CN107350737A - A kind of preparation technology of high intensity plug valve for plunger pump - Google Patents

A kind of preparation technology of high intensity plug valve for plunger pump Download PDF

Info

Publication number
CN107350737A
CN107350737A CN201610305922.2A CN201610305922A CN107350737A CN 107350737 A CN107350737 A CN 107350737A CN 201610305922 A CN201610305922 A CN 201610305922A CN 107350737 A CN107350737 A CN 107350737A
Authority
CN
China
Prior art keywords
embryo material
plug valve
carried out
plunger pump
high intensity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610305922.2A
Other languages
Chinese (zh)
Inventor
傅剑波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Chenwei Mechanical Equipment Manufacturing Co Ltd
Original Assignee
Nanjing Chenwei Mechanical Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Chenwei Mechanical Equipment Manufacturing Co Ltd filed Critical Nanjing Chenwei Mechanical Equipment Manufacturing Co Ltd
Priority to CN201610305922.2A priority Critical patent/CN107350737A/en
Publication of CN107350737A publication Critical patent/CN107350737A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • B23P15/001Making specific metal objects by operations not covered by a single other subclass or a group in this subclass valves or valve housings

Abstract

The present invention discloses a kind of preparation technology of the high intensity plug valve for plunger pump, comprises the following steps:Lower embryo material, and embryo material is calcined in intermediate frequency furnace;Go out embryo material and using pneumatic hammer to just forging, descale;Finish-forging is carried out using friction press to embryo material, trimming then is carried out to embryo material;Embryo material is sent into car type furnace after trimming and carries out normalized treatment, bead;Finished product is obtained after the assay was approved to the rough turn processing of embryo material progress, finishing, defectoscope.Pin of the present invention is 0.65wt%~0.85wt% from manganese content, S content≤0.025%, the 42CrMo round steel of P content≤0.025% is as embryo material, and the technique such as just forging, finish-forging, flanging, normalizing, shot-peening, quenched is carried out successively for its characteristic, plug valve tensile strength >=800MPa, yield strength >=750MPa made from this processing technology, deviation ratio≤0.01% of processing, material elongation percentage >=15%, the contraction percentage of area to≤40%.

