CN107386741A - A kind of truck space guiding system and installation method - Google Patents
A kind of truck space guiding system and installation method Download PDFInfo
- Publication number
- CN107386741A CN107386741A CN201710539221.XA CN201710539221A CN107386741A CN 107386741 A CN107386741 A CN 107386741A CN 201710539221 A CN201710539221 A CN 201710539221A CN 107386741 A CN107386741 A CN 107386741A
- Authority
- CN
- China
- Prior art keywords
- back box
- parking stall
- parking lot
- testing bridge
- guiding system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H6/00—Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
- E04H6/42—Devices or arrangements peculiar to garages, not covered elsewhere, e.g. securing devices, safety devices, monitoring and operating schemes; centering devices
- E04H6/426—Parking guides
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/30—Installations of cables or lines on walls, floors or ceilings
- H02G3/34—Installations of cables or lines on walls, floors or ceilings using separate protective tubing
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a kind of truck space guiding system and installation method, belongs to guiding system regions, including parking lot detector, cable testing bridge and parking stall, parking lot detector is provided with above the middle part of the parking stall;Multiple parking lot detectors corresponding to multiple parking stalls are along lineal layout;Along the rectilinear direction, the cable testing bridge is arranged at the top of multiple parking lot detectors, and the parking lot detector is fixedly connected with the cable testing bridge;Truck space guiding system disclosed by the invention and method, crane span structure has been saved to the cable dosage between detector, and the more saving in parking stall is more;Only need to greatly save to piece pipe of parking stall indicator lamp, the quantity of pipe with detector;Only need that 1 the 3rd suspension rod is installed in parking stall indicator lamp position, detector position is directly installed on crane span structure bottom and is fixedly connected with pipe joint, reduces the 3rd suspension rod dosage;With the saving of material, manually also and then save.
Description
Technical field
The present invention relates to guiding system regions, more particularly to a kind of truck space guiding system and drawing for above-mentioned parking stall
The installation method of guiding systems.
Background technology
Truck space guiding system is mainly used in that the parked vehicle for passing in and out parking lot effectively guide and manage.The system can
The realization person of parking is convenient and swift to be parked, and parking stall is monitored, and makes parking position management more specification, orderly, raising car
Position utilization rate;Parking stall detection uses ultrasound examination or video vehicle license plate recognition in parking lot, occupancy to each parking stall or
Idle condition is reliably detected.Ultrasonic detector or video detector are installed above each parking stall to be detected with
Without vehicle parking on parking stall, management system collects all detection informations in system in real time, and system is real-time by computer
Guidance information is fed back into each guiding indication signal device.Parking stall indicator lamp is arranged on the front of each parking stall, works as showing
Preceding parking space state, is controlled by parking lot detector, and different colors is shown according to the instruction of detector.When indicator lamp is green,
Expression parking stall is empty parking space.When indicator lamp is red, represent there is vehicle parking on parking stall.
It is laid in parking lot detector 1 as shown in figure 3, general parking lot detector 1 and indicator lamp mounting means are cable testing bridges 2
Between parking stall indicator lamp 6.The connection cable of parking lot detector 1 is that 485 connections are handed in hand, and one-in-and-one-out adds a 24V power supply
Line.Usual construction method is such as used, the distance of cable testing bridge 2 to parking lot detector 1 adds cable dosage;Parking lot detector 1
There are 4 cables on side, the independent pipe arrangement of 24V power lines, remaining 3 cable pipe arrangement quantity at least 2, adds pipe arrangement amount;Back box needs
To be fixed with 2 suspension rods, increase fixed derrick dosage, so as to cause labor hour to increase.And cable testing bridge 2 arrives parking stall respectively
Detector 1 and the spacing of parking stall indicator lamp 6 are different, and installation slightly deviation can cause unsightly phenomenon.
The content of the invention
The defects of in order to overcome prior art, the technical problems to be solved by the invention are to propose that a kind of parking stall parking stall is drawn
Guiding systems, by the ingenious rational installation site for setting cable testing bridge and detector, cable testing bridge is significantly saved to detector
Between cable dosage, reduce materials cost and cost of labor.
