=1, 2, …,N)Time-frequency spectrum is converted to, N is represented The length of signal;
Step 2:One piece of regional area having compared with high s/n ratio is chosen from time-frequency spectrum, will using Prewitt detection algorithms The regional area is converted into bianry image, and bianry image includes more vallate bands;
Step 3:Excluded using t check algorithms per exceptional value of the vallate with lower edges;
Step 4:Above-mentioned more vallate bands are most complete according to the mutual kinematics proportionate relationship wherein profile that is added to Ridge band on, structure one have complete sharp edge synthesis ridge band;
Step 5:Above-mentioned exceptional value of the synthesis ridge with lower edges is excluded using t check algorithms;
Step 6:Calculate the Mean curve of above-mentioned synthesis ridge band, using 5 points three times smoothing algorithm Mean curve is smoothly located Reason, obtains smooth Mean curve, calculates the confidential interval of the smooth Mean curve in 95% confidence level;
Step 7:By above-mentioned smooth Mean curve and its confidential interval according between smooth Mean curve and target crestal line to be estimated Kinematics proportionate relationship be mapped on target crestal line;
Step 8:Reference line using the smooth Mean curve after mapping as target crestal line, using the confidential interval after mapping as mesh Mark the Local Search section of crestal line;
Step 9:Ridge point is searched in the Local Search section corresponding to each moment using non-delayed cost function, it is determined that each Instantaneous frequency corresponding to moment, finally obtain the instantaneous frequency on whole time interval.
2. the instantaneous Frequency Estimation method according to claim 1 examined based on Prewitt operators and t, it is characterised in that Short Time Fourier Transform algorithm comprises the following steps in the step 1:
1)To signal x(k)Carry out Short Time Fourier Transform:
,
TF (t, f) representation signal x(k)Short Time Fourier Transform result, t represents time factor, and f represents scale factor, function W (z) represents window function of the independent variable as z;
2)Calculate signal x(k)Time-frequency spectrum:
,
Spectrogram (t, f) represents x(k)Time-frequency spectrum.
3. the instantaneous Frequency Estimation method according to claim 1 examined based on Prewitt operators and t, it is characterised in that Prewitt detection algorithms comprise the following steps in the step 2:
1) if f (x, y) represents original image, the time point of x representative images, the Frequency point of y representative images, Gx(x, y) generation The derivatives of table f (x, y) in the horizontal direction, Gy(x, y) represents the derivatives of f (x, y) in vertical direction:
,,
Symbol * represents convolutional calculation;
2) the Grad G (x, y) of gradation of image is calculated:
3) a suitable threshold value is set, if the Grad G (x, y) of some point (x, y) is more than the threshold value on image, It is edge then to judge the point.
4. the instantaneous Frequency Estimation method according to claim 1 examined based on Prewitt operators and t, it is characterised in that: T check algorithms comprise the following steps in the step 3:
1)Estimate signal xn(n=1, 2, …,N)Standard deviation,
,
Representative sample average, σ representative sample standard deviations, N representative sample length;
2)If, then x is rejectedn;tσ(N-1) standard deviation is represented as σ, and the free degree is (N-1)T distribution.
5. the instantaneous Frequency Estimation method according to claim 1 examined based on Prewitt operators and t, it is characterised in that: Non-delayed cost function comprises the following steps in the step 9:
1)Local Search section FB corresponding to k-th of momentkIt is defined as
,
fk(pmc) value of the smooth Mean curve after mapping k-th of moment is represented,It is bent to represent the smooth average after mapping For line confidential interval in the half of k-th of moment width, m represents the length of target crestal line;
2)Non-delayed cost function CF corresponding to k-th of momentkIt is defined as:
,
,
fk(i) represent in FBkIn the range of the frequency values that are taken, TF (tk, fk) represent values of the TF (t, f) k-th of moment, tk Represent values of the t k-th of moment, fkRepresent values of the f k-th of moment, ekRepresent weight factor.
6. the instantaneous Frequency Estimation method according to claim 1 examined based on Prewitt operators and t, it is characterised in that: Relative error≤0.691%, average relative error≤0.063%.
CN201710608108.2A 2017-07-24 2017-07-24 The instantaneous Frequency Estimation method examined based on Prewitt operator and t Active CN107389341B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710608108.2A CN107389341B (en) 2017-07-24 2017-07-24 The instantaneous Frequency Estimation method examined based on Prewitt operator and t

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710608108.2A CN107389341B (en) 2017-07-24 2017-07-24 The instantaneous Frequency Estimation method examined based on Prewitt operator and t

Publications (2)

Publication Number Publication Date
CN107389341A true CN107389341A (en) 2017-11-24
CN107389341B CN107389341B (en) 2019-03-19

Family

ID=60336701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710608108.2A Active CN107389341B (en) 2017-07-24 2017-07-24 The instantaneous Frequency Estimation method examined based on Prewitt operator and t

Country Status (1)

Country Link
CN (1) CN107389341B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109272017A (en) * 2018-08-08 2019-01-25 太原理工大学 The vibration signal mode identification method and system of distributed fiberoptic sensor

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104268883A (en) * 2014-10-07 2015-01-07 电子科技大学 Time-frequency spectrum curve extracting method based on edge detection
EP2120328A3 (en) * 2008-05-16 2015-04-29 Schneider Electric USA, Inc. Complex phase locked loop
CN104634526A (en) * 2015-01-27 2015-05-20 西安交通大学 Rotor rub impact fault detection method based on nonlinear compression conversion and rotor rub impact fault detection system based on nonlinear compression conversion
CN104713712A (en) * 2015-01-27 2015-06-17 西安交通大学 Rotor rubbing fault detection method and system based on matching demodulation conversion

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2120328A3 (en) * 2008-05-16 2015-04-29 Schneider Electric USA, Inc. Complex phase locked loop
CN104268883A (en) * 2014-10-07 2015-01-07 电子科技大学 Time-frequency spectrum curve extracting method based on edge detection
CN104634526A (en) * 2015-01-27 2015-05-20 西安交通大学 Rotor rub impact fault detection method based on nonlinear compression conversion and rotor rub impact fault detection system based on nonlinear compression conversion
CN104713712A (en) * 2015-01-27 2015-06-17 西安交通大学 Rotor rubbing fault detection method and system based on matching demodulation conversion

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘珊珊: "基于统计估计的图像边缘插值方法", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *
江星星: "时频脊融合方法及时变工况行星齿轮箱故障识别", 《振动工程学报》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109272017A (en) * 2018-08-08 2019-01-25 太原理工大学 The vibration signal mode identification method and system of distributed fiberoptic sensor
CN109272017B (en) * 2018-08-08 2022-07-12 太原理工大学 Vibration signal mode identification method and system of distributed optical fiber sensor

Also Published As

Publication number Publication date
CN107389341B (en) 2019-03-19

Similar Documents

Publication Publication Date Title
CN109885854B (en) ARMA model-based chatter boundary real-time prediction system and prediction method
CN108463630B (en) Method for assessing the incident flow on a rotor blade of a wind turbine, and method for controlling a wind turbine and wind turbine
CN107368457B (en) The instantaneous Frequency Estimation method examined based on LoG operator and Grubbs
KR102157578B1 (en) Method for measuring significant wave height using artificial neural network in radar type wave gauge system
US11635345B2 (en) System for separating periodic frequency of interest peaks from non-periodic peaks in machine vibration data
US20190346343A1 (en) System for Separating Periodic Amplitude Peaks from Non-Periodic Amplitude Peaks in Machine Vibration Data
Liu et al. An online bearing fault diagnosis technique via improved demodulation spectrum analysis under variable speed conditions
CN107389342B (en) The instantaneous Frequency Estimation method examined based on Roberts operator and Grubbs
CN111664929A (en) System for separating periodic amplitude peaks and non-periodic amplitude peaks in machine vibration data
EP3649568B1 (en) Method for automatic detection of physical modes in a modal analysis model
CN107389329A (en) The instantaneous Frequency Estimation method examined based on non-delayed cost function and PauTa
CN107391935B (en) The instantaneous Frequency Estimation method examined based on non-delayed cost function and Grubbs
CN107389341A (en) The instantaneous Frequency Estimation method examined based on Prewitt operators and t
CN107368814B (en) The instantaneous Frequency Estimation method examined based on Sobel operator and PauTa
CN107368456B (en) The instantaneous Frequency Estimation method examined based on Sobel operator and t
CN107357760B (en) The instantaneous Frequency Estimation method examined based on Roberts operator and PauTa
CN107391934B (en) The instantaneous Frequency Estimation method examined based on Prewitt operator and PauTa
CN107368686A (en) The instantaneous Frequency Estimation method examined based on Prewitt operators and Grubbs
CN107389343B (en) The instantaneous Frequency Estimation method examined based on Roberts operator and t
CN107340129B (en) The instantaneous Frequency Estimation method examined based on LoG operator and PauTa
CN107356429B (en) The instantaneous Frequency Estimation method examined based on LoG operator and t
CN107368458A (en) The instantaneous Frequency Estimation method examined based on Sobel operators and Grubbs
CN107290147B (en) The instantaneous Frequency Estimation method examined based on non-delayed cost function and t

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220124

Address after: 1210 Jinhai North Road, high tech Industrial Development Zone, Gucheng street, Shouguang City, Weifang City, Shandong Province

Patentee after: Shandong kangjinuo Technology Co.,Ltd.

Address before: 261061 No. 5147 Dongfeng East Street, Shandong, Weifang

Patentee before: WEIFANG University

TR01 Transfer of patent right