CN107380011A - Bending-resistant type pre-buried channel flow is suspended vertically base device - Google Patents

Bending-resistant type pre-buried channel flow is suspended vertically base device Download PDF

Info

Publication number
CN107380011A
CN107380011A CN201710559160.3A CN201710559160A CN107380011A CN 107380011 A CN107380011 A CN 107380011A CN 201710559160 A CN201710559160 A CN 201710559160A CN 107380011 A CN107380011 A CN 107380011A
Authority
CN
China
Prior art keywords
suspended
buried channel
channel flow
base
suspention
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710559160.3A
Other languages
Chinese (zh)
Other versions
CN107380011B (en
Inventor
卢涛
高鸣
冀炎
黎峰
崔莹
徐阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Railway Electrification Design And Research Institute Co Ltd
Baoji Equipment Co Ltd of China Railway Electrification Engineering Group Co Ltd
Original Assignee
Tianjin Railway Electrification Design And Research Institute Co Ltd
Baoji Equipment Co Ltd of China Railway Electrification Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Railway Electrification Design And Research Institute Co Ltd, Baoji Equipment Co Ltd of China Railway Electrification Engineering Group Co Ltd filed Critical Tianjin Railway Electrification Design And Research Institute Co Ltd
Priority to CN201710559160.3A priority Critical patent/CN107380011B/en
Publication of CN107380011A publication Critical patent/CN107380011A/en
Application granted granted Critical
Publication of CN107380011B publication Critical patent/CN107380011B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60MPOWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
    • B60M1/00Power supply lines for contact with collector on vehicle
    • B60M1/12Trolley lines; Accessories therefor
    • B60M1/20Arrangements for supporting or suspending trolley wires, e.g. from buildings
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Bolts, Nuts, And Washers (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

A kind of bending-resistant type pre-buried channel flow is suspended vertically base device, including suspention base and suspended screw, has the boss and mounting hole that can be embedded in pre-buried channel flow on the upper surface of the suspention base, and boss is located at mounting hole both sides;The middle part of the suspention base is horizontally suspends plate, and the center for horizontally suspending plate is formed with suppending hole, and the upper port of the suppending hole is tapered;The suspention base is arranged on pre-buried channel flow by T-bolt component through mounting hole, the suspended screw is inserted in taper faced washer, spheric washer and locking nut successively after passing through suppending hole from top to bottom, and the screw head of suspended screw is adapted to the tapered upper end mouth of suppending hole by sphere, the perpendicularity of adjust automatically suspended screw, suspended screw is vertically fixed on and horizontally suspended on plate.The present invention can improve bending resistance of the pre-buried channel flow along line direction, and the perpendicularity of energy adjust automatically suspended screw, ensure the right angle setting of suspended screw.

Description

Bending-resistant type pre-buried channel flow is suspended vertically base device
Technical field
The present invention relates to technical field of rail traffic, and in particular to a kind of bending-resistant type pre-buried channel flow is suspended vertically base dress Put.
Background technology
Overhead rigid suspension bus-bar electric power system, it is a kind of important urban rail transit contact network power supply mode, Through being widely used, and it is suspended vertically the important component that base device is whole rigid electric power system.Existing skill In art, otherwise it is to be fixed on tunnel top by expansion bolt to be suspended vertically base device;By pre-buried channel flow with T-shaped spiral shell Bolt is installed.Big using expansion bolt on-site installation work amount, installation reliability is relatively low, progressively by pre-buried channel flow mounting means institute Substitution.
Conventional vertical suspends base in midair because structure is limited, and causes pre-buried channel flow bending resistance not good enough;In addition, according to design requirement Hanging bolt needs right angle setting, and tradition suspention base device does not possess regulatory function, and this is just to installation foundation and part sheet Body proposes higher required precision, is otherwise suspended vertically base device installation rear overhang hanger bolt and is not easy vertically, high-precision requirement Installation foundation capital construction high expensive.
With the high speed development of electric railway, base device reliability requirement is suspended vertically to overheat rigid also increasingly It is high, it is desirable to which that it can be securely fixed on pre-buried channel flow, and can improve the non-deformability of pre-buried channel flow, while requires structure Simply and possess regulatory function, be easily installed, reduce capital construction cost.It is difficult to meet to want it can be seen that being suspended vertically base device Ask.Therefore, it is necessary to which developing a kind of new-type bending-resistant type pre-buried channel flow is suspended vertically base device.
The content of the invention
The purpose of the present invention is that a kind of bending-resistant type pre-buried channel flow of design is suspended vertically base device, improves pre-buried channel flow fair line The bending resistance in road direction, when ought particularly meet accident (e.g., bus-bar clamping stagnation), pre-buried channel flow anti-in itself can be improved Curved ability, avoid pre-buried channel flow deformation failure.And can adjust automatically suspended screw perpendicularity, ensure the vertical peace of suspended screw Dress.
The technical solution of the present invention:A kind of bending-resistant type pre-buried channel flow is suspended vertically base device, including suspention base And suspended screw, it is characterised in that:There is the boss and mounting hole that can be embedded in pre-buried channel flow on the upper surface of the suspention base, And boss is located at mounting hole both sides;The middle part of the suspention base to horizontally suspend plate, and the center for horizontally suspending plate be formed with it is outstanding Hanging hole, the upper port of the suppending hole are tapered;The suspention base is arranged on pre-buried by T-bolt component through mounting hole On conduit, the suspended screw is inserted in taper faced washer, spheric washer and locking nut successively after passing through suppending hole from top to bottom, and The screw head of suspended screw is adapted to the tapered upper end mouth of suppending hole by sphere, the perpendicularity of adjust automatically suspended screw, will Suspended screw, which is vertically fixed on, to horizontally suspend on plate.
The upper surface of the suspention base coincide for circular arc mounting surface and with tunnel tip circle cambered surface closely connected.
The upper surface width of the suspention base is more than the width of pre-buried channel flow.
The present invention has the advantage that compared with prior art and effect:
1st, mounting surface width of the present invention is wider than pre-buried channel flow, along line direction stress when dispersible load to tunnel wall, carry High pre-buried channel flow bending resistance.
2nd, the boss on mounting surface of the present invention is easy to suspend in midair the installation positioning of base, convenient installation;Along line direction stress When, the dispersible T-bolt load of boss, improve pre-buried channel flow bending resistance.
3rd, the present invention by sphere and cone match using can play a part of automatically adjusting, adjust automatically suspended screw Perpendicularity, ensure the right angle setting of suspended screw.
4th, the present invention being used cooperatively by spheric washer and taper faced washer, increases the frictional force between screw thread, can rise To certain anti-loose effect.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is Fig. 1 A-A sectional views;
Fig. 3 is the structure top view of the present invention;
Fig. 4 is the use state figure of the present invention.
Embodiment
With reference to a kind of embodiment of the description present invention of accompanying drawing 1,2,3,4.
A kind of bending-resistant type pre-buried channel flow is suspended vertically base device, including suspention base 1 and suspended screw 7, the suspention There is the boss 1-1 and mounting hole 1-4 that can be embedded in pre-buried channel flow 8, and boss 1-1 is located at mounting hole on the upper surface 1-3 of base 1 1-4 both sides;The middle part of the suspention base 1 is horizontally suspends plate 1-5, and the center for horizontally suspending plate 1-5 is formed with suppending hole 1- 6, the upper port 1-2 of the suppending hole 1-6 is tapered;The suspention base 1 is pacified by T-bolt component 3 through mounting hole 1-4 On pre-buried channel flow 8, the suspended screw 7 is inserted in taper faced washer 4, ball ring successively after passing through suppending hole 1-6 from top to bottom Circle 5 and locking nut 6, and the screw head of suspended screw 7 is adapted to suppending hole 1-6 tapered upper end mouth by sphere 7-1, automatically The perpendicularity of suspended screw 7 is adjusted, suspended screw 7 is vertically fixed on and horizontally suspended on plate 1-5.It is described to suspend the upper of base 1 in midair End face 1-3 is circular arc mounting surface and coincide with tunnel tip circle cambered surface 2 closely connected.The upper surface 1-3 width of the suspention base 1 is big In the width of pre-buried channel flow 8.
During installation, first T-bolt component 3, suspended screw 7, taper faced washer 4, spheric washer 5 and locking nut 6 are pacified in advance On outstanding base 1, nut is not first locked, and will suspend base in midair according still further to design requirement is positioned at design attitude, boss 1-1 edges In pre-buried channel flow, 90 ° of T-bolt is rotated, is made after T-bolt flute profile engages with conduit internal tooth, locking T-bolt component 3, suspention base 1 is fixed on pre-buried channel flow 8, finally tightens locking nut 6, is vertically fixed on suspended screw 7 horizontal outstanding On hanging plate 1-5, install.
The present invention is installed by boss 1-1 and positioned, convenient installation;During along line direction stress, the dispersible T-bolt of boss Load, improve pre-buried channel flow bending resistance.The present invention suspention width of base 1 it is wider than pre-buried channel flow, along line direction stress when can Distractive load further improves pre-buried channel flow bending resistance to tunnel wall.The cone that the present invention passes through suppending hole 1-6 upper ports 1-2 Shape face and the sphere 7-1 of suspended screw 7 match;Taper faced washer 4 matches with spheric washer 5;Both are automatic with the use of that can play The effect of suspended screw perpendicularity is adjusted, ensures suspended screw right angle setting.Make locking nut 6 and the stress of suspended screw 7 simultaneously Uniformly, reliability is improved, is increased the service life.The present invention is used cooperatively by taper faced washer 4 and spheric washer 5, when fastening is locked During tight nut 6, it is possible to increase the axial tension stress of suspended screw 7, while the frictional force between screw thread is increased, it can play certain Anti-loose effect.
Above-described embodiment, simply presently preferred embodiments of the present invention, is not used for limiting the scope of the present invention, therefore all with this The equivalent variations that content described in invention claim is done, it all should be included within scope of the invention as claimed.

Claims (3)

1. a kind of bending-resistant type pre-buried channel flow is suspended vertically base device, including suspention base (1) and suspended screw (7), its feature It is:There is the boss (1-1) and mounting hole that can be embedded in pre-buried channel flow (8) on the upper surface (1-3) of the suspention base (1) (1-4), and boss (1-1) is located at mounting hole (1-4) both sides;The middle part of the suspention base (1) is to horizontally suspend plate (1-5), And the center for horizontally suspending plate (1-5) is formed with suppending hole (1-6), the upper port (1-2) of the suppending hole (1-6) is tapered;Institute State suspention base (1) to be arranged on pre-buried channel flow (8) through mounting hole (1-4) by T-bolt component (3), the suspention spiral shell Bar (7) is inserted in taper faced washer (4), spheric washer (5) and locking nut (6) successively after passing through suppending hole (1-6) from top to bottom, and The screw head of suspended screw (7) is adapted to the tapered upper end mouth of suppending hole (1-6) by sphere (7-1), adjust automatically suspention spiral shell The perpendicularity of bar (7), suspended screw (7) is vertically fixed on and horizontally suspended on plate (1-5).
2. bending-resistant type pre-buried channel flow according to claim 1 is suspended vertically base device, it is characterised in that:The suspention bottom The upper surface (1-3) of seat (1) coincide closely connected for circular arc mounting surface and with tunnel tip circle cambered surface (2).
3. bending-resistant type pre-buried channel flow according to claim 1 or 2 is suspended vertically base device, it is characterised in that:It is described outstanding Upper surface (1-3) width for hanging base (1) is more than the width of pre-buried channel flow (8).
CN201710559160.3A 2017-07-11 2017-07-11 Bending-resistant embedded channel vertical suspension base device Active CN107380011B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710559160.3A CN107380011B (en) 2017-07-11 2017-07-11 Bending-resistant embedded channel vertical suspension base device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710559160.3A CN107380011B (en) 2017-07-11 2017-07-11 Bending-resistant embedded channel vertical suspension base device

Publications (2)

Publication Number Publication Date
CN107380011A true CN107380011A (en) 2017-11-24
CN107380011B CN107380011B (en) 2023-05-05

Family

ID=60339118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710559160.3A Active CN107380011B (en) 2017-07-11 2017-07-11 Bending-resistant embedded channel vertical suspension base device

Country Status (1)

Country Link
CN (1) CN107380011B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110001456A (en) * 2019-04-26 2019-07-12 中铁高铁电气装备股份有限公司 A kind of adjustable conversion cradle of pre-buried channel flow bending-resistant type
CN113715694A (en) * 2021-08-24 2021-11-30 江苏大学 Novel non/local channel direct-connected segment pre-buried anchor

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001057722A (en) * 1999-08-11 2001-02-27 Mirai Ind Co Ltd Box device for wiring, support fitting, and support fitting device
JP2001182244A (en) * 1999-12-27 2001-07-03 Matsushita Electric Works Ltd Eaves gutter hanger
CN104908612A (en) * 2015-06-19 2015-09-16 中铁电气化局集团有限公司 Rigid suspension system device for overhead contact line
CN205010021U (en) * 2015-09-23 2016-02-03 中铁电气化局集团宝鸡器材有限公司 Tunnel embedding slot says and makes somebody a mere figurehead rigidity hanging device
CN207015195U (en) * 2017-07-11 2018-02-16 中铁电气化局集团宝鸡器材有限公司 Bending-resistant type pre-buried channel flow is suspended vertically base device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001057722A (en) * 1999-08-11 2001-02-27 Mirai Ind Co Ltd Box device for wiring, support fitting, and support fitting device
JP2001182244A (en) * 1999-12-27 2001-07-03 Matsushita Electric Works Ltd Eaves gutter hanger
CN104908612A (en) * 2015-06-19 2015-09-16 中铁电气化局集团有限公司 Rigid suspension system device for overhead contact line
CN205010021U (en) * 2015-09-23 2016-02-03 中铁电气化局集团宝鸡器材有限公司 Tunnel embedding slot says and makes somebody a mere figurehead rigidity hanging device
CN207015195U (en) * 2017-07-11 2018-02-16 中铁电气化局集团宝鸡器材有限公司 Bending-resistant type pre-buried channel flow is suspended vertically base device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
侯茂华;: "地铁车辆段上盖平台下接触网悬挂固定研究" *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110001456A (en) * 2019-04-26 2019-07-12 中铁高铁电气装备股份有限公司 A kind of adjustable conversion cradle of pre-buried channel flow bending-resistant type
CN113715694A (en) * 2021-08-24 2021-11-30 江苏大学 Novel non/local channel direct-connected segment pre-buried anchor

Also Published As

Publication number Publication date
CN107380011B (en) 2023-05-05

Similar Documents

Publication Publication Date Title
CN107035095B (en) Integrated mounting structure of wall
CN107380011A (en) Bending-resistant type pre-buried channel flow is suspended vertically base device
CN104833572B (en) Bolt tension test tool and the tensile test apparatus using the test tool
CN207015195U (en) Bending-resistant type pre-buried channel flow is suspended vertically base device
CN214462397U (en) Cantilever support for building construction
CN206988579U (en) A kind of Duct fixing clamp device for portal crane ladder rail
CN216355732U (en) Fireproof high-speed leaky-cable clamp
CN205930335U (en) Rectangle locator and be used for adjustable locator seat of fixed this rectangle locator
CN203686414U (en) Spalling-preventing pipe clamping hoop
CN113690811A (en) Fireproof high-speed leaky-cable clamp
CN210027972U (en) Blade angle adjusting device of split propeller
CN208559083U (en) A kind of double flute road installing type is suspended vertically device
CN209719313U (en) A kind of low clearance single-track tunnel contact line positioning device
CN106195449A (en) A kind of pipeline fixing bracket
CN209381842U (en) A kind of rotation adjustable base
CN205861973U (en) The insulated down lead clamp of wall
CN205768766U (en) A kind of anchor props up positioning checkpoint
CN205479723U (en) Novel support for cable
CN212837881U (en) Grout outlet positioning support
CN109720238A (en) A kind of low clearance single-track tunnel contact line positioning device
CN205921298U (en) First anticreep staple bolt of composite insulator bowl
CN205745675U (en) A kind of Cable hanger
CN211701406U (en) Conversion base for fixing vertical suspension base
CN211175663U (en) Novel building engineering construction pipeline is fixed device
CN218820108U (en) Embedded part structure for mounting and fixing tunnel lighting facilities

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Lu Tao

Inventor after: Gao Ming

Inventor after: Ji Yan

Inventor after: Li Feng

Inventor after: Cui Ying

Inventor after: Xu Yang

Inventor before: Lu Tao

Inventor before: Gao Ming

Inventor before: Ji Yan

Inventor before: Li Feng

Inventor before: Cui Ying

Inventor before: Xu Yang

CB02 Change of applicant information
CB02 Change of applicant information

Address after: 721013 No. 196 High-tech Avenue, Baoji High-tech Development Zone, Shaanxi Province

Applicant after: CHINA RAILWAY HIGH-SPEED ELECTRIFICATION EQUIPMENT Co.,Ltd.

Applicant after: TIANJIN ZHONGTIE ELECTRIFICATION DESIGN RESEARCH INSTITUTE CO.,LTD.

Address before: 721000 No. 196, hi tech Avenue, Weibin District, Shaanxi, Baoji

Applicant before: BAOJI LINE PARTS CO., LTD. OF CHINA RAILWAY ELECTRIFICATION BUREAU Group

Applicant before: TIANJIN ZHONGTIE ELECTRIFICATION DESIGN RESEARCH INSTITUTE CO.,LTD.

CB02 Change of applicant information
CB02 Change of applicant information

Address after: No. 196, Gaoxin Avenue, high tech Development Zone, Baoji City, Shaanxi Province

Applicant after: CHINA RAILWAY HIGH-SPEED ELECTRIFICATION EQUIPMENT Co.,Ltd.

Applicant after: CHINA RAILWAY ELECTRIFICATION SURVEY DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Address before: No. 196, Gaoxin Avenue, high tech Development Zone, Baoji City, Shaanxi Province

Applicant before: CHINA RAILWAY HIGH-SPEED ELECTRIFICATION EQUIPMENT Co.,Ltd.

Applicant before: TIANJIN ZHONGTIE ELECTRIFICATION DESIGN RESEARCH INSTITUTE CO.,LTD.

GR01 Patent grant
GR01 Patent grant