To use following technical scheme up to this purpose, the present invention:
A kind of truck space guiding system provided by the invention, including parking lot detector, cable testing bridge and parking stall, the parking stall
Middle part above be provided with parking lot detector;Multiple parking lot detectors corresponding to multiple parking stalls are along lineal layout;
Along the rectilinear direction, the cable testing bridge is arranged at the top of multiple parking lot detectors, the parking lot detector with
The cable testing bridge is fixedly connected.
Preferably, described truck space guiding system, in addition to for accommodating the first back box of line or circuit board;The electricity
The bottom of cable crane span structure is fixedly connected with the upper end of first back box;The top of the parking lot detector and first back box
Lower end is fixedly connected.
Preferably, it is provided with pipe joint above first back box;First back box is fixed on by the pipe joint
The cable testing bridge bottom;The bottom of the cable testing bridge is provided with mounting hole;The pipe joint is matched somebody with somebody with the mounting hole screw thread
Close;The mounting hole size is adapted with cable specifications and models and quantity.
Preferably, the truck space guiding system, in addition to for fixing the pallet of the cable testing bridge;
The pallet is by furred ceiling mode with being fixedly connected at the top of garage;By described in the setting height(from bottom) regulation of the pallet
The investigative range of parking lot detector.
Preferably, the pallet includes the first suspension rod, the first suspension rod and angle steel;One end of the angle steel and described first
The lower end of suspension rod is fixedly connected;The other end of the angle steel is fixedly connected with the lower end of second suspension rod.
Preferably, the truck space guiding system, it is characterised in that:Also include the parking stall indicator lamp of instruction parking stall position;Institute
State parking stall side and be provided with track;The parking stall indicator lamp is located above the track, and close to the parking stall.
Preferably, in addition to for fixing the 3rd suspension rod of the parking stall indicator lamp;Set at the top of the parking stall indicator lamp
It is equipped with the second back box;Second back box is fixed on the lower end of the 3rd suspension rod by nut;The upper end of 3rd suspension rod
With being fixedly connected at the top of garage.
Preferably, the truck space guiding system, in addition to pipe arrangement;Second back box passes through the pipe arrangement and the first back box
It is connected, first back box is each configured to 86 back box with second back box.
Preferably, the pipe arrangement is configured to KBG penetration pipes;The parking lot detector is configured to ultrasonic detector.
Preferably, a kind of installation method for above-described truck space guiding system detector, it is characterised in that by such as
Lower step is implemented:
Step 1:The cable testing bridge is installed:The cable testing bridge is installed along the parking lot detector installation site straight line,
The cable testing bridge is fixedly connected by the pallet with garage, and the pallet installation of ceiling height is visited in the parking lot detector
Within the scope of survey;
Step 2:Fix the first back box:A hole is opened among the crane span structure bottom corresponding to the parking lot detector position,
Perforate size is adapted with cable specifications and models and quantity, and the first back box is fixed on into the cable testing bridge bottom with the pipe joint
Portion;
Step 3:3rd suspension rod is installed:3rd suspension rod, the 3rd suspension rod are installed at the top of the indicator lamp position of parking stall
It is highly fixed with the second back box adjusted design;
Step 4:Cabling:By 2 485 lines of one-in-and-one-out and 1,24V feed cables are laid from the cable testing bridge
Into first back box, 1 cable is laid between first back box and second back box;
Step 5:Equipment wiring is installed:Fixed according to drawing and specification wiring, and by the parking lot detector and installation
In first back box, the parking stall indicator lamp is arranged in second back box.
Beneficial effects of the present invention are:
Truck space guiding system provided by the invention, cable testing bridge are laid by detector installation site, have saved crane span structure to spy
The cable dosage surveyed between device, and the more saving in parking stall is more;Only need with detector to piece pipe of parking stall indicator lamp, pipe
Quantity greatlys save;Only need that 1 the 3rd suspension rod is installed in parking stall indicator lamp position, detector position is directly installed on crane span structure bottom
Portion is fixedly connected with pipe joint, reduces the 3rd suspension rod dosage;With the saving of material, manually also and then save.
Brief description of the drawings
Fig. 1 is the side view for the truck space guiding system that the specific embodiment of the invention provides;
Fig. 2 is the construction drawing for the truck space guiding system that the specific embodiment of the invention provides;
Fig. 3 is the usual construction drawing of the truck space guiding system provided in background of invention.
