CN107354320A - A kind of efficient Zinc powder production device - Google Patents

A kind of efficient Zinc powder production device Download PDF

Info

Publication number
CN107354320A
CN107354320A CN201710836798.7A CN201710836798A CN107354320A CN 107354320 A CN107354320 A CN 107354320A CN 201710836798 A CN201710836798 A CN 201710836798A CN 107354320 A CN107354320 A CN 107354320A
Authority
CN
China
Prior art keywords
zinc powder
dust
storehouse
condenser
dust chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710836798.7A
Other languages
Chinese (zh)
Other versions
CN107354320B (en
Inventor
石运明
容敏
贲仕胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Xinfeng Industrial Waste Residue Comprehensive Recovery And Reuse Co Ltd
Original Assignee
Guizhou Xinfeng Industrial Waste Residue Comprehensive Recovery And Reuse Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Xinfeng Industrial Waste Residue Comprehensive Recovery And Reuse Co Ltd filed Critical Guizhou Xinfeng Industrial Waste Residue Comprehensive Recovery And Reuse Co Ltd
Priority to CN201710836798.7A priority Critical patent/CN107354320B/en
Publication of CN107354320A publication Critical patent/CN107354320A/en
Application granted granted Critical
Publication of CN107354320B publication Critical patent/CN107354320B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B19/00Obtaining zinc or zinc oxide
    • C22B19/04Obtaining zinc by distilling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F9/00Making metallic powder or suspensions thereof
    • B22F9/02Making metallic powder or suspensions thereof using physical processes
    • B22F9/12Making metallic powder or suspensions thereof using physical processes starting from gaseous material
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Abstract

The invention discloses a kind of efficient Zinc powder production device, and it includes automatic feed electricity zinc stove, raw material electric heating equipment, condenser, pulsating collection device and screening packing apparatus;Automatic feed electricity zinc stove includes electric arc furnaces and feeding device, and electric arc furnaces includes bell, body of heater and hearth electrode, and the side wall of body of heater one is provided with exhaust outlet, negative electrode is provided with body of heater;The hearth electrode includes refractory lining, and conductive homogenizing plate is provided with below refractory lining, and refractory lining is provided with one group of positive plate, is connected below positive plate through refractory lining with conductive homogenizing plate, conductive homogenizing plate side is connected with cast steel contact rod;Feeding device includes tube for feed, material bin, feeding pipe and the pan feeding motor for being located at feeding pipe side.The zinc powder process equipment of the present invention has the advantages of mechanical automation degree is higher, globality is relatively strong, zinc powder production and processing efficiency high, reduces processing cost, improves that processing efficiency is relatively low, improves product quality.

