CN107385202A - A kind of quick lime feed opening dust arrester and its application method - Google Patents

A kind of quick lime feed opening dust arrester and its application method Download PDF

Info

Publication number
CN107385202A
CN107385202A CN201710672799.2A CN201710672799A CN107385202A CN 107385202 A CN107385202 A CN 107385202A CN 201710672799 A CN201710672799 A CN 201710672799A CN 107385202 A CN107385202 A CN 107385202A
Authority
CN
China
Prior art keywords
hot blast
dust
quick lime
excluding hood
main pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710672799.2A
Other languages
Chinese (zh)
Inventor
罗来清
张思平
周鹏飞
王国文
乐文毅
郑建溪
吴明强
詹徐山
钟宏平
周孝良
程昌云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinyu Iron and Steel Co Ltd
Original Assignee
Xinyu Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinyu Iron and Steel Co Ltd filed Critical Xinyu Iron and Steel Co Ltd
Priority to CN201710672799.2A priority Critical patent/CN107385202A/en
Publication of CN107385202A publication Critical patent/CN107385202A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B1/00Preliminary treatment of ores or scrap
    • C22B1/14Agglomerating; Briquetting; Binding; Granulating
    • C22B1/16Sintering; Agglomerating

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The invention discloses a kind of quick lime feed opening dust arrester and its application method, including central cooler, hot blast collecting hood, hot blast main pipe, hot blast manifold, dust excluding hood, quicklime slaking system, cleaning shaft, thermocouple, sack cleaner and valve, dust excluding hood upper pipe is connected by cleaning shaft with sack cleaner, one end of hot blast main pipe is connected with the hot blast collecting hood on central cooler, and the other end is connected by hot blast manifold with the bottom of dust excluding hood.The present invention is by introducing in the hot blast on central cooler to dust excluding hood, change the composition and temperature of dust-laden mixed gas in dust excluding hood, and dust-laden mixed gas temperature is kept more than 106 DEG C, avoiding in steam has water droplet to separate out reacts with quick lime, so as to effectively prevent quick lime dust caused by quick lime blanking process dust stratification ring formation, blocking in cleaning shaft, manpower cleaning dredging work is significantly reduced, reduces the labor intensity of employee.

