CN107386467A - Steel reinforced concrete joint portion water resistance lifting construction and its method to set up - Google Patents

Steel reinforced concrete joint portion water resistance lifting construction and its method to set up Download PDF

Info

Publication number
CN107386467A
CN107386467A CN201710660623.5A CN201710660623A CN107386467A CN 107386467 A CN107386467 A CN 107386467A CN 201710660623 A CN201710660623 A CN 201710660623A CN 107386467 A CN107386467 A CN 107386467A
Authority
CN
China
Prior art keywords
steel
joint portion
water resistance
lifting construction
waterstop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710660623.5A
Other languages
Chinese (zh)
Inventor
刘朵
张建东
冯晓楠
葛明丽
徐剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
JSTI Group Co Ltd
Original Assignee
Nanjing Tech University
JSTI Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University, JSTI Group Co Ltd filed Critical Nanjing Tech University
Priority to CN201710660623.5A priority Critical patent/CN107386467A/en
Publication of CN107386467A publication Critical patent/CN107386467A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings

Abstract

The invention discloses a kind of steel reinforced concrete joint portion water resistance lifting construction, including armored concrete, steel and waterstop;It is provided with the upper surface of armored concrete for placing the first end reinforced groove;The second groove for fixing waterstop is provided with first groove inner wall.Steel reinforced concrete joint portion water resistance lifting construction in the present invention is simple in construction, and set-up mode is easy to operate, both it can effectively prevent steel-concrete combined structure from producing crack, seep water leak Corroded Reinforced Concrete and steel can be prevented again, it is significant to the service life of raising steel-concrete combined structure.

Description

Steel-mixed joint portion water resistance lifting construction and its method to set up
Technical field
The present invention relates to a kind of steel-mixed joint portion water resistance lifting construction and its method to set up, belongs to steel-mixed combination knot Structure construction field.
Background technology
Steel-concrete combined structure, it is a kind of overall structure combined by steel part and bar-reinforced concrete member, it is simultaneous Have some characteristics of steel construction and reinforced concrete structure.Available for the floor beam in multilayer and skyscraper, truss, plate and Post, roof boarding, beam and truss in roof structure, post and workbench beam, plate and bridge in factory building, it is additionally operable in China Crane girder in factory building, Wavelike steel webplate bridge and cable-stayed bridge are also widely used in recent years.Steel and concrete combined structure include Combination beam, compoboard, composite roof truss and the major class of coupled column four.
At present, in steel-mixed combining structure engineering, special waterproof structure is not done in steel and armored concrete binding site Make, when steel and armored concrete faying face generation crack, rainwater can enter crack along steel, so as to corrosion steel and steel Reinforced concrete, reduce the service life of steel-mixed combining structure, especially science of bridge building, because it is often exposed to outdoor, this is asked Topic is particularly acute.
In view of above-mentioned existing steel-mixed combination structure node waterproof construction method the defects of existing, the present inventor be based on from The such construction method research of thing abundant for many years practical experience and professional knowledge, and coordinate the utilization of scientific principle, actively studied Innovation, to found a kind of steel-mixed joint portion water resistance lifting construction and its method to set up, it is set to have more practicality.Through Constantly research, design are crossed, and after repetition test and improvement, creates the present invention having practical value finally.
The content of the invention
By the steel in the present invention-mixed joint portion water resistance lifting construction, steel-mixed combining structure both can have effectively been prevented Crack is produced, seep water leak Corroded Reinforced Concrete and steel can be prevented again, the service life to improving steel-mixed combining structure It is significant.
The present invention solve its technical problem technical scheme be:
A kind of steel-mixed joint portion water resistance lifting construction, including armored concrete, steel and waterstop;
It is provided with the upper surface of armored concrete for placing the first end reinforced groove;
The second groove for fixing waterstop is provided with first groove inner wall.
Further, upper surface is provided with 3% gradient.
Further, waterstop is elastomeric material.
Further, waterstop is water uptake expansion material.
Further, the expansion rate of water absorption of waterstop is not less than 3.
A kind of steel-mixed joint portion water resistance lifting construction method to set up, comprises the following steps:
A, waterstop is fixed to the precalculated position of steel;
B, the reinforcing bar in assembling reinforcement concrete, and make its formwork for placing;
C, fixed steel, the relative position between its formwork for placing with armored concrete is made to reach design requirement;
D, casting concrete.
Further, the fixed form of waterstop is bonding way.
Further, the upper mould of armored concrete formwork for placing is provided with 3% gradient.
After employing above-mentioned technical proposal, the present invention has following beneficial effect:
1st, the steel in the present invention-mixed joint portion water resistance lifting construction is simple in construction, and set-up mode is easy to operate, effectively Human cost is saved;
2nd, waterstop is flexible and water swellability, by armored concrete and steel strong bond and can play damping, buffering Effect, be effectively prevented the generation in steel-mixed combining structure crack.
3rd, after waterstop water swelling, the effect of sealing is served between armored concrete and steel, prevents infiltration from leaking Water Corroded Reinforced Concrete and steel, effectively extend the service life of steel-mixed combining structure.
4th, armored concrete upper surface sets 3% gradient, rainwater can be facilitated quickly to be flowed down from reinforced concrete surface.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments described in application, for those of ordinary skill in the art, on the premise of not paying creative work, Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the schematic diagram of steel in the present invention-mixed joint portion water resistance lifting construction;
Fig. 2 is the structural representation of armored concrete in the present invention;
Reference:Armored concrete 1, upper surface 11, the first groove 12, steel 2, waterstop 3.
Embodiment
In order that those skilled in the art more fully understand the technical scheme in the application, it is real below in conjunction with the application The accompanying drawing in example is applied, the technical scheme in the embodiment of the present application is clearly and completely described, it is clear that described implementation Example only some embodiments of the present application, rather than whole embodiments.It is common based on the embodiment in the application, this area The every other embodiment that technical staff is obtained under the premise of creative work is not made, it should all belong to the application protection Scope.
As shown in Figure 1 and 2, a kind of steel-mixed joint portion water resistance lifting construction, including armored concrete 1, steel 2 and only Water band 3;The first groove 12 for placing the end of reinforcing bar 2 is provided with the upper surface 11 of armored concrete 1, in order that secondary water Can quickly it discharge, upper surface 11 is provided with 3% gradient;It is provided with the inwall of first groove 12 for fixing waterstop 3 The second groove 13.
In order that waterstop 3 can play cushioning effect between armored concrete 1 and steel 2, waterstop 3 is arranged to bullet Property material, while in order to increase sealing effectiveness, waterstop 3 is arranged to water uptake expansion material, and its expansion rate of water absorption is 3.
Steel-mixed joint portion water resistance lifting construction method to set up, comprises the following steps:
A, waterstop 3 is fixed to the precalculated position of steel 2, after the completion of armored concrete 1 pours, precalculated position and reinforced concrete The distance on the surface of placement steel 2 is chosen moderate in soil 1, and being chosen at for this distance ensures that waterstop 3 fixes effective premise Under, reduce the distance that secondary water gos deep into gap between steel 2 and armored concrete 1 as far as possible;
B, the reinforcing bar in assembling reinforcement concrete 1, and make its formwork for placing;
C, fixed steel 2, the relative position between its formwork for placing with armored concrete 1 is reached design requirement, avoid reinforcing bar After the completion of concrete 1 pours, deviation occurs for the pre-buried position of steel 2;
D, casting concrete.
Wherein, the fixed form of waterstop 3 is bonding way, easy to operation without other fixtures, in order that There are guide functions on the surface of armored concrete 1, and the upper mould of formwork for placing is provided with 3% gradient.
Waterstop 3 in the present invention is flexible and water swellability, and expansion rate of water absorption is 3 times, in no secondary water During infiltration, steel 2 and armored concrete 1 can be closely bonded;When secondary water penetrates into, progressively water swelling, expanded by itself Gap sealing between the compacted armored concrete 1 of caused pressure and steel 2.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or using the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope caused.

Claims (8)

1. steel-mixed joint portion water resistance lifting construction, it is characterised in that:Including armored concrete(1), steel(2)And sealing Band(3);
The armored concrete(1)Upper surface(11)On be provided with for placing the reinforcing bar(2)First groove of end (12);
First groove(12)It is provided with inwall for fixing the waterstop(3)The second groove(13).
2. steel according to claim 1-mixed joint portion water resistance lifting construction, it is characterised in that:The upper surface (11)It is provided with 3% gradient.
3. steel according to claim 1-mixed joint portion water resistance lifting construction, it is characterised in that:The waterstop(3) For elastomeric material.
4. steel according to claim 1-mixed joint portion water resistance lifting construction, it is characterised in that:The waterstop(3) For water uptake expansion material.
5. steel according to claim 3-mixed joint portion water resistance lifting construction, it is characterised in that:The waterstop(3) Expansion rate of water absorption be not less than 3.
6. steel-mixed joint portion water resistance lifting construction method to set up, it is characterised in that comprise the following steps:
The fixed waterstop(3)To the steel(2)Precalculated position;
Armored concrete described in colligation(1)In reinforcing bar, and make its formwork for placing;
The fixed steel(2), make itself and the armored concrete(1)Relative position between formwork for placing reaches design requirement;
Casting concrete.
7. steel according to claim 6-mixed joint portion water resistance lifting construction method to set up, it is characterised in that described Waterstop(3)Fixed form be bonding way.
8. steel according to claim 6-mixed joint portion water resistance lifting construction method to set up, it is characterised in that described Armored concrete(1)The upper mould of formwork for placing is provided with 3% gradient.
CN201710660623.5A 2017-08-04 2017-08-04 Steel reinforced concrete joint portion water resistance lifting construction and its method to set up Pending CN107386467A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710660623.5A CN107386467A (en) 2017-08-04 2017-08-04 Steel reinforced concrete joint portion water resistance lifting construction and its method to set up

