CN107366522A - The sliding sleeve opener and its sliding sleeve of bushing of a kind of variable-length - Google Patents

The sliding sleeve opener and its sliding sleeve of bushing of a kind of variable-length Download PDF

Info

Publication number
CN107366522A
CN107366522A CN201710646867.8A CN201710646867A CN107366522A CN 107366522 A CN107366522 A CN 107366522A CN 201710646867 A CN201710646867 A CN 201710646867A CN 107366522 A CN107366522 A CN 107366522A
Authority
CN
China
Prior art keywords
sliding sleeve
opener
bushing
rod
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710646867.8A
Other languages
Chinese (zh)
Other versions
CN107366522B (en
Inventor
廖作杰
隆世明
苏敏文
邓小强
张文
李景彬
李星星
田文超
庞磊
晏健
王伟鹏
牛朋伟
冯江
韩硕
何文俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201710646867.8A priority Critical patent/CN107366522B/en
Publication of CN107366522A publication Critical patent/CN107366522A/en
Application granted granted Critical
Publication of CN107366522B publication Critical patent/CN107366522B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/14Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)
  • Earth Drilling (AREA)

Abstract

The invention provides the sliding sleeve opener and its sliding sleeve of bushing of a kind of variable-length, sliding sleeve opener includes spacing control-rod and packing seat, spacing control-rod is located at the top of packing seat, the end of adjacent packing seat is provided with boss on spacing control-rod, the top of boss is disposed with compression spring, the external wall of upper portion of spacing control-rod is provided with opener valve body, and control spring leaf is being horizontally arranged with close to opener valve body end;Sliding sleeve of bushing includes sliding sleeve body, is provided with inner sliding sleeve on the inside of sliding sleeve body, inner sliding sleeve top is provided with top connection, adapter sleeve is provided with the end of sliding sleeve body, the end of adapter sleeve is provided with lower contact.Structure of the present invention increases the series of instrument by changing the length of opener and respective sleeve sliding sleeve, there is no the differential limitation of interior latus rectum between at different levels, full-bore and unlimited pole can be realized, and use is simple to operate, so as to efficiently solve the limitation of existing sliding sleeve of bushing instrument application.

Description

The sliding sleeve opener and its sliding sleeve of bushing of a kind of variable-length
Technical field
The invention belongs to oil gas field low permeability reservoir renovation technique field, is related to a kind of change length control mechanism, is specially The sliding sleeve opener and its sliding sleeve of bushing of a kind of variable-length, for Oil/gas Well cased hole completion fracturing reform technique.
Background technology
In recent years at home in oil field compression fracture construction, well completion of casing sliding sleeve separate stratum fracfturing pattern is using more and more, set Pipe sliding sleeve completion separate stratum fracfturing construction mainly will enter well for the sliding sleeve of different payzones and cement the well together with sleeve pipe, all intervals Pressing crack construction one, which plows, to be drilled into.With well completion of casing sliding sleeve pressing crack construction mode processes and the supporting gradual maturation of instrument, the work The application of skill at the scene is also more and more, and its advantage shown is also more and more obvious, main following points:A 1. pipe Post can complete the pressing crack construction to all intervals, realize a brill operation, saved the engineering time;2. without individually being penetrated Hole operation, card layer is carried out without extra packer, not only saved the time but also saved cost;, can be fine 3. interior latus rectum is big Ground meets the construction requirement of huge discharge, and can still keep larger interior latus rectum after having constructed, and facilitates the construction operations such as later stage well workover. Well completion of casing sliding sleeve separate stratum fracfturing is just progressively receiving accreditation, this technique because of its efficient construction advantage by domestic each elephant Pattern is just being becoming increasingly popular in the recovery process of unconventional petroleum resources.
Used sliding sleeve of bushing fracturing tool in the market, few, the Huo Zhecao that limited series by borehole size mostly Make tedious process, there is a certain degree of limitation in use at the scene.Given this situation, present invention design, a kind of change is developed Length control mechanism, the change length control mechanism mainly include sliding sleeve of bushing instruments at different levels and matched with sliding sleeve of bushing instruments at different levels The sliding sleeve openers at different levels of set, series is realized by increasing the length of sliding sleeve of bushing instrument and corresponding stage sliding sleeve opener Be continuously increased, there is no the differential limitation of interior latus rectum between at different levels, it is possible to achieve full-bore and unlimited pole, and the instrument makes at the scene It is simple with middle operational sequence, it is complete in sliding sleeve of bushing so as to effectively solve used sliding sleeve of bushing fracturing tool in the market The limitation applied in well separate stratum fracfturing transformation.
The content of the invention
The present invention develops a kind of variable for the construction Demand Design of Oil/gas Well cased hole completion sliding sleeve of bushing fracturing reform The sliding sleeve opener and its sliding sleeve of bushing of length, sliding sleeve of bushing instrument of the present invention is mainly by changing opener and corresponding set The length of pipe sliding sleeve increases the series of instrument, does not have the differential limitation of interior latus rectum between at different levels, it is possible to achieve full-bore and unlimited Pole, and use is simple to operate, so as to efficiently solve the limitation of existing sliding sleeve of bushing instrument application.
The present invention realizes especially by following technical scheme:
A kind of sliding sleeve opener of variable-length, including center cavity, described center cavity are by spacing control-rod and disk The inner chamber that root seat is formed, described spacing control-rod are located at the top of packing seat, the end of adjacent packing seat on spacing control-rod End is provided with boss, and the top of described boss is disposed with compression spring, is fixed on opener valve at the top of described compression spring The end of body, described opener valve body is located at the external wall of upper portion of spacing control-rod, in opener valve body and spacing control The top of bar, which is provided with, solves lock ring, in the gap that described solution lock ring is formed between opener valve body and spacing control-rod, Control spring leaf is being horizontally arranged with close to opener valve body end, described control spring leaf is used to drive spacing control-rod Axially moved with compression spring.
The end of described spacing control-rod is horizontally arranged with the clamp-screw through boss, for fixing spacing control Bar.
Described packing seat top inner side is provided with excessively stream ring, and described excessively stream ring is laterally positioned in center cavity.
Steel ball and control instrument pressure cap are provided with the outside of described packing seat end, described control instrument pressure cap is located at steel ball Bottom.
Present invention also offers a kind of sliding sleeve of bushing to match with above-mentioned sliding sleeve opener, including sliding sleeve body, institute Inner sliding sleeve is provided with the inside of the sliding sleeve body stated, top connection, the bottom of described top connection and cunning are provided with inner sliding sleeve top The top of set body is fixed by the first stopping screw, and adapter sleeve is provided with the end of sliding sleeve body, described adapter sleeve Top and the end of sliding sleeve body are fixed by the second stopping screw, and the end of described adapter sleeve is provided with lower contact.
The end of described inner sliding sleeve is provided with the 3rd stopping screw, C-shaped ring and pressure cap, the 3rd described stopping screw and C-shaped ring is used to fix inner sliding sleeve in adapter sleeve, and described pressure cap is located on the inside of inner sliding sleeve end, for protecting the 3rd retaining spiral shell Nail and C-shaped ring.
Described adapter sleeve is fixed with lower contact by the 4th stopping screw.
The bottom of described sliding sleeve body is provided through the shear pin of its wall, and stretches into the wall of inner sliding sleeve.
The inner surface of described inner sliding sleeve is recessed positioned at second formed with the first groove and the second groove, the first described groove The top of groove.
Beneficial effects of the present invention are:
The present invention develops a kind of elongated for the construction Demand Design of Oil/gas Well cased hole completion sliding sleeve of bushing fracturing reform Controlling organization is spent, the change length control mechanism mainly includes sliding sleeve of bushing, specialized opener.Well cementing process middle sleeve sliding sleeve with Sleeve pipe is fixedly arranged in pit shaft together, by coiled tubing band specialized opener tripping in sliding sleeve of bushing, opening before pressing crack construction Instrument claw, which stretchs out to match somebody with somebody with the inner sliding sleeve shoulder for the corresponding stage sliding sleeve of bushing instrument for needing to open, merges locking, adds in coiled tubing Pressure, sliding sleeve shear pin is cut, sliding sleeve is moved down, and the by-pass prot of sliding sleeve of bushing instrument is opened, and realizes normal pressure break.Sliding sleeve of bushing instrument master To increase the series of instrument by changing the length of opener and respective sleeve sliding sleeve, there is no interior latus rectum differential between at different levels Limitation, it is possible to achieve full-bore and unlimited pole, and use is simple to operate, so as to efficiently solve existing sliding sleeve of bushing instrument application Limitation.
Brief description of the drawings
Fig. 1 is the structural representation of sliding sleeve of bushing instrument of the present invention;
Fig. 2 is the structural representation of sliding sleeve opener of the present invention;
Fig. 3 is that state when sliding sleeve opener of the present invention passes through the sliding sleeve of bushing instrument that non-corresponding needs to open is shown It is intended to;
Fig. 4 is that sliding sleeve opener is reached and is anchored to mutually in requisition for the state signal during sliding sleeve of bushing instrument of unlatching Figure;
Fig. 5 is the view kept it turned on after phase fully opens in requisition for the sliding sleeve of bushing instrument of unlatching.
In figure:1st, top connection, the 2, first stopping screw, 3, sliding sleeve body, the 4, first groove, 5, inner sliding sleeve, 6, second is recessed Groove, 7, shear pin, the 8, second stopping screw, 9, adapter sleeve, the 10, the 3rd stopping screw, 11, C-shaped ring, 12, pressure cap, 13, Four stopping screws, 14, lower contact, 15, solution lock ring, 16, spacing control-rod, 17, opener valve body, 18, compression spring, 19, Control spring leaf, 20, clamp-screw, 21, excessively stream ring, 22, packing seat, 23, steel ball, 24, control instrument pressure cap.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
As shown in figure 1, a kind of sliding sleeve opener of variable-length, including spacing control-rod 16 and packing seat 22, it is spacing Control-rod 16 is located at the top of packing seat 22, and the internal face that spacing control-rod 16 is located at packing seat 22 forms opener of the present invention Center cavity, the end of adjacent packing seat 22 is provided with boss on spacing control-rod 16, and the top of boss is disposed with compression spring 18, the end of opener valve body 17 is fixed at the top of compression spring 18, and opener valve body 17 is located at spacing control-rod 16 External wall of upper portion, the top of opener valve body 17 and spacing control-rod 16 be provided with solution lock ring 15, solution lock ring 15 positioned at open In the gap formed between instrument valve body 17 and spacing control-rod 16, control is being horizontally arranged with close to the end of opener valve body 17 Spring leaf 19 processed, control spring leaf 19 are used to drive spacing control-rod 16 and compression spring 18 to axially move.
Preferably, the end of spacing control-rod 16 is horizontally arranged with the clamp-screw 20 through boss, is limited for fixed Position control-rod 16.
Preferably, the top inner side of packing seat 22 is provided with excessively stream ring 21, and excessively stream ring 21 is laterally positioned in center cavity.
Preferably, steel ball 23 and control instrument pressure cap 24 are provided with the outside of the end of packing seat 22, control instrument pressure cap 24 is located at The bottom of steel ball 23.
As shown in Fig. 2 a kind of sliding sleeve of bushing to match with above-mentioned sliding sleeve opener, including sliding sleeve body 3, sliding sleeve sheet The inner side of body 3 is provided with inner sliding sleeve 5, and top connection 1 is provided with the top of inner sliding sleeve 5, and the end of sliding sleeve body 3 is provided with adapter sleeve 9, The end of adapter sleeve 9 is provided with lower contact 14.
Preferably, the bottom of top connection 1 and the top of sliding sleeve body 3 are fixed by the first stopping screw 2;Adapter sleeve 9 Top and the end of sliding sleeve body 3 are fixed by the second stopping screw 8.
Preferably, the end of inner sliding sleeve 5 is provided with the 3rd stopping screw 10, C-shaped ring 11 and pressure cap 12, the 3rd stopping screw 10 and C-shaped ring 11 be used for fix inner sliding sleeve 5 in adapter sleeve 9, after sliding sleeve of bushing instrument is opened, C-shaped ring 11 is caught in accordingly Groove so that this grade of sliding sleeve of bushing instrument can keep it turned on after unlatching and can't accidental switch off.Pressure cap 12 is located at interior cunning Cover on the inside of 5 ends, for protecting the 3rd stopping screw 10 and C-shaped ring 11.
Preferably, adapter sleeve 9 is fixed with lower contact 14 by the 4th stopping screw 13.
Preferably, the bottom of sliding sleeve body 3 is provided through the shear pin 7 of its wall, and stretches into the wall of inner sliding sleeve 5 It is interior.
Preferably, the inner surface of inner sliding sleeve 5 is recessed positioned at second formed with the first groove 4 and the second groove 6, the first groove 4 The top of groove 6.
The sliding sleeve opener and its sliding sleeve of bushing of variable-length of the present invention, by increasing sliding sleeve of bushing instrument and corresponding stage The length of sliding sleeve opener realizes being continuously increased for series, when sliding sleeve opener controls spring leaf 19 end projection and valve When the distance between body end projection is shorter than the distance between first, second groove 6, the sliding sleeve opener can pass through this Level sliding sleeve of bushing instrument, when sliding sleeve opener controls the end projection of spring leaf 19 and valve body end projection to be caught in inner sliding sleeve simultaneously During two groove in 5, the sliding sleeve opener can open this grade of sliding sleeve of bushing instrument.
As shown in figure 3, when sliding sleeve opener control the distance between the end projection of spring leaf 19 and valve body end projection When being shorter than the distance between first, second groove 6:The sliding sleeve of bushing is struck in the opener control end projection of spring leaf 19 During instrument undergauge position, control spring leaf 19 can move up along opener valve body 17, and drive spacing control-rod 16 to press Contracting spring 18 moves upwards, until the control end projection of spring leaf 19 is sunk to inside opener valve body 17, while solves lock ring 15 The top claw bump position of opener valve body 17 is upwardly separated from out, now sliding sleeve opener can pass through this grade of sleeve pipe and slide Set instrument.
As shown in figure 4, when simultaneously the sliding sleeve opener control end projection of spring leaf 19 and valve body end projection can be caught in During first, second groove 6 in inner sliding sleeve 5:Enter in the sliding sleeve opener control end projection of spring leaf 19 and be caught in sleeve pipe During sliding sleeve instrument 5 second groove 6 of inner sliding sleeve, its end claw projection of opener valve body 17 also enters simultaneously and is caught in inner sliding sleeve 5 first grooves 4, now continue to pressurize, then sliding sleeve opener moves downwardly together with sliding sleeve of bushing instrument inner sliding sleeve 5, and cuts The shear pin 7 to break on the sliding sleeve of bushing instrument, the by-pass prot on this grade of sliding sleeve body 3 are slowly opened.As shown in figure 5, work as c-type Ring 11 moves down and after the groove location on Snap joint set 9, sliding sleeve opener and this grade of sliding sleeve of bushing instrument inner sliding sleeve 5 Position fixation with respect to adapter sleeve 9 can no longer be moved up and down, and the by-pass prot on this grade of sliding sleeve of bushing tool body is opened completely, should Level sliding sleeve of bushing instrument, which is opened, to be finished.
As in Figure 3-5, a kind of sliding sleeve opener of variable-length of the present invention and its sliding sleeve of bushing are carrying out Oil/gas Well During the construction of cased hole completion fracturing reform, comprise the following steps:
(1) lower tubular column:The riding position of sliding sleeve of bushing instrument is determined and using series according to oil reservoir, has assembled tubing string, really Protect sliding sleeve of bushing instruments at different levels and design position is in tubing string, by sliding sleeve of bushing tool tubular column tripping in pit shaft;
(2) cement the well:After sliding sleeve of bushing tool tubular column tripping in pit shaft, conventional cementing is carried out, sliding sleeve of bushing instrument is with sleeve pipe one Rise and be fixedly arranged in pit shaft, now, in pit shaft sequentially consist of one-level sliding sleeve of bushing instrument, two level sliding sleeve of bushing instrument, three Level sliding sleeve of bushing instrument, level Four sliding sleeve of bushing instrument, Pyatyi sliding sleeve of bushing instrument are until most rear class sliding sleeve of bushing instrument;
(3) open first order sliding sleeve of bushing instrument and carry out first layer pressing crack construction
The corresponding one-level sliding sleeve opener of first order sliding sleeve of bushing instrument is launched into pit shaft, and pumps the instrument, When one-level sliding sleeve opener reach first order sliding sleeve of bushing instrument above sliding sleeve of bushing tool location at different levels when, open work When the tool control end projection of spring leaf 19 strikes top sliding sleeve of bushing instrument undergauge position at different levels, control spring leaf 19 can be along Opener valve body 17 moves up, and drives the spacing compression spring 18 of control-rod 16 to move upwards, until control spring leaf 19 End projection is sunk to inside opener valve body 17, while solves lock ring 15 to be upwardly separated from out the end claw of opener valve body 17 convex Block position, now one-level sliding sleeve opener can pass through the sliding sleeve of bushing works at different levels above first order sliding sleeve of bushing instrument Tool.When the one-level sliding sleeve opener control end projection of spring leaf 19 enters and is caught in first order sliding sleeve of bushing instrument inner sliding sleeve 5 During the second groove 6, its end claw projection of opener valve body 17 also enters simultaneously and is caught in the groove 4 of inner sliding sleeve 5 first, now Continue to pressurize, then one-level sliding sleeve opener moves downwardly together with first order sliding sleeve of bushing instrument inner sliding sleeve 5, and cuts first Shear pin 7 on level sliding sleeve of bushing instrument, the by-pass prot on first order sliding sleeve of bushing tool body are slowly opened, and work as C-shaped ring 11 move down and after the groove location on Snap joint set 9, in one-level sliding sleeve opener and first order sliding sleeve of bushing instrument Sliding sleeve 5 is fixed with respect to the position of adapter sleeve 9 and can no longer moved up and down, and the by-pass prot on first order sliding sleeve of bushing tool body is complete Open, first order sliding sleeve of bushing instrument is opened and finished, and then can carry out the pressing crack construction of first layer;
(4) after complete first layer to be onstructed, open second level sliding sleeve of bushing instrument and carry out second layer pressing crack construction:To pit shaft Middle to launch the corresponding two level sliding sleeve opener of second level sliding sleeve of bushing instrument, as described in step (3), two level sliding sleeve opens work Tool, which passes sequentially through the sliding sleeve of bushing instruments at different levels above the sliding sleeve of bushing instrument of the second level and is finally caught in, opens second level sleeve pipe cunning Set instrument, it then can carry out the pressing crack construction of the second layer;
(5) after the complete second layer to be onstructed, corresponding sliding sleeve opener is launched successively and opens top sliding sleeve of bushing works at different levels Have and complete pressing crack construction;
(6) after treating all interval pressing crack constructions, all sliding sleeve openers are salvaged by pit shaft using coiled tubing Or directly bore and grind off all sliding sleeve openers, to ensure that it is unimpeded that construction terminates rear full pit shaft.
Embodiments of the invention, for the ordinary skill in the art, Ke Yili have been shown and described in pipe Solution without departing from the principles and spirit of the present invention can to these embodiments carry out it is a variety of change, modification, replace and Modification, the scope of the present invention is defined by the appended.

Claims (9)

1. a kind of sliding sleeve opener of variable-length, including center cavity, it is characterised in that:Described center cavity is by spacing control The inner chamber that bar (16) processed and packing seat (22) are formed, described spacing control-rod (16) are located at the top of packing seat (22), limited The end of adjacent packing seat (22) is provided with boss on position control-rod (16), and the top of described boss is disposed with compression spring (18) end of opener valve body (17), described opener valve body, are fixed at the top of described compression spring (18) (17) it is located at the external wall of upper portion of spacing control-rod (16), is provided with the top of opener valve body (17) and spacing control-rod (16) Lock ring (15) is solved, described solution lock ring (15) is located at the gap formed between opener valve body (17) and spacing control-rod (16) In, control spring leaf (19) is being horizontally arranged with close to opener valve body (17) end, described control spring leaf (19) is used Axially moved in driving spacing control-rod (16) and compression spring (18).
A kind of 2. sliding sleeve opener of variable-length according to claim 1, it is characterised in that:Described spacing control The end of bar (16) is horizontally arranged with the clamp-screw (20) through boss, for fixing spacing control-rod (16).
A kind of 3. sliding sleeve opener of variable-length according to claim 1, it is characterised in that:Described packing seat (22) top inner side is provided with excessively stream ring (21), and described excessively stream ring (21) is laterally positioned in center cavity.
A kind of 4. sliding sleeve opener of variable-length according to claim 1, it is characterised in that:Described packing seat (22) steel ball (23) and control instrument pressure cap (24) are provided with the outside of end, described control instrument pressure cap (24) is located at steel ball (23) Bottom.
5. a kind of sliding sleeve of bushing to match with sliding sleeve opener described in claim 1, including sliding sleeve body (3), its feature It is:Inner sliding sleeve (5) is provided with the inside of described sliding sleeve body (3), inner sliding sleeve (5) top is provided with top connection (1), it is described The bottom of top connection (1) and the top of sliding sleeve body (3) it is fixed by the first stopping screw (2), at the end of sliding sleeve body (3) End is provided with adapter sleeve (9), and the top of described adapter sleeve (9) passes through the second stopping screw (8) with the end of sliding sleeve body (3) Fixed, the end of described adapter sleeve (9) is provided with lower contact (14).
6. sliding sleeve of bushing according to claim 5, it is characterised in that:The end of described inner sliding sleeve (5) is provided with the 3rd Stopping screw (10), C-shaped ring (11) and pressure cap (12), the 3rd described stopping screw (10) and C-shaped ring (11) are used in fixed In on adapter sleeve (9), described pressure cap (12) is located on the inside of inner sliding sleeve (5) end sliding sleeve (5), for protecting the 3rd stopping screw And C-shaped ring (11) (10).
7. sliding sleeve of bushing according to claim 5, it is characterised in that:Described adapter sleeve (9) passes through with lower contact (14) 4th stopping screw (13) is fixed.
8. sliding sleeve of bushing according to claim 5, it is characterised in that:The bottom of described sliding sleeve body (3), which is provided with, to be passed through The shear pin (7) of its wall is worn, and is stretched into the wall of inner sliding sleeve (5).
9. sliding sleeve of bushing according to claim 5, it is characterised in that:The inner surface of described inner sliding sleeve (5) is formed with One groove (4) and the second groove (6), described the first groove (4) are located at the top of the second groove (6).
CN201710646867.8A 2017-08-01 2017-08-01 Sliding sleeve opening tool with variable length and sleeve sliding sleeve thereof Active CN107366522B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710646867.8A CN107366522B (en) 2017-08-01 2017-08-01 Sliding sleeve opening tool with variable length and sleeve sliding sleeve thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710646867.8A CN107366522B (en) 2017-08-01 2017-08-01 Sliding sleeve opening tool with variable length and sleeve sliding sleeve thereof

Publications (2)

Publication Number Publication Date
CN107366522A true CN107366522A (en) 2017-11-21
CN107366522B CN107366522B (en) 2023-08-18

Family

ID=60309187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710646867.8A Active CN107366522B (en) 2017-08-01 2017-08-01 Sliding sleeve opening tool with variable length and sleeve sliding sleeve thereof

Country Status (1)

Country Link
CN (1) CN107366522B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590578A (en) * 2018-04-25 2018-09-28 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of repeatable switching sliding sleeve mechanism for sliding sleeve of bushing
CN109267978A (en) * 2018-09-07 2019-01-25 中国石油化工股份有限公司 A kind of separate injection tubing string
CN114482957A (en) * 2020-10-26 2022-05-13 中国石油化工股份有限公司 Open hole full-bore infinite staged fracturing well completion device and fracturing well completion method thereof

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB916328A (en) * 1958-12-12 1963-01-23 George Gordon Grimmer Well tools
SU493342A1 (en) * 1973-05-03 1975-11-28 Всесоюзный Проектно-Технологический Институт Тяжелого Машиностроения Cartridge for tightening the studs
AU2038997A (en) * 1996-03-22 1997-10-17 Smith International, Inc. Hydraulic sliding side-door sleeve
US5794699A (en) * 1996-11-27 1998-08-18 Halliburton Energy Services, Inc. Metal-to-metal sliding side door for wells
US6220363B1 (en) * 1999-07-16 2001-04-24 L. Murray Dallas Wellhead isolation tool and method of using same
US20070114065A1 (en) * 2005-11-21 2007-05-24 Hall David R Drill Bit Assembly
US20090277650A1 (en) * 2008-05-08 2009-11-12 Baker Hughes Incorporated Reactive in-flow control device for subterranean wellbores
CN101629480A (en) * 2009-07-31 2010-01-20 中国石油集团西部钻探工程有限公司准东钻井公司 Inner blowout preventer of full-port drilling tool
CN102182438A (en) * 2011-06-03 2011-09-14 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Layered fracturing technology for variable-length graded sliding sleeve
CN102337862A (en) * 2011-10-17 2012-02-01 中国石油天然气股份有限公司 Variable-diameter fracturing valve
GB201121743D0 (en) * 2010-12-16 2012-02-01 Tunget Bruce A Cable compatible fluid hydrodynamic and homogenizing bearing rotary steerable system for drilling and milling
CN102606110A (en) * 2012-02-24 2012-07-25 中国石油大学(北京) Composite sliding sleeve, fracturing device and method for increasing well fracturing layer section
CA2810045A1 (en) * 2012-03-21 2013-09-21 Oiltool Engineering Services, Inc. Multizone frac system
CN103321624A (en) * 2013-07-09 2013-09-25 中国石油集团渤海钻探工程有限公司 Threaded sliding sleeve with ball seat capable of being taken out
CA2837997A1 (en) * 2012-12-21 2014-03-14 Resource Well Completion Technologies Inc. Multi-stage well isolation
US20140083689A1 (en) * 2011-08-29 2014-03-27 Halliburton Energy Services, Inc. Method of Completing a Multi-Zone Fracture Stimulation Treatment of a Wellbore
WO2014131141A1 (en) * 2013-02-28 2014-09-04 中国石油天然气集团公司 Hydraulic injection packer tool suitable for multi-stage hydraulic injection fracturing
CN104196492A (en) * 2014-08-26 2014-12-10 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Pressurized dragging down-hole blocking valve
US20150285026A1 (en) * 2013-05-13 2015-10-08 Magnum Oil Tools International, Ltd. Dissolvable aluminum downhole plug
CN105822256A (en) * 2016-05-20 2016-08-03 中石化石油工程技术服务有限公司 Hinged type sliding sleeve opening tools capable of achieving staged opening and equal-diameter casing pipe sliding sleeves
CN207080201U (en) * 2017-08-01 2018-03-09 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 The sliding sleeve opener and its sliding sleeve of bushing of a kind of variable-length

Patent Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB916328A (en) * 1958-12-12 1963-01-23 George Gordon Grimmer Well tools
SU493342A1 (en) * 1973-05-03 1975-11-28 Всесоюзный Проектно-Технологический Институт Тяжелого Машиностроения Cartridge for tightening the studs
AU2038997A (en) * 1996-03-22 1997-10-17 Smith International, Inc. Hydraulic sliding side-door sleeve
US5794699A (en) * 1996-11-27 1998-08-18 Halliburton Energy Services, Inc. Metal-to-metal sliding side door for wells
US6220363B1 (en) * 1999-07-16 2001-04-24 L. Murray Dallas Wellhead isolation tool and method of using same
US20070114065A1 (en) * 2005-11-21 2007-05-24 Hall David R Drill Bit Assembly
US20090277650A1 (en) * 2008-05-08 2009-11-12 Baker Hughes Incorporated Reactive in-flow control device for subterranean wellbores
CN101629480A (en) * 2009-07-31 2010-01-20 中国石油集团西部钻探工程有限公司准东钻井公司 Inner blowout preventer of full-port drilling tool
GB201121743D0 (en) * 2010-12-16 2012-02-01 Tunget Bruce A Cable compatible fluid hydrodynamic and homogenizing bearing rotary steerable system for drilling and milling
CN102182438A (en) * 2011-06-03 2011-09-14 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Layered fracturing technology for variable-length graded sliding sleeve
US20140083689A1 (en) * 2011-08-29 2014-03-27 Halliburton Energy Services, Inc. Method of Completing a Multi-Zone Fracture Stimulation Treatment of a Wellbore
CN102337862A (en) * 2011-10-17 2012-02-01 中国石油天然气股份有限公司 Variable-diameter fracturing valve
CN102606110A (en) * 2012-02-24 2012-07-25 中国石油大学(北京) Composite sliding sleeve, fracturing device and method for increasing well fracturing layer section
CA2810045A1 (en) * 2012-03-21 2013-09-21 Oiltool Engineering Services, Inc. Multizone frac system
CA2837997A1 (en) * 2012-12-21 2014-03-14 Resource Well Completion Technologies Inc. Multi-stage well isolation
CN105143597A (en) * 2012-12-21 2015-12-09 资源成套设备公司 Multi-stage well isolation and fracturing
WO2014131141A1 (en) * 2013-02-28 2014-09-04 中国石油天然气集团公司 Hydraulic injection packer tool suitable for multi-stage hydraulic injection fracturing
US20150285026A1 (en) * 2013-05-13 2015-10-08 Magnum Oil Tools International, Ltd. Dissolvable aluminum downhole plug
CN103321624A (en) * 2013-07-09 2013-09-25 中国石油集团渤海钻探工程有限公司 Threaded sliding sleeve with ball seat capable of being taken out
CN104196492A (en) * 2014-08-26 2014-12-10 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Pressurized dragging down-hole blocking valve
CN105822256A (en) * 2016-05-20 2016-08-03 中石化石油工程技术服务有限公司 Hinged type sliding sleeve opening tools capable of achieving staged opening and equal-diameter casing pipe sliding sleeves
CN207080201U (en) * 2017-08-01 2018-03-09 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 The sliding sleeve opener and its sliding sleeve of bushing of a kind of variable-length

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
刘涛等: "水平井用不限级压裂滑套研制及应用", 《石油矿场机械》 *
刘涛等: "水平井用不限级压裂滑套研制及应用", 《石油矿场机械》, vol. 45, no. 09, 30 September 2016 (2016-09-30), pages 75 - 77 *
张文仲等: "高压油气井S-96修井技术", 《断块油气田》 *
张文仲等: "高压油气井S-96修井技术", 《断块油气田》, vol. 10, no. 05, 30 September 2003 (2003-09-30), pages 80 - 82 *
李梅等: "连续管无限级滑套分段压裂技术在苏里格的应用", 《石油机械》 *
李梅等: "连续管无限级滑套分段压裂技术在苏里格的应用", 《石油机械》, vol. 43, no. 02, 28 February 2015 (2015-02-28), pages 40 - 43 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590578A (en) * 2018-04-25 2018-09-28 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of repeatable switching sliding sleeve mechanism for sliding sleeve of bushing
CN109267978A (en) * 2018-09-07 2019-01-25 中国石油化工股份有限公司 A kind of separate injection tubing string
CN114482957A (en) * 2020-10-26 2022-05-13 中国石油化工股份有限公司 Open hole full-bore infinite staged fracturing well completion device and fracturing well completion method thereof
CN114482957B (en) * 2020-10-26 2024-05-24 中国石油化工股份有限公司 Open hole full-drift diameter infinite stage staged fracturing completion device and fracturing completion method thereof

Also Published As

Publication number Publication date
CN107366522B (en) 2023-08-18

Similar Documents

Publication Publication Date Title
CN104314546B (en) Staged fracturing completion tubular column and staged fracturing technique in horizontal well casing pipe
AU785117B2 (en) Well completion method and apparatus
CN107366522A (en) The sliding sleeve opener and its sliding sleeve of bushing of a kind of variable-length
EP1312750A2 (en) Method and apparatus for selective horizontal well re-entry using retrievable diverter oriented by logging means
CN107178347A (en) A kind of long-acting CO2Gas injection tube column and operating method
US9206678B2 (en) Zonal contact with cementing and fracture treatment in one trip
CA2511249A1 (en) Method for drilling a lateral wellbore with secondary fluid injection
CN109723406B (en) Method for sectionally opening and closing ball-throwing type sliding sleeve of oil field horizontal well
CN107255023A (en) Exempt to bore bridging plug with the big orifice for setting function of giving up
CN105156088B (en) Binary channels injects multiple-string packer fracturing strings and its application method
CN207080201U (en) The sliding sleeve opener and its sliding sleeve of bushing of a kind of variable-length
CN107178335B (en) Multifunctional setting ball seat and use method thereof
CN112127855B (en) Full latus rectum sand control doublestage mechanism to segmentation fracturing pit shaft
CN205714102U (en) Elastic claw spacing well cementation pitching sliding sleeve
CN107939336A (en) The solvable seal pack rubber plug of full-bore and completion method
CA2839377C (en) Sleeve fracturing assembly, device using the same and method for using the same
CN102168546B (en) Key unlocking-type sliding sleeve switch
CN110617057B (en) Full-pipe type underground test pipe column and test method thereof
CN202125288U (en) Intelligent sliding bush closing tool
CN108571306A (en) Sliding sleeve, fracturing tool and fracturing process
CN109915097A (en) 4 cun of half-covering tube layered fracturing pipe strings of one kind and fracturing process
CN110017127A (en) The water integrated device of acid fracturing control, acid fracturing water control pipe column and acid fracturing water control method
CN204960803U (en) Coiled tubing sprays and to creep into sleeve pipe rotatory cloth hole director of windowing
RU2379487C1 (en) Multi-bottomhole design for production in permafrost
CA2456217A1 (en) Method for operating a well jet device during repair and insulating operations and device for carrying out said method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201027

Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Applicant after: CHINA NATIONAL PETROLEUM Corp.

Applicant after: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd.

Address before: 710018 Shaanxi province Xi'an Weiyang Changqing Changqing prosperous Park District Building Room 1203

Applicant before: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant