Summary of the invention
Technical problem to be solved by the invention is to provide a kind of bridge building operations devices, are able to solve above-mentioned existing
In the art the problem of.
The present invention is achieved through the following technical solutions: a kind of bridge building operations device of the invention, including
Pedestal and concrete box, base right side top tail end are equipped with case slot, and the concrete box is installed in the case slot and solid
Fixed connection, the concrete box top are equipped with funnel, are equipped with agitating chamber, institute in the concrete box below the funnel bottom
State the soil outlet that inner bottom wall on the left of agitating chamber is equipped with setting of extending downwards, the soil outlet bottom extension tail end connect be equipped with to
Extend the chamber in batches of setting on right side, is equipped with the first conduction chamber in the concrete box of agitating chamber center lower section, and described the
Rotation is connected with the rotary sleeve for setting of extending up and down in the concrete box between one conduction chamber and the agitating chamber,
It is intracavitary and put on the left of the intracavitary rotary sleeve of the agitating to put in the agitating for extension tail end at the top of the rotary sleeve
Outer surface is fixedly installed gear connecting plate, and the rotary sleeve bottom extension tail end puts in the intracavitary and tail end of first conduction and fixes
It is provided with the first cone runner, rotation is connected with the first rotary shaft of setting of extending up and down in the rotary sleeve, and described the
Extension tail end extends to outside the rotary sleeve top surface at the top of one rotary shaft and tail end is fixedly installed agitator, first conduction
The second conduction chamber of setting of extending to the right is equipped in the concrete box of chamber bottom part down, described first conducts on the right side of chamber
It is connected in wall equipped with the first guide groove, is slided in first guide groove and be connected with the first guide block, it is solid in first guide block
Surely it is provided with driver, is respectively cooperating at left and right sides of the driver and is connected with the second cone runner and third cone runner, described the
Be connected with replacement device at the top of one guide block, first rotary shaft bottom extension perforation, the first cone runner bottom surface with
And the concrete box and rotatable engagement connection between the first conduction chamber and the second conduction chamber, first rotation
Axis bottom extension tail end put in it is described second conduction it is intracavitary, it is described second conduction it is intracavitary be equipped with conduction control device, it is described in batches
Intracavitary excavation device, the funnel in batches of being equipped with is provided with sealing cover, and the sealing cover and the funnel helical line are close
It is cooperatively connected, the sealing hd top face is fixedly installed lifting iron hoop.
Preferably technical solution, the replacement device includes that second be arranged in the first guide groove inner roof wall is led
Slot and the second guide block that is arranged in second guide groove of being cooperatively connected is slided, helical line is cooperatively connected on second guide block
There is the screw rod of left and right extension setting, extension tail end is connect with the second guide groove inner left wall rotatable engagement on the left of the screw rod,
Extension tail end and the first driver are cooperatively connected on the right side of the screw rod, and first driver outer surface is set to described second and leads
Inner wall is interior on the right side of slot and is fixedly connected, and second guide block bottom tail end is fixedly connected with first guide block top surface.
Preferably technical solution, the conduction control device include matching with first rotary shaft bottom extension tail end
The speed for closing connection becomes device and the described second the second rotary shaft for conducting setting of extending on the right side of chamber and up and down, the speed is arranged in
Become device outer surface to be set in the intracavitary bottom wall of second conduction and be fixedly connected, intracavitary first rotation of second conduction
The first conducting wheel is fixedly installed on shaft outer surface, extension penetrates through first guide groove and institute at the top of second rotary shaft
It states the concrete box between the second conduction chamber and rotatable engagement connects, extension tail end puts in institute at the top of second rotary shaft
It states in the first guide groove and tail end is fixedly installed the 4th cone runner, second rotary shaft bottom extension tail end and described second passes
The connection of guide cavity inner bottom wall rotatable engagement, second conduction are fixedly installed second on intracavitary second rotary shaft outer surface
Conducting wheel is equipped with conduction band between second conducting wheel and first conducting wheel.
Preferably technical solution, the excavation device in batches include that setting is set in batches intracavitary and upper and lower extend
The third rotary shaft set is fixedly installed revolving fragment on third rotary shaft outer surface, extends at the top of the third rotary shaft
Tail end and the speed become device bottom and are cooperatively connected, and third rotary shaft bottom extension tail end and the in batches intracavitary bottom wall rotate
It is cooperatively connected, extension tail end is equipped with the soil outlet for penetrating through outer end face on the right side of the concrete box on the right side of the chamber in batches.
The beneficial effects of the present invention are:
1. rotating the rotation for being cooperatively connected and extending be arranged up and down by the way that the concrete box between the first conduction chamber and agitating chamber is interior
Shaft set, it is intracavitary and put in the intracavitary rotary sleeve left outer surface of agitating and fix to put in agitating for extension tail end at the top of rotary sleeve
Setting gear connecting plate, rotary sleeve bottom extension tail end put in that the first conduction is intracavitary and tail end fixed setting the first cone runner, rotation
The first rotary shaft of the extension setting up and down that is cooperatively connected is rotated in axle sleeve, the first rotary shaft top extension tail end extends to rotary sleeve
Outside top surface and agitator is fixedly installed in tail end, manages the agitating work of agitator to realize by the first rotary shaft and passes through
The unlatching work of rotary sleeve control gear connecting plate, it is easy to operate, it is time saving and energy saving, improve the work effect of concrete material agitating
Rate.
2. setting the first guide groove by connecting in inner wall on the right side of the first conduction chamber, mating connection first is slided in the first guide groove
Guide block, the first guide block is interior to be fixedly installed driver, and the second cone runner of connection is respectively cooperating at left and right sides of driver and third is bored and turned
Wheel is cooperatively connected at the top of the first guide block and substitutes device, the first cone runner bottom surface of the first rotary shaft bottom extension perforation and the
Concrete box and rotatable engagement between one conduction chamber and the second conduction chamber connect, and the first rotary shaft bottom extension tail end puts in the
Two conduction are intracavitary, and the second conduction is intracavitary to set conduction control device, in batches intracavitary to set excavation device in batches, to realize automatic control
The automatic opening work and switching control agitator for keeping off connecting plate carry out agitating and drive work, meanwhile, realize control revolving fragment rotation
Tube control is unearthed work, is improved automation control rate, is reduced worker's amount of labour, improves efficiency of being unearthed.
3. the configuration of the present invention is simple, easy to operate, it is able to achieve the automatic opening work and switching of automatic control gear connecting plate
It manages agitator and carries out agitating driving work, meanwhile, it realizes that unearthed work is managed in control revolving fragment rotation, uses both time saving
It is again laborsaving, unearthed effect is improved, the workload of operating personnel is alleviated.
Specific embodiment
As Figure 1-Figure 4, a kind of bridge building operations device of the invention, including pedestal 5 and concrete box 6, institute
5 right hand top tail end of pedestal is stated equipped with case slot 51, the concrete box 6 is installed in the case slot 51 and is fixedly connected, described
It is equipped with funnel 61 at the top of concrete box 6, agitating chamber 62 is equipped in the concrete box 6 of 61 bottom part down of funnel, it is described
62 left side inner bottom wall of agitating chamber is equipped with the soil outlet 63 for setting of extending downwards, and the 63 bottom extension tail end of soil outlet, which connects, to be set
There are chamber 65 in batches for setting of extending to the right, is equipped with the first conduction in the concrete box 6 of the 62 center lower section of agitating chamber
Chamber 64, the interior rotation of the concrete box 6 between the first conduction chamber 64 and the agitating chamber 62 are connected with downward
The rotary sleeve 622 of setting is opened up, extension tail end puts in the agitating chamber 62 and puts in described mix at the top of the rotary sleeve 622
622 left outer surface of the rotary sleeve stirred in chamber 62 is fixedly installed gear connecting plate 623, and 622 bottom of rotary sleeve is prolonged
Exhibition tail end is put in the first conduction chamber 64 and tail end is fixedly installed the first cone runner 641,622 inward turning of rotary sleeve
Turn to be connected with the first rotary shaft 624 for extending be arranged up and down, extension tail end extends to described at the top of first rotary shaft 624
Outside 622 top surface of rotary sleeve and tail end is fixedly installed agitator 621, the coagulation of the first conduction 64 bottom part down of chamber
It is equipped with the second conduction chamber 68 of setting of extending to the right in native case 6, connects and is equipped in the first conduction 64 right side inner wall of chamber
First guide groove 67 slides in first guide groove 67 and is connected with the first guide block 671, and fixation is set in first guide block 671
It is equipped with driver 672, is respectively cooperating at left and right sides of the driver 672 and is connected with the second cone runner 673 and third cone runner
674, replacement device is connected at the top of first guide block 671, described in 624 bottom extension of the first rotary shaft perforation
First cone 641 bottom surface of runner and it is described first conduction chamber 64 and it is described second conduction chamber 68 between the concrete box 6 and
Rotatable engagement connection, the 624 bottom extension tail end of the first rotary shaft are put in the second conduction chamber 68, second conduction
It is equipped with conduction control device in chamber 68, excavation device in batches is equipped in the chamber in batches 65, is provided at the top of the funnel 61 close
Capping 611, the sealing cover 611 is closely connected with the 61 helical line of funnel, 611 top surface of the sealing cover fixed setting
There is lifting iron hoop 612.
Valuably, the replacement device includes the second guide groove 69 being arranged in 67 inner roof wall of the first guide groove and slides
Capable the second guide block 691 being arranged in second guide groove 69 that is cooperatively connected, helical line is cooperatively connected on second guide block 691
There is the screw rod 692 of left and right extension setting, extension tail end is matched with 69 inner left wall of the second guide groove rotation on the left of the screw rod 692
Connection is closed, extension tail end and the first driver 693 are cooperatively connected on the right side of the screw rod 692,693 outer surface of the first driver
It is set in the 69 right side inner wall of the second guide groove and is fixedly connected, the 691 bottom tail end of the second guide block is led with described first
671 top surface of block is fixedly connected, to realize automatic opening work and the switching control agitator of automatic control gear connecting plate 623
621, which carry out agitating, drives work, meanwhile, realize that work of being unearthed is managed in the control rotation of revolving fragment 652.
Valuably, the conduction control device includes being cooperatively connected with the 624 bottom extension tail end of the first rotary shaft
Speed becomes device 685 and interior and setting of extending up and down the second rotary shaft 681, the speed on the right side of the second conduction chamber 68 is arranged in
Become 685 outer surface of device to be set in the second conduction 68 inner bottom wall of chamber and be fixedly connected, the institute in the second conduction chamber 68
It states and is fixedly installed the first conducting wheel 683 on 624 outer surface of the first rotary shaft, the 681 top extension of the second rotary shaft is passed through
The concrete box 6 and rotatable engagement led between first guide groove 67 and the second conduction chamber 68 connects, and described second
Extension tail end is put in first guide groove 67 at the top of rotary shaft 681 and tail end is fixedly installed the 4th cone runner 675, and described the
Two rotary shafts, 681 bottom extension tail end is connect with the second conduction 68 inner bottom wall rotatable engagement of chamber, the second conduction chamber 68
Be fixedly installed the second conducting wheel 682 on interior 681 outer surface of the second rotary shaft, second conducting wheel 682 with it is described
Conduction band 684 is equipped between first conducting wheel 683, thus realize that third cone runner 674 and the 4th cone runner 675 coincide and connect,
It realizes automatic control 624 rotary work of the first rotary shaft, improves working efficiency, realize automatic agitating and work of being unearthed automatically.
Valuably, the excavation device in batches includes the third rotation being arranged that is arranged in the chamber in batches 65 and extends up and down
Shaft 651 is fixedly installed revolving fragment 652 on 651 outer surface of third rotary shaft, prolongs at the top of the third rotary shaft 651
It opens up tail end and the speed becomes 685 bottom of device and is cooperatively connected, the 651 bottom extension tail end of third rotary shaft and chamber 65 in batches
Inner bottom wall rotatable engagement connects, and extension tail end, which is equipped with, on the right side of the chamber in batches 65 penetrates through the 6 right side outer end face of concrete box
Soil outlet 66, to realize by conducting 651 rotary shaft of third rotary shaft after speed change 685 speed change of device, and by third rotary shaft 651
The rotation of revolving fragment 652 is driven to realize work of being unearthed.
When original state, connecting plate 623 is kept off as shown in Figure 3 and is located at the leftward position of 62 inner bottom wall of agitating chamber and is located at soil outlet
63 position directly above, at this point, soil outlet 63 is in close state, meanwhile, it is located at the second guide block 691 in second guide groove 69
Right-most position, at this point, driving the first guide block 671 to be utmostly located at the rightmost side in the first guide groove 67 by the second guide block 691
Position, meanwhile, drive the second cone runner 673 of left-hand end utmostly to bore runner 641 far from first by the first guide block 671, this
When, so that the third of 671 right-hand end of the first guide block is bored 674 bottom right side of runner and the 4th identical connection of cone 675 left side top of runner.
When needing unearthed work, concrete material is poured into funnel 61 first, at this point, being driven by driver 672
Third is bored runner 674 and is rotated, and drives the second of the 4th cone runner 675 and the 4th cone 675 bottom of runner by third cone runner 674
Rotary shaft 681 rotates, and then drives the first conducting wheel by conduction band 684 by the second conducting wheel 682 in the second rotary shaft 681
683 and be fixedly connected with the first conducting wheel 683 the first rotary shaft 624 rotation, at this point, by the first rotary shaft 624 drive push up
Agitating work is realized in the rotation of agitator 621 in portion, after the completion of agitating, drives screw rod 692 to rotate by the first driver 693,
The second guide block 691 is driven to slide to the left-most position in the second guide groove 69 by screw rod 692, at this point, driving the second guide block 691
First guide block 671 is utmostly located at the left-most position in the first guide groove 67, meanwhile, left-hand end is driven by the first guide block 671
The second cone runner 673 utmostly put in the first conduction chamber 64 and bore 673 left side top of the second cone runner with first and turn
The identical connection of 641 bottom right sides is taken turns, at this point, the third of 671 right-hand end of the first guide block is made to bore runner 674 utmostly far from the 4th
Runner 675 is bored, is then rotated by the control of driver 672 second cone runner 673, and then drive first by the second cone runner 673
Cone runner 641 and the rotary sleeve 622 being fixedly connected with the first cone runner 641 rotate, at this point, driving rotary sleeve 622
It keeps off connecting plate 623 to rotate, and gear connecting plate 623 is made to be gradually distance from 63 top position of soil outlet, until, gear connecting plate 623 is utmostly remote
When from 63 top position of soil outlet, at this point, driving screw rod 692 to reversely rotate by the first driver 693, driven by screw rod 692
Second guide block 691 is slided to the right-most position in the second guide groove 69, at this point, driving the first guide block 671 most by the second guide block 691
Big degree is located at the right-most position in the first guide groove 67, meanwhile, the second cone runner of left-hand end is driven by the first guide block 671
673 utmostly far from the first cone runner 641, at this point, the third of 671 right-hand end of the first guide block is made to bore 674 bottom right side of runner
It coincide and connects with the 4th cone 675 left side top of runner, then drive third to bore the rotation of runner 674 by control driver 672, by
Third bores the second rotary shaft 681 rotation that runner 674 drives the 4th cone runner 675 and the 4th cone 675 bottom of runner, and by the
Two rotary shafts 681 drive the rotation of the second conducting wheel 682, drive the first conducting wheel by the conduction band 684 on the second conducting wheel 682
683 and be fixedly connected with the first conducting wheel 683 the first rotary shaft 624 rotation, at this point, by the first rotary shaft 624 drive push up
The agitator 621 in portion rotates, and prevents concrete material from blocking, the concrete material after agitating falls into chamber 65 in batches through soil outlet 63
It is interior, meanwhile, the third rotary shaft 651 for driving speed change device 685 and speed to become 685 bottom of device is rotated by the first rotary shaft 624 to be rotated,
The rotation of revolving fragment 652 is driven to realize work of being unearthed by third rotary shaft 651.
The beneficial effects of the present invention are:
1. rotating the rotation for being cooperatively connected and extending be arranged up and down by the way that the concrete box between the first conduction chamber and agitating chamber is interior
Shaft set, it is intracavitary and put in the intracavitary rotary sleeve left outer surface of agitating and fix to put in agitating for extension tail end at the top of rotary sleeve
Setting gear connecting plate, rotary sleeve bottom extension tail end put in that the first conduction is intracavitary and tail end fixed setting the first cone runner, rotation
The first rotary shaft of the extension setting up and down that is cooperatively connected is rotated in axle sleeve, the first rotary shaft top extension tail end extends to rotary sleeve
Outside top surface and agitator is fixedly installed in tail end, manages the agitating work of agitator to realize by the first rotary shaft and passes through
The unlatching work of rotary sleeve control gear connecting plate, it is easy to operate, it is time saving and energy saving, improve the work effect of concrete material agitating
Rate.
2. setting the first guide groove by connecting in inner wall on the right side of the first conduction chamber, mating connection first is slided in the first guide groove
Guide block, the first guide block is interior to be fixedly installed driver, and the second cone runner of connection is respectively cooperating at left and right sides of driver and third is bored and turned
Wheel is cooperatively connected at the top of the first guide block and substitutes device, the first cone runner bottom surface of the first rotary shaft bottom extension perforation and the
Concrete box and rotatable engagement between one conduction chamber and the second conduction chamber connect, and the first rotary shaft bottom extension tail end puts in the
Two conduction are intracavitary, and the second conduction is intracavitary to set conduction control device, in batches intracavitary to set excavation device in batches, to realize automatic control
The automatic opening work and switching control agitator for keeping off connecting plate carry out agitating and drive work, meanwhile, realize control revolving fragment rotation
Tube control is unearthed work, is improved automation control rate, is reduced worker's amount of labour, improves efficiency of being unearthed.
3. the configuration of the present invention is simple, easy to operate, it is able to achieve the automatic opening work and switching of automatic control gear connecting plate
It manages agitator and carries out agitating driving work, meanwhile, it realizes that unearthed work is managed in control revolving fragment rotation, uses both time saving
It is again laborsaving, unearthed effect is improved, the workload of operating personnel is alleviated.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention
Protection scope should be determined by the scope of protection defined in the claims.