CN107351347B - A kind of material collecting device on power supply line Preparation equipment - Google Patents

A kind of material collecting device on power supply line Preparation equipment Download PDF

Info

Publication number
CN107351347B
CN107351347B CN201710671681.8A CN201710671681A CN107351347B CN 107351347 B CN107351347 B CN 107351347B CN 201710671681 A CN201710671681 A CN 201710671681A CN 107351347 B CN107351347 B CN 107351347B
Authority
CN
China
Prior art keywords
short axle
power supply
gear
supply line
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710671681.8A
Other languages
Chinese (zh)
Other versions
CN107351347A (en
Inventor
潘克飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG HAINING PASE AUTOMATION TECHNOLOGY Co Ltd
Original Assignee
ZHEJIANG HAINING PASE AUTOMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG HAINING PASE AUTOMATION TECHNOLOGY Co Ltd filed Critical ZHEJIANG HAINING PASE AUTOMATION TECHNOLOGY Co Ltd
Priority to CN201710671681.8A priority Critical patent/CN107351347B/en
Publication of CN107351347A publication Critical patent/CN107351347A/en
Application granted granted Critical
Publication of CN107351347B publication Critical patent/CN107351347B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/001Combinations of extrusion moulding with other shaping operations
    • B29C48/0022Combinations of extrusion moulding with other shaping operations combined with cutting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/15Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor incorporating preformed parts or layers, e.g. extrusion moulding around inserts
    • B29C48/154Coating solid articles, i.e. non-hollow articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/25Component parts, details or accessories; Auxiliary operations
    • B29C48/28Storing of extruded material, e.g. by winding up or stacking
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2031/00Other particular articles
    • B29L2031/34Electrical apparatus, e.g. sparking plugs or parts thereof
    • B29L2031/3462Cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Gear Transmission (AREA)
  • Gears, Cams (AREA)

Abstract

The present invention provides the material collecting devices on a kind of power supply line Preparation equipment, belong to technical field of electric wires and cables.It solves that rewinding is synchronous with blowing, prevents the technical problems such as equipment malfunction.A kind of material collecting device on power supply line Preparation equipment, this Preparation equipment includes main shaft, this material collecting device includes pedestal three and cricoid bracket three, bracket three is fixed on pedestal three, master gear three and three is fixedly installed on bracket three from gear three, master gear three is fixed on main shaft, three are engaged from gear San Tong method with master gear three, it is rotatably connected on bracket three from gear three, rotation is realized from gear three by the short axle three of tubulose, the phase line of power supply line, zero curve and ground wire, which pass through respectively in three short axles three, to be passed through, and under the rotation of short axle three, phase line, zero curve and ground wire are forced to rotate synchronously with corresponding short axle one.The present invention has many advantages, such as synchronous with blowing.

Description

A kind of material collecting device on power supply line Preparation equipment
Technical field
The invention belongs to technical field of electric wires and cables, a kind of be related on power supply line Preparation equipment material collecting device.
Background technique
Power supply line is wrapped by armouring or modeling by phase line, zero curve and ground wire three and then is passed through the package of oversheath, is formed Finished product, presently, production process are complicated, it is various to be related to equipment, and be all to give birth to respectively to phase line, zero curve and ground wire Postpartum completes to prepare using the mode of package oversheath, long in time limit, the retracting of electric wire often, to the damage of electric wire and It pollutes larger, cannot disposably complete, have negative effect to the total quality and performance of power supply line.
Summary of the invention
In view of the above problems existing in the prior art, the purpose of the present invention is to provide on a kind of power supply line Preparation equipment Material collecting device, the technical problem to be solved by the present invention is to how the power supply line prepared be accepted and be stored.
Object of the invention can be realized by the following technical scheme: the material collecting device on a kind of power supply line Preparation equipment, It is characterized in that, this Preparation equipment includes main shaft, this material collecting device includes pedestal three and cricoid bracket three, and the bracket three is solid It is fixed to be arranged on the pedestal three, master gear three and three is fixedly installed on the bracket three from gear three, the master gear Three are fixed on the main shaft, engage described in three from gear San Tong method with master gear three, and described rotate from gear three connects It connects on bracket three, it is described that rotation, phase line, zero curve and the ground wire difference of power supply line are realized by the short axle three of tubulose from gear three By passing through in three short axles three, and under the rotation of short axle three, phase line, zero curve and ground wire are forced turn synchronous with corresponding short axle one It is dynamic.
Three are engaged master gear three from gear three, and under the transmission of main shaft, three from three synchronous rotary of gear, quilt Power supply line after wrapping up oversheath keeps it smooth by traction, between further increasing between phase line, zero curve and ground wire and oversheath Gap is cut after the completion of single batch preparation, since power supply line length is shorter, there is no knotting, if it is considered that outer shield Gap is excessive between set and phase line, zero curve and ground wire, can make oversheath heat shrinkable, in addition, having by uniformly heated mode The oversheath temperature of package is higher, and after its cooling, gap can also reduce, this equipment changes traditional preparation methods, uses Single power supply line is prepared separately in the mode of truncation.
In the material collecting device on a kind of above-mentioned power supply line Preparation equipment, bearing is fixedly installed in the short axle three Three, be fixedly installed the one-to-one connecting rod three of a short axle three on the bracket three, the connecting rod three and short axle three respectively with axis The outer ring and inner ring for holding three are fixedly linked.
In the material collecting device on a kind of above-mentioned power supply line Preparation equipment, there is a rubber on the inner wall of the short axle three Frictional layer three has the inclined teeth to the opposite direction in three direction of rotation of short axle on the inner wall of the rubber friction layer three Three.
Teeth three can effectively prevent that relative motion occurs between conducting wire and short axle three, prevent conducting wire by torsion degree compared with Greatly, on the other hand, phase line, zero curve and ground wire are also unlikely to be difficult to pass through in short axle three.
In the material collecting device on a kind of above-mentioned power supply line Preparation equipment, offering in the short axle three can will lubricate The fuel feed hole three of the inner cavity of oil injection short axle three.
Lubricating oil is injected in short axle three, conducting wire is capable of increasing and passes through smoothness.
Compared with prior art, the invention has the following advantages that
Three are engaged master gear three from gear three, and under the transmission of main shaft, three from three synchronous rotary of gear, quilt Power supply line after wrapping up oversheath keeps it smooth by traction, between further increasing between phase line, zero curve and ground wire and oversheath Gap is cut after the completion of single batch preparation, since power supply line length is shorter, there is no knotting, if it is considered that outer shield Gap is excessive between set and phase line, zero curve and ground wire, can make oversheath heat shrinkable, in addition, having by uniformly heated mode The oversheath temperature of package is higher, and after its cooling, gap can also reduce, this equipment changes traditional preparation methods, uses Single power supply line is prepared separately in the mode of truncation.
Detailed description of the invention
Fig. 1 is the overall structure diagram of this power supply line Preparation equipment.
Fig. 2 is the structural schematic diagram of discharging device in this power supply line Preparation equipment.
Fig. 3 is the structural schematic diagram of extrusion device in this power supply line Preparation equipment.
Fig. 4 is the structural schematic diagram of material collecting device in this power supply line Preparation equipment
Fig. 5 is the structural schematic diagram of nozzle in this power supply line Preparation equipment.
Fig. 6 is the structural schematic diagram of extruder in this power supply line Preparation equipment.
In figure, 11, pedestal one;12, bracket one;13, driving motor;14, main shaft;15, master gear one;16, from gear one; 17, connecting rod one;21, pedestal two;22, steel pipe;23, bracket two;31, casing;32, extrusion screw rod;33, feed pipe;34, pan feeding Bar;35, impeller;4, oil pump;51, pull rod;52, inner tube;53, outer tube;54, relief portion;55, steel ball;61, pedestal three;62, bracket Three;63, master gear three;64, from gear three;65, connecting rod three;7, laminator;8, cooling device.
Specific embodiment
Following is a specific embodiment of the present invention in conjunction with the accompanying drawings, technical scheme of the present invention will be further described, However, the present invention is not limited to these examples.
As depicted in figs. 1 and 2, this Preparation equipment includes discharging device, extrusion device, laminator 7 and material collecting device, blowing Device includes pedestal 1 and cricoid bracket 1, and bracket 1 is fixed on pedestal 1, fixed on bracket 1 Driving motor 13, main shaft 14, master gear 1 and three are provided with from gear 1, driving motor 13 passes through belt and main shaft 14 It is connected, master gear 1 is fixed on main shaft 14, and three are engaged with master gear 1 simultaneously from gear 1, from gear one 16 are rotatably connected on bracket 1, and individual blowing roller is each provided with from gear 1, is passed through from gear 1 The short axle one of tubulose realizes rotation, and three conducting wires of power supply line are passed through out of three short axles one respectively, and under the rotation of short axle one, Three conducting wires are forced to rotate synchronously with corresponding short axle one;
Conducting wire successively passes through discharging device, extrusion device, laminator 7 and material collecting device, and there are two wind for setting on laminator 7 Device for cooling, two air cooling equipments respectively carry out the electric wire for entering laminator 7 and the electric wire come out from laminator 7 air-cooled.
Three conducting wires furl on blowing roller, and master gear 1 rotates under the drive of driving motor 13, drive simultaneously Three rotate from gear 1, and conducting wire is threaded through in short axle one, rotates under the rotatory force of short axle one, by extrusion device, A layer insulating is wrapped up on conducting wire, it is carried out by air cooling equipment it is air-cooled solidify to insulating layer, three conducting wires are made respectively Standby is phase line, zero curve and ground wire, and three passes through the gathering of laminator 7 and crosses after modeling, and the device 8 that is cooled herein is cooling, makes it Oversheath is cured, finally, furling by the power supply line that retracting device completes preparation.
It is not difficult to find out that since conducting wire is in rotation status before carrying out extrusion package, the difference after wrapping up insulating layer Become phase line, zero curve and ground wire, three continues to pass through modeling package and retracting under rotation status, can make wrapped in wire in this way More uniform when insulating layer, more closely knit between conducting wire and insulating layer, gap is smaller, when progress oversheath crosses modeling, phase line, zero It will not be stuck between line and ground wire and oversheath, will not exist between phase line, zero curve and ground wire three and paste, on the one hand may be used To improve insulation effect, the aesthetics of entire power supply line on the other hand can be improved, there is no because between conducting wire and insulating layer Gap is larger and loose, and also there is no paste to cause entire power supply line part concave-convex between phase line, zero curve and ground wire and oversheath Injustice, whole ride comfort are poor etc..
It is fixedly installed bearing one in short axle one, the one-to-one connecting rod one of a short axle one is fixedly installed on bracket 1 17, connecting rod 1 and short axle one are fixedly linked with the outer ring of bearing one and inner ring respectively;There is a rubber on the inner wall of short axle one Frictional layer one has the inclined teeth one to the opposite direction in one direction of rotation of short axle on the inner wall of rubber friction layer one;Tooth Tooth one can effectively prevent that relative motion occurs between conducting wire and short axle one, prevent conducting wire larger by torsion degree, on the other hand, Conducting wire is also unlikely to be difficult to pass through in short axle one;Offered in short axle one can lubricating oil is injected into the inner cavity of short axle one into Oilhole one;Lubricating oil is injected in short axle one, conducting wire is capable of increasing and passes through smoothness.
As shown in Fig. 1, Fig. 3 and Fig. 6, extrusion device includes pedestal 2 21 and the steel pipe being fixedly linked with pedestal 2 21 22, Be further fixedly arranged on bracket 2 23 on steel pipe 22, be uniformly arranged on bracket 2 23 there are three extruder, extruder include casing 31, Extrusion screw rod 32 and feed pipe 33, in a tubular form, one end of casing 31 has nozzle to casing 31, is provided on casing 31 and casing 31 vertical material feeding rods 34, material feeding rod 34 are hollow structure, and extrusion screw rod 32, which is plugged in, to be squeezed out in bar, feed pipe 33 and extrusion bar Cavity communicate, the upper end of extrusion screw rod 32 is fixedly installed an impeller 35, and impeller 35 is located in steel pipe 22, the both ends of steel pipe 22 It is connected respectively by hose with an oil pump 4, is marked with hydraulic oil in steel pipe 22.