Description

A kind of efficient Zinc powder production device
Technical field
The present invention relates to one kind to industrialize zinc metallurgy device, particularly a kind of efficient Zinc powder production device.
Background technology
Electric furnace zinc smelting is using electric energy as thermal source, and under the reducing agent existence condition such as coke or coal, directly heating furnace charge makes it In ZnO component be continuously reduced into zinc fume and be condensed into metallic zinc.The technique can handle high-copper high ferro zinc ore.
There is electric furnace zinc smelting technology abroad in the 1930s.The eighties, China start to use electric furnace zinc smelting technology, extremely The present, production scale was more considerable in the popularization and application of Duo Jia pyrometallurgy of zinc factory.
Electric furnace zinc smelting is mainly powered by electric arc furnaces and heated, and raw material in stove is reacted in the presence of electrical heat energy, is obtained Zinc fume, condensed and operation of gathering dust obtain zinc powder.
Electric arc furnaces(electric arc furnace)It is to utilize high melt ore and metal caused by electrode arc Electric furnace.Energy is concentrated very much when gas discharge forms electric arc, and arc area temperature is more than 3000 DEG C.For smelting metal, electric arc furnaces ratio Other converter technological flexibilities are big, can effectively remove impurity, the furnace temperature such as desulfuration, phosphorus and be easily controlled, and occupation area of equipment is small, fit In the melting of superior alloy steel.
Existing electric arc furnaces conductive bottom has anode assembly, by drainage steel plate, flows steel plate, bottom is drawn steel plate welding and added Work and furnace bottom refractory brick form with block, but existing direct current zinc metallurgy electric arc furnaces bottom anode electrode structure is easily because of furnace bottom refractory lining After being corroded by metal bath, cause positive plate to melt, penetrate furnace bottom, cause slag breakthrough accident;Furnace bottom conduction is drawn simultaneously Steel plate is long and more, need to open multiple furnace bottom rings drawn long mouth to connect extraction copper bar, need design to special procure for this in steel plate of furnace hearth Shaped steel tendon concrete structure basis, greatly increases electric furnace cost and completion time of project.
Due to the speed of electric furnace zinc smelting production and processing, in electric arc furnaces ore and the speed of reducing agent consumption compared with It hurry up, then need often to add raw material into electric arc furnaces during zinc metallurgy, but the operation of existing electric zinc stove filling is more troublesome, leads to Often need to shut down to carry out filling, not only reduce the efficiency of processing, and cost of labor is higher;And in process of production The speed that heating after raw material is added in electric zinc stove be present is relatively slow, it is necessary to raw material could be warming up to processing temperature by the long period, and Relatively complicated in the operation that the pre-heat treatment is carried out to raw material at present, device structure is complicated, and input and output material process is cumbersome, and raw material is pre- Heat is uneven, and pre-heat effect is poor.
In electric furnace zinc smelting process of manufacture, the temperature of zinc fume caused by electric arc furnaces is higher, is difficult in process of production It is cooled down in time, can be damaged if the zinc fume cooling in tail gas is not just directly discharged into dust arrester installation completely in dust arrester installation The part in portion, production equipment service life is gently then influenceed, the quality of production is received influences, heavy then cause production equipment to scrap, increasing Add maintenance cost, delay manufacturing schedule, cause production loss;Current used condenser is mostly spiral coil cooling tube knot Structure, because spiral coil cooling tube bend pipe loop is more, zinc fume is easily deposited on spiral coil cooling tube bend pipe loop during condensation In, the velocity of liquid assets of air-flow can be not only influenceed, reduces cooling effectiveness, and easily block cooling tube;If cooling tube is blocked, zinc steams The heat of vapour institute band can not discharge in time, then easily cause blast, potential safety hazard is larger;To solve the above problems, at present to zinc Often shut down in powder production process and checked, maintained and changed cooling tube, not only replacement operation is cumbersome, and maintenance cost is higher, and And production efficiency can be reduced, cause zinc powder overall yield not high.
Because the zinc particle that zinc vapor condensing is formed is smaller, condenser can not collect zinc powder completely, if tail gas is straight Run in put and not only result in waste, influence zinc powder yield, and the zinc particle in tail gas easily causes and causes environmental pollution to pollute; Current dust-precipitator zinc powder produce during gather dust it is ineffective, be primarily due to dust easily absorption in dust-precipitator In gather dust on cloth bag, when adsorbing powder dust to a certain extent after, the cloth bag that gathers dust absorb dust ability can decline to a great extent, cause tail Zinc powder dust in gas can not be completely absorbed, and waste gas utilization rate is relatively low, can still cause to waste, to solve this problem, at present Frequently with means be to shut down cleaning to gather dust cloth bag, but the cost safeguarded is higher, and often maintenance shut-downs can shorten dust-precipitator Service life;So there is the ability shakiness that the cloth bag that gathers dust absorbs dust in existing dust-precipitator during zinc powder produces Calmly, the problem of dust collection effect is poor, dust-collecting efficiency is relatively low, and the utilization rate of tail gas is relatively low.
When being packed to zinc powder more using sealing bucket;Existing sealing bucket packaging facilities to zinc powder when packing The problem of dust after zinc powder pouring process is cumbersome, zinc powder is poured into sealing bucket is more loose be present, and capping behaviour can not be carried out Make, need manually to be sealed lid operation after the completion of filling, it is not only less efficient, be difficult to operate, and the effect sealed It is unstable, easily influence preservation effect.
Therefore, there is the problem of complicated, process operation is cumbersome in existing zinc powder process equipment, not only mechanization degree Relatively low, equipment globality is poor, and processing cost is higher, processing efficiency is relatively low, unstable product quality.
The content of the invention
It is an object of the present invention to provide a kind of efficient Zinc powder production device.The zinc powder process equipment of the present invention has machine The advantages of tool automaticity is higher, globality is relatively strong, zinc powder production and processing efficiency high, in process of manufacture at raw material heat Speed is managed, treatment effect effect is preferable, and electric zinc stove pan feeding is convenient and swift, heating response speed, and security is higher;It is cold Solidifying and dust collection effect is preferable;Screening packing efficiency high, screening packing cost are low, and zinc powder packaging is more close, reduces and is processed into This, improve that processing efficiency is relatively low, improves product quality.
Technical scheme:A kind of efficient Zinc powder production device, including automatic feed electricity zinc stove and and automatic feed The raw material electric heating equipment of electric zinc stove connection, in addition to the pulsating collection device that condensed device is connected with automatic feed electricity zinc stove, Condenser and pulsating collection device are connected with screening packing apparatus respectively;The automatic feed electricity zinc stove includes electric arc furnaces and is located at Feeding device above electric arc furnaces, the electric arc furnaces include bell, body of heater and hearth electrode, and the bell is located above body of heater, Hearth electrode is located at below body of heater, and the side wall of body of heater one is provided with exhaust outlet, the negative electrode of bell is provided through in body of heater;The furnace bottom Electrode includes the refractory lining for being located at bottom of furnace body, is provided with conductive homogenizing plate below refractory lining, refractory lining is provided with one group Positive plate, positive plate lower section are connected through refractory lining with conductive homogenizing plate, and conductive homogenizing plate side is connected with cast steel contact rod; The feeding device includes tube for feed, and material bin is provided with below tube for feed, the feeding pipe connect with bell is provided with below material bin, enters Expects pipe side is additionally provided with pan feeding motor.
In a kind of foregoing efficiently Zinc powder production device, the cast steel contact rod is L-shaped structure, cast steel contact rod one end Provided with welding teeth groove, conductive homogenizing plate is connected with cast steel contact rod by welding teeth groove, and the cast steel contact rod other end passes through bolt It is connected with copper bar, cast steel contact rod bottom is provided with one group of air-cooled passage, and the air-cooled passage is respectively with the air inlet of body of heater and going out Air port connects.
In a kind of foregoing efficiently Zinc powder production device, the pan feeding of the raw material electric heating equipment and automatic feed electricity zinc stove Device connects, and raw material electric heating equipment includes electrocaloric effect, and electrocaloric effect tank wall is provided with electrothermal piece, fume pipe is provided with above electrocaloric effect Road, electrocaloric effect one end are connected with feed pipe, and the electrocaloric effect other end is provided with discharging opening;Transmission spiral shell is additionally provided with the electrocaloric effect Bar, transmission screw rod one end are connected with being located at the Rotating shafts of electrocaloric effect side, and the transmission screw rod other end is another with being located at electrocaloric effect The power set connection of side, the power set include support bracket, and support bracket is provided with motor.
In a kind of foregoing efficiently Zinc powder production device, the condenser passes through the row of feeding mouth and automatic feed electricity zinc stove Gas port connects, and condenser includes on the condenser that sets gradually from top to bottom group and condenser the following group in group, condenser;Condenser Upper group includes shell, is provided with water seal short tube card above shell, water seal short tube card is provided with one group of short tube, side is organized in condenser Wall is provided with feeding mouth, and drawing mechanism is provided with condenser the following group.
In a kind of foregoing efficiently Zinc powder production device, the pulsating collection device includes compound dust collecting box, compound to gather dust Case is connected by air inlet pipe with condenser, discharge device is provided with below compound dust collecting box, it is quiet that the compound dust collecting box includes water smoke Electric dust chamber, pocket type pulsed dust chamber A and pocket type pulsed dust chamber B, spray electrostatic dust chamber, pocket type pulsed dust chamber A and bag Formula pulsating collection room B is sequentially connected, and is all provided with below spray electrostatic dust chamber, pocket type pulsed dust chamber A and pocket type pulsed dust chamber B There is dust hopper, the pulse dust collector also includes being located at the pulse air pump device above compound dust collecting box, pulse air pump device bag Include air compressor and connect the pulse air flue of air compressor and compound dust collecting box, the air compressor is provided with pulse control Device processed.
In a kind of foregoing efficiently Zinc powder production device, the spray electrostatic dust chamber is connected with air inlet pipe, spray electrostatic The junction of dust chamber and air inlet pipe is provided with waterfog head, and electrostatic gas channel, electrostatic gas are additionally provided with spray electrostatic dust chamber Circulation road tube wall is connected with electrostatic generator;The spray electrostatic dust chamber and pocket type pulsed dust chamber A junction are provided with quiet Electrostatic (electric dust) precipitator, precipitator are connected with electrostatic generator.
In a kind of foregoing efficiently Zinc powder production device, in the pocket type pulsed dust chamber A and pocket type pulsed dust chamber B Provided with dust collection filter bag, dust collection filter bag is connected with pulse air pump device
In a kind of foregoing efficiently Zinc powder production device, the screening packing apparatus includes support, and support is provided with lifting device, Crushed aggregates device is provided with above lifting device, lifting device side is provided with rotation screen tray, is provided with below rotation screen tray and is connected with support Hydraulic lifting valve, discharge bucket is additionally provided with support, the discharge bucket is located at below rotation screen tray side, is provided with below discharge bucket Packing device, packing device are connected by transfer tube with discharge bucket.
In a kind of foregoing efficiently Zinc powder production device, the packing device includes packing storehouse and the transmission through packing storehouse Device, be provided with filling storehouse and feed supplement storehouse in the packing storehouse, filling storehouse and feed supplement storehouse are located above conveyer, in storehouse of packing and also Provided with material pressing device and capping apparatus, the material pressing device and capping apparatus are connected with packing storehouse upper wall, and material pressing device includes setting Binder valve A between the filling storehouse and feed supplement storehouse and binder valve B being located between feed supplement storehouse and capping apparatus.
Compared with prior art, present invention design automatic feed electricity zinc stove adds as the electric furnace of electric furnace zinc smelting to raw material Heat, the energy is saved, heat utilization efficiency is higher, and filling is simple to operate effectively raises production efficiency, reduces production cost; By setting the electrocaloric effect being connected with feed pipe, and electrothermal piece is set in electrocaloric effect, can be carried out in raw material transportation Preheating, reduce and heated up the required time in the electric zinc stove of raw material addition, improve the production and processing efficiency of electric furnace zinc smelting;By in electric heating Transmission screw rod is set in case, and drives transmission screw rod to rotate by being located at the power set of electrocaloric effect side, by rotating screw rod Rotation, can not only stir the raw material in electrocaloric effect, make raw material preheating uniform, and can be driven by transmitting the helical blade of screw rod Raw material Mobile Transmission, improve the efficiency of raw material preheating.