Description

A kind of quick lime feed opening dust arrester and its application method
Technical field
The present invention relates to quick lime during a kind of Sintering Blend with addition of dedusting technology, under more particularly to a kind of quick lime Material mouth dust arrester and its application method.
Background technology
Sintering Blend process generally uses quicklime slaking system, i.e., quicklime slaking process is with addition of a certain proportion of Water, material temperature is improved for improving the activity of quick lime and meeting water hair thermal property using quick lime.It can only keep away in the process The meeting exempted from produces quick lime dust, therefore, being provided with dust excluding hood in quick lime feed opening, bag-type dust is connected by cleaning shaft Device.Because quick lime dust meets the characteristic and strong cohesive property of water condensation, the quick lime dust after process and dust excluding hood, dedusting are digested Inner-walls of duct is collided, bonded, and condenses into cementing circle, more long-pending bigger, reduces dedusting tubing internal diameter, or even cause pipeline to block up Fill in the generation of phenomenon.In order to avoid dedusting pipeline blockage, it will usually increase substantial amounts of manpower cleaning dredging work, the person of adding The labor intensity of work.How quick lime blanking process caused by quick lime dust cleaning shaft in dust stratification ring formation is effectively avoided, It is insurmountable problem always in industry.
The content of the invention
For above-mentioned technical problem, it is an object of the invention to provide a kind of quick lime feed opening dust arrester and its Application method, avoid the quick lime dust after digestion process from depositing ring formation in cleaning shaft, thoroughly solve dedusting pipeline blockage Problem.
The technical solution used in the present invention is:A kind of quick lime feed opening dust arrester, including central cooler, hot blast are collected Cover, hot blast main pipe, hot blast manifold, dust excluding hood, quicklime slaking system, cleaning shaft, thermocouple, sack cleaner and valve, Dust excluding hood upper pipe is connected by cleaning shaft with sack cleaner, it is characterised in that sets hot blast main pipe, its one end and ring Hot blast collecting hood connection in cold, the other end are connected by hot blast manifold with the bottom of dust excluding hood.
Thermocouple is provided with the hot blast main pipe, dust excluding hood and cleaning shaft;
Hot blast control valve is provided with the hot blast main pipe;
Hot blast regulating valve is provided with the hot blast manifold;
The cleaning shaft, hot blast main pipe periphery are wrapped up or coated with insulation material.
A kind of application method of quick lime feed opening dust arrester, step are as follows:
(1), the hot blast control valve on hot blast main pipe and the dedusting control valve on cleaning shaft are opened, then open heat again Hot blast regulating valve on wind branch pipe;
(2) air exhauster on sack cleaner, is opened, central cooler air blast is cooled down to the hot blast introducing collected after sintering deposit and removed Dust hood, hot blast temperature are 160 DEG C~500 DEG C;
(3) quicklime slaking system, the hot blast that on-line monitoring enters in dust excluding hood and cold air, steam and raw stone, are opened Grey dust heat exchange situation, adjust the hot blast control valve on hot blast main pipe and the hot blast control valve opening on hot blast manifold, it is ensured that The dust-laden mixed gas temperature of formation is more than 106 DEG C;
(4), dust-laden mixed gas removing dust pipeline enters sack cleaner dedusting.
The present invention has made intensive studies to cleaning shaft dust stratification ring formation mechanism, in technology arrangement, whole dust pelletizing system Using air aspiration process, before dust arrester is not transformed, charging aperture and burnt lime digester of a large amount of cold airs from dust excluding hood Feed opening enter dust excluding hood, although quicklime slaking process produces a small amount of 150 DEG C~200 DEG C of the vaporific steam of high temperature, Into after dust excluding hood, mixed rapidly with the cold air in dust excluding hood, quick lime dust, heat exchange, make mixed dusty gas Temperature is down to less than 100 DEG C, and actually detected result only has 55 DEG C~60 DEG C, and known steam is condensed into water below 100 DEG C.55℃ ~60 DEG C of dust-laden mixed gas is collided with dust excluding hood, cleaning shaft inwall during pump drainage, bonded, and is changed Learn reaction:
CaO+H2O=Ca (OH)2
As a result, in the lime white formed after the quick lime curing in dust, lime particle forms calcium hydroxide colloform texture, It is attached to dust excluding hood, on cleaning shaft inwall, condenses into cementing circle, it is more long-pending bigger.
According to cleaning shaft dust stratification ring formation study mechanism result, the general thought of technical solution of the present invention is by central cooler Hot blast introduce dust excluding hood in, by with cold air, steam and the rapid heat exchange of quick lime dust, the dust-laden mixed gas of formation More than 106 DEG C, pump drainage process does not have condensed water, fully enters sack cleaner.
Compared with prior art, beneficial effect is the present invention:By setting hot blast main pipe, the hot blast on central cooler is introduced In dust excluding hood, change the composition and temperature of dust-laden mixed gas in dust excluding hood, avoiding in steam has water droplet precipitation and quick lime React, so as to effectively prevent the dust stratification ring formation, stifled in cleaning shaft of quick lime dust caused by quick lime blanking process Plug, manpower cleaning dredging work is significantly reduced, reduce the labor intensity of employee.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
In figure:1st, central cooler;2nd, hot blast collecting hood;3rd, hot blast main pipe;4th, hot blast manifold;5th, hot blast regulating valve;6th, dedusting Cover;7th, cleaning shaft;8th, sack cleaner;9th, quick lime feed bin;10th, belted electronic balance;11st, burnt lime digester;12nd, it is electric Machine;13rd, material conveyer belt;14th, hot blast control valve;15th, dedusting control valve;16th, thermocouple.
Embodiment
The invention will be further described with reference to the accompanying drawings and examples.Referring to Fig. 1, a kind of quick lime feed opening dedusting Device, including central cooler 1, hot blast collecting hood 2, hot blast main pipe 3, hot blast manifold 4, dust excluding hood 6, quicklime slaking system, dedusting Pipeline 7, thermocouple 16, sack cleaner 8 and valve, the upper pipe of dust excluding hood 6 are connected by cleaning shaft 7 and sack cleaner 8 It is logical, it is characterised in that hot blast main pipe 3 is set, and its one end connects with the hot blast collecting hood 2 on central cooler 1, and the other end passes through hot blast Branch pipe 4 connects with the bottom of dust excluding hood 6.Thermocouple 16 is provided with the hot blast main pipe 3, dust excluding hood 6 and cleaning shaft 7;Institute State and hot blast control valve 14 is provided with hot blast main pipe 3;Hot blast regulating valve 5 is provided with the hot blast manifold 4;The cleaning shaft 7th, the periphery of hot blast main pipe 3 is wrapped up or coated with insulation material.
A kind of application method of quick lime feed opening dust arrester, step are as follows:
(1), the hot blast control valve 14 on hot blast main pipe 3 and the dedusting control valve 15 on cleaning shaft 7 are opened, Ran Houzai Open the hot blast regulating valve 5 on hot blast manifold 4;
(2) air exhauster on sack cleaner 8, is opened, the air blast of central cooler 1 is cooled down to the hot blast collected after sintering deposit and introduced Dust excluding hood 6, hot blast temperature are 160 DEG C~500 DEG C;
(3) quicklime slaking system, the hot blast that on-line monitoring enters in dust excluding hood 6 and cold air, steam and raw stone, are opened Grey dust heat exchange situation, the hot blast control valve 14 on hot blast main pipe 3 and the aperture of hot blast regulating valve 5 on hot blast manifold 4 are adjusted, Ensure the dust-laden mixed gas temperature to be formed more than 106 DEG C;
(4), dust-laden mixed gas removing dust pipeline 7 enters the dedusting of sack cleaner 8.
Sintering deposit is directly entered the entrance of sintering deposit central cooler 1 after single roller is broken, and sintering deposit temperature has 450 DEG C~800 DEG C, Need sintering deposit central cooler 1 to be cooled further to less than 150 DEG C, Belt Conveying to blast furnace hopper could be used.Sintering deposit central cooler 1 Typically 45~80 chassis and 12~26 bellows, bellows are set to be each provided on the air channel of central cooler 1 according to Sintering Yield scale. Chassis orbits, the sintering deposit in bellows air blast cooling chassis.With China's energy-saving and emission-reduction, efforts at environmental protection it is further Promote, some sintering plants increase flue gas waste heat power generation device in succession on central cooler 1, therefore, being set on the top of the track of central cooler 1 Put hot blast collecting hood 2 and collect hot blast, flue gas heat is utilized effectively.The hot blast temperature of collection is as track is away from central cooler 1 entrance and reduce, generally 160 DEG C~500 DEG C.
Embodiment:As shown in figure 1, the air exhauster (not shown) flow on sack cleaner 8:90000m3/ h, total head: 4800Pa, rotating speed:1450r/min, shaft power:135KW.One end of hot blast main pipe 3 and the hot blast collecting hood 2 on central cooler 1 are logical Welding manner connection is crossed, the other end connects by welding hot blast manifold 4 with the bottom of dust excluding hood 6, makes the heat on central cooler 1 Wind enters in dust excluding hood 6.Hot blast control valve 14 is installed on the hot blast main pipe 3 close to hot blast collecting hood 2, controlled by hot blast Valve 14 controls hot air flow, the flow velocity in hot blast main pipe 3.Hot blast regulating valve 6, regulation heat are installed on each hot blast manifold 4 Wind enters the air quantity of dust excluding hood 6.Hot blast temperature selects according to seasonal variations, and winter environment temperature is low, is electricity from the charging aperture of dust excluding hood 6 The air temperature that the sub- feeding port of belt conveyer scale 10 is pumped into is also low, now selects the high-temperature hot-air in 350 DEG C~500 DEG C sections, to protect The dust-laden mixed gas temperature ultimately formed in card dust excluding hood 6 is more than 106 DEG C.Summer environment temperature is high, is fed from dust excluding hood 6 The air temperature that mouth is pumped into is also high, the hot blast in 160 DEG C~260 DEG C sections is now selected, it is ensured that most end form in dust excluding hood 6 Into dust-laden mixed gas temperature more than 106 DEG C, and dust-laden mixed gas remains to the temperature of terminal more than 101 DEG C. The upper pipe of dust excluding hood 6 is welded with cleaning shaft 7, then is connected with sack cleaner 8, the dust-laden mixed gas of extraction is smoothly entered Enter sack cleaner 8.Dedusting control valve 15 is installed on the cleaning shaft 7 close to sack cleaner 8, controls whole exhausting system Flow, the flow velocity of system wind.Fig. 1 shows, in hot blast main pipe 3 at hot blast collecting hood 2 and the top of dust excluding hood 6 and cleaning shaft 7 are separately installed with thermocouple 16 at sack cleaner 8, the mixed gas temperature in on-line monitoring dust excluding hood 6, are easy to whole Exhausting system adjusts wind-warm syndrome, and the dust-laden mixed gas temperature for ensureing to ultimately form in dust excluding hood 6 is more than 106 DEG C.In order to avoid Whole exhausting system wind-warm syndrome is greatly lowered, in cleaning shaft 7, the periphery parcel insulation material of hot blast main pipe 3, as asbestos, Alumina silicate fiber felt, or thermal insulation coatings are coated in the periphery of cleaning shaft 7, hot blast main pipe 3, such as alumina silicate thermal insulation coatings or nanometer Ceramic coating.
In Fig. 1, quicklime slaking system includes quick lime feed bin 9, belted electronic balance 10 and burnt lime digester 11.Thing The operation of material is so:The quick lime fine powder that quick lime feed bin 9 gets off identifies after the metering of belted electronic balance 10 from stretching into figure A, one end of belted electronic balance 10 of B dust excluding hood 6 is fallen, and is fallen into burnt lime digester 11, now, in belted electronic balance 10 Feed opening produce quick lime dust, covered by dust excluding hood 6, mix with hot blast, meanwhile, exhausting system run, also by cold air from The charging aperture of dust excluding hood 6 is pumped into dust excluding hood 6, is mixed with hot blast.Burnt lime digester 11 is really the auger of a translator 12 Mechanism.Add water into the quick lime fine powder in burnt lime digester 11, digested when twisting, from the feed opening of burnt lime digester 11 Fall, be layered on the iron charge on material conveyer belt 13, material falls in the great wheel of material conveyer belt 13 and (C dust excluding hoods 6 identified in figure Position), then sintering machine is transported to by another material conveyer belt 13.Meanwhile exhausting system is also by under burnt lime digester 11 In the dust excluding hood 6 that A, B are identified in the vaporific steam suction figure of high temperature caused by a small amount of cold air and quicklime slaking that material mouth is pumped into, Mixed with hot blast.In addition, exhausting system also continues cold air and quick lime to digest caused high temperature on material conveyer belt 13 Vaporific steam is pumped into the dust excluding hood 6 that C is identified in figure, is mixed with hot blast.
The present invention is in use, operating procedure is as follows:
(1), the hot blast control valve 14 on hot blast main pipe 3 and the dedusting control valve 15 on cleaning shaft 7 are opened, Ran Houzai Open the hot blast regulating valve 5 on hot blast manifold 4;
(2) air exhauster on sack cleaner 8, is opened, the air blast of central cooler 1 is cooled down to the hot blast (Fig. 1 collected after sintering deposit Flowed to shown in cathetus arrow) dust excluding hood 6 and whole exhausting system are introduced, winter selects the high warm in 350 DEG C~500 DEG C sections Wind, summer select the hot blast in 160 DEG C~260 DEG C sections, and the temperature in other seasons selects in the range of 160 DEG C~500 DEG C;
(3) quicklime slaking system, is opened, passes through mixed gas temperature in the on-line monitoring dust excluding hood 6 of thermocouple 16, moment After monitoring enters the hot blast in dust excluding hood 6 and cold air, steam and quick lime dust heat exchange, the dust-laden gaseous mixture body temperature of formation Degree is more than 106 DEG C, if dust-laden mixed gas temperature is less than 106 DEG C, adjusts the hot blast control valve 14 on hot blast main pipe 3 in time And the aperture of hot blast regulating valve 5 on hot blast manifold 4, increase hot air flow, or both combination selection higher temperature hot blast, improve Dust-laden mixed gas temperature is to more than 106 DEG C;
(4), dust-laden mixed gas further mixes in cleaning shaft 7, eventually enters into the dedusting of sack cleaner 8 (in Fig. 1 Flowed to shown in setback arrow).
The present invention implements monitoring result and is shown in Table 1:
The present invention of table 1 implements monitoring result
Monitor the time The outlet temperature of hot blast collecting hood 2 Dust excluding hood 6A Dust excluding hood 6B Dust excluding hood 6C The inlet temperature of sack cleaner 8
2016.10.15 320℃ 125℃ 126℃ 117℃ 114℃
2016.12.26 450℃ 135℃ 133℃ 128℃ 131℃
2017.1.10 480℃ 138℃ 136℃ 132℃ 134℃
2017.4.12 280℃ 121℃ 123℃ 119℃ 120℃
2017.6.17 260℃ 116℃ 118℃ 115℃ 110℃
2017.7.26 160℃ 109℃ 108℃ 106℃ 103℃
The implementation of the present invention obtains extraordinary effect, and cleaning shaft 7 and dedusting are opened after production run half a year, during maintenance Manhole observation on cover 6, no quick lime dust is in the inwall of cleaning shaft 7 and the inwall of dust excluding hood 6 deposition ring formation phenomenon, thoroughly solution Dedusting pipeline blockage problem.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, some improvement and modification can also be made, these improvement and modification Also it should be regarded as protection scope of the present invention.

Claims (6)

1. a kind of quick lime feed opening dust arrester, including central cooler, hot blast collecting hood, hot blast main pipe, hot blast manifold, dedusting Cover, quicklime slaking system, cleaning shaft, thermocouple, sack cleaner and valve, dust excluding hood upper pipe pass through cleaning shaft Connected with sack cleaner, it is characterised in that hot blast main pipe is set, and its one end connects with the hot blast collecting hood on central cooler, separately One end is connected by hot blast manifold with the bottom of dust excluding hood.
2. a kind of quick lime feed opening dust arrester according to claim 1, it is characterised in that the hot blast main pipe, remove Thermocouple is provided with dust hood and cleaning shaft.
3. a kind of quick lime feed opening dust arrester according to claim 1, it is characterised in that set on the hot blast main pipe It is equipped with hot blast control valve.
4. a kind of quick lime feed opening dust arrester according to claim 1, it is characterised in that set on the hot blast manifold It is equipped with hot blast regulating valve.
5. a kind of quick lime feed opening dust arrester according to claim 1, it is characterised in that the cleaning shaft, heat Wind supervisor wraps up or coated with insulation material periphery.
6. a kind of application method of quick lime feed opening dust arrester, step are as follows:
(1), the hot blast control valve on hot blast main pipe and the dedusting control valve on cleaning shaft opened, then open hot blast branch again Hot blast regulating valve on pipe;
(2), open air exhauster on sack cleaner, will central cooler air blast cool down sintering deposit after the hot blast collected introduce dedusting Cover, hot blast temperature are 160 DEG C ~ 500 DEG C;
(3), open quicklime slaking system, hot blast and cold air, steam and the calcium lime powder that on-line monitoring enters in dust excluding hood Dirt heat exchange situation, adjust the hot blast control valve on hot blast main pipe and the hot blast control valve opening on hot blast manifold, it is ensured that formed Dust-laden mixed gas temperature more than 106 DEG C;
(4), dust-laden mixed gas removing dust pipeline enter sack cleaner dedusting.
CN201710672799.2A 2017-08-08 2017-08-08 A kind of quick lime feed opening dust arrester and its application method Pending CN107385202A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710672799.2A CN107385202A (en) 2017-08-08 2017-08-08 A kind of quick lime feed opening dust arrester and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710672799.2A CN107385202A (en) 2017-08-08 2017-08-08 A kind of quick lime feed opening dust arrester and its application method

Publications (1)

Publication Number Publication Date
CN107385202A true CN107385202A (en) 2017-11-24

Family

ID=60354999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710672799.2A Pending CN107385202A (en) 2017-08-08 2017-08-08 A kind of quick lime feed opening dust arrester and its application method

Country Status (1)

Country Link
CN (1) CN107385202A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110564954A (en) * 2019-09-10 2019-12-13 中冶长天国际工程有限责任公司 Iron smelting device and sintering equipment thereof
CN110564955A (en) * 2019-09-10 2019-12-13 中冶长天国际工程有限责任公司 Iron smelting device and sintering equipment thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2591048Y (en) * 2002-12-19 2003-12-10 长沙超凡机电自控设备有限公司 Quick lime metering, dispensing & nitration apparatus
CN2658681Y (en) * 2003-11-14 2004-11-24 中国冶金建设集团鞍山冶金设计研究总院 Caustic lime pneumatic transfer storage, blending device for sintering
CN1590943A (en) * 2003-08-27 2005-03-09 天津渤海化工有限责任公司天津碱厂 Treatment method of lime kiln smoke dust pollution
CN203565025U (en) * 2013-07-30 2014-04-30 宝山钢铁股份有限公司 Sieve-mesh sprayed hot air type sintering mixer machine dust collector
CN106045339A (en) * 2016-06-01 2016-10-26 中冶长天国际工程有限责任公司 Quick lime digestion, mixing and dust removal technology and device
CN205746916U (en) * 2016-06-16 2016-11-30 光大环保(中国)有限公司 A kind of ash silo
CN206109221U (en) * 2016-06-01 2017-04-19 中冶长天国际工程有限责任公司 Lime slaking and compounding device
CN206188665U (en) * 2016-11-09 2017-05-24 重庆鸿庆达产业有限公司 Lime stone material loading system of calcining
CN207331009U (en) * 2017-08-08 2018-05-08 新余钢铁股份有限公司 A kind of quick lime feed opening dust-extraction unit

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2591048Y (en) * 2002-12-19 2003-12-10 长沙超凡机电自控设备有限公司 Quick lime metering, dispensing & nitration apparatus
CN1590943A (en) * 2003-08-27 2005-03-09 天津渤海化工有限责任公司天津碱厂 Treatment method of lime kiln smoke dust pollution
CN2658681Y (en) * 2003-11-14 2004-11-24 中国冶金建设集团鞍山冶金设计研究总院 Caustic lime pneumatic transfer storage, blending device for sintering
CN203565025U (en) * 2013-07-30 2014-04-30 宝山钢铁股份有限公司 Sieve-mesh sprayed hot air type sintering mixer machine dust collector
CN106045339A (en) * 2016-06-01 2016-10-26 中冶长天国际工程有限责任公司 Quick lime digestion, mixing and dust removal technology and device
CN206109221U (en) * 2016-06-01 2017-04-19 中冶长天国际工程有限责任公司 Lime slaking and compounding device
CN205746916U (en) * 2016-06-16 2016-11-30 光大环保(中国)有限公司 A kind of ash silo
CN206188665U (en) * 2016-11-09 2017-05-24 重庆鸿庆达产业有限公司 Lime stone material loading system of calcining
CN207331009U (en) * 2017-08-08 2018-05-08 新余钢铁股份有限公司 A kind of quick lime feed opening dust-extraction unit

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110564954A (en) * 2019-09-10 2019-12-13 中冶长天国际工程有限责任公司 Iron smelting device and sintering equipment thereof
CN110564955A (en) * 2019-09-10 2019-12-13 中冶长天国际工程有限责任公司 Iron smelting device and sintering equipment thereof
CN110564954B (en) * 2019-09-10 2021-08-31 中冶长天国际工程有限责任公司 Iron smelting device and sintering equipment thereof
CN110564955B (en) * 2019-09-10 2021-08-31 中冶长天国际工程有限责任公司 Iron smelting device and sintering equipment thereof

Similar Documents

Publication Publication Date Title
CN207331009U (en) A kind of quick lime feed opening dust-extraction unit
CN104832930B (en) Slag cooling device applicable to dry slag discharge machines and application thereof
CN106556258A (en) Sintering mine sensible heat retracting device and its using method
CN109776002A (en) A kind of the suspension calcining activation system and method for Suitable clays mine tailing
CN107894173A (en) A kind of full negative pressure coke stoving process of flue gas self-circulation type and system
CN114447464A (en) High-temperature pyrolysis treatment system and method for waste lithium batteries
CN107385202A (en) A kind of quick lime feed opening dust arrester and its application method
CN106702143A (en) Efficiently-energy-saving hot air supply method for belt type roasting machine
CN206683423U (en) A kind of sintering circular-cooler flue gas waste heat utilization device
CN202016883U (en) Device for producing alumina clinker in semidry method
CN108411116A (en) A kind of lateritic nickel ore RKEF smelting processes smoke gas comprehensive treatment system and method
CN209131421U (en) A kind of kiln integral structure and the process system using the kiln integral structure
CN108088250A (en) A kind of belt type roasting machine heat power engineering system and its control method
CN104748573B (en) It is a kind of from rotary kiln take wind take heat method and desirable wind take heat rotary system
CN207066020U (en) A kind of semi-coke drying system using limekiln exhaust gas waste heat
CN203980922U (en) A kind of vertical helical particle waste-heat recovery device for sintering waste heat generating system
CN207872304U (en) A kind of ball mill heating plant
CN214747299U (en) Device for producing mineral admixture by using coal gangue
CN102674716A (en) Cyclic calcining and decomposing process for powdered materials
CN211198619U (en) Energy-conserving efficient carbide production system
CN207231245U (en) Fluidized bed furnace cooling collection slag system
CN102827993A (en) Fuel gas injection type recovery method of sensible heat of convertor coal gas and convertor flue gas
CN110331248A (en) A kind of energy saving regulation method of blast funnace hot blast stove combustion fan
CN110044185A (en) A kind of grate-cooler waste heat recycling system
CN215724959U (en) Drying device for blast furnace ironmaking coke entering furnace

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124