In figure:
1st, parking lot detector;2nd, cable testing bridge;3rd, pipe joint;41st, the first back box;42nd, the second back box;5th, pallet;51st,
One suspension rod;52nd, the second suspension rod;53rd, angle steel;6th, parking stall indicator lamp;7th, the 3rd suspension rod;8th, nut;10th, penetration pipe;11st, parking stall.
Embodiment
Further illustrate technical scheme below in conjunction with the accompanying drawings and by embodiment.
As depicted in figs. 1 and 2, a kind of truck space guiding system provided in the present embodiment, including parking lot detector 1, cable
Crane span structure 2 and parking stall 11, it is characterised in that:Parking lot detector 1 is provided with above the middle part of parking stall 11;Multiple correspondences of parking stall 11
Multiple parking lot detectors 1 along lineal layout;Along rectilinear direction, cable testing bridge 2 is arranged at the upper of multiple parking lot detectors 1
Side, parking lot detector 1 are fixedly connected with cable testing bridge 2.
Further, truck space guiding system also includes being used for the first back box 41 for accommodating line or circuit board;Cable testing bridge 2
Bottom be fixedly connected with the upper end of the first back box 41;The top of parking lot detector 1 is fixedly connected with the lower end of the first back box 41.
Further, the top of the first back box 41 is provided with pipe joint 3;First back box 41 is fixed on cable by pipe joint 3
The bottom of crane span structure 2;The bottom of cable testing bridge 2 is provided with mounting hole;Pipe joint 3 coordinates with mounting hole screw thread;Mounting hole size and electricity
Cable specifications and models and quantity are adapted.
Further, truck space guiding system also includes being used for the pallet 5 for fixing cable testing bridge 2;Pallet 5 passes through furred ceiling mode
With being fixedly connected at the top of garage;The investigative range of parking lot detector 1 is adjusted by the setting height(from bottom) of pallet 5.
Further, pallet 5 includes the first suspension rod 51, the first suspension rod 52 and angle steel 53;Hung with first one end of angle steel 53
The lower end of bar 51 is fixedly connected;The other end of angle steel 53 is fixedly connected with the lower end of the second suspension rod 52.
Further, truck space guiding system, the parking stall indicator lamp 6 of instruction parking stall position is included;The side of parking stall 11 is set
There is track;Parking stall indicator lamp 6 is located above track, and close to parking stall 11.
Further, truck space guiding system, in addition to for fixing the 3rd suspension rod 7 of parking stall indicator lamp 6;Parking stall indicator lamp
6 top is provided with the second back box 42;Second back box 42 is fixed on the lower end of the 3rd suspension rod 7 by nut 8;3rd suspension rod 7
Upper end at the top of garage with being fixedly connected.
Further, truck space guiding system, in addition to pipe arrangement 10;Second back box 42 passes through pipe arrangement 10 and the phase of the first back box 41
Connection, the first back box 41 and the second back box 42 are each configured to 86 back box.
Further, pipe arrangement 10 is configured to KBG penetration pipes;
Parking lot detector 1 is configured to ultrasonic detector.
Further, a kind of installation method for above-mentioned truck space guiding system detector, implements as follows:
Step 1:Cable testing bridge 2 is installed:Cable testing bridge 2 is installed along the installation site straight line of parking lot detector 1, cable testing bridge 2
It is fixedly connected by pallet 5 with garage, the installation of ceiling of pallet 5 height is within parking lot detector investigative range;
Step 2:Fix the first back box:A hole is opened among the crane span structure bottom corresponding to the position of parking lot detector 1, is opened
Hole size is adapted with cable specifications and models and quantity, and first back box 41 is fixed on into the bottom of cable testing bridge 2 with pipe joint 3;
Step 3:3rd suspension rod 7 is installed:3rd suspension rod 7, the 3rd suspension rod 7 and the are installed at the top of the position of parking stall indicator lamp 6
The adjusted design of two back box 42 is highly fixed;
Step 4:Cabling:By 2 485 lines of one-in-and-one-out and 1,24V feed cables are applied to from cable testing bridge 2
In first back box 41,1 cable is laid between the first back box 41 and the second back box 42;
Step 5:Equipment wiring is installed:According to drawing and specification wiring, and by parking lot detector 1 and it is fixed on
In first back box 41, parking stall indicator lamp 6 is arranged in the second back box 42.
The present invention is described with reference to the preferred embodiments, and those skilled in the art know, is not departing from the present invention's
In the case of spirit and scope, various changes or equivalence replacement can be carried out to these features and embodiment.The present invention is not by this
The limitation of specific embodiment disclosed in place, other embodiments fallen into claims hereof belong to protection of the present invention
Scope.
Claims (10)
1. a kind of truck space guiding system, including parking lot detector (1), cable testing bridge (2) and parking stall (11), it is characterised in that:
Parking lot detector (1) is provided with above the middle part of the parking stall (11);
Multiple parking lot detectors (1) corresponding to multiple parking stalls (11) are along lineal layout;
Along the rectilinear direction, the cable testing bridge (2) is arranged at the top of multiple parking lot detectors (1), the car
Location probe (1) is fixedly connected with the cable testing bridge (2).
2. truck space guiding system according to claim 1, it is characterised in that:
Also include being used for the first back box (41) for accommodating line or circuit board;
The bottom of the cable testing bridge (2) is fixedly connected with the upper end of first back box (41);
The top of the parking lot detector (1) is fixedly connected with the lower end of first back box (41).
3. truck space guiding system according to claim 2, it is characterised in that:
Pipe joint (3) is provided with above first back box (41);
First back box (41) is fixed on the cable testing bridge (2) bottom by the pipe joint (3);
The bottom of the cable testing bridge (2) is provided with mounting hole;
The pipe joint (3) coordinates with the mounting hole screw thread;
The mounting hole size is adapted with cable specifications and models and quantity.
4. truck space guiding system according to claim 1, it is characterised in that:
Also include being used for the pallet (5) for fixing the cable testing bridge (2);
The pallet (5) is by furred ceiling mode with being fixedly connected at the top of garage;
The investigative range of the parking lot detector (1) is adjusted by the setting height(from bottom) of the pallet (5).
5. truck space guiding system according to claim 4, it is characterised in that:
The pallet (5) includes the first suspension rod (51), the first suspension rod (52) and angle steel (53);
One end of the angle steel (53) is fixedly connected with the lower end of first suspension rod (51);
The other end of the angle steel (53) is fixedly connected with the lower end of second suspension rod (52).
6. the truck space guiding system according to claim 1 or 4, it is characterised in that:
Also include the parking stall indicator lamp (6) of instruction parking stall position;
Parking stall (11) side is provided with track;
The parking stall indicator lamp (6) is located above the track, and close to the parking stall (11).
7. truck space guiding system according to claim 6, it is characterised in that:
Also include being used for the 3rd suspension rod (7) for fixing the parking stall indicator lamp (6);
The second back box (42) is provided with the top of the parking stall indicator lamp (6);
Second back box (42) is fixed on the lower end of the 3rd suspension rod (7) by nut (8);
The upper end of 3rd suspension rod (7) at the top of garage with being fixedly connected.
8. truck space guiding system according to claim 7, it is characterised in that:
Also include pipe arrangement (10);
Second back box (42) is connected by the pipe arrangement (10) with the first back box (41);
First back box (41) is each configured to 86 back box with second back box (42).
9. truck space guiding system according to claim 8, it is characterised in that:
The pipe arrangement (10) is configured to KBG penetration pipes;
The parking lot detector (1) is configured to ultrasonic detector.