Automatic feed electricity zinc stove is to be connected feeding device with bell by setting to realize automatic feed;Feeding device mainly wraps Tube for feed, material bin, feeding pipe and pan feeding motor are included, by the way that well mixed ore and reducing agent are previously added into charge In cylinder, when filling is needed in production process, material bin is opened, tube for feed ore and reducing agent is fallen into material bin, together When open pan feeding motor, drive material bin in ore and reducing agent through feeding pipe transmit into electric zinc stove complete enter automatically Material operation;By setting multiple feeding devices, be previously added raw material and reducing agent, can be achieved do not shut down in process of production into Material, filling operation is relatively simple, effectively raises production efficiency, reduces production cost;And automatic feed electricity zinc stove It is vertically-mounted in body of heater that bottom anode electrode assembly employs polylith positive plate, below positive plate through refractory lining with it is conductive Homogenizing plate is welded, and conductive homogenizing plate and cast steel contact rod is welded by welding teeth groove, and it is to ensure bead contact conducting surface that it, which is acted on, Accumulate the overtemperature that do not generated heat when meeting cast steel contact rod at full capacity.By setting homogenizing plate, and the weldering for passing through trapezoid groove structure in furnace bottom Spreading groove and welding teeth groove weld conductive homogenizing plate and cast steel contact rod, can reduce by 1.6 meters of epipodium steel bars of EAF bottom and mix Solidifying soil matrix seat, while factory building height is reduced, electric furnace factory building and infrastructure investment are saved, and save building time.Cast steel contact rod bottom Portion sets the air-cooled passage that is connected respectively with the air inlet and air outlet of body of heater, and by bolt by cast steel contact rod afterbody and copper Row's connection, makes direct current zinc stove conductive bottom anode bulk temperature uniform, avoids direct current zinc stove and caused directly by slag etch Electric zinc furnace bottom anode electrode device damage is flowed, extends the service life of direct current zinc stove, and reduce manufacturing cost and fortune Row cost.
Condenser using triad combination form, have it is simple in construction, be easy to dismount and maintain;Slided by setting Wheel, designed using movable type, solve cleaning furnace gas export and block the technical barrier for needing blowing out;The design solution cooled down using straight tube The easily stifled powder problem of cooling tube of having determined, improves cooling effectiveness, improves safety coefficient, while more convenient cooling tube is changed.
Pulsating collection device used in the present invention, utilize spray electrostatic dust chamber, pocket type pulsed dust chamber A and pocket type pulsed Dust chamber B carries out absorptive collection to the zinc powder dust in tail gas;By setting spray electrostatic dust chamber to carry out the tail gas of entrance Water smoke lumps and Electrostatic Absorption, sprays water smoke particular by waterfog head, makes water droplet by zinc powder dust accumulation into larger particles, It is easy to collect;By the way that the tube wall of electrostatic gas channel is connected with electrostatic generator, be easy to the dust granules in tail gas stream and Air separates;By setting precipitator, the dust granules in absorptive collection air-flow;By in pocket type pulsed dust chamber A and Dust collection filter bag is set in pocket type pulsed dust chamber B, for the zinc powder dust in adsorption filtration exhaust gas flow, and by dust collection filter bag With pulse air pump device, gases at high pressure are blown to dust collection filter bag inside using pulse air pump device, dust are shaken off, into dust Bucket, the adsorption effect of stable dust collection filter bag;Using conveying worm as discharge device, zinc powder below dust collecting box can will be fallen on Discharge in time, and be not susceptible to block, improve dust-collecting efficiency.
For screening packing apparatus used in the present invention by carrying out screening operation from rotation screen tray, screening amount is larger, can be real Continuous screening is not shut down now, screening efficiency is higher, reduces screening cost, and can rotate screen tray by hydraulic lifting valve regulation Angle of inclination, improve the effect of screening;By setting lifting device, lifted, zinc powder can be added in rotation screen tray for transporting, By setting crushed aggregates device, the bulky grain zinc powder on the horizontal reduction stage of lifting device is crushed using nip rolls, to improve zinc powder Quality;Packed by setting packing device by the zinc powder completed is sieved;Using the conveyer being located in packing device, It is easy to sealing bucket to be moved in storehouse of packing, is easy to filling, feed supplement, binder and closure application to carry out, improves packaging efficiency, reduces Packing cost;By setting filling storehouse, after conveyer, which will seal bucket, to be sent into filling storehouse, filling storehouse can be opened by setting Feeding pipe, zinc powder is poured into from trend sealing bucket;After sealing bucket is transported by filling storehouse, by the binder valve A of setting to sealing bucket In zinc powder carry out binder, will seal bucket in zinc powder compacting, make the zinc powder in sealing bucket more close;By setting feed supplement Storehouse, after conveyer, which will seal bucket, to be sent into feed supplement storehouse, feed supplement storehouse can open feeding pipe by setting, and be filled from trend sealing bucket Enter zinc powder, the space in bucket is sealed with supplement;After sealing bucket is transported by feed supplement storehouse, by the binder valve B of setting to sealing bucket In zinc powder carry out binder, will seal bucket in zinc powder compacting, make the zinc powder in sealing bucket even closer;By setting capping dress Put, sealing bucket can be covered, realize automatic progress closure application, improve packaging efficiency, and the effect sealed is more It is stable.
In summary, zinc powder process equipment of the invention has that mechanical automation degree is higher, globality is relatively strong, zinc powder life The advantages of high in machining efficiency is produced, raw material thermal treatment rate is very fast in process of manufacture, and treatment effect effect is preferable, electric zinc stove Pan feeding is convenient and swift, heating response speed, and security is higher;Condensation and dust collection effect are preferable;Screening packing efficiency high, sieve Point packing cost is low, and zinc powder packaging is more close, reduces processing cost, improves that processing efficiency is relatively low, improves product matter Amount.
Brief description of the drawings
Fig. 1 is the structured flowchart of the present invention;
Fig. 2 is the structural representation of automatic feed electricity zinc stove;
Fig. 3 is the structural representation of raw material electric heating equipment;
Fig. 4 is the structural representation of condenser;
Fig. 5 is the structural representation of pulsating collection device;
Fig. 6 is the structural representation for sieving packing apparatus.
Mark in accompanying drawing for:1- raw material electric heating equipments, 2- automatic feed electricity zinc stoves, 3- condensers, 4- pulsating collections Device, 5- screening packing apparatus, 6- electric arc furnaces, 7- bells, 8- bodies of heater, 9- hearth electrodes, 10- exhaust outlets, 11- negative electrodes, 12- are resistance to Stove serves as a contrast, 13- conduction homogenizing plates, 14- positive plates, 15- cast steel contact rods, 16- tube for feed, 17- material bins, 18- feeding pipes, 19- pan feeding motors, 20- electrocaloric effects, 21- electrothermal pieces, 22- flues, 23- feed pipes, 24- transmission screw rods, 25- rotary shafts Part, 26- support brackets, 27- motor, 28- water seal short tube cards, 29- short tubes, 30- feeding mouths, 31- drawing mechanisms, 32- are multiple Formula dust collecting box, 33- discharge devices, 34- spray electrostatic dust chambers, the 35- pocket type pulsed dust chamber B of pocket type pulsed dust chamber A, 36-, 37- dust hoppers, 38- air compressors, 39- pulse air flues, 40- waterfog heads, 41- electrostatic gas channels, 42- electrostatic precipitations Device, 43- dust collection filter bags, 44- supports, 45- lifting devices, 46- crushed aggregates devices, 47- rotation screen trays, 48- hydraulic lifting valves, 49- Discharge bucket, 50- transfer tubes, 51- packings storehouse, 52- conveyers, the filling storehouses of 53-, 54- feed supplement storehouses, 55- capping apparatus, 56- pressures Expect valve A, 57- binder valve B.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples, but be not intended as to the present invention limit according to According to.
Embodiment.A kind of efficient Zinc powder production device, as shown in Figures 1 to 6, including automatic feed electricity zinc stove 2 and with from The raw material electric heating equipment 1 that the dynamic electric zinc stove 2 of charging connects, in addition to the pulse that condensed device 3 is connected with automatic feed electricity zinc stove 2 Dust arrester installation 4, condenser 3 and pulsating collection device 4 are connected with screening packing apparatus 5 respectively;The automatic feed electricity zinc stove 2 wraps Include electric arc furnaces 6 and be located at the feeding device of the top of electric arc furnaces 6, the electric arc furnaces 6 includes bell 7, body of heater 8 and hearth electrode 9, institute State bell 7 and be located at the top of body of heater 8, hearth electrode 9 is located at the lower section of body of heater 8, and the side wall of body of heater 8 one is provided with exhaust outlet 10, in body of heater 8 It is provided through the negative electrode 11 of bell 7;The hearth electrode 9 includes being located at the refractory lining 12 of the bottom of body of heater 1, under refractory lining 12 Side is provided with conductive homogenizing plate 13, and refractory lining 12 is provided with one group of positive plate 14, the lower section of positive plate 14 pass through refractory lining 12 and Conductive homogenizing plate 13 is connected, and the conductive side of homogenizing plate 13 is connected with cast steel contact rod 15;The feeding device includes tube for feed 16, The lower section of tube for feed 16 is provided with material bin 17, and the lower section of material bin 17 is provided with the feeding pipe 18 connect with bell 7, and the side of feeding pipe 18 is also set There is pan feeding motor 19.
The cast steel contact rod 15 is L-shaped structure, and the one end of cast steel contact rod 15 is provided with welding teeth groove, conductive homogenizing plate 13 Connected with cast steel contact rod 15 by welding teeth groove, the other end of cast steel contact rod 15 is connected by bolt with copper bar, and cast steel is conductive The bottom of rod 15 is provided with one group of air-cooled passage, and the air-cooled passage is connected with the air inlet and air outlet of body of heater 8 respectively;The raw material Electric heating equipment 1 is connected with the feeding device of automatic feed electricity zinc stove 2, and raw material electric heating equipment 1 includes electrocaloric effect 20, electrocaloric effect 20 tank walls are provided with electrothermal piece 21, and the top of electrocaloric effect 20 is provided with flue 22, and the one end of electrocaloric effect 20 is connected with feed pipe 23, The other end of electrocaloric effect 20 is provided with discharging opening;Transmission screw rod 24 is additionally provided with the electrocaloric effect 20, transmission screw rod 24 one end is with being located at The Rotating shafts 25 of the side of electrocaloric effect 20 connect, the transmission other end of screw rod 24 and the power set company for being located at the opposite side of electrocaloric effect 20 Connect, the power set include support bracket 26, and support bracket 26 is provided with motor 27;The condenser 3 include on to Under group and condenser the following group in group, condenser on the condenser that sets gradually;Group includes shell on condenser, is provided with above shell Water seal short tube card 28, water seal short tube card 28 are provided with one group of short tube 29, and group side wall is provided with feeding mouth 30 in condenser, cold Drawing mechanism 31 is provided with condenser the following group;The condenser 3 is connected by the exhaust outlet 10 of feeding mouth 30 and automatic feed electricity zinc stove 2 Connect;The pulsating collection device 4 includes compound dust collecting box 32, and compound dust collecting box 32 is connected by air inlet pipe with condenser 3, compound The lower section of dust collecting box 32 is provided with discharge device 33, the compound dust collecting box 32 including spray electrostatic dust chamber 34, pocket type pulsed gather dust Room A35 and pocket type pulsed dust chamber B36, spray electrostatic dust chamber 34, pocket type pulsed dust chamber A35 and pocket type pulsed dust chamber B36 is sequentially connected, and collection is equipped with below spray electrostatic dust chamber 34, pocket type pulsed dust chamber A35 and pocket type pulsed dust chamber B36 Dirt bucket 37, the pulse dust collector also include the pulse air pump device for being located at the compound top of dust collecting box 32, pulse air pump device bag Include air compressor 38 and connect the pulse air flue 39 of air compressor 38 and compound dust collecting box 32, on the air compressor 38 Provided with impulse controller;The spray electrostatic dust chamber 34 is connected with air inlet pipe, spray electrostatic dust chamber 34 and the company of air inlet pipe Meet place and be provided with waterfog head 40, electrostatic gas channel 41, the tube wall of electrostatic gas channel 41 are additionally provided with spray electrostatic dust chamber 34 It is connected with electrostatic generator;The junction of the spray electrostatic dust chamber 34 and pocket type pulsed dust chamber A35 is provided with electrostatic precipitation Device 42, precipitator 42 are connected with electrostatic generator;It is all provided with pocket type pulsed dust chamber A35 and pocket type pulsed dust chamber B36 There is dust collection filter bag 43, dust collection filter bag 43 is connected with pulse air pump device;The screening packing apparatus 5 includes support 44, support 44 Lifting device 45 is provided with, the top of lifting device 45 is provided with crushed aggregates device 46, and the side of lifting device 45 is provided with rotation screen tray 47, rotation Turn the lower section of screen tray 47 and be provided with the hydraulic lifting valve 48 being connected with support 44, discharge bucket 49, the discharge bucket are additionally provided with support 44 49 are located at the rotation side-lower of screen tray 47 1, and the lower section of discharge bucket 49 is provided with packing device, and packing device passes through transfer tube 50 and discharging The connection of bucket 49;The packing device includes packing storehouse 51 and the conveyer 52 through packing storehouse 51, is set in the packing storehouse 51 There are filling storehouse 53 and feed supplement storehouse 54, filling storehouse 53 and feed supplement storehouse 54 are located at the top of conveyer 52, and pressure is additionally provided with storehouse 51 of packing Expect device and capping apparatus 55, the material pressing device and capping apparatus 55 are connected with the packing upper wall of storehouse 51, and material pressing device includes setting Binder valve A56 between filling storehouse 53 and feed supplement storehouse 54 and the binder valve being located between feed supplement storehouse 54 and capping apparatus 55 B57。
Operation principle:Feed pipe 23 is connected with electrocaloric effect 20, connects electrothermal piece 21 and power set upper motor 27 Power supply;When raw material is after feeding pipe 18 adds electrocaloric effect 20, electrothermal piece 21 heats to raw material;It is electronic on power set The driving transmission screw rod 24 of machine 27 rotates, and is rotated by rotating screw rod, stirs the raw material in electrocaloric effect 20, make raw material preheating uniform, The efficiency of raw material preheating is improved, and the helical blade for transmitting screw rod 24 can drive raw material Mobile Transmission, when transmission screw rod 24 will After material transport to discharging opening, raw material is fallen from discharging opening, completes raw material preheating;Automatic feed electricity zinc stove 2 refines as electric furnace The electric arc furnaces 6 of zinc, the welding teeth groove of cast steel contact rod 15 is grown with the welding on conductive homogenizing plate 13 using joint filling welding manner Slot welding expires, and ensures the overtemperature that do not generated heat when bead contact conductive area meets cast steel contact rod 15 at full capacity;By using electrode electricity High melt zinc ore caused by arc;The air inlet of body of heater 8 and air outlet are connected with air-cooled passage and carry out cooling work.
Raw material is added in tube for feed 16 after the preheating of raw material electric heating equipment 1, is opened material bin 17, is made the ore of tube for feed 16 Raw material and reducing agent are fallen into material bin 17, while open pan feeding motor 19, drive the ore in material bin 17 and reduction Agent is transmitted into electric zinc stove through feeding pipe 18 completes automatic feed operation;By setting multiple feeding devices, raw material is previously added With reducing agent, it is necessary to when carrying out filling operation, it only need to start pan feeding motor 19, make ore and reducing agent in material bin 17 Added through feeding pipe 18 in electric zinc stove, realize and do not shut down charging in process of production;By using high caused by electrode arc Warm melting zinc ore, after ore adds electric arc furnaces 6, the UNICOM of hearth electrode 9 and negative electrode 11 switches on power, after energization Form short circuit and produce lasting electric arc, the ore in stove is melted using high temperature caused by electric arc, carries out melting reaction, The liquation of caused melting is contacted with positive plate 14, and in fusion process, the liquation melted in body of heater 8 gradually increases, and melting is melted Liquid can serve as conductor in fusion process again, and electric conductivity is gradually strengthened with the increasing number of the liquation of melting, the heat discharged Amount also gradually increase, accelerates speed of melting, by not shutting down filling, can keep speed of melting, zinc fume caused by melting is through row Gas port 10 is passed through in condenser 3.
The feeding mouth 30 of the condensed device 3 of zinc fume enters, and cooling water is passed through into short tube 29, makes the zinc into condenser 3 Steam is condensed, and zinc vapor condensing aggregation is fallen into discharge bucket 49 afterwards to a certain extent, is transported zinc powder using drawing mechanism 31 Go out into screening packing apparatus 5, complete condensation discharging work, and tail gas after condensation is expelled in pulsating collection device 4;When After tail gas is discharged into pulsating collection device 4 by condenser 3, waterfog head 40 sprays water smoke, by the oxide powder and zinc in tail gas Dirt is assembled, and exhaust gas flow leads to electrostatic generator, electrostatic generator and electrostatic gas channel 41 through electrostatic gas channel 41 Connection, makes the static electrification of electrostatic gas channel 41, and the zinc oxide dust in exhaust gas flow is adsorbed and separated with air, subsequent tail gas warp Precipitator 42 is passed through in pulsating collection room A and pulsating collection room B successively, and the filter bag of dust collection filter bag 43 is by the zinc oxide in tail gas Dust carries out adsorpting aggregation;The impulse controller in pulse air pump device drives air to compress with having frequency according to setting simultaneously Dust is shaken off to gases at high pressure are blown inside dust collection filter bag 43, zinc oxide dust is dropped in dust hopper 37, then by machine 38 Zinc powder is transported into screening packing apparatus 5 using discharge device 33, completes discharging of gathering dust, zinc powder is by condenser 3 and the dress that gathers dust Put and be transported in screening packing apparatus 5, zinc powder is transported in rotation screen tray 47 by the lifting device 45 for sieving packing apparatus 5, is being transported The zinc powder of bulky grain is carried out precrushing by crushed aggregates device 46 during defeated;After zinc powder is fallen into rotation screen tray 47, pass through rotary screen Disk 47 rotates to be sieved to zinc powder, and the zinc powder after screening is fallen into discharge bucket 49, and zinc powder is sent into packaging dress through transfer tube 50 Packed in putting;Sealing bucket is put on conveyer 52 successively during packing, conveyer 52 is transported into filling storehouse by bucket is sealed In 53, filling storehouse 53 pours into the zinc powder of set amount to sealing bucket;Subsequent conveyer 52 transports filling storehouse 53, binder by bucket is sealed Valve A56 carries out binder to the zinc powder in sealing bucket, and the zinc powder sealed in bucket is compacted;Conveyer 52 is transported into feed supplement by bucket is sealed In storehouse 54, feed supplement storehouse 54 pours into the zinc powder of set amount to sealing bucket, the space filled up in sealing bucket;Conveyer 52 will seal bucket Feed supplement storehouse 54 is transported, the zinc powder sealed in bucket is compacted by binder valve B57, and last conveyer 52 is transported to capping apparatus by bucket is sealed 55 lower sections, by the crush seal bung edge sealing strip of capping apparatus 55, sealing bung banding sealing bucket is set to complete to pack.

Claims (9)

  1. A kind of 1. efficient Zinc powder production device, it is characterised in that:Including automatic feed electricity zinc stove(2)And with automatic feed electricity zinc stove (2)The raw material electric heating equipment of connection(1), in addition to condensed device(3)With automatic feed electricity zinc stove(2)The pulsating collection of connection Device(4), condenser(3)With pulsating collection device(4)Respectively with sieving packing apparatus(5)Connection;The automatic feed electricity zinc Stove(2)Including electric arc furnaces(6)Be located at electric arc furnaces(6)The feeding device of top, the electric arc furnaces(6)Including bell(7), body of heater (8)And hearth electrode(9), the bell(7)It is located at body of heater(8)Top, hearth electrode(9)It is located at body of heater(8)Lower section, body of heater (8)One side wall is provided with exhaust outlet(10), body of heater(8)In be provided through bell(7)Negative electrode(11);The hearth electrode(9) Including being located at body of heater(1)The refractory lining of bottom(12), refractory lining(12)Lower section is provided with conductive homogenizing plate(13), refractory lining (12)It is provided with one group of positive plate(14), positive plate(14)Lower section passes through refractory lining(12)With conductive homogenizing plate(13)Connection, Conductive homogenizing plate(13)Side and cast steel contact rod(15)Connection;The feeding device includes tube for feed(16), tube for feed(16) Lower section is provided with material bin(17), material bin(17)Lower section is provided with and bell(7)The feeding pipe connect(18), feeding pipe(18)Side is also Provided with pan feeding motor(19).
  2. A kind of 2. efficient Zinc powder production device according to claim 1, it is characterised in that:The cast steel contact rod(15)For L-shaped structure, cast steel contact rod(15)One end is provided with welding teeth groove, conductive homogenizing plate(13)With cast steel contact rod(15)Pass through weldering Connect teeth groove connection, cast steel contact rod(15)The other end is connected by bolt with copper bar, cast steel contact rod(15)Bottom is provided with one group Air-cooled passage, the air-cooled passage respectively with body of heater(8)Air inlet connected with air outlet.
  3. A kind of 3. efficient Zinc powder production device according to claim 1, it is characterised in that:The raw material electric heating equipment (1)With automatic feed electricity zinc stove(2)Feeding device connection, raw material electric heating equipment(1)Including electrocaloric effect(20), electrocaloric effect (20)Tank wall is provided with electrothermal piece(21), electrocaloric effect(20)Top is provided with flue(22), electrocaloric effect(20)One end is connected with Feed pipe(23), electrocaloric effect(20)The other end is provided with discharging opening;The electrocaloric effect(20)In be additionally provided with transmission screw rod(24), pass Defeated screw rod(24)One end is with being located at electrocaloric effect(20)The Rotating shafts of side(25)Connection, transmit screw rod(24)The other end is with being located at Electrocaloric effect(20)The power set connection of opposite side, the power set include support bracket(26), support bracket(26)On set There is motor(27).
  4. A kind of 4. efficient Zinc powder production device according to claim 1, it is characterised in that:The condenser(3)By entering Material mouth(30)With automatic feed electricity zinc stove(2)Exhaust outlet(10)Connection, condenser(3)It is cold including what is set gradually from top to bottom Group and condenser the following group in group, condenser on condenser;Group includes shell on condenser, and water seal short tube card is provided with above shell (28), water seal short tube card(28)It is provided with one group of short tube(29), group side wall is provided with feeding mouth in condenser(30), condenser Drawing mechanism is provided with the following group(31).
  5. A kind of 5. efficient Zinc powder production device according to claim 1, it is characterised in that:The pulsating collection device(4) Including compound dust collecting box(32), compound dust collecting box(32)Pass through air inlet pipe and condenser(3)Connection, compound dust collecting box(32)Lower section Provided with discharge device(33), the compound dust collecting box(32)Including spray electrostatic dust chamber(34), pocket type pulsed dust chamber A(35) With pocket type pulsed dust chamber B(36), spray electrostatic dust chamber(34), pocket type pulsed dust chamber A(35)With pocket type pulsed dust chamber B (36)It is sequentially connected, spray electrostatic dust chamber(34), pocket type pulsed dust chamber A(35)With pocket type pulsed dust chamber B(36)Lower section It is equipped with dust hopper(37), the pulse dust collector is also including being located at compound dust collecting box(32)The pulse air pump device of top, arteries and veins Qi of chong channel ascending adversely pump installation includes air compressor(38)And connection air compressor(38)With compound dust collecting box(32)Pulse air flue (39), the air compressor(38)It is provided with impulse controller.
  6. A kind of 6. efficient Zinc powder production device according to claim 5, it is characterised in that:The spray electrostatic dust chamber (34)It is connected with air inlet pipe, spray electrostatic dust chamber(34)Waterfog head is provided with the junction of air inlet pipe(40), spray electrostatic Dust chamber(34)In be additionally provided with electrostatic gas channel(41), electrostatic gas channel(41)Tube wall is connected with electrostatic generator;It is described Spray electrostatic dust chamber(34)With pocket type pulsed dust chamber A(35)Junction be provided with precipitator(42), precipitator (42)It is connected with electrostatic generator.
  7. A kind of 7. efficient Zinc powder production device according to claim 5 or 6, it is characterised in that:It is described pocket type pulsed to gather dust Room A(35)With pocket type pulsed dust chamber B(36)In be equipped with dust collection filter bag(43), dust collection filter bag(43)Connect with pulse air pump device Connect.
  8. A kind of 8. efficient Zinc powder production device according to claim 1, it is characterised in that:The screening packing apparatus(5) Including support(44), support(44)It is provided with lifting device(45), lifting device(45)Top is provided with crushed aggregates device(46), lifting Device(45)Side is provided with rotation screen tray(47), rotate screen tray(47)Lower section is provided with and support(44)The hydraulic lifting valve of connection (48), support(44)On be additionally provided with discharge bucket(49), the discharge bucket(49)It is located at rotation screen tray(47)One side-lower, discharge bucket (49)Lower section is provided with packing device, and packing device passes through transfer tube(50)With discharge bucket(49)Connection.
  9. A kind of 9. efficient Zinc powder production device according to claim 8, it is characterised in that:The packing device includes packing Storehouse(51)With through packing storehouse(51)Conveyer(52), the packing storehouse(51)In be provided with filling storehouse(53)And feed supplement storehouse (54), filling storehouse(53)And feed supplement storehouse(54)It is located at conveyer(52)Top, storehouse of packing(51)In be additionally provided with material pressing device and Capping apparatus(55), the material pressing device and capping apparatus(55)With storehouse of packing(51)Upper wall connects, and material pressing device includes being located at Filling storehouse(53)And feed supplement storehouse(54)Between binder valve A(56)And it is located at feed supplement storehouse(54)And capping apparatus(55)Between Binder valve B(57).
CN201710836798.7A 2017-09-17 2017-09-17 High-efficient zinc powder production facility Active CN107354320B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710836798.7A CN107354320B (en) 2017-09-17 2017-09-17 High-efficient zinc powder production facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710836798.7A CN107354320B (en) 2017-09-17 2017-09-17 High-efficient zinc powder production facility

Publications (2)

Publication Number Publication Date
CN107354320A true CN107354320A (en) 2017-11-17
CN107354320B CN107354320B (en) 2023-06-27

Family

ID=60291057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710836798.7A Active CN107354320B (en) 2017-09-17 2017-09-17 High-efficient zinc powder production facility

Country Status (1)

Country Link
CN (1) CN107354320B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1049714A (en) * 1989-08-21 1991-03-06 亚瑞亚·勃朗勃威力有限公司 Direct current electric arc furnace
CN2711549Y (en) * 2004-07-09 2005-07-20 大连东泰产业废弃物处理有限公司 Plasma melting pyrolysis device
CN101261078A (en) * 2008-01-03 2008-09-10 谢西平 Large-sized DC hollow electrode hermetic submerged arc furnace
CN201380291Y (en) * 2009-03-24 2010-01-13 株洲火炬工业炉有限责任公司 High-efficiency condenser used in short-flow reduction process of zinc powder
CN201455266U (en) * 2009-05-19 2010-05-12 方喜 Transferred arc direct-current plasma zinc powder electric furnace
CN201678715U (en) * 2010-05-13 2010-12-22 昆明圣奥科技发展有限公司 Zinc smelting equipment for DC submerged arc furnace
CN102059017A (en) * 2010-12-10 2011-05-18 北京化工大学 Double screw dehydrating equipment capable of realizing dehydrating, drying and puffing processes
CN102181663A (en) * 2011-04-27 2011-09-14 葫芦岛锌业股份有限公司 Method for producing zinc powder by treating zinc-containing miscellaneous material through electric furnace
CN102225705A (en) * 2011-04-13 2011-10-26 黑龙江奥宇石墨集团有限公司 Combined screening packer
CN102814097A (en) * 2012-09-18 2012-12-12 辽宁调兵山煤矸石发电有限责任公司 Tandem-type static electricity-cloth bag composite dust collector
CN103205581A (en) * 2013-03-11 2013-07-17 中国恩菲工程技术有限公司 Bottom blowing smelting electrothermal reduction lead and zinc smelting device
CN104129608A (en) * 2014-07-15 2014-11-05 湖州大周高分子材料有限公司 Powder conveying and heating device and powder conveying and heating method

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1049714A (en) * 1989-08-21 1991-03-06 亚瑞亚·勃朗勃威力有限公司 Direct current electric arc furnace
CN2711549Y (en) * 2004-07-09 2005-07-20 大连东泰产业废弃物处理有限公司 Plasma melting pyrolysis device
CN101261078A (en) * 2008-01-03 2008-09-10 谢西平 Large-sized DC hollow electrode hermetic submerged arc furnace
CN201380291Y (en) * 2009-03-24 2010-01-13 株洲火炬工业炉有限责任公司 High-efficiency condenser used in short-flow reduction process of zinc powder
CN201455266U (en) * 2009-05-19 2010-05-12 方喜 Transferred arc direct-current plasma zinc powder electric furnace
CN201678715U (en) * 2010-05-13 2010-12-22 昆明圣奥科技发展有限公司 Zinc smelting equipment for DC submerged arc furnace
CN102059017A (en) * 2010-12-10 2011-05-18 北京化工大学 Double screw dehydrating equipment capable of realizing dehydrating, drying and puffing processes
CN102225705A (en) * 2011-04-13 2011-10-26 黑龙江奥宇石墨集团有限公司 Combined screening packer
CN102181663A (en) * 2011-04-27 2011-09-14 葫芦岛锌业股份有限公司 Method for producing zinc powder by treating zinc-containing miscellaneous material through electric furnace
CN102814097A (en) * 2012-09-18 2012-12-12 辽宁调兵山煤矸石发电有限责任公司 Tandem-type static electricity-cloth bag composite dust collector
CN103205581A (en) * 2013-03-11 2013-07-17 中国恩菲工程技术有限公司 Bottom blowing smelting electrothermal reduction lead and zinc smelting device
CN104129608A (en) * 2014-07-15 2014-11-05 湖州大周高分子材料有限公司 Powder conveying and heating device and powder conveying and heating method

Also Published As

Publication number Publication date
CN107354320B (en) 2023-06-27

Similar Documents

Publication Publication Date Title
CN111850194A (en) High-temperature steel slag bottom blowing air cooling crushing waste heat recovery device and method
CN108330235B (en) Liquid slag granulation and waste heat recovery device
CN108823412B (en) Processing and production process of secondary aluminum
CN202530134U (en) Pretreatment production line for aluminum scraps
CN102181663B (en) Method for producing zinc powder by treating zinc-containing miscellaneous material through electric furnace
CN212426080U (en) Broken waste heat recovery device of forced air cooling is blown at bottom to high temperature slag
CN108518984A (en) Horizontal double ribbon roller-type resistance furnace systems and its technological process
CN108754178A (en) A kind of smelting process of zinc sulfide concentrates
CN104357655A (en) Continuous ore reduction and hot-charging steelmaking device
CN104748508B (en) Coal slurry drying system
CN207405219U (en) A kind of efficient Zinc powder production device
CN107354320A (en) A kind of efficient Zinc powder production device
CN208720804U (en) Horizontal double ribbon roller-type resistance furnace systems
CN107354319A (en) A kind of low zinc powder process equipment of production cost
CN207358167U (en) A kind of inexpensive Zinc powder production device
CN207362313U (en) A kind of low zinc powder process equipment of production cost
CN209989442U (en) Waste pop can recovery system
CN203371024U (en) Lead melting system for feeding materials to battery plate casting machine
CN210085290U (en) Device for granulating molten smelting slag glass and recovering waste heat
CN107344242A (en) A kind of inexpensive Zinc powder production device
CN106480245A (en) The device that a kind of high-temperature slag heat step is reclaimed
CN208532692U (en) Metallurgical breeze forming production device and system
CN208008865U (en) A kind of system of recycling zinc powder
CN206291730U (en) A kind of adverse current roasting system
CN110747346A (en) Novel aluminium ash piece-rate system of environmental protection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant