CN107378286A - The preparation method for the composite hard layer that roller surface built-up welding remelting is combined - Google Patents

The preparation method for the composite hard layer that roller surface built-up welding remelting is combined Download PDF

Info

Publication number
CN107378286A
CN107378286A CN201710486006.8A CN201710486006A CN107378286A CN 107378286 A CN107378286 A CN 107378286A CN 201710486006 A CN201710486006 A CN 201710486006A CN 107378286 A CN107378286 A CN 107378286A
Authority
CN
China
Prior art keywords
welding
built
remelting
roller surface
preparation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710486006.8A
Other languages
Chinese (zh)
Inventor
顾晋南
朱龙华
王清宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangyin Green Metallurgical Equipment Co Ltd
Original Assignee
Jiangyin Green Metallurgical Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangyin Green Metallurgical Equipment Co Ltd filed Critical Jiangyin Green Metallurgical Equipment Co Ltd
Priority to CN201710486006.8A priority Critical patent/CN107378286A/en
Publication of CN107378286A publication Critical patent/CN107378286A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K28/00Welding or cutting not covered by any of the preceding groups, e.g. electrolytic welding
    • B23K28/02Combined welding or cutting procedures or apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Arc Welding In General (AREA)

Abstract

A kind of preparation method for the composite hard layer being combined the present invention relates to roller surface built-up welding remelting, it is characterised in that:The preparation method is to coordinate resurfacing welding material, overlaying method surfacing roll surface using submerged arc overlay welding or open arc built-up welding mode, and after built-up welding certain thickness, remelting is carried out to bead welding using plasma arc.The present invention is using plasma arc temperature is high, energy is concentrated, stability is good, and surface thermal deformation it is small the advantages that, realize roller surface crystal grain refinement, tissue, composition are uniform, S inside overlay cladding, the amount of inclusions such as P are reduced, it is achieved thereby that the raising of roller surface hardness and mechanical uniformity energy, reduces the probability that surface after high-performance roll works produces light and dark striped.