10. a kind of installation method of truck space guiding system detector for described in any one of claim 1 to 9, its feature exist
In implementing as follows:
Step 1:The cable testing bridge (2) is installed:The cable testing bridge (2) is along the parking lot detector (1) installation site straight line
Installation, the cable testing bridge (2) are fixedly connected by the pallet (5) with garage, and pallet (5) the installation of ceiling height is in institute
State within parking lot detector investigative range;
Step 2:Fix the first back box:A hole is opened among the crane span structure bottom corresponding to the parking lot detector (1) position,
Perforate size is adapted with cable specifications and models and quantity, and the first back box (41) is fixed on into the electricity with the pipe joint (3)
Cable crane span structure (2) bottom;
Step 3:3rd suspension rod (7) is installed:3rd suspension rod (7) is installed at the top of indicator lamp (6) position in parking stall, described the
Three suspension rods (7) are highly fixed with the second back box (42) adjusted design;
Step 4:Cabling:By 2 485 lines of one-in-and-one-out and 1,24V feed cables are laid from the cable testing bridge (2)
In to first back box (41), 1 cable is laid between first back box (41) and second back box (42);
Step 5:Equipment wiring is installed:Fixed according to drawing and specification wiring, and by the parking lot detector (1) and installation
On first back box (41), the parking stall indicator lamp (6) is arranged on second back box (42).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710539221.XA CN107386741A (en) | 2017-07-04 | 2017-07-04 | A kind of truck space guiding system and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710539221.XA CN107386741A (en) | 2017-07-04 | 2017-07-04 | A kind of truck space guiding system and installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107386741A true CN107386741A (en) | 2017-11-24 |
Family
ID=60335100
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710539221.XA Pending CN107386741A (en) | 2017-07-04 | 2017-07-04 | A kind of truck space guiding system and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107386741A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109284534A (en) * | 2018-08-10 | 2019-01-29 | 五冶集团上海有限公司 | A kind of method and system that the cable dosage information based on BIM technology accurately counts |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2124363U (en) * | 1992-05-26 | 1992-12-09 | 巴陵石油化工公司长岭炼油化工厂 | Cable bridge with knock-off hole and novel pipe joint |
CN201818907U (en) * | 2010-09-30 | 2011-05-04 | 安徽精工电缆桥架有限公司 | Cable bridge with knock-off holes and pipe joints |
CN104104037A (en) * | 2014-06-27 | 2014-10-15 | 镇江市江岛电器制造有限公司 | Combined cable bridge |
-
2017
- 2017-07-04 CN CN201710539221.XA patent/CN107386741A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2124363U (en) * | 1992-05-26 | 1992-12-09 | 巴陵石油化工公司长岭炼油化工厂 | Cable bridge with knock-off hole and novel pipe joint |
CN201818907U (en) * | 2010-09-30 | 2011-05-04 | 安徽精工电缆桥架有限公司 | Cable bridge with knock-off holes and pipe joints |
CN104104037A (en) * | 2014-06-27 | 2014-10-15 | 镇江市江岛电器制造有限公司 | Combined cable bridge |
Non-Patent Citations (1)
Title |
---|
1: "车位引导系统安装及使用说明书(485中性)", 《HTTPS://WENKU.BAIDU.COM/VIEW/42E267E819E8B8F67C1CB96D.HTML》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109284534A (en) * | 2018-08-10 | 2019-01-29 | 五冶集团上海有限公司 | A kind of method and system that the cable dosage information based on BIM technology accurately counts |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204242411U (en) | Based on the automobile parking auxiliary security warning system of infrared distance measurement | |
CN106981215A (en) | A kind of automatic parking parking stall bootstrap technique of multi sensor combination formula | |
CN204789765U (en) | A wiring structure for ground resistance of lightning grounding earth mat monitors | |
CN106157634B (en) | Stop detector for parking lot parking stall | |
CN206021570U (en) | Intelligent parking position guidance system | |
CN208337039U (en) | Bend power cable wire dispenser | |
CN110360488A (en) | Single storey industry workshop inner lighting system and laying method | |
CN107386741A (en) | A kind of truck space guiding system and installation method | |
CN208607792U (en) | A kind of automotive parking intelligent management system | |
CN206599746U (en) | Dormitory gate | |
CN205498908U (en) | Overhaul and use combination platform structure | |
CN103174103A (en) | Remote ramp control system | |
CN205504342U (en) | Detector drawbar test system in submarine pipeline | |
CN207367388U (en) | A kind of road transition | |
CN109229161A (en) | Intelligent machine vehicle detection control apparatus | |
CN210690585U (en) | Device capable of monitoring water content in pavement structure layer in real time | |
CN210351722U (en) | Light following system | |
CN102278533A (en) | Three-way bridge connector | |
CN102278532A (en) | Two-directional bridge frame connector | |
CN207571899U (en) | A kind of Novel underground parking position suggestion device | |
CN204187128U (en) | A kind of cable testing bridge threeway underframe | |
CN208593399U (en) | A kind of intelligent machine vehicle detection control apparatus | |
CN206872211U (en) | A kind of machine-roomless lift puts machine beam | |
CN206942320U (en) | A kind of across railway Construction of continuous beam safety guide rail | |
CN206829182U (en) | A kind of Combined formwork support system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171124 |