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710660623.5A CN107386467A (en) 2017-08-04 2017-08-04 Steel reinforced concrete joint portion water resistance lifting construction and its method to set up

Publications (1)

Publication Number Publication Date
CN107386467A true CN107386467A (en) 2017-11-24

Family

ID=60344867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710660623.5A Pending CN107386467A (en) 2017-08-04 2017-08-04 Steel reinforced concrete joint portion water resistance lifting construction and its method to set up

Country Status (1)

Country Link
CN (1) CN107386467A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797316A (en) * 2018-08-30 2018-11-13 兰州交通大学 A kind of mixed engaging portion waterstop of Wavelike steel webplate composite beam bridge steel-

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101418641A (en) * 2008-10-17 2009-04-29 陕西省第三建筑工程公司 Obligate pore construction method for construction floor
CN103452221A (en) * 2013-08-26 2013-12-18 叶长青 Pitched roof concrete construction method
CN104358936A (en) * 2014-09-26 2015-02-18 中建七局第二建筑有限公司 Seepage prevention structure and method for periphery of floor-passing-through pipeline
CN204959787U (en) * 2015-08-28 2016-01-13 南通四建集团有限公司 Novel tower crane combination formula basis
CN105421596A (en) * 2015-10-28 2016-03-23 河南省第二建设集团有限公司 Sealing method for steel pipe and concrete floor preformed hole
CN207048079U (en) * 2017-08-04 2018-02-27 苏交科集团股份有限公司 Built-in steel mixed connection fitting water proof structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101418641A (en) * 2008-10-17 2009-04-29 陕西省第三建筑工程公司 Obligate pore construction method for construction floor
CN103452221A (en) * 2013-08-26 2013-12-18 叶长青 Pitched roof concrete construction method
CN104358936A (en) * 2014-09-26 2015-02-18 中建七局第二建筑有限公司 Seepage prevention structure and method for periphery of floor-passing-through pipeline
CN204959787U (en) * 2015-08-28 2016-01-13 南通四建集团有限公司 Novel tower crane combination formula basis
CN105421596A (en) * 2015-10-28 2016-03-23 河南省第二建设集团有限公司 Sealing method for steel pipe and concrete floor preformed hole
CN207048079U (en) * 2017-08-04 2018-02-27 苏交科集团股份有限公司 Built-in steel mixed connection fitting water proof structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797316A (en) * 2018-08-30 2018-11-13 兰州交通大学 A kind of mixed engaging portion waterstop of Wavelike steel webplate composite beam bridge steel-

Similar Documents

Publication Publication Date Title
CN108060746A (en) A kind of prefabricated PC concrete large-span frame system and its construction method
CN109469202A (en) Prestressed assembly integral concrete frame structure system and construction method thereof
CN207194146U (en) Prestressing force assembly concrete frame joint attachment structure
CN105113425A (en) Novel construction method for efficient fabricated steel-concrete composite beam
CN203475598U (en) Shock-proof prefabricated building of steel bar truss shearing wall composite structure
CN106481090B (en) A kind of Shockproof reinforcing method of existing reinforced concrete concrete frame joint
CN108755963A (en) A kind of partial precast assembled steel reinforced concrete giant frame structure and construction method
CN207538322U (en) A kind of prefabricated PC concrete frame frame system
CN103397696A (en) Building adopting aseismatic precasted reinforcing steel truss shear wall composite structure
CN103741958A (en) Method for reinforcing existing building by peripheral assembled substructure
CN109944250A (en) The foundation pit of impermanent vertical support system is along inverse combining construction method
CN109653350B (en) Mixed reinforcement embedded low-prestress dry beam column node and method
CN103510639A (en) Overlapped plate type shear wall with restorability and constructing method thereof
CN104251038A (en) Encased steel plate-concrete composite coupling beam and construction method thereof
CN107190635A (en) Concrete-filled steel tube with dumbbell sections assembled pier and the connection structure and method with cushion cap
CN110258789A (en) A kind of beam-column connection and its construction method that energy consumption rod iron is replaceable
CN105507470A (en) Periphery-overlapped integral fabricated floor and construction method thereof
CN208267234U (en) A kind of prefabricated PC concrete large-span frame system
CN207079627U (en) A kind of assembled underground pipe gallery member connecting structure
CN216740039U (en) Self-resetting fabricated composite structure beam column side node with floor
CN204311614U (en) The fabricated shear wall of prestressing force splicing
CN105970803A (en) Shearing resisting energy consumption device and construction method of prefabricated pier
CN106088657A (en) The ruggedized construction of a kind of rowlock wall body and construction method thereof
CN108005304A (en) A kind of prefabricated PC concrete frame frame system and its construction method
CN110644646A (en) Split-level grouting sleeve connected assembled shear wall system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124

RJ01 Rejection of invention patent application after publication