Description

The preparation method for the composite hard layer that roller surface built-up welding remelting is combined
Technical field
It is compound that built-up welding is combined the present invention relates to a kind of submerged arc or open arc hardfacing alloy and plasma arc remelting welding bead (Again)The technique for manufacturing roller surface, belongs to welding technology field.
Background technology
Iron and steel metallurgical industry is the basic activity of country, and the heavy industry of country, main zero in its production equipment are standby Part --- roll, be largely high alternate stress, high thermal stress adverse circumstances under work, such as Continuous Casting Rolls, alignment roller, support Roller, Wrapping Roll, pinch roll, working roll etc., cause roll is too fast to scrap.Bead weld repair is mainly using suitable technique and properly Resurfacing welding material the roll of abrasion is returned into original size, research is found, to roller surface carry out built-up welding processing, can be obvious Extend roll campaign, reduce steel rolling consumption.
The method of Bead weld repair roll mainly has at present:Submerged arc overlay welding, gas shielded arc welding built-up welding, self-shield built-up welding, wait from Sub- cladding, laser cladding, high-power electron beam weldering, strip surfacing etc..Due to traditional submerged arc overlay welding, gas shielded arc welding built-up welding, from Protecting built-up welding to have, column crystal is thick, and alloying component segregation is serious, uneven microstructure, occasionally has the defects of slag inclusion, seriously limits The built-up welding of high-performance roll is compound to remanufacture application.And new welding such as plasma cladding built-up welding, laser cladding built-up welding, electronics Although the plasma arc that its heat is concentrated, protective atmosphere and controllability are good, packing material is mainly powdered alloy for beam built-up welding, Weld deposit process is stable, and overlay cladding mother metal dilution ratio is low, and shaping is smooth, smooth, and the high alloy such as base, Ni-based is bored especially suitable for built-up welding Material.But on the one hand finally made because the powder of mechanical mixture may be layered or skewness due to various particle specific gravity differences Into the stifled powder phenomenon of uneven and normal appearance for preparing overlay performance, equipment can not normal work;On the other hand production effect be present Rate is low, and cost of alloy is high, and the built-up welding for also seriously limiting high-performance roll compound remanufactures application.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of roller surface built-up welding remelting phase for above-mentioned prior art With reference to composite hard layer preparation method, on the one hand utilize traditional submerged arc or open arc surfacing roll, improve built-up welding efficiency;It is another Aspect, beneficial to crystal grain thinning, reduces alloy and just analysed, remove to carrying out rapid remelting to bead welding using plasma remelting technology Be mingled with, slag inclusion the defects of, really realize the compound new built-up welding skill for remanufacturing application of the built-up welding of high-performance roll in complete meaning Art.
Technical scheme is used by the present invention solves the above problems:A kind of roller surface built-up welding remelting is combined compound The preparation method of hardstanding, including two parts of arc surfacing and plasma remelting:
First, roll overlaying:
Overlaying method includes SMAW, melting pole gas shielded arc welding(Including consumable electrode non gas shielded welding), Tungsten Inert Gas shielded arc welding, filament submerged-arc welding and combinations thereof.Coordinate suitable resurfacing welding material, bead-welding technology carries out surfacing roll.
General step is:
1.1 roll surface built-up welding should be carried out by bead-welding technology guiding book;Repair welding should be carried out by repair welding guiding book.Particularly built-up welding Electric current, voltage, roller rotational speed, the head speed of travel, amount of lap, leading, electrode extension, heat treatment, resurfacing welding material, The Proper Match of the parameters such as detection.
Drying, use, the keeping of 1.2 resurfacing welding materials should meet the requirement of the specification of resurfacing welding material manufactory offer.
1.3 roller stocks preferably select heating furnace to be preheated.Roll surface built-up welding preheating temperature and interlayer temperature should be according to procedure qualifications As a result choose.During preheating, in room temperature in the range of 100 DEG C, programming rate should not be greater than 40 DEG C/h;After 100 DEG C, should not Higher than 50 DEG C/h, uniformly heating.
In 1.4 weld deposit process, built-up welding environmental requirement relative closure, insulation can use gas heating or insulation stove heat two Kind mode.Gas heating must be prevented from carbon black caused by combustion gas and pollute.
1.5 weld deposit process must take continual interlayer temperature and the welding quality of carrying out of automatic or manual mode Monitoring, defect occur should immediately treat, must not the direct built-up welding on defective layer.
When 1.6 built-up welding one-sided thickness are more than 20mm, in order to reduce the harm of stress and hydrogen, prevent crackle from producing, holding group Knit and the uniformity of mechanical property, corresponding intermediate heat-treatment can be carried out.
2nd, roll remelting
Roll overlaying carries out plasma remelting processing to after certain size:
2.1 roll surface remeltings should be carried out by bead-welding technology guiding book.Particularly welding current, voltage, roller rotational speed, head row Walk the Proper Match of the parameters such as speed, amount of lap, leading, throughput, tungsten electrode pattern, tungsten electrode extension elongation, detection.And especially It is the matching between optimization built-up welding layer and plasma remelting.
Before 2.2 remeltings, answer repair welding and cleaning roller surface, surface defect repair welding is finished as far as possible, after clean out surface Dust.
During 2.3 plasma remelting, to improve remelting efficiency, the surface temperature of roll is improved as far as possible, not less than facing surface Temperature.
Occur defect during 2.4 plasma remelting and answer timely processing, also can carry out secondary remelting in defect area, must not have Direct built-up welding on the layer of defect.
Particularly:
To ensure the wear-resisting of roller surface, corrosion-resistant, the performance such as endurance and good meltability, the selection of resurfacing welding material should be joined According to:
1)Resurfacing welding material hardness selects:The hardness of resurfacing welding material is typically higher 3~8HRC than the hardness of traditional resurfacing welding material.
2)The selection of alloying component:The alloying component of resurfacing welding material is typically higher than the alloying component of traditional resurfacing welding material by 3 ~15%.
3) impurity such as S, P:On the premise of resurfacing welding material facing surface does not crack, the impurity content such as S, P can be carried suitably Height, but be not higher than<0.04%
4)Facing surface crackle:Surface cracks during to prevent hardfacing alloy weld seam remelting, typically requires the carbon of resurfacing welding material Content is not higher than 0.8%, and normal temperature section elongation is not less than 6%.
Compared with prior art, the advantage of the invention is that:
The present invention combines the advantages of technique for overlaying and plasma remelting technology, and the refinement for realizing bead welding is brilliant Grain, alloy just analyses, is mingled with, and reduction the defects of slag inclusion, it is compound to breach current single mode built-up welding(Again)Manufacture high-performance is rolled The limitation of roller, really realize that the built-up welding of high-performance roll in complete meaning is compound and remanufacture.Using present invention process reparation Roll has been successfully applied in hot strip mill strip pinch roll, Wrapping Roll;The composite manufacturing by hard surfacing of cold rolling support roller, upper machine The advantages that functional using rear surface oxidation-resistant, and surface is without glutinous slag, and light and dark striped is not notable, and surface is smooth, can Meet roll working condition requirement, the obvious bead-welding technology more common than market of service life.The present invention can be exploited to other surfaces engineering Apply in field.
Embodiment
The above embodiments of the present invention are only intended to the embodiment of the explanation present invention, rather than for limiting this hair Bright protection domain, it is every for person skilled in the art, as long as can without departing from the technical characteristic scope of the present invention Various change or amendment are done, its essence is identical with that technical scheme of the present invention, belongs to the protection category of the present invention.
The built-up welding of embodiment 1, remelting are compound(Again)The technique for manufacturing Cr5 cold rolling support rollers
A kind of roller diameter is the submerged arc overlay welding and plasma remelting restorative procedure of Φ 1525mm cold rolling Cr5 support rollers, including Following processing step and parameter are:
1)The wear surface of lathe turning processing roll is first used, removes face crack and hole, and carry out Non-Destructive Testing.It is final true It is 18mm that size is repaired on order side.
2)Welding procedure is formulated according to procedure qualification guiding book.
3)Roll preheats, 350 DEG C of preheating temperature, is incubated 30 hours.
4)The bead-welding technology parameter used for:
By taking Φ 3.2mm flux-cored wires as an example, for Φ 3.2mm flux-cored wires, it is desirable to:
Welding current:420~480A
Weldingvoltage:29~32V
Speed of welding:400~550mm/min
Welding bead overlaps:Adjacent welding bead overlap joint must be more than 50%, and specific amount of lap should regard welding bead flat smooth situation.
Weld polarity:Using DC reverse connection.
Electrode extension:16~28mm
Welding bead interlayer temperature:260~380℃
5)In the high tough transition zone of roller surface built-up welding, two layers of built-up welding.
6)Roller surface is cleared up, carries out plasma remelting afterwards.
Melting current:160~280A
Weld rotating speed:100~180mm/min,
Working gas:Argon gas is typically selected during built-up welding, throughput is 3~5L/min
Protective gas:Throughput is 8~12L/min
Fusion penetration:3~5mm
Molten wide:8~13mm
Tungsten electrode retraction length:1.5~3.0mm.
Welding bead overlaps:Adjacent welding bead overlap joint about 18%
7)Skull on surface, carries out built-up welding capping layer after cleaning remelting, per built-up welding two layers surface layer, a remelting is carried out, with this Carry out, until a diameter of Φ 1532mm of Bead weld repair sum.
8)The roller surface of built-up welding remelting is heat-treated, including:
Roll is cooled to room temperature laggard furnace treatment reason, and in room temperature within 100 DEG C, programming rate not should be greater than 40 DEG C/h, afterwards 50 DEG C/h is not should be greater than, and cooling rate not should be greater than 25 DEG C/h.
It is 565 DEG C to be tempered maximum temperature, is incubated 36 hours.When furnace temperature is reduced to 150 DEG C, it can come out of the stove and be placed in dedicated box Or slow cooling is covered to room temperature with asbestos.
9)Last turning is refined to given size and precision.
10)The detection of roll, including the defects of hardness and crackle.It was found that heap postwelding case hardness is in 51 ± 1.5HRC, table Face and internal equal zero defect.Visible by hardness, the roll hardness uniformity after Bead weld repair is significantly improved.
The built-up welding of embodiment 2, remelting are compound(Again)The technique for manufacturing hot-strip Wrapping Roll
A kind of roller diameter is the submerged arc overlay welding and plasma remelting restorative procedure of Φ 380mm Wrapping Roll, including following technique Step:
1)The wear surface of lathe turning processing roll is first used, removes face crack and hole.And carry out Non-Destructive Testing.It is final true It is 15mm that size is repaired on order side.
2)Welding procedure is formulated according to procedure qualification guiding book.
3)Roll preheats, 350 DEG C of preheating temperature, is incubated 8 hours.
4)The bead-welding technology parameter used for:
By taking Φ 3.2mm flux-cored wires as an example, for Φ 3.2mm flux-cored wires, it is desirable to:
Welding current:360~480A
Weldingvoltage:27~32V
Speed of welding:380~500mm/min
Welding bead overlaps:Adjacent welding bead overlap joint must be more than 50%, and specific amount of lap should regard welding bead flat smooth situation.
Weld polarity:Using DC reverse connection.
Electrode extension:16~28mm
Welding bead interlayer temperature:260~380℃
5)In the high tough transition zone of roller surface built-up welding, one layer of built-up welding.
6)Roller surface is cleared up, carries out plasma remelting afterwards.The parameter of plasma remelting is:
Melting current:160~260A
Weld rotating speed:100~180mm/min,
Working gas:Argon gas is typically selected during built-up welding, throughput is 3~5L/min
Protective gas:Throughput is 8~12L/min
Fusion penetration:3~5mm
Molten wide:8~13mm
Tungsten electrode retraction length:1.5~3.0mm.
Welding bead overlaps:Adjacent welding bead overlap joint about 20%
7)Skull on surface, carries out built-up welding capping layer after cleaning remelting, per one layer of capping layer of built-up welding, a remelting is carried out, with this Carry out, until a diameter of Φ 386mm. of Bead weld repair sum
8)The roller surface of built-up welding remelting is heat-treated, including:
Roll is cooled to room temperature laggard furnace treatment reason, and in room temperature within 100 DEG C, programming rate not should be greater than 40 DEG C/h, afterwards 50 DEG C/h is not should be greater than, and cooling rate not should be greater than 25 DEG C/h.
It is 550 DEG C to be tempered maximum temperature, is incubated 12 hours.When furnace temperature is reduced to 150 DEG C, it can come out of the stove and be placed in dedicated box Or slow cooling is covered to room temperature with asbestos.
9)Last turning is refined to given size and precision.
10)The detection of roll, including the defects of hardness and crackle.It was found that heap postwelding case hardness is in 57 ± 1.5HRC, table Face and internal equal zero defect.Visible by hardness, the roll hardness uniformity after Bead weld repair is significantly improved.
The built-up welding of embodiment 3, remelting are compound(Again)The technique for manufacturing Continuous Casting Rolls
A kind of roller diameter is the open arc oscillating build-up welding and plasma remelting restorative procedure of Φ 180mm Continuous Casting Rolls, including following Processing step:
1)The wear surface of lathe turning processing roll is first used, removes face crack and hole.And carry out Non-Destructive Testing.It is final true It is 5mm that size is repaired on order side.
2)Welding procedure is formulated according to procedure qualification guiding book.
3)Roll preheats, 150 DEG C of preheating temperature, is incubated 2 hours.
4)In one layer of Cr17 of roller surface built-up welding transition zone, the bead-welding technology parameter used for:
By taking Φ 2.4mm flux-cored wires as an example, for Φ 2.4mm flux-cored wires, it is desirable to::
Arc voltage:26.0~28.5V,
Welding current:270~300A
Wire feed rate:125~130in/min
Transverse moving speed:0.22~0.25ipm
Welding wire extends:22~28mm
Tip angle of inclination:3~5 degree backward
Swing width (final size) is about 48mm, beats 8~12mm of the amount of connecing
Delay:Press the local multiple-time delay in road about 0.5 second, the place in Bu Ya roads is delayed about 0.3 second less.
Electrode extension:20~35mm
5)Built-up welding capping layer, two layers of built-up welding, parameter is consistent with bottoming.
6)Carry out a remelting.The parameter of plasma remelting is:
Melting current:160~260A
Weld rotating speed:90~150mm/min,
Working gas:Argon gas is typically selected during built-up welding, throughput is 3~5L/min
Protective gas:Throughput is 8~12L/min
Fusion penetration:4~5mm
Molten wide:8~13mm
Tungsten electrode retraction length:1.5~3.0mm.
Welding bead overlaps:Adjacent welding bead overlap joint about 20%
7)The roller surface of built-up welding remelting carries out slow cooling insulation, has ready conditions thermally processable.
8)Last turning is refined to given size and precision.
9)The detection of roll, including the defects of hardness and crackle.It was found that heap postwelding case hardness is on 44 ± 1.5HRC, surface And internal equal zero defect.Visible by hardness, the roll hardness uniformity after Bead weld repair is significantly improved.

Claims (6)

  1. A kind of 1. preparation method for the composite hard layer that roller surface built-up welding remelting is combined, it is characterised in that:The preparation side Method is to coordinate resurfacing welding material, overlaying method surfacing roll surface, built-up welding certain thickness using submerged arc overlay welding or open arc built-up welding mode Afterwards, remelting is carried out to bead welding using plasma arc.
  2. 2. the preparation method for the composite hard layer that a kind of roller surface built-up welding remelting according to claim 1 is combined, its It is characterised by:
    1)The hardness of resurfacing welding material is higher 3~8HRC than the hardness of traditional resurfacing welding material before remelting;
    2)The alloying component of resurfacing welding material is higher than the alloying component of traditional resurfacing welding material by 3~15% before remelting;
    3)Impurity content can properly increase, but be not higher than<0.04%;
    4)The carbon content of resurfacing welding material is not higher than 0.8%, and normal temperature section elongation is not less than 6%.
  3. 3. the preparation method for the composite hard layer that a kind of roller surface built-up welding remelting according to claim 1 is combined, its It is characterised by:Overlaying method includes SMAW, melting pole gas shielded arc welding, gas tungsten arc welding, filament Submerged-arc welding and combinations thereof.
  4. 4. the preparation method for the composite hard layer that a kind of roller surface built-up welding remelting according to claim 1 is combined, its It is characterised by:Roll overlaying certain thickness refers to reach optimum performance or cost performance, optimization overlay cladding and plasma remelting layer it Between matching.
  5. 5. the preparation method for the composite hard layer that a kind of roller surface built-up welding remelting according to claim 1 is combined, its It is characterised by:Roll surface built-up welding preheating temperature and interlayer temperature should be chosen according to procedure qualification result, during preheating, in room temperature to 100 In the range of DEG C, programming rate should not be greater than 40 DEG C/h;After 100 DEG C, 50 DEG C/h is should not be greater than, uniformly heating;Interlayer temperature Spend because being higher than interlayer temperature when individually using built-up welding.
  6. 6. the preparation method for the composite hard layer that a kind of roller surface built-up welding remelting according to claim 1 is combined, its It is characterised by:The roller surface of built-up welding remelting is heat-treated, including:Roll is cooled to the laggard furnace treatment reason of room temperature, in room temperature To within 100 DEG C, programming rate not should be greater than 40 DEG C/h, not should be greater than 50 DEG C/h afterwards, and cooling rate not should be greater than 25 DEG C/h; Soaking time is not less than roller diameter divided by 50.5, unit hour;When furnace temperature is reduced to 150 DEG C, it can come out of the stove and be placed in dedicated box It is interior or cover slow cooling to room temperature with asbestos.
CN201710486006.8A 2017-06-23 2017-06-23 The preparation method for the composite hard layer that roller surface built-up welding remelting is combined Pending CN107378286A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710486006.8A CN107378286A (en) 2017-06-23 2017-06-23 The preparation method for the composite hard layer that roller surface built-up welding remelting is combined

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710486006.8A CN107378286A (en) 2017-06-23 2017-06-23 The preparation method for the composite hard layer that roller surface built-up welding remelting is combined

Publications (1)

Publication Number Publication Date
CN107378286A true CN107378286A (en) 2017-11-24

Family

ID=60333091

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710486006.8A Pending CN107378286A (en) 2017-06-23 2017-06-23 The preparation method for the composite hard layer that roller surface built-up welding remelting is combined

Country Status (1)

Country Link
CN (1) CN107378286A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110293131A (en) * 2019-06-27 2019-10-01 西峡龙成特种材料有限公司 A kind of heat resistant and wear resistant roller and its production technology
CN114669840A (en) * 2022-05-09 2022-06-28 苏州威奥得焊材科技有限公司 Method for repairing nodular cast iron roller

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1053829A (en) * 1990-12-18 1991-08-14 东北电力试验研究院 A kind ofly manufacture or repair the large axle bush new process
JPH04187377A (en) * 1990-11-21 1992-07-06 Honda Motor Co Ltd Manufacture of compounding treating cylinder block
CN1672849A (en) * 2005-04-14 2005-09-28 上海交通大学 B4C+Al bead welding remelting method for magnesium alloy surface
CN102896458A (en) * 2011-07-26 2013-01-30 上海宝钢设备检修有限公司 Surface treatment method for loop back rolls of hot continuous rolling units
CN105728964A (en) * 2014-12-09 2016-07-06 重庆金国凯畅机床厂 Roller build-up welding technology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04187377A (en) * 1990-11-21 1992-07-06 Honda Motor Co Ltd Manufacture of compounding treating cylinder block
CN1053829A (en) * 1990-12-18 1991-08-14 东北电力试验研究院 A kind ofly manufacture or repair the large axle bush new process
CN1672849A (en) * 2005-04-14 2005-09-28 上海交通大学 B4C+Al bead welding remelting method for magnesium alloy surface
CN102896458A (en) * 2011-07-26 2013-01-30 上海宝钢设备检修有限公司 Surface treatment method for loop back rolls of hot continuous rolling units
CN105728964A (en) * 2014-12-09 2016-07-06 重庆金国凯畅机床厂 Roller build-up welding technology

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
严密: "镍基喷焊层的等离子弧重熔试验研究", 《北京科技大学学报》 *
洪永昌等: "激光重熔Co基合金堆焊层的组织和耐热疲劳性的研究", 《电焊机》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110293131A (en) * 2019-06-27 2019-10-01 西峡龙成特种材料有限公司 A kind of heat resistant and wear resistant roller and its production technology
CN114669840A (en) * 2022-05-09 2022-06-28 苏州威奥得焊材科技有限公司 Method for repairing nodular cast iron roller
CN114669840B (en) * 2022-05-09 2023-11-17 苏州威奥得焊材科技有限公司 Method for repairing ductile cast iron roller

Similar Documents

Publication Publication Date Title
CN101543926B (en) Overlaying welding technology of ductile cast iron roller
CN109693026B (en) Combined surfacing method for excircle large-area stellite alloy hardfacing
CN103481010B (en) A kind of full-automatic online cold welding pattching roll squeezer technique
CN107335939B (en) The build-up welding repair process of large-scale 70Cr3Mo backing roll
CN109877418B (en) Surfacing repair method for coiled side guide plate
CN110560844A (en) Welding method of nickel-based material pipeline
CN110102878A (en) The CMT and laser melting coating combined-repair method of roller mill main axle flat head sleeve inner hole
CN103255412A (en) High hardness material laser cladding process method for roller work surface
CN103878470B (en) A kind of titanium alloy and the argon tungsten arc process of nickel alloy foreign material
CN109722662A (en) A kind of laser melting coating restorative procedure of breast roll
CN102950363B (en) Overlaying repair process for winch drum
CN107378286A (en) The preparation method for the composite hard layer that roller surface built-up welding remelting is combined
CN114406512B (en) Welding and electric pulse heat treatment process for dissimilar alloy
CN115007966A (en) Surface wear-resistant surfacing method for railway rolled steel wheel
CN102248281A (en) Thick plate joint welding method
CN110576274A (en) Metal material, process and product for welding high-temperature high-pressure stainless steel pipeline
CN103212771A (en) TIG/MIG indirect electric arc method for bead welding copper alloy on cast iron valve sealing face
CN112589241A (en) Vertical grinding roller core inclined plane welding repair method
CN104690396A (en) Grinding roller surfacing technology for high-chromium wear-resistant material
CN103658929A (en) Method for repairing and manufacturing bending roll in surfacing mode
CN103350316B (en) A kind of method of 4PG 900 × 700 four-roller crusher roller skin Bead weld repair
CN103695831B (en) Spray-welding coating technology for hot-rolling laminar cooling roller and use fixture for technology
CN102785002B (en) Aluminum bronze build-up welding technology on surface of rolling mill screw-down screw
CN108453467A (en) A method of manufacturing bending roll using technology for repairing surfacing
CN102139423A (en) Cover surface layer self-protecting metal core surfacing welding wire for repairing cold-rolled backup roller

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124

RJ01 Rejection of invention patent application after publication