CN107355212A - Deep drill deformation monitoring integrated system and monitoring system - Google Patents

Deep drill deformation monitoring integrated system and monitoring system Download PDF

Info

Publication number
CN107355212A
CN107355212A CN201710781379.8A CN201710781379A CN107355212A CN 107355212 A CN107355212 A CN 107355212A CN 201710781379 A CN201710781379 A CN 201710781379A CN 107355212 A CN107355212 A CN 107355212A
Authority
CN
China
Prior art keywords
deep drill
integrated system
capstan winch
deep
deformation monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710781379.8A
Other languages
Chinese (zh)
Inventor
宋杰
胡辉
董梅
张亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Ruhr Technology Co Ltd
Original Assignee
Hangzhou Ruhr Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Ruhr Technology Co Ltd filed Critical Hangzhou Ruhr Technology Co Ltd
Priority to CN201710781379.8A priority Critical patent/CN107355212A/en
Publication of CN107355212A publication Critical patent/CN107355212A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells

Landscapes

  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Geophysics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention provides a kind of deep drill deformation monitoring integrated system and monitoring system, including casing, deep drill measurement apparatus and fixed support, control terminal.The deep drill measurement apparatus includes:At least one capstan winch;And be arranged on the capstan winch, for being released in predetermined deep drill, to carry out the sensor chain of deep drill deformation measurement.The deep drill monitoring integrated system that the embodiment of the present application provides in casing by setting fixed support and capstan winch, capstan winch can will be arranged on for the sensor chain for carrying out deep drill monitoring, the integrated system can realize the monitoring resultses that deep drill is carried out in some extreme environments.The integrated system is simple in construction, beneficial to deployment, convenient working, can meet the deep drill monitoring resultses in various environment.

Description

Deep drill deformation monitoring integrated system and monitoring system
Technical field
The present invention relates to borehole survey technical field, in particular to a kind of deep drill deformation monitoring integrated system And monitoring system.
Background technology
When carrying out the deformation monitoring of deep drill, it is often necessary in extreme environments such as fields, in this environment When being monitored operation, due to no fixed place, monitoring resultses are difficult expansion, and the deployment of equipment is difficult to carry out, and Less than digital preservation, the deep drill measurement operation being unfavorable in the environment such as field.
The content of the invention
In view of this, the invention provides a kind of deep drill deformation monitoring integrated system and monitoring system, can solve Above mentioned problem.
Technical scheme provided by the invention is as follows:
A kind of deep drill deformation monitoring integrated system, including:
Casing, the casing have accommodating chamber;
It is arranged in the accommodating chamber, for carrying out the deep drill measurement apparatus of deep drill measurement;
It is arranged in the accommodating chamber, for fixing the fixed support of the deep drill measurement apparatus;
It is connected with the deep drill measurement apparatus, the control of the measurement data for receiving the deep drill measurement apparatus Terminal processed;Wherein, the deep drill measurement apparatus includes:At least one capstan winch;And be arranged on the capstan winch, for quilt It is discharged into predetermined deep drill, to carry out the sensor chain of deep drill deformation measurement.
Further, the deep drill deformation monitoring integrated system also includes being connected with the rotating shaft of the capstan winch, for driving The dynamic capstan winch rotation, to discharge or reclaim the drive device of the sensor chain.
Further, the deep drill deformation monitoring integrated system also includes:
For detecting the detection device of the capstan winch rotating cycle;The detection device includes the light being arranged on the capstan winch Line generator, and be arranged on the fixed support, it is corresponding with the light beam generator, for receiving the light hair The photoelectric conversion sensor of pulse signal is generated during the light that raw device is sent.
Further, the detection device includes the magnetic patch being arranged on the capstan winch, and is arranged on the fixed branch It is corresponding with the magnetic patch on frame, for generating the Hall sensor of pulse signal when sensing the magnetic field of the magnetic patch.
Further, the jacking apparatus for driving the fixed support to rise or fall is additionally provided with the casing.
Further, the deep drill deformation monitoring integrated system also includes being used to be the deep drill deformation monitoring collection Into the power supply of system power supply, and it is arranged on outside the casing, for converting the solar into the solar panel of electric energy.
Further, the deep drill deformation monitoring integrated system also includes being arranged in the casing, with the control Terminal connects, for the data server that the measurement data is stored and handled.
Further, the deep drill deformation monitoring integrated system also includes being connected with the server communication, for depositing Store up and handle the remote server of the measurement data.
Further, the capstan winch be four in capstan winch or six capstan winch.
Present invention also offers a kind of monitoring system, including multiple above-mentioned deep drill deformation monitoring integrated systems, and Measurement data for detecting to obtain the sensor chain is sent to the communication base station of external equipment.
The embodiment of the present application provide deep drill deformation monitoring integrated system by casing set fixed support and Capstan winch, capstan winch can will be arranged on for the sensor chain for carrying out deep drill deformation monitoring, can conveniently be passed by capstan winch The sensor integrated system can realize the monitoring resultses that deep drill is carried out in some extreme environments.Integrated system structure letter It is single, beneficial to deployment, convenient working, the deep drill deformation monitoring operation in various environment can be met.
To enable the above objects, features and advantages of the present invention to become apparent, preferred embodiment cited below particularly, and coordinate Appended accompanying drawing, is described in detail below.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below by embodiment it is required use it is attached Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore be not construed as pair The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is a kind of high-level schematic functional block diagram of deep drill deformation monitoring integrated system provided in an embodiment of the present invention.
Fig. 2 is a kind of structural representation of deep drill deformation monitoring integrated system provided in an embodiment of the present invention.
Fig. 3 is the schematic diagram of another deep drill deformation monitoring integrated system provided in an embodiment of the present invention.
Fig. 4 is the schematic diagram of another deep drill deformation monitoring integrated system provided in an embodiment of the present invention.
Fig. 5 is the schematic diagram of another deep drill deformation monitoring integrated system provided in an embodiment of the present invention.
Fig. 6 is the schematic diagram of another deep drill deformation monitoring integrated system provided in an embodiment of the present invention.
Icon:100- deep drill deformation monitoring integrated systems;110- casings;120- deep drill measurement apparatus;121- Capstan winch;122- sensor chains;130- fixed supports;140- controls terminal;150- drive devices;160- detection devices;161- light Line generator;162- photoelectric conversion sensors;163- magnetic patch;164- Hall sensors;170- jacking apparatus;180- data, services Device;190- remote servers.
Embodiment
Below in conjunction with accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Ground describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.Generally exist The component of the embodiment of the present invention described and illustrated in accompanying drawing can be configured to arrange and design with a variety of herein.Cause This, the detailed description of the embodiments of the invention to providing in the accompanying drawings is not intended to limit claimed invention below Scope, but it is merely representative of the selected embodiment of the present invention.Based on embodiments of the invention, those skilled in the art are not doing The every other embodiment obtained on the premise of going out creative work, belongs to the scope of protection of the invention.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined, then it further need not be defined and explained in subsequent accompanying drawing in individual accompanying drawing.Meanwhile the present invention's In description, term " first ", " second " etc. are only used for distinguishing description, and it is not intended that instruction or hint relative importance.
The embodiment of the present application provides a kind of deep drill deformation monitoring integrated system 100, as shown in figure 1, including casing 110th, deep drill measurement apparatus 120, fixed support 130 and control terminal 140.
The size of casing 110 can determine according to being actually needed, such as can use container as placement other equipment Casing 110, the size of container is unified, and the container of different size can be selected to meet the deep drill deformation in different places Monitoring requirements.And the lifting and transhipment of container may be by existing hanging device and haulage vehicle and carry out, and conveniently enter The rapid deployment of row deep drill.Space in casing 110 can be as the place for accommodating other equipment, and staff can be The related monitoring resultses of deep drill are carried out in casing 110, the area in fixed house is built in some fields or inconvenience, by can The casing 110 of transhipment is lifted, can quickly establish an Active workings.
Deep drill measurement apparatus 120 is arranged in the accommodating chamber, for carrying out deep drill measurement.Detailed, The deep drill measurement apparatus 120 can include capstan winch 121, and be arranged on the capstan winch 121, for being released in advance In the deep drill of determination, to carry out the sensor chain 122 of deep drill deformation measurement.Capstan winch 121 can rotate around the shaft, pass Sensor chain 122 can be previously wound around on capstan winch 121, by rotate capstan winch 121 can realize sensor chain 122 release or Recovery.Simultaneously when carrying out the deformation measurement of deep drill, the length of sensor chain 122 may be longer, will be passed using capstan winch 121 Sensor chain 122 is stored, and can reduce the occupancy volume of sensor chain 122, convenient to carry storage.Meanwhile the length of sensor chain 122 Degree can need to predefine according to measurement, and be wrapped on capstan winch 121.When needing to measure, sensor will be wound with The capstan winch 121 of chain 122 is fixedly installed in casing 110.By adjusting the position of fixed support 130, ensure that capstan winch 121 is discharging During sensor chain 122, sensor chain 122 can be entered vertically in deep drill.
During sensor chain 122 in the embodiment of the present application can have including be used to be arranged at below earth's surface at least two The cylinder unit of hollow structure, it is attached using flexible joint between two neighboring cylinder unit, is installed in each cylinder unit There are sensor, processor, analog-digital converter and voltage-stabilized power supply etc..The sensor being arranged in cylinder unit can be used for gathering waiting to supervise The deformation measurement data of carrier are surveyed, the analog signal that sensor exports can be converted into data signal by analog-digital converter.At this Apply in embodiment, the sensor may include double-axis tilt sensor, water-level gauge and acceleration transducer etc..For difference Application scenarios, monitoring requirements and Contents for Monitoring, different sensor group synthesis sensor chains 122, the sensor may be selected Sensor in chain 122 can re-start fractionation and combination.
Fixed support 130 is arranged in the accommodating chamber, for fixing the deep drill measurement apparatus 120.It is fixed The set location of support 130 can determine that guarantee, which can both have been realized, to be measured deep drill according to the physical location of deep drill The fixation of device 120, while it is predetermined to ensure that the sensor chain 122 on capstan winch 121 can be smoothly placed into In deep drill.
It is also provided with being connected with the deep drill measurement apparatus 120 in casing 110, for receiving the deep The control terminal 140 of the measurement data of borehole survey device 120.The control terminal 140 can deposit to the data collected Storage and display, and whether can meet that preparatory condition judges to the data collected, and can be discontented with the data collected During sufficient preparatory condition, alerted.
In a kind of embodiment, as shown in Fig. 2 deep drill measurement apparatus 120 can also include and the strand The rotating shaft connection of disk 121, for driving the capstan winch 121 to rotate, to discharge or reclaim the drive device of the sensor chain 122 150.Drive device 150 can be motor, realize the rotation of capstan winch 121 by the operating of controlled motor, and then realize sensor The release or recovery of chain 122.The capstan winch 121 can be four at capstan winch 121 or six capstan winch 121.Four side capstan winches, 121 each circle 4 Sensor Measurement Units can be wound, six-sided structure, which is often enclosed, can wind 6 Sensor Measurement Units.The structure of four side capstan winch 121 Suitable for drilling depth less, it is necessary to which the less situation of number of sensors, the structure of six side capstan winch 121 can be adapted to depth deeper Drilling.
In a kind of embodiment, as shown in figure 4, the deep drill deformation monitoring integrated system 100 can also wrap Include the detection device 160 for detecting the rotating cycle of capstan winch 121.The detection device 160 includes being arranged on the capstan winch 121 On light beam generator 161, and be arranged on the fixed support 130, it is corresponding with the light beam generator 161, for The photoelectric conversion sensor 162 of pulse signal is generated when receiving the light that the light beam generator 161 is sent.It is arranged on capstan winch Light beam generator 161 on 121 can send the light of specific wavelength, and photoelectric conversion sensor 162 is receiving such light Pulse signal can be generated during line.For light beam generator 161 during being rotated with capstan winch 121, photoelectric conversion sensor 162 can To receive a light week about, and generate a pulse signal.By determining that the quantity of pulse signal can determine capstan winch The number of turns of 121 rotations, and then determine the length of the sensor chain 122 of release or recovery.
In a kind of embodiment, as shown in figure 5, the detection device 160 includes being arranged on the capstan winch 121 Magnetic patch 163, and be arranged on the fixed support 130, it is corresponding with the magnetic patch 163, for sensing the magnetic patch The Hall sensor 164 of pulse signal is generated during 163 magnetic field.By setting magnetic patch 163, and setting pair on capstan winch 121 The Hall sensor 164 answered, by the magnetic field of magnetic patch 163 Hall sensor 164 can be made to generate corresponding pulse signal.Realize Record the record of the rotating cycle of capstan winch 121, the convenient statistics for being discharged to sensor chain 122 or reclaiming length.Magnetic patch 163 it is specific The position of set location and Hall sensor 164 can be according to the structure determination of capstan winch 121.
In a kind of embodiment, then as shown in Figures 2 and 3, it is additionally provided with the casing 110 for driving institute State the jacking apparatus that fixed support 130 rises or falls.The jacking apparatus 170 can be hydraulic test or the dress of other forms Put, it is possible to achieve the jacking to fixed support 130, facilitate the placement of fixed support 130 and capstan winch 121, be easy to deep drill Monitoring resultses.
In a kind of embodiment, the deep drill deformation monitoring integrated system 100 also includes being used to be the confession The power supply of electricity, and be arranged on outside the casing 110, for converting the solar into the solar panel of electric energy.Power supply can , can be by the electric energy of solar panel conversion so that battery can also be included using the electric energy of civil power or other forms, power supply Stored, facilitate deep drill deformation monitoring integrated system 100 to be used on the place of no civil power, extend the deep The job area of drilling deformation monitoring integrated system 100, meet the deep drill deformation monitoring demand of different places.
In a kind of embodiment, as shown in fig. 6, the deep drill deformation monitoring integrated system 100 can also wrap The remote server 190 communicated to connect with control terminal 140 is included, can be by the various data transfers that monitoring obtains to remote service Storage analysis is carried out in device 190, improves the security of data storage and the speed of processing.It can also configure and control in casing 110 The data server 180 that terminal 140 two processed connects, various data can be stored and handled in data server 180.
In addition, various deep drills can also be set in the deep drill deformation monitoring integrated system 100 in casing 110 The instrument used, such as screwdriver, spanner, communication device for emergency are needed, facilitates the monitoring resultses of deep drill.Conventional equipment It can be integrally disposed in control terminal 140 in a casing 110, and waterproofing design can be carried out, conveniently be monitored operation. Meanwhile various safety work equipment can also be configured in casing 110, to carry out various safety measures when being in an emergency Expansion, it is horizontal to improve safety work.
The embodiment of the present application additionally provides a kind of monitoring system, including multiple above-mentioned deep drill deformation monitoring integrated systems 100, and communication base station, the measurement number that the communication base station can obtain each deep drill deformation monitoring integrated system 100 According to carrying out communication forwarding.
In summary, the deep drill deformation monitoring integrated system 100 that the embodiment of the present application provides is by casing 110 Fixed support 130 and capstan winch 121 are set, can will be arranged on capstan winch 121 for the sensor chain 122 for carrying out deep drill monitoring On, the integrated system can realize the monitoring resultses that deep drill is carried out in some extreme environments.Integrated system structure letter It is single, beneficial to deployment, convenient working, the deep drill monitoring resultses in various environment can be met.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.It should be noted that:Similar label and letter exists Similar terms is represented in following accompanying drawing, therefore, once being defined in a certain Xiang Yi accompanying drawing, is then not required in subsequent accompanying drawing It is further defined and explained.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be contained Cover within protection scope of the present invention.Therefore, protection scope of the present invention described should be defined by scope of the claims.

Claims (10)

  1. A kind of 1. deep drill deformation monitoring integrated system, it is characterised in that including:
    Casing, the casing have accommodating chamber;
    It is arranged in the accommodating chamber, for carrying out the deep drill measurement apparatus of deep drill measurement;
    It is arranged in the accommodating chamber, for fixing the fixed support of the deep drill measurement apparatus;
    It is connected with the deep drill measurement apparatus, it is whole for receiving the control of measurement data of the deep drill measurement apparatus End;Wherein, the deep drill measurement apparatus includes:At least one capstan winch;And be arranged on the capstan winch, for being released Into predetermined deep drill, to carry out the sensor chain of deep drill deformation measurement.
  2. 2. deep drill deformation monitoring integrated system according to claim 1, it is characterised in that deep drill deformation prison Surveying integrated system also includes being connected with the rotating shaft of the capstan winch, for driving the capstan winch to rotate, to discharge or reclaim the biography The drive device of sensor chain.
  3. 3. deep drill deformation monitoring integrated system according to claim 1, it is characterised in that deep drill deformation prison Surveying integrated system also includes:
    For detecting the detection device of the capstan winch rotating cycle;The detection device includes the light hair being arranged on the capstan winch Raw device, and be arranged on the fixed support, it is corresponding with the light beam generator, for receiving the light beam generator The photoelectric conversion sensor of pulse signal is generated during the light sent.
  4. 4. deep drill deformation monitoring integrated system according to claim 3, it is characterised in that the detection device includes The magnetic patch being arranged on the capstan winch, and be arranged on the fixed support, it is corresponding with the magnetic patch, for sensing The Hall sensor of pulse signal is generated when stating the magnetic field of magnetic patch.
  5. 5. deep drill deformation monitoring integrated system according to claim 1, it is characterised in that also set up in the casing There is the jacking apparatus for driving the fixed support to rise or fall.
  6. 6. deep drill deformation monitoring integrated system according to claim 1, it is characterised in that deep drill deformation prison Surveying integrated system also includes being used for the power supply for deep drill deformation monitoring integrated system power supply, and is arranged on the case In vitro, for converting the solar into the solar panel of electric energy.
  7. 7. deep drill deformation monitoring integrated system according to claim 1, it is characterised in that deep drill deformation prison Surveying integrated system also includes being arranged in the casing, is connected with the control terminal, for being deposited to the measurement data Storage and the data server of processing.
  8. 8. deep drill deformation monitoring integrated system according to claim 1, it is characterised in that deep drill deformation prison Surveying integrated system also includes being connected with the server communication, for storing and handling the remote server of the measurement data.
  9. 9. the deep drill deformation monitoring integrated system according to claim 1 to 8 any one, it is characterised in that described Capstan winch be four in capstan winch or six capstan winch.
  10. 10. a kind of monitoring system, it is characterised in that including the deep drill deformation described in multiple claim 1 to 9 any one Integrated system is monitored, and the measurement data for monitoring to obtain the sensor chain is sent to the communication base of external equipment Stand.
CN201710781379.8A 2017-09-01 2017-09-01 Deep drill deformation monitoring integrated system and monitoring system Pending CN107355212A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710781379.8A CN107355212A (en) 2017-09-01 2017-09-01 Deep drill deformation monitoring integrated system and monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710781379.8A CN107355212A (en) 2017-09-01 2017-09-01 Deep drill deformation monitoring integrated system and monitoring system

Publications (1)

Publication Number Publication Date
CN107355212A true CN107355212A (en) 2017-11-17

Family

ID=60291324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710781379.8A Pending CN107355212A (en) 2017-09-01 2017-09-01 Deep drill deformation monitoring integrated system and monitoring system

Country Status (1)

Country Link
CN (1) CN107355212A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4565007A (en) * 1982-09-27 1986-01-21 Geoservices S. A. Process and apparatus for measuring the coiled/uncoiled length of winding gear cable
US5675088A (en) * 1995-04-03 1997-10-07 Serata; Shosei Method and apparatus for automatic monitoring of tectonic stresses and quantitative forecast of shallow earthquakes
US6347462B1 (en) * 1998-08-27 2002-02-19 Asm Automation Sensorik Messtechnik Gmbh Measuring cable travel sensor with housing
CN201310342Y (en) * 2008-12-02 2009-09-16 中国石油天然气集团公司 Continuous-tube well logging machine
CN103822602A (en) * 2014-02-26 2014-05-28 三峡大学 Multi-channel large deformation landslide displacement automatic monitoring device and method
US20170044894A1 (en) * 2015-08-11 2017-02-16 Intrasen, LLC Groundwater monitoring system and method
CN106705927A (en) * 2016-12-20 2017-05-24 杭州鲁尔物联科技有限公司 Deformation measuring device and system
CN207538826U (en) * 2017-09-01 2018-06-26 杭州鲁尔物联科技有限公司 Deep drill deformation monitoring integrated system and monitoring system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4565007A (en) * 1982-09-27 1986-01-21 Geoservices S. A. Process and apparatus for measuring the coiled/uncoiled length of winding gear cable
US5675088A (en) * 1995-04-03 1997-10-07 Serata; Shosei Method and apparatus for automatic monitoring of tectonic stresses and quantitative forecast of shallow earthquakes
US6347462B1 (en) * 1998-08-27 2002-02-19 Asm Automation Sensorik Messtechnik Gmbh Measuring cable travel sensor with housing
CN201310342Y (en) * 2008-12-02 2009-09-16 中国石油天然气集团公司 Continuous-tube well logging machine
CN103822602A (en) * 2014-02-26 2014-05-28 三峡大学 Multi-channel large deformation landslide displacement automatic monitoring device and method
US20170044894A1 (en) * 2015-08-11 2017-02-16 Intrasen, LLC Groundwater monitoring system and method
CN106705927A (en) * 2016-12-20 2017-05-24 杭州鲁尔物联科技有限公司 Deformation measuring device and system
CN207538826U (en) * 2017-09-01 2018-06-26 杭州鲁尔物联科技有限公司 Deep drill deformation monitoring integrated system and monitoring system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
潘雪涛、温秀兰: "《传感器原理与检测技术》", 湖南大学出版社, pages: 244 - 151 *

Similar Documents

Publication Publication Date Title
CN107024366A (en) A kind of Portable water sampler
CN107101615A (en) Incline monitoring system for electric transmission line pole and its application process based on Bluetooth communication
CN109374847A (en) A kind of vertical water quality data automatic acquisition device of buoyancy compensation formula multi-parameter and application method
CN104847412B (en) A kind of underground coal separation plant chamber bottom plate displacement dynamic monitoring method
CN202529757U (en) Safe monitoring and managing device for GPRS tower crane
CN102815614A (en) Detecting and monitoring device for displaying real-time lifting hook declination angle
CN108827267A (en) A kind of verticality monitoring device
CN104326360B (en) High pedestal jib crane holographic measuring method
CN207538826U (en) Deep drill deformation monitoring integrated system and monitoring system
CN104596581A (en) Intelligent suspension rod flow measuring device
CN107355212A (en) Deep drill deformation monitoring integrated system and monitoring system
CN104016232B (en) Dynamic weighing mechanism for lifting device
CN203547704U (en) Universal drilling machine well drilling parameter instrument
CN102561941A (en) Rotary drilling rig and pore-forming state detection device thereof
CN209727899U (en) A kind of discarded vertical gas boring and surveying device
CN1811489A (en) Portable gravity and environment parameter graphic display instrument
CN104743445B (en) Safety of tower crane device for detecting performance based on communicating pipe and attitude and the method for analysis thereof
CN211145913U (en) Seabed landform and landform close-range detection device
CN211338594U (en) Tower crane with monitoring system
CN112960553A (en) System and method for monitoring electric energy efficiency of crane hoisting mechanism
JPH0868620A (en) Measuring apparatus of wall shape of excavation hole
CN211498980U (en) Empty pile section engineering pile concrete face elevation equipment
CN208907807U (en) A kind of verticality monitoring device
CN211846905U (en) Synchronous lifting system of gantry crane
WO2018152721A1 (en) On-line monitoring system and method for suspension steel wire rope for hoisting container

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination