CN107355679A - A kind of integrated natural gas line pressure testing feeder and its temprature control method - Google Patents

A kind of integrated natural gas line pressure testing feeder and its temprature control method Download PDF

Info

Publication number
CN107355679A
CN107355679A CN201710641863.0A CN201710641863A CN107355679A CN 107355679 A CN107355679 A CN 107355679A CN 201710641863 A CN201710641863 A CN 201710641863A CN 107355679 A CN107355679 A CN 107355679A
Authority
CN
China
Prior art keywords
pressure
supply
transmitter
outlet
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710641863.0A
Other languages
Chinese (zh)
Other versions
CN107355679B (en
Inventor
薛峰
李静
陆颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum Tennessee Gas Transmission Co North China Chemical Gas Transportation Co
TERRENCE ENERGY CO Ltd
Original Assignee
China Petroleum Tennessee Gas Transmission Co North China Chemical Gas Transportation Co
TERRENCE ENERGY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum Tennessee Gas Transmission Co North China Chemical Gas Transportation Co, TERRENCE ENERGY CO Ltd filed Critical China Petroleum Tennessee Gas Transmission Co North China Chemical Gas Transportation Co
Priority to CN201710641863.0A priority Critical patent/CN107355679B/en
Publication of CN107355679A publication Critical patent/CN107355679A/en
Application granted granted Critical
Publication of CN107355679B publication Critical patent/CN107355679B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/02Pipe-line systems for gases or vapours
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D3/00Arrangements for supervising or controlling working operations
    • F17D3/01Arrangements for supervising or controlling working operations for controlling, signalling, or supervising the conveyance of a product
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D5/00Protection or supervision of installations
    • F17D5/005Protection or supervision of installations of gas pipelines, e.g. alarm

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigating Or Analyzing Materials Using Thermal Means (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The invention discloses a kind of integrated natural gas line pressure testing feeder, including it is sequentially connected in series the air inlet pipeline of setting, supply gas pressure control unit, outlet pipe and switch board;On air inlet pipeline inlet pressure transmitter, filter, electric heater and heating-up temperature transmitter are connected with turn along gas flow;Supply gas pressure control unit is formed by supply gas pressure limiting value into some supply air lines and one side path in parallel of incremental setting;On outlet pipe outlet pressure transmitter, outlet temperature transmitter and index combustion fan are connected with turn along gas flow;Switch board electrically connects with inlet pressure transmitter, heating-up temperature transmitter, outlet pressure transmitter, outlet temperature transmitter, flammable gas alarm, gate inhibition, blower fan and the valve for opening each supply air line respectively.By the technical scheme in the present invention, intelligence degree is high, has saved human cost, and the effective cycle for shortening experiment.

Description

A kind of integrated natural gas line pressure testing feeder and its temprature control method
Technical field
The present invention relates to natural gas transmission and distribution field, and in particular to a kind of integrated natural gas line pressure testing feeder and its Temprature control method.
Background technology
As Natural Gas Demand is growing day by day, the long distance pipeline using heavy caliber, Hi-grade steel, high pressure turns into world day The main flow of right tracheae transferring technology, the defeated safety problem of natural gas tube thus brought receives more and more attention, and full-scale day Right gas reality gas explosion bulge test is the state-of-the-art technology means of currently acquired tube performance data.Meanwhile study a pipe explosion (Blast)The destruction and influence degree to another laying in one ditch pipeline such as shock wave, seismic wave, heat radiation and to environment Influence, also provide the design standard for natural gas line laying in one ditch to test basis and support.These all will be that China is defeated greatly Amount, high pressure, Hi-grade steel NG Pipeline Construction and safe operation provide important technology support.
But at present because natural gas line pressure testing experimental provision intelligence degree is not high so that the week that this experiment is carried out Phase is long, and implements inconvenience.
The defects of existing in view of above-mentioned existing natural gas line pressure testing experimental provision, the present inventor are such based on being engaged in Product design manufacture abundant for many years practical experience and professional knowledge, and coordinate the utilization of scientific principle, actively it is subject to research and innovation, with Phase founds a kind of integrated natural gas line pressure testing feeder and its control method.
The content of the invention
Pass through the technical scheme in the present invention, there is provided one kind can be during natural gas line pressure testing simultaneously to natural The feeder that the temperature of gas is monitored, intelligence degree is high, has saved human cost, and the effective week for shortening experiment Phase.
The present invention solve its technical problem technical scheme be:
A kind of integrated natural gas line pressure testing feeder, including it is sequentially connected in series the air inlet pipeline of setting, supply gas pressure control Portion, outlet pipe and switch board;
Inlet pressure transmitter, filter, electric heater and heating-up temperature are connected with turn on air inlet pipeline along gas flow to become Send device;
Supply gas pressure control unit by supply gas pressure limiting value into some supply air lines and one side path in parallel of incremental setting and Into supply air line is used to meet a variety of needs with atmospheric pressure during pressure testing, and bypass is used to be not required to regulation atmospheric pressure Shi Jinhang is supplied;
On outlet pipe outlet pressure transmitter, outlet temperature transmitter and index combustion fan are connected with turn along gas flow;
Switch board respectively with inlet pressure transmitter, heating-up temperature transmitter, outlet pressure transmitter, outlet temperature transmitter and Valve for opening each supply air line electrically connects.
Further, pressure regulator valve is provided with supply air line, for controlling the limiting value of supply gas pressure.
Further, the incremental value of supply gas pressure limiting value is not more than 4MPa between each supply air line.
Further, integrated natural gas line pressure testing feeder also includes casing, and air inlet pipeline, supply are set for cover Pressure control portion and outlet pipe;
Blower fan and gate inhibition are provided with wall box, flammable gas alarm is provided with casing;
Blower fan, gate inhibition and flammable gas alarm electrically connect with switch board.
A kind of integrated natural gas line pressure testing feeder temprature control method, comprises the following steps:
A, begin to warm up, remote opening electric heater, and adjust the aperture of index combustion fan to 1/2;
Whether the gas temperature for B, detecting outlet pipe exit is more than 2 DEG C, if so, then performing step C, otherwise, performs step E;
C, the aperture of remote adjustment index combustion fan is to standard-sized sheet;
Whether the gas temperature for D, detecting outlet pipe exit is more than 2 DEG C, if so, then continuing to supply, then performs step F, If it is not, then perform step E;
E, detect whether outlet temperature of electric heater is more than 60 DEG C, if so, the aperture for then adjusting index combustion fan is laid equal stress on to fully closed It is new to perform step A, if it is not, then being overhauled to electric heater, step A is re-executed after confirming equipment fault-free;
F, detect whether outlet temperature of electric heater is more than 80 DEG C, if so, carrying out power down process to electric heater, cooled, Until outlet temperature is less than or equal to 80 DEG C, step D is performed, if it is not, then directly performing step D.
After employing above-mentioned technical proposal, the present invention has following beneficial effect:
Pass through the technical scheme in the present invention, there is provided it is a kind of can during natural gas line pressure testing simultaneously to natural gas The feeder that temperature is monitored, miniaturization, convenience in transport, can not limited, greatly with flexible deployment by experimental situation, place The big preliminary preparation for reducing experiment, while intelligence degree is high, lifts the efficiency of experiment, is a safe and reliable, technology Advanced, stable performance, function be strong, it is easy to operate, be easy to extend and develop, economical rationality, the ratio of performance to price are high be applied to it is defeated The natural gas supply device of feed channel engineering.
Brief description of the drawings
, below will be to embodiment or existing skill in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art The required accompanying drawing used is briefly described in art description, it should be apparent that, drawings in the following description are only the application Described in some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, may be used also To obtain other accompanying drawings according to these accompanying drawings.
Fig. 1 is the structural representation of integrated natural gas line pressure testing feeder in the present invention;
Fig. 2 is the flow chart that gas temperature controls in the present invention;
Reference:Import high-pressure hose 1, inlet pressure transmitter 2, heating-up temperature transmitter 3,12MPa supply air lines 4, 16MPa supply air lines 5, gate inhibition 6, outlet pressure transmitter 7, outlet temperature transmitter 8, flammable gas alarm 9, switch board 10th, high-pressure hose 11, index combustion fan 12,8MPa supply air lines 13,4MPa supply air lines 14, bypass 15, electrical heating are exported Device 16, filter 17, casing 18, blower fan 19.
Embodiment
In order that those skilled in the art more fully understand the technical scheme in the application, it is real below in conjunction with the application The accompanying drawing in example is applied, the technical scheme in the embodiment of the present application is clearly and completely described, it is clear that described implementation Example only some embodiments of the present application, rather than whole embodiments.It is common based on the embodiment in the application, this area The every other embodiment that technical staff is obtained under the premise of creative work is not made, it should all belong to the application protection Scope.
A kind of integrated natural gas line pressure testing feeder, including it is sequentially connected in series the air inlet pipeline of setting, supply gas pressure Control unit, outlet pipe and switch board 10;On air inlet pipeline inlet pressure transmitter 2, filtering are connected with turn along gas flow Device 17, electric heater 16 and heating-up temperature transmitter 3;Supply gas pressure control unit is by 4MPa supply air lines 14,8MPa supply air lines 13rd, 12MPa supply air lines 4,16MPa supply air lines 5 and bypass 15 are formed in parallel, and supply air line is used for during meeting pressure testing A variety of needs with atmospheric pressure, self-operated type air vent valve is provided with supply air line, for controlling the limiting value of supply gas pressure, Bypass 15 is used to be supplied when being not required to regulation with atmospheric pressure;On outlet pipe outlet pressure is connected with turn along gas flow Power transmitter 7, outlet temperature transmitter 8 and index combustion fan 12;Switch board 10 is warm with inlet pressure transmitter 2, heating respectively Degree transmitter 3, outlet pressure transmitter 7, outlet temperature transmitter 8 and the valve for opening each supply air line electrically connect.
For the ease of equipment conveying and onsite application, above-mentioned each structure assembly is on a sledge seat, integrated natural gas tube Pressure testing feeder in road also includes casing 18, and air inlet pipeline, supply gas pressure control unit and outlet pipe and whole sledge are set for cover Seat;Blower fan 19 and gate inhibition 6 are provided with the side wall of casing 18, wherein blower fan 19 is flame-proof type, and gate inhibition 6 is not controlled for monitoring casing Enabling, with ensure feeder operation safety.Flammable gas alarm 9 is provided with casing 18;Blower fan 19, the and of gate inhibition 6 Flammable gas alarm 9 electrically connects with switch board 10, and feeder inlet and outlet are provided with import high-pressure hose 1 and outlet high pressure is soft Pipe 11, facilitates joint connection in site.
During work, the source of the gas of feeder is used by compressed natural gas(CNG)The CNG that tank car provides, gas source is convenient, Higher import step pressure can be provided simultaneously, meets the more kinds of requirements with atmospheric pressure of 0~18MPa of downstream, feeder tool There is import to bear 20~25MPa pressure, the ability of 20MPa pressure is born in outlet.After CNG supply, first by filter 17 to CNG Filtered, remove the impurity of gas entrainment, ensure the safety of upstream device.By inlet pressure pick-up after filter 17 Device 2, for monitoring CNG inlet pressures.For system after pressure regulation, gas temperature will produce very big change, to ensure to be The normal work of system and each equipment, electric heater 16 is provided with after filter 17, the gas in pipeline is preheated.Electrical heating Heating-up temperature transmitter 3 is provided with after device 16, for monitoring the temperature of the outlet of electric heater 16, to ensure system worked well. Supply takes voltage regulating mode in parallel step by step, takes 4 road self-operated type air vent valve pressure regulation, respectively 4MPa supply air lines 14, 8MPa supply air lines 13,12MPa supply air lines 4,16MPa supply air lines 5, pressure difference controls between pressure regulator valve downstream and test pipe Less than 4MPa.Meanwhile then swim supply during not pressure regulation directly down by bypass 15.Pressure regulator valve downstream air supply header is provided with Outlet pressure transmitter 7, outlet temperature transmitter 8, for monitoring the pressure after pressure regulation, temperature conditions.Feeder outlet is total Pipe is provided with index combustion fan 12, for being linked with control system, auto-control supply state.The present apparatus is compact-sized, Compact, in light weight, dependable performance, installation and removal are convenient, easy to operate, it is not necessary to special maintenance, can be by flat Plate lorry is convenient to be transported, after installation can automatic running, without manual intervention.
A kind of integrated natural gas line pressure testing feeder temprature control method, comprises the following steps:
A, when feeder starts to put into operation, remote opening electric heater 16, electric heater 16 is designed using flame-proof type, switch board 10 In PLC remote adjustment index combustion fan 12 aperture to 1/2;
B, whether the gas temperature in the detection outlet pipe of outlet temperature transmitter 8 exit is more than 2 DEG C, if so, then performing step C, otherwise, perform step E;
C, the PLC in switch board 10 opens the aperture of index combustion fan 12 described in the remote adjustment in 30 seconds to standard-sized sheet Begin normal supply;
D, whether outlet temperature transmitter 8 continues to detect the gas temperature in outlet pipe exit more than 2 DEG C, if so, then continuing Supply, step F is then performed, if it is not, then performing step E;
E, heating-up temperature transmitter 3 detects whether outlet temperature of electric heater is more than 60 DEG C, if so, explanation gas consumption is big, electricity adds The hot heating amount of device 16 is inadequate, electric-heating control system by generation system low-temperature warning, and adjust the aperture of index combustion fan 12 to It is fully closed, and step A is re-executed, if it is not, the then power output of electric heater 16 deficiency, electric-heating control system will produce electricity Heater failure is alarmed, and electric heater 16 is overhauled, and step A is re-executed after confirming equipment fault-free;
F, heating-up temperature transmitter 3 detects whether outlet temperature of electric heater is more than 80 DEG C, if so, be protection upstream device, it is electric Heating control system carries out power down process to the electric heater 16, is cooled, until outlet temperature is less than or equal to 80 DEG C, holds Row step D, if it is not, then directly performing step D.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or using the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope caused.

Claims (5)

  1. A kind of 1. integrated natural gas line pressure testing feeder, it is characterised in that including be sequentially connected in series setting air inlet pipeline, Supply gas pressure control unit, outlet pipe and switch board(10);
    On the air inlet pipeline inlet pressure transmitter is connected with turn along gas flow(2), filter(17), electric heater (16)With heating-up temperature transmitter(3);
    Some supply air lines and a bypass of the supply gas pressure control unit by supply gas pressure limiting value into incremental setting (15)It is formed in parallel, the supply air line is used to meet a variety of needs with atmospheric pressure during pressure testing, the bypass(15) For being supplied when being not required to regulation with atmospheric pressure;
    On the outlet pipe outlet pressure transmitter is connected with turn along gas flow(7), outlet temperature transmitter(8)With go out Mouth regulating valve(12);
    The switch board(10)Respectively with the inlet pressure transmitter(2), heating-up temperature transmitter(3), outlet pressure pick-up Device(7), outlet temperature transmitter(8)Electrically connected with the valve for opening each supply air line.
  2. 2. integrated natural gas line pressure testing feeder according to claim 1, it is characterised in that the supply air line On be provided with pressure regulator valve, for controlling the limiting value of supply gas pressure.
  3. 3. integrated natural gas line pressure testing feeder according to claim 1, it is characterised in that between each supply air line The incremental value of supply gas pressure limiting value is not more than 4MPa.
  4. 4. integrated natural gas line pressure testing feeder according to claim 1, it is characterised in that also including casing (18), the air inlet pipeline, supply gas pressure control unit and outlet pipe are set for cover;
    The casing(18)Blower fan is provided with side wall(19)And gate inhibition(6), the casing(18)Inside it is provided with fuel gas report Alert device(9);
    The blower fan(19), gate inhibition(6)And flammable gas alarm(9)With the switch board(10)Electrical connection.
  5. 5. a kind of integrated natural gas line pressure testing feeder temprature control method, it is characterised in that comprise the following steps:
    A, begin to warm up, electric heater described in remote opening(16), and adjust the index combustion fan(12)Aperture to 1/2;
    Whether the gas temperature for B, detecting outlet pipe exit is more than 2 DEG C, if so, then performing step C2, otherwise, performs step Rapid E2;
    C, index combustion fan described in remote adjustment(12)Aperture to standard-sized sheet;
    Whether the gas temperature for D, detecting outlet pipe exit is more than 2 DEG C, if so, then continuing to supply, then performs step F2, If it is not, then perform step E2;
    E, detect whether outlet temperature of electric heater is more than 60 DEG C, if so, then adjusting the index combustion fan(12)Aperture extremely It is fully closed, and step A2 is re-executed, if it is not, then to the electric heater(16)Overhauled, after confirmation equipment fault-free again Perform step A2;
    F, detect whether outlet temperature of electric heater is more than 80 DEG C, if so, to the electric heater(16)Power down process is carried out, is entered Row cooling, until outlet temperature is less than or equal to 80 DEG C, step D2 is performed, if it is not, then directly performing step D2.
CN201710641863.0A 2017-07-31 2017-07-31 A kind of integrated natural gas line pressure testing feeder and its temprature control method Expired - Fee Related CN107355679B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710641863.0A CN107355679B (en) 2017-07-31 2017-07-31 A kind of integrated natural gas line pressure testing feeder and its temprature control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710641863.0A CN107355679B (en) 2017-07-31 2017-07-31 A kind of integrated natural gas line pressure testing feeder and its temprature control method

Publications (2)

Publication Number Publication Date
CN107355679A true CN107355679A (en) 2017-11-17
CN107355679B CN107355679B (en) 2018-12-14

Family

ID=60285924

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710641863.0A Expired - Fee Related CN107355679B (en) 2017-07-31 2017-07-31 A kind of integrated natural gas line pressure testing feeder and its temprature control method

Country Status (1)

Country Link
CN (1) CN107355679B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107228279A (en) * 2017-07-31 2017-10-03 特瑞斯能源装备股份有限公司 A kind of integrated natural gas line pressure testing feeder and its control method
CN113504123A (en) * 2021-06-30 2021-10-15 上海氢枫能源技术有限公司 Automatic novel pressure test system for hydrogenation station
CN109386738B (en) * 2018-12-18 2023-11-14 中国石油天然气集团有限公司 Pipe explosion monitoring alarm and interlocking protection device for valve chamber main pipeline of gas pipeline
CN117366475A (en) * 2023-11-13 2024-01-09 上海韩科建设工程有限公司 Novel method for controlling temperature change of extra-gas high-low pressure regulating valve

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2844641Y (en) * 2005-09-07 2006-12-06 常州信力燃气设备有限公司 Bottle prized LNG gas-supply terminal
CN201326903Y (en) * 2008-12-31 2009-10-14 鲁鸣 Natural gas supply system
CN102135233A (en) * 2011-01-14 2011-07-27 上海万事红燃气技术发展有限公司 Bundle gas supply decompression device for compression natural gas supply station and pressure regulating and gas supplying method thereof
CN102155621A (en) * 2011-01-14 2011-08-17 上海万事红燃气技术发展有限公司 Medium pressure regulating box in compressed natural gas supplying station and pressure regulating and gas supplying method thereof
CN202012742U (en) * 2011-01-17 2011-10-19 上海万事红燃气技术发展有限公司 Compressed natural gas multi-stage temperature and pressure adjusting device
CN205261226U (en) * 2015-11-13 2016-05-25 天津华迈燃气装备股份有限公司 Large -scale regulator of brief multi -functional incessant air feed
CN107228279A (en) * 2017-07-31 2017-10-03 特瑞斯能源装备股份有限公司 A kind of integrated natural gas line pressure testing feeder and its control method
CN207005727U (en) * 2017-07-31 2018-02-13 特瑞斯能源装备股份有限公司 A kind of integrated natural gas line pressure testing feeder

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2844641Y (en) * 2005-09-07 2006-12-06 常州信力燃气设备有限公司 Bottle prized LNG gas-supply terminal
CN201326903Y (en) * 2008-12-31 2009-10-14 鲁鸣 Natural gas supply system
CN102135233A (en) * 2011-01-14 2011-07-27 上海万事红燃气技术发展有限公司 Bundle gas supply decompression device for compression natural gas supply station and pressure regulating and gas supplying method thereof
CN102155621A (en) * 2011-01-14 2011-08-17 上海万事红燃气技术发展有限公司 Medium pressure regulating box in compressed natural gas supplying station and pressure regulating and gas supplying method thereof
CN202012742U (en) * 2011-01-17 2011-10-19 上海万事红燃气技术发展有限公司 Compressed natural gas multi-stage temperature and pressure adjusting device
CN205261226U (en) * 2015-11-13 2016-05-25 天津华迈燃气装备股份有限公司 Large -scale regulator of brief multi -functional incessant air feed
CN107228279A (en) * 2017-07-31 2017-10-03 特瑞斯能源装备股份有限公司 A kind of integrated natural gas line pressure testing feeder and its control method
CN207005727U (en) * 2017-07-31 2018-02-13 特瑞斯能源装备股份有限公司 A kind of integrated natural gas line pressure testing feeder

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107228279A (en) * 2017-07-31 2017-10-03 特瑞斯能源装备股份有限公司 A kind of integrated natural gas line pressure testing feeder and its control method
CN109386738B (en) * 2018-12-18 2023-11-14 中国石油天然气集团有限公司 Pipe explosion monitoring alarm and interlocking protection device for valve chamber main pipeline of gas pipeline
CN113504123A (en) * 2021-06-30 2021-10-15 上海氢枫能源技术有限公司 Automatic novel pressure test system for hydrogenation station
CN117366475A (en) * 2023-11-13 2024-01-09 上海韩科建设工程有限公司 Novel method for controlling temperature change of extra-gas high-low pressure regulating valve

Also Published As

Publication number Publication date
CN107355679B (en) 2018-12-14

Similar Documents

Publication Publication Date Title
CN107355679A (en) A kind of integrated natural gas line pressure testing feeder and its temprature control method
CN107228279A (en) A kind of integrated natural gas line pressure testing feeder and its control method
CN105299659B (en) A kind of coke oven automatic relief Iganition control system and control method
CN203500850U (en) Movable type storage, transportation and pressure reduction device for compressed natural gas
CN104100229B (en) Method for heating by using wellhead natural gas and skid-mounted device
CN203752307U (en) Intelligentized steam curing system
CN207005727U (en) A kind of integrated natural gas line pressure testing feeder
CN212031995U (en) Flash evaporation gas recovery integrated device
CN200949923Y (en) Energy saving safety control device of oil field gas heating-furnace
CN206247036U (en) A kind of device for preventing natural gas pressure regulating device from freezing
CN110159922B (en) Well head gas recovery system
CN203360385U (en) Energy-saving and environmental-protection industrialized waste rubber and plastic oiling device
CN214536192U (en) Waste incineration power plant furnace cooling system
CN205191636U (en) HCL synthesizer hydrogen more than needed and natural gas multifuel combustion system
CN205065745U (en) Automatic ignition control system of diffusing of coke oven
CN203743859U (en) Pressure regulating device of coalbed methane feed gas inlet pipe
CN208475665U (en) More boiler nonshared control units
CN207065077U (en) A kind of water power dual-purpose type liquid ammonia vaporization device
CN2849139Y (en) Solar energy automatic gas extraction well head device
CN205367725U (en) Purification heating device of system of oxygenerator group
CN216345430U (en) Natural gas unit and engine gas supply device
CN210786907U (en) Temperature-controllable liquid membrane separation equipment
CN219473419U (en) Automatic pressure control mechanism for liquefied chlorine gasification
CN211345269U (en) Steam sub-cylinder with cooling water capable of being recycled
CN203230387U (en) Skid-mounted device for heating by using wellhead natural gas

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181214

CF01 Termination of patent right due to non-payment of annual fee