Description

A kind of preparation technology of high intensity plug valve for plunger pump
Technical field
The invention belongs to parts machining technical field, and in particular to a kind of preparation of high intensity plug valve for plunger pump Technique.
Background technology
Plunger pump is an important device of hydraulic system, and it is moved back and forth by plunger in cylinder body, holds seal operation The volume of chamber changes to realize oil suction, force feed, and plunger will move back and forth in cylinder body, and therefore, its amount of exercise is very Greatly, therefore, plunger pump is particularly the plunger pump for being used for shale gas exploitation, is had because working strength is higher, inside and outside pump larger Pressure difference, to prevent the liquid leakage in the pump housing, it is desirable to the intensity of each parts on the pump housing will height, with pump body Fitness to get well, plug valve also requires that its intensity and fitness as the important accessory on plunger pump;At present, city Existing plug valve uses common steel, common preparation technology on field, and resulting body strength is only capable of reaching 100MPa or so, and the contraction percentage of area is higher, it is inconsistent with pre-set dimension easily to cause to process member, is assembling It can not well coordinate with the pump housing in journey, reduce fitness, exist in the lid course of work with plunges pump body connectivity not The problem of good and sealing difference, influence the operating efficiency of plunger pump.
The content of the invention
Goal of the invention:Present invention aims in view of the shortcomings of the prior art, there is provided it is a kind of process precision it is high be used for post Fill in the preparation technology of the high intensity plug valve of pump.
Technical scheme:A kind of preparation technology of high intensity plug valve for plunger pump of the present invention, including following step Suddenly:
(1) embryo material under, and 1150~1250 DEG C of calcinings are heated to embryo material in intermediate frequency furnace, heating rhythm control exists 20~30S/ parts;
(2) go out embryo material and high temperature embryo material is carried out just to forge using the pneumatic hammer of 200~300 tonnages, descale, control Beat processed is 15~25S/ parts, and ensures that embryo material temperature is higher than 900 DEG C after the completion of this processing procedure;
(3) finish-forging is carried out using the friction press of 800~1200 tonnages to the embryo material after scale removal, controls beat For 20~30S/ parts;Embryo material is cooled to 160~200 DEG C, trimming is then carried out to embryo material using press;
(4) embryo material is sent into car type furnace after trimming, is heated to 850~950 DEG C, stopped 2.5~5h and carry out normalized treatment, Then bead is carried out, single-nozzle ball blast amount is 45~60Kg/min, and velocity of shot is 65~80m/s;
(5) after bead, rough turn processing is carried out to embryo material, the overall profile of plug valve is obtained, to the plug valve Risen again after quenching to 550~650 DEG C, and be incubated 2.5~5h and carry out modifier treatment;Then by finishing, flaw detection machine examination Test it is qualified after obtain finished product.
Preferably, I improves the bulk strength of plug valve, and the embryo material is 42CrMo round steel, and wherein Mn contents are 0.65 Wt%~0.85wt%, S content≤0.025wt%, P content≤0.025wt%.
Preferably, press described in step (3) is 60~65 tonnage levels, and it is 15~30S/ parts to control beat.
Preferably, it is described it is rough turn plus during the lathe tool speed of mainshaft be 800~1000r/min, enter part speed be 0.2~0.6 mm/s;
Preferably, the finishing includes smart car technique, and the lathe tool speed of mainshaft is 300~500r/min in smart car technical process, It is 0.1~0.5mm/s to enter part speed.
Beneficial effect:(1) pin of the present invention is 0.65wt%~0.85wt% from manganese content, S contents≤0.025%, P The 42CrMo round steel of content≤0.025% carries out just forging, finish-forging, flanging, just successively as embryo material, and for its characteristic The technique such as fire, shot-peening, quenched, in first forging process, temperature calcination 20~30 second of the every embryo material at 1150~1250 DEG C, The self-defect of material is effectively eliminated, ensures to enter finish-forging technique when the embryo material temperature after just forging is higher than 900 DEG C, this The forging pressure and forging beat that it is appropriate that temperature parameter is arranged in pairs or groups, the selected of this process conditions can preferably improve the strong of material Degree;(2) can effectively be assisted according to the property settings normalizing of finish-forging material, shot-peening and the technological parameter such as quenched in the present invention Help and improve material elongation percentage to 15%, the reduction contraction percentage of area to 40%, effectively prevent material from occurring in process Complete the problem of part differs increasing with pre-set dimension;(3) present invention sets rough turn, thin Vehicle Processing work according to material property The parameter of skill, the mismachining tolerance of process kind is effectively reduced, improves processing precision, the deviation of the processing of this programme Rate≤0.01%;(4) plug valve tensile strength >=800MPa, yield strength >=750MPa made from this processing technology.
Embodiment
Technical solution of the present invention is described in detail below by specific embodiment, but protection scope of the present invention not office It is limited to the embodiment.
Embodiment 1:A kind of preparation technology of high intensity plug valve for plunger pump, comprises the following steps:
(1) embryo material under, the embryo material are 42CrMo round steel, and wherein Mn contents are 0.80wt%, S contents 0.020 Wt%, P content 0.018wt%, and 1800 DEG C of calcinings are heated to embryo material in intermediate frequency furnace, heating rhythm control exists 20S/ parts;
(2) go out embryo material and high temperature embryo material is carried out just to forge using the pneumatic hammer of 250 tonnages, descale, control section Clap as 20S/ parts, and embryo material temperature is higher than 900 DEG C after the completion of ensureing this processing procedure;
(3) finish-forging is carried out using the friction press of 1000 tonnages to the embryo material after scale removal, controls the beat to be 20S/ parts;Embryo material is cooled to 160~165 DEG C, trimming is then carried out to embryo material using press, the press is 63 tons Position level, it is 20S/ parts to control beat;
(4) embryo material is sent into car type furnace after trimming, is heated to 900 DEG C, stopped 3h and carry out normalized treatment, Ran Houjin Row bead, single-nozzle ball blast amount are 55Kg/min, velocity of shot 75m/s;
(5) after bead, carry out rough turn processing to embryo material, it is described rough turn plus during the lathe tool speed of mainshaft be 900 R/min, it is 0.45mm/s to enter part speed, obtains the overall profile of plug valve, to the plug valve quench after rise again to 600 DEG C of progress modifier treatment;Then finished product, smart car technical process are obtained after the assay was approved by smart car technique, defectoscope The middle lathe tool speed of mainshaft is 450r/min, and it is 0.25mm/s to enter part speed.
Embodiment 2:A kind of preparation technology of high intensity plug valve for plunger pump, comprises the following steps:
(1) embryo material under, the embryo material are 42CrMo round steel, and wherein Mn contents are 0.65wt%, S content 0.018wt%, P content 0.022wt%, and 1150 DEG C of calcinings are heated to embryo material in intermediate frequency furnace, heating rhythm control is in 25S/ parts;
(2) go out embryo material and high temperature embryo material is carried out just to forge using the pneumatic hammer of 200 tonnages, descale, control section Clap as 15S/ parts, and embryo material temperature is higher than 900 DEG C after the completion of ensureing this processing procedure;
(3) finish-forging is carried out using the friction press of 800 tonnages to the embryo material after scale removal, it is 25 to control beat S/ parts;Embryo material is cooled to 180~185 DEG C, trimming is then carried out to embryo material using press, the press is 60 tonnages Level, it is 15S/ parts to control beat;
(4) embryo material is sent into car type furnace after trimming, is heated to 850 DEG C, stopped 2.5h and carry out normalized treatment, then Bead is carried out, single-nozzle ball blast amount is 45Kg/min, velocity of shot 65m/s;
(5) after bead, carry out rough turn processing to embryo material, it is described rough turn plus during the lathe tool speed of mainshaft be 800 R/min, it is 0.2mm/s to enter part speed, obtains the overall profile of plug valve, to the plug valve quench after rise again to Modifier treatment is carried out at 550 DEG C;Then finished product, smart car technique mistake are obtained after the assay was approved by smart car technique, defectoscope The lathe tool speed of mainshaft is 300r/min in journey, and it is 0.1mm/s to enter part speed.
Embodiment 3:A kind of preparation technology of high intensity plug valve for plunger pump, comprises the following steps:
(1) embryo material under, the embryo material are 42CrMo round steel, and wherein Mn contents are 0.85wt%, S content 0.025wt%, P content 0.018wt%, and 1250 DEG C of calcinings are heated to embryo material in intermediate frequency furnace, heating rhythm control is in 30S/ parts;
(2) go out embryo material and high temperature embryo material is carried out just to forge using the pneumatic hammer of 300 tonnages, descale, control section Clap as 25S/ parts, and embryo material temperature is higher than 900 DEG C after the completion of ensureing this processing procedure;
(3) finish-forging is carried out using the friction press of 1200 tonnages to the embryo material after scale removal, controls the beat to be 30S/ parts;Embryo material is cooled to 190~200 DEG C, trimming is then carried out to embryo material using press, the press is 65 tons Position level, it is 30S/ parts to control beat;
(4) embryo material is sent into car type furnace after trimming, is heated to 950 DEG C, stopped 5h and carry out normalized treatment, Ran Houjin Row bead, single-nozzle ball blast amount are 60Kg/min, velocity of shot 80m/s;
(5) after bead, carry out rough turn processing to embryo material, it is described rough turn plus during the lathe tool speed of mainshaft be 1000 R/min, it is 0.6mm/s to enter part speed, obtains the overall profile of plug valve, to the plug valve quench after rise again to 650 DEG C of progress modifier treatment;Then finished product, smart car technical process are obtained after the assay was approved by smart car technique, defectoscope The middle lathe tool speed of mainshaft is 500r/min, and it is 0.5mm/s to enter part speed.
The correction data of the properties of product of the embodiment of the present invention 1~3 and existing product performance is as shown in table 1;
The properties of product of the embodiment 1~3 of table 1 and the correction data of existing product performance

Claims (5)

1. the preparation technology of a kind of high intensity plug valve for plunger pump, it is characterised in that comprise the following steps:
(1) embryo material under, and 1150~1250 DEG C of calcinings are heated to embryo material in intermediate frequency furnace, heating rhythm control is in 20~30S/ parts;
(2) go out embryo material and high temperature embryo material is carried out just to forge using the pneumatic hammer of 200~300 tonnages, descale, it is 15~25S/ parts control beat, and ensures that embryo material temperature is higher than 900 DEG C after the completion of this processing procedure;
(3) finish-forging is carried out using the friction press of 800~1200 tonnages to the embryo material after scale removal, it is 20~30S/ parts to control beat;Embryo material is cooled to 160~200 DEG C, trimming is then carried out to embryo material using press;
(4) embryo material is sent into car type furnace after trimming, is heated to 850~950 DEG C, stopped 2.5~5h and carry out normalized treatment, then carry out bead, single-nozzle ball blast amount is 45~60Kg/min, and velocity of shot is 65~80m/s;
(5) after bead, rough turn processing is carried out to embryo material, obtains the overall profile of plug valve, is risen again after being quenched to the plug valve to 550~650 DEG C, and be incubated 2.5~5h and carry out modifier treatment;Then finished product is obtained after the assay was approved by finishing, defectoscope.
2. the preparation technology of the high intensity plug valve according to claim 1 for plunger pump, it is characterised in that:The embryo material is 42CrMo round steel, and wherein Mn contents are 0.65wt%~0.85wt%, S contents≤0.025wt%, P content≤0.025wt%.
3. the preparation technology of the high intensity plug valve according to claim 1 for plunger pump, it is characterised in that:Press described in step (3) is 60~65 tonnage levels, and it is 15~30S/ parts to control beat.
4. the preparation technology of the high intensity plug valve according to claim 1 for plunger pump, it is characterised in that:It is described it is rough turn plus during the lathe tool speed of mainshaft be 800~1000r/min, it is 0.2~0.6mm/s to enter part speed.
5. the preparation technology of the high intensity plug valve according to claim 1 for plunger pump, it is characterised in that:The finishing includes smart car technique, and the lathe tool speed of mainshaft is 300~500r/min in smart car technical process, and it is 0.1~0.5mm/s to enter part speed.
CN201610305922.2A 2016-05-09 2016-05-09 A kind of preparation technology of high intensity plug valve for plunger pump Pending CN107350737A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610305922.2A CN107350737A (en) 2016-05-09 2016-05-09 A kind of preparation technology of high intensity plug valve for plunger pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610305922.2A CN107350737A (en) 2016-05-09 2016-05-09 A kind of preparation technology of high intensity plug valve for plunger pump

Publications (1)

Publication Number Publication Date
CN107350737A true CN107350737A (en) 2017-11-17

Family

ID=60271351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610305922.2A Pending CN107350737A (en) 2016-05-09 2016-05-09 A kind of preparation technology of high intensity plug valve for plunger pump

Country Status (1)

Country Link
CN (1) CN107350737A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105127679A (en) * 2015-08-17 2015-12-09 河北宏润核装备科技股份有限公司 Valve machining technology
CN105397416A (en) * 2015-12-01 2016-03-16 温州市研制阀门厂 Forging method of valve

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105127679A (en) * 2015-08-17 2015-12-09 河北宏润核装备科技股份有限公司 Valve machining technology
CN105397416A (en) * 2015-12-01 2016-03-16 温州市研制阀门厂 Forging method of valve

Similar Documents

Publication Publication Date Title
CN106399860B (en) A kind of method for manufacturing of 1Cr17Ni2 piston rods forging
CN107350730A (en) A kind of processing technology of valve seat
CN106119723A (en) A kind of production method of deep-sea oil extracting ship 4130 coupling forging raw material
CN104988403B (en) A kind of oil-gas mining martensitic stainless steel seamless steel pipe and its manufacture method
CN107052728B (en) A kind of manufacturing process applied to bevel gear shaft
CN110193580A (en) A kind of H13 material forging mold technique
CN103464991A (en) Gear ring machining process
CN108723269A (en) Groove shape part one-mold multiple-member forges technique
CN1775465A (en) Method and equipment for manufacturing high-alloy seamless steel pipe
CN101905244A (en) Method for producing mandrel by utilizing 28NiCrMoV steel as raw material
CN111270050A (en) Cryogenic treatment process and die steel thereof
CN103949569A (en) Preparation method of structure steel forging
CN107350737A (en) A kind of preparation technology of high intensity plug valve for plunger pump
CN104002111B (en) Machining center spindle taper hole processing technique
CN107350728A (en) A kind of production technology of high intensity bushing for plunger pump
CN111570687B (en) Forging process of sliding frame
CN107262647A (en) A kind of method for upsetting of large-scale round steel bar
CN104878310B (en) A kind of high-pressure seamless gas storage cylinder and manufacturing process
CN114130814B (en) Method for controlling flatness of grinding ball steel with high precision
CN107350733A (en) A kind of manufacturing process of high intensity discharge cap flange for plunger pump
CN107350729A (en) A kind of preparation technology of high-strength valve cover for plunger pump
CN107350735A (en) A kind of processing method of pump cover
CN107350736A (en) A kind of manufacturing process of high intensity stopper ring for plunger pump
CN107350727B (en) A kind of processing technology of high intensity plunger pump pipe clamp
CN107350738A (en) A kind of production technology of plug screw for plunger pump

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171117

WD01 Invention patent application deemed withdrawn after publication