Hydraulic oil passes through steel pipe 22, and impeller 35 is driven and is rotated, after making extrusion screw rod 32 in material feeding rod 34 by hot melt Plastics slurries are squeezed out to shell, and the plastics slurries after hot melt are adhered on conducting wire at nozzle, since conducting wire is in rotation State, the thickness of insulating layer on phase line obtained, zero curve and ground wire is uniform, and can effectively prevent plastics slurries by gravity Effect is unevenly distributed on conducting wire surface layer, situations such as flash, local crowning occurs.
Steel pipe 22 is fixedly linked by several pull rods 51 with pedestal 2 21;The upper end of extrusion screw rod 32 is stretched out except steel pipe 22 Side is connected between extrusion screw rod 32 and steel pipe 22 by plane bearing;By plane bearing, locate extrusion screw rod 32 in the axial direction In static shape, slurries are carried out to continue extrusion.
As shown in figure 5, nozzle includes inner tube 52 and outer tube 53, there is gap, outer tube 53 between inner tube 52 and outer tube 53 End shrink, and formed between inner tube 52 and squeeze out gap, the end back shrinkage of inner tube 52, and being formed between outer tube 53 One relief portion 54 is provided with several steel balls 55 in relief portion 54.
Common nozzle is shunk in extruding end, to increase extrusion pressure, still, due to slurry fluidity, squeezes out pressure Power will lead to slurries and occur bubble when extrusion is adhered on conducting wire, and also not enough uniformly, this nozzle, which uses, is increasing slurry for distribution After liquid extrusion pressure, a relief portion 54 is set, which slows down the extruded velocity of slurries, pass through equally distributed several steel Gap between pearl 55 and inner tube 52 and outer tube 53, which is realized, to be squeezed out, and steel ball 55 moves in the movement of conducting wire and rotation process, makes Insulation sides and Wire stick are by close, and steel ball 55 forms spiral helicine groove in surface of insulating layer, and phase line, zero curve and ground wire exist After mutually reclining, it is not easy to by single extraction, indirectly improve the submissive degree of power supply line, also improve power supply line beauty Degree and intensity.
As shown in Figure 1 and Figure 4, material collecting device includes pedestal 3 61 and cricoid bracket 3 62, and bracket 3 62 is fixedly installed On pedestal 3 61, master gear 3 63 and three are fixedly installed on bracket 3 62 from gear 3 64, the fixation of master gear 3 63 is set It sets on main shaft 14, three are engaged with master gear 3 63 simultaneously from gear 3 64, are rotatably connected on bracket 3 62 from gear 3 64 On, rotation is realized from gear 3 64 by the short axle three of tubulose, and phase line, zero curve and the ground wire of power supply line pass through three short axles respectively It is passed through in three, and under the rotation of short axle three, phase line, zero curve and ground wire are forced to rotate synchronously with corresponding short axle one;Three from tooth It takes turns 3 64 pairs of master gears 3 63 to be engaged, under the transmission of main shaft 14, three, from 3 64 synchronous rotary of gear, are protected outside package Power supply line after set keeps it smooth by traction, further increases gap between phase line, zero curve and ground wire and oversheath, and single batch It after the completion of secondary preparation, is cut, since power supply line length is shorter, there is no knotting, if it is considered that oversheath and phase Gap is excessive between line, zero curve and ground wire, can make oversheath heat shrinkable, in addition, there is package by uniformly heated mode Oversheath temperature is higher, and after its cooling, gap can also reduce, this equipment changes traditional preparation methods, using truncation Single power supply line is prepared separately in mode.
It is fixedly installed bearing three in short axle three, the one-to-one connecting rod three of a short axle three is fixedly installed on bracket 3 62 65, connecting rod 3 65 and short axle three are fixedly linked with the outer ring of bearing three and inner ring respectively;There is a rubber on the inner wall of short axle three Frictional layer three has the inclined teeth three to the opposite direction in three direction of rotation of short axle on the inner wall of rubber friction layer three;Tooth Tooth three can effectively prevent that relative motion occurs between conducting wire and short axle three, prevent conducting wire larger by torsion degree, on the other hand, Phase line, zero curve and ground wire are also unlikely to be difficult to pass through in short axle three.
Offering in short axle three can lubricating oil is injected into the fuel feed holes three of the inner cavity of short axle three;Profit is injected in short axle three Lubricating oil is capable of increasing conducting wire and passes through smoothness.
Master gear 1 and 3 63 teeth quantity of master gear are identical with teeth size, from gear 1 and from gear 3 64 Teeth quantity is identical with teeth size;It keeps discharging device synchronous with material collecting device, prevents conducting wire, phase line, zero curve and ground wire It is equal to distort.
Specific embodiment described herein is only an example for the spirit of the invention.The neck of technology belonging to the present invention The technical staff in domain can make various modifications or additions to the described embodiments or replace by a similar method In generation, however, it does not deviate from the spirit of the invention or beyond the scope of the appended claims.

Claims (4)

1. the material collecting device on a kind of power supply line Preparation equipment, which is characterized in that this Preparation equipment includes main shaft (14), this rewinding Device includes pedestal three (61) and cricoid bracket three (62), and the bracket three (62) is fixed at the pedestal three (61) On, master gear three (63) and three are fixedly installed on the bracket three (62) from gear three (64), the master gear three (63) It is fixed on the main shaft (14), is engaged simultaneously with master gear three (63) described in three from gear three (64), it is described from tooth Three (64) of wheel are rotatably connected on bracket three (62), described to realize rotation, power supply by the short axle three of tubulose from gear three (64) Phase line, zero curve and the ground wire of line, which pass through respectively in three short axles three, to be passed through, and under the rotation of short axle three, phase line, zero curve and ground wire It is forced to rotate synchronously with corresponding short axle one.
2. the material collecting device on a kind of power supply line Preparation equipment according to claim 1, which is characterized in that in the short axle three It is fixedly installed bearing three, the one-to-one connecting rod three (65) of a short axle three is fixedly installed on the bracket three (62), it is described Connecting rod three (65) and short axle three are fixedly linked with the outer ring of bearing three and inner ring respectively.
3. the material collecting device on a kind of power supply line Preparation equipment according to claim 2, which is characterized in that the short axle three There is a rubber friction layer three on inner wall, there is the side opposite to three direction of rotation of short axle on the inner wall of the rubber friction layer three To inclined teeth three.
4. the material collecting device on a kind of power supply line Preparation equipment according to claim 3, which is characterized in that in the short axle three Offering can lubricating oil is injected into the fuel feed holes three of the inner cavity of short axle three.
CN201710671681.8A 2017-08-08 2017-08-08 A kind of material collecting device on power supply line Preparation equipment Active CN107351347B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710671681.8A CN107351347B (en) 2017-08-08 2017-08-08 A kind of material collecting device on power supply line Preparation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710671681.8A CN107351347B (en) 2017-08-08 2017-08-08 A kind of material collecting device on power supply line Preparation equipment

Publications (2)

Publication Number Publication Date
CN107351347A CN107351347A (en) 2017-11-17
CN107351347B true CN107351347B (en) 2019-07-16

Family

ID=60286430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710671681.8A Active CN107351347B (en) 2017-08-08 2017-08-08 A kind of material collecting device on power supply line Preparation equipment

Country Status (1)

Country Link
CN (1) CN107351347B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107932867B (en) * 2017-12-12 2020-06-26 安徽蕴通管业科技有限公司 Spool wind for extruder
CN112185622A (en) * 2020-09-25 2021-01-05 天长市荣达电子有限公司 Material collecting device on power line preparation equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0650011U (en) * 1985-06-27 1994-07-08 エスティーシー パブリック リミティド カンパニー Fiber optic cable
CN100345223C (en) * 1997-08-19 2007-10-24 古河电气工业株式会社 Insulated wire
EP2367177A1 (en) * 2010-03-18 2011-09-21 Nexans Electrical cable and extruder nozzle for its production
CN203267147U (en) * 2013-04-12 2013-11-06 乐利精密工业(深圳)有限公司 Injection molding device for wrapping three-color spiral insulating layer on conductor

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7772492B2 (en) * 2007-10-23 2010-08-10 Southwire Company Anti-microbial/anti-fungal plastic jacketed/insulated electric power cords

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0650011U (en) * 1985-06-27 1994-07-08 エスティーシー パブリック リミティド カンパニー Fiber optic cable
CN100345223C (en) * 1997-08-19 2007-10-24 古河电气工业株式会社 Insulated wire
EP2367177A1 (en) * 2010-03-18 2011-09-21 Nexans Electrical cable and extruder nozzle for its production
CN203267147U (en) * 2013-04-12 2013-11-06 乐利精密工业(深圳)有限公司 Injection molding device for wrapping three-color spiral insulating layer on conductor

Also Published As

Publication number Publication date
CN107351347A (en) 2017-11-17

Similar Documents

Publication Publication Date Title
CN111775427B (en) Cooling and shaping equipment for manufacturing communication cable insulating sheath
CN107351347B (en) A kind of material collecting device on power supply line Preparation equipment
CN107481807B (en) A kind of extruder on power supply line Preparation equipment
CN107492422B (en) A kind of power supply line Preparation equipment
CN207566589U (en) A kind of old conducting wire recycling compression set
CN107516564B (en) A kind of discharging device on power supply line Preparation equipment
CN107351343B (en) A kind of extrusion device on power supply line Preparation equipment
CN104129684A (en) Winding mechanism suitable for storage of cables with different cable diameters
CN104752008B (en) A kind of thermosetting cable conductor maker and the manufacture method of cable core
CN101599325B (en) Rubber sleeve cable closed-type high-efficiency powder distribution device
CN204740913U (en) Transposition electric wire insulating extrudes rolling production line
CN204817816U (en) Wire spiral forming device of spring pipe
CN114843041B (en) Cable insulation layer cladding device
CN106205873B (en) A kind of cable molding press device
CN102087891A (en) Process for producing filmed rectangular aluminum stranded wire for extra-high voltage dry type reactor
CN205522554U (en) Spiral belt strip manufacturing system
CN204712403U (en) A kind of monolayer silicon rubber high voltage bus extrusion system
CN106827481A (en) Film blowing device
CN203543077U (en) Single-drive twin-screw extruder
CN206937931U (en) A kind of transmission mechanism of double screw extruder
CN202186050U (en) Plastic pipe knurling device
CN202307329U (en) Multiple-core cable conductor
CN206357466U (en) A kind of five screw extruders
CN205009621U (en) Plastic pressure hose braider draw gear
CN116504466B (en) Insulating sleeve extrusion device for computer cable production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A material receiving device on a power cord preparation equipment

Effective date of registration: 20231124

Granted publication date: 20190716

Pledgee: Huangwan sub branch of Zhejiang Haining Rural Commercial Bank Co.,Ltd.

Pledgor: ZHEJIANG HAINING PASE AUTOMATION TECHNOLOGY Co.,Ltd.

Registration number: Y2023980067466