China
Prior art keywords
refuse landfill
reparation
gravestone
built
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710573705.6A
Other languages
Chinese (zh)
Inventor
谭勇
张�林
高用贵
王殿二
高国龙
宗海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Everbright Envirotech China Ltd
Everbright Environmental Protection Research Institute Nanjing Co Ltd
Everbright Environmental Protection Technology Research Institute Shenzhen Co Ltd
Everbright Environmental Protection Technology Equipment Changzhou Co Ltd
Original Assignee
Everbright Envirotech China Ltd
Everbright Environmental Protection Research Institute Nanjing Co Ltd
Everbright Environmental Protection Technology Research Institute Shenzhen Co Ltd
Everbright Environmental Protection Technology Equipment Changzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Everbright Envirotech China Ltd, Everbright Environmental Protection Research Institute Nanjing Co Ltd, Everbright Environmental Protection Technology Research Institute Shenzhen Co Ltd, Everbright Environmental Protection Technology Equipment Changzhou Co Ltd filed Critical Everbright Envirotech China Ltd
Priority to CN201710573705.6A priority Critical patent/CN107339006A/en
Publication of CN107339006A publication Critical patent/CN107339006A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H14/00Buildings for combinations of different purposes not covered by any single one of main groups E04H1/00-E04H13/00 of this subclass, e.g. for double purpose; Buildings of the drive-in type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/002Design or lay-out of roads, e.g. street systems, cross-sections ; Design for noise abatement, e.g. sunken road
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H13/00Monuments; Tombs; Burial vaults; Columbaria

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Soil Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention provides a kind of method recycled after refuse landfill reparation, including:Artificial ecology lake is built using the hole of material and formation caused by refuse landfill repair process;Centered on the artificial ecology lake, the refuse landfill after reparation is divided into multiple functional areas;Functional architecture is built in each functional areas.The method recycled after the refuse landfill reparation changes the original Land use systems of landfill yard, opens another feasible way that landfill yard is administered and repaired, realizes land increment.

Description

A kind of method recycled after refuse landfill reparation
Technical field
The present invention relates to refuse landfill reparation to utilize technical field, after being repaired in particular to a kind of refuse landfill The method of recycling.
Background technology
It is in all parts of the country to have built large quantities of city life garbage landfills in succession since late 1980s, and according to Whether engineering measure is complete, can environmental protection standard meet to judge, can be classified as Mini nutritionalassessment, controlled landfill yard and health Landfill yard Three Estate.Landfill yard reservoir area base impervious, landfill gas Collection utilization, leachate collection processing, landfill operation point Deficiency existing for reality and the daily covering of landfill yard etc. is laminated, most of landfill yard is not because meeting the standard of sanitary landfills and wanting Ask, be also directly defined as informal landfill.Usually, landfill yard takes large amount of land resources, and caused rubbish oozes The pollution source such as filtrate and foul gas, serious potential hazard can be caused to surrounding body, air, soil and resident, needed Go into overdrive to administer it and repaired.
At present, the technology administered and repaired to refuse landfill both at home and abroad mainly have oxygen therapy-exhaust technique in situ, Dystopy Sanitary Landfill Technology and dystopy exploitation-material sieving technology.The case of dystopy exploitation-domestic refuse landfill of material sieving technology processing Example is more, and the informal landfill yard in Beijing area more than 1,000 largely uses this method.Generally in landfill yard repair process, production The finished products such as raw lightweight oversize, brick and tile crushed stone aggregate, fertile soil and metal class, and often after the completion of landfill yard reparation, storehouse The intratelluric hollow place in area field and the brick and tile crushed stone aggregate and fertile soil largely stored up, how more effectively to utilize the part resource Turn into urgent problem to be solved with the soil after reparation.
Cremated in addition, the funeral and interment system in existing China city is carried out, the bone ash after cremate is placed in cinerary casket, many persons of dying Cinerary casket is placed in constructed cemetery by family members' selection, and establishes stone tablet with the permanent grief of table.As China human mortality is aged Change the progressively quickening of structure, the number died every year is being continuously increased, and cemetery land area also constantly expands, especially for me For the city that state has a large population and a few land, the situation that dead person fights for living space with living person has often been resulted in.
Therefore need to propose a kind of method recycled after refuse landfill reparation, at least partly to solve the above problems.
The content of the invention
A series of concept of reduced forms is introduced in Summary, this will enter in specific embodiment part One step describes in detail.The Summary of the present invention is not meant to attempt to limit technical scheme claimed Key feature and essential features, the protection domain for attempting to determine technical scheme claimed is not meant that more.
In order to solve the problems, such as to presently, there are, one aspect of the present invention provides the side recycled after a kind of refuse landfill reparation Method, including:
Artificial ecology lake is built using the hole of material and formation caused by refuse landfill repair process;
Centered on the artificial ecology lake, the refuse landfill after reparation is divided into multiple functional areas;
Functional architecture is built in each functional areas.
Alternatively, it is described to build artificial ecology lake using the hole of material and formation caused by refuse landfill repair process Including:
Caused aggregate and clay in refuse landfill repair process are inserted after refuse landfill reparation to the hole formed, and Compacting layer is formed by mechanical ramming;
Waterproof layer and bed course are formed on the compacting layer.
Alternatively, the waterproof layer uses sodium base bentonite waterproof blanket.
Alternatively, it is described to build artificial ecology lake using the hole of material and formation caused by refuse landfill repair process Also include:
Road is built in the artificial ecology lakeside, and is laid in the road both sides in refuse landfill repair process Caused fertile soil, in favor of plant growth.
Alternatively, the functional architecture is cemetery.
Alternatively, it is described centered on the artificial ecology lake, the refuse landfill after reparation is divided into multiple functions Area includes:
Multiple main stem roads radially extended along the artificial ecology lake are built around the artificial ecology lake, will be repaired Refuse landfill afterwards is divided into multiple longitudinal regions.
Alternatively, gutter is built in the main both sides of the road.
Alternatively, in addition to:Each longitudinal region is divided into multiple transverse areas, for use as vertical gravestone area or Horizontal gravestone area.
Alternatively, in addition to:Refuse landfill is covered between gravestone in the vertical gravestone area or horizontal gravestone area Caused fertile soil in repair process, in favor of plant growth.
Alternatively, built in the vertical gravestone area or horizontal gravestone area and hold a memorial ceremony for aisle.
According to the method that recycles after the refuse landfill reparation of the present invention, the space of the inside of landfill yard is taken full advantage of Construction, geographical advantage and existing resource (aggregate and fertile soil), one is constructed near the mountain with water, the ecological cemetery of back to nature Garden, ecological environment is protected, improve the artistic taste in cemetery garden, so as to not only change the original Land use systems of landfill yard, Another feasible way that landfill yard is administered and repaired is opened, realizes land increment, and can be combined with the custom of locality Custom, vertical gravestone and horizontal gravestone are combined, and meet the traditional concept of the person's of dying " burial brings peace to the deceased ", save a large amount of soil moneys Source, effectively alleviate the situation that city dead person fights for living space with living person.
Brief description of the drawings
The drawings below of the present invention is used to understand the present invention in this as the part of the present invention.Shown in the drawings of this hair Bright embodiment and its description, for explaining the principle of the present invention.
In accompanying drawing:
Fig. 1 shows the square illustrated steps flow recycled after refuse landfill reparation according to an embodiment of the present invention Figure;
Fig. 2 shows vertical gravestone area arrangement schematic diagram according to an embodiment of the present invention;
Fig. 3 shows horizontal gravestone area arrangement schematic diagram according to an embodiment of the present invention.
Embodiment
In the following description, a large amount of concrete details are given to provide more thorough understanding of the invention.So And it is obvious to the skilled person that the present invention can be able to without one or more of these details Implement.In other examples, in order to avoid obscuring with the present invention, do not enter for some technical characteristics well known in the art Row description.
It should be appreciated that the present invention can be implemented in different forms, and it should not be construed as being limited to what is proposed here Embodiment.On the contrary, providing these embodiments disclosure will be made thoroughly and complete, and will fully convey the scope of the invention to Those skilled in the art.In the accompanying drawings, for clarity, the size and relative size in Ceng He areas may be exaggerated phase from beginning to end Identical element is represented with reference.
It should be understood that when element or layer be referred to as " ... on ", " with ... it is adjacent ", " being connected to " or " being coupled to " other members When part or layer, its can directly on other elements or layer, it is adjacent thereto, be connected or coupled to other elements or layer, or There may be element or layer between two parties.On the contrary, when element be referred to as " on directly existing ... ", " with ... direct neighbor ", " be directly connected to To " or when " being directly coupled to " other elements or layer, then element or layer between two parties is not present.It should be understood that although art can be used Language first, second, third, etc. describe various elements, part, area, floor and/or part, these elements, part, area, floor and/or portion Dividing to be limited by these terms.These terms are used merely to distinguish an element, part, area, floor or part and another Element, part, area, floor or part.Therefore, do not depart from present invention teach that under, the first element discussed below, part, area, Floor or part are represented by the second element, part, area, floor or part.
Spatial relationship term for example " ... under ", " ... below ", " below ", " ... under ", " ... on ", " above " etc., herein can for convenience description and by using so as to describe an element shown in figure or feature with it is other The relation of element or feature.It should be understood that in addition to the orientation shown in figure, spatial relationship term be intended to also including the use of with The different orientation of device in operation.For example, if the device upset in accompanying drawing, then, is described as " below other elements " Or " under it " or " under it " element or feature will be oriented to other elements or feature " on ".Therefore, exemplary term " ... below " and " ... under " it may include upper and lower two orientations.Device, which can be additionally orientated, (to be rotated by 90 ° or other takes To) and spatial description language as used herein correspondingly explained.
The purpose of term as used herein is only that description specific embodiment and not as the limitation of the present invention.Make herein Used time, " one " of singulative, "one" and " described/should " be also intended to include plural form, unless context is expressly noted that separately Outer mode.It is also to be understood that term " composition " and/or " comprising ", when in this specification in use, determining the feature, whole Number, step, operation, the presence of element and/or part, but be not excluded for one or more other features, integer, step, operation, The presence or addition of element, part and/or group.Herein in use, term "and/or" includes any and institute of related Listed Items There is combination.
In order to thoroughly understand the present invention, detailed structure and step will be proposed in following description, to explain this hair The technical scheme of bright proposition.Presently preferred embodiments of the present invention is described in detail as follows, but in addition to these detailed descriptions, the present invention There can also be other embodiment.
Refuse landfill need to be typically built in traffic convenience, the preferable mountain region of hydrogeologic condition or basin, to landfill yard After being repaired using exploitation material sieving technology, low-lying hollow place will be formed in these reservoir area places, and store up substantial amounts of brick and tile Crushed stone aggregate and fertile soil, often aggregate is backfilled in landfill yard on the spot, and fertile soil then needs to carry out the outer of long range Fortune, outward transport process adds additional great amount of cost, the present invention based on providing a kind of recycled after refuse landfill reparation method, A kind of landfill yard reparation new governance way integrated with the construction of ecological cemetery is provided, was both reached by landfill yard reparation Preserve the ecological environment, on the one hand and can meets traditional burial custom of people's " burial brings peace to the deceased " by cemetery construction, on the other hand Increment is realized by the utilization in soil.
Carried out with reference to the method recycled after refuse landfill reparations of the Fig. 1 to Fig. 3 to an embodiment of the present invention Description.
As shown in figure 1, the method recycled after the refuse landfill reparation of the present embodiment includes:
Step 101, artificial ecology lake is built using the hole of material and formation caused by refuse landfill repair process.
Exemplarily, formed and cheated after being repaired to refuse landfill, such as low-lying hollow place, first pass around site clearing and field After ground leveling, according to the arrangement and method for construction of design it is orderly insert the unclassified stores such as aggregate and clay, and pass through mechanical ramming shape Into compacting layer, while waterproof layer and/or bed course are set on compacting layer, then build into artificial ecology lake.Exemplarily, waterproof Layer can use sodium base bentonite waterproof blanket, and the pollution to underground water can be prevented by waterproof layer.
Further, the lakeside in artificial ecology lake builds the road of such as cobblestone manway, and in both sides of the road Fertile soil is laid, in favor of the growth of trees and lawn plant.
In addition, in order to be recycled as described in the present invention after refuse landfill reparation, for Valley Type Landfill Site, Exploit screening process in, it is preferable that by aggregate and fertile soil respectively heap store away it is standby.
Step 102, centered on the artificial ecology lake, the refuse landfill after reparation is divided into multiple functional areas.
Exemplarily, multiple main stems radially extended along the artificial ecology lake are built around the artificial ecology lake Road, the refuse landfill after reparation is divided into multiple longitudinal regions, for use as functional areas.I.e. using artificial ecology lake in The heart, longitudinal direction are radially divided into some longitudinal regions, build a center master from bottom to top respectively between each subregion Road, to distinguish each region, exemplarily width is set to 1.2m or 1.5m on its main stem road, and builds draining in main both sides of the road Ditch, for collecting and discharging rainwater.
It should be noted that this paper radial direction refers to the approximate diameter direction in man-made lake ecology lake, i.e., and artificial ecology Lake generally perpendicular direction, because refuse landfill is typically in mountain valley-type, therefore artificial ecology lake is located at the lowest point, in the present embodiment The middle main stem road radially extended along artificial ecology lake can be understood as Longitudinal extending from low to high.
Step 103, cemetery is built in each region.
Exemplarily, each area in longitudinal direction is subjected to transverse horizontal subregion, has be divided into vertical gravestone area and horizontal gravestone with stressing Area.Exemplarily, vertical gravestone size is (height × width x thickness=1000mm × 600mm × 80mm), and horizontal gravestone size is (high × width x thickness=500mm × 800mm × 80mm), its horizontal layout is as shown in Figures 2 and 3.Vertical gravestone area, which is set, holds a memorial ceremony for platform use Visitd in holding a memorial ceremony for, horizontal gravestone area, which is not set, holds a memorial ceremony for platform, and the spacing of two kinds of gravestones is set to 0.4m, adjacent gravestone or different interval tomb Pine, cypress etc. are planted between upright stone tablet has the trees of symbolic meaning, is then covered vacantly with lawn, and all afforested areas in tomb area are used Fertile soil is covered, wherein, green coverage accounts for the 91% and 72% of vertical gravestone and horizontal gravestone tomb area respectively.
Exemplarily, all roads width of holding a memorial ceremony for are arranged to 0.8m in the garden of cemetery, are interconnected with center main road.
Exemplarily, correspondingly auxiliary facility such as administrative office, illuminator, monitoring system, discharge is had in the garden of cemetery Water system etc..
According to the method recycled after the refuse landfill reparation of the present embodiment, the sky of the inside of landfill yard is taken full advantage of Between construction, geographical advantage and existing resource (aggregate and fertile soil), construct one near the mountain with water, the ecological cemetery of back to nature Garden, ecological environment is protected, improve the artistic taste in cemetery garden, so as to not only change the original Land use systems of landfill yard, Another feasible way that landfill yard is administered and repaired is opened, realizes land increment, and can be combined with the custom of locality Custom, vertical gravestone and horizontal gravestone are combined, and meet the traditional concept of the person's of dying " burial brings peace to the deceased ", save a large amount of soil moneys Source, effectively alleviate the situation that city dead person fights for living space with living person.
Although it is understood that in the present embodiment, the refuse landfill after reparation is carried out again by building cemetery Utilize, but in other embodiments, other suitable functional architectures or structure etc. can also be built.
The present invention is illustrated by above-described embodiment, but it is to be understood that, above-described embodiment is only intended to Citing and the purpose of explanation, and be not intended to limit the invention in described scope of embodiments.In addition people in the art Member can also make more kinds of it is understood that the invention is not limited in above-described embodiment according to the teachings of the present invention Variants and modifications, these variants and modifications are all fallen within scope of the present invention.Protection scope of the present invention by The appended claims and its equivalent scope are defined.

Claims (10)

1. a kind of method recycled after refuse landfill reparation, it is characterised in that including:
Artificial ecology lake is built using the hole of material and formation caused by refuse landfill repair process;
Centered on the artificial ecology lake, the refuse landfill after reparation is divided into multiple functional areas;
Functional architecture is built in each functional areas.
2. according to the method for claim 1, it is characterised in that described to utilize material caused by refuse landfill repair process And the hole formed is built artificial ecology lake and included:
Caused aggregate and clay in refuse landfill repair process are inserted after refuse landfill reparation to the hole formed, and passed through Mechanical ramming forms compacting layer;
Waterproof layer and bed course are formed on the compacting layer.
3. according to the method for claim 2, it is characterised in that the waterproof layer uses sodium base bentonite waterproof blanket.
4. according to the method for claim 2, it is characterised in that described to utilize material caused by refuse landfill repair process And the hole formed is built artificial ecology lake and also included:
Road is built in the artificial ecology lakeside, and is produced in laying refuse landfill repair process in the road both sides Fertile soil, in favor of plant growth.
5. according to the method for claim 1, it is characterised in that the functional architecture is cemetery.
6. according to the method for claim 5, it is characterised in that it is described centered on the artificial ecology lake, after reparation Refuse landfill be divided into multiple functional areas and include:
Multiple main stem roads radially extended along the artificial ecology lake are built around the artificial ecology lake, after reparation Refuse landfill is divided into multiple longitudinal regions.
7. according to the method for claim 6, it is characterised in that build gutter in the main both sides of the road.
8. according to the method for claim 6, it is characterised in that also include:Each longitudinal region is divided into multiple Transverse area, for use as vertical gravestone area or horizontal gravestone area.
9. according to the method for claim 8, it is characterised in that also include:
Caused corruption in refuse landfill repair process is covered between gravestone in the vertical gravestone area or horizontal gravestone area Soil is grown, in favor of plant growth.
10. according to the method for claim 8, it is characterised in that built in the vertical gravestone area or horizontal gravestone area Hold a memorial ceremony for aisle.
CN201710573705.6A 2017-07-14 2017-07-14 A kind of method recycled after refuse landfill reparation Pending CN107339006A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710573705.6A CN107339006A (en) 2017-07-14 2017-07-14 A kind of method recycled after refuse landfill reparation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710573705.6A CN107339006A (en) 2017-07-14 2017-07-14 A kind of method recycled after refuse landfill reparation

Publications (1)

Publication Number Publication Date
CN107339006A true CN107339006A (en) 2017-11-10

Family

ID=60219851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710573705.6A Pending CN107339006A (en) 2017-07-14 2017-07-14 A kind of method recycled after refuse landfill reparation

Country Status (1)

Country Link
CN (1) CN107339006A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114033009A (en) * 2021-11-02 2022-02-11 湘潭大学 Ecological restoration construction method and system for surface sludge of sludge landfill

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974899A (en) * 2010-11-08 2011-02-16 王彦 Method for converting obsolete refuse landfill into construction land
CN104641755A (en) * 2014-12-09 2015-05-27 涞水丰源环保科技有限公司 Land restoration method for abandoned sand mining field
CN105926645A (en) * 2016-04-27 2016-09-07 谢铁冬 Ecological restoration method for construction refuse landfill

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974899A (en) * 2010-11-08 2011-02-16 王彦 Method for converting obsolete refuse landfill into construction land
CN104641755A (en) * 2014-12-09 2015-05-27 涞水丰源环保科技有限公司 Land restoration method for abandoned sand mining field
CN105926645A (en) * 2016-04-27 2016-09-07 谢铁冬 Ecological restoration method for construction refuse landfill

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨旭: "昆明市垃圾填埋场废弃地景观修复设计", 《林业调查规划》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114033009A (en) * 2021-11-02 2022-02-11 湘潭大学 Ecological restoration construction method and system for surface sludge of sludge landfill
CN114033009B (en) * 2021-11-02 2022-10-21 湘潭大学 Ecological restoration construction method and system for surface sludge of sludge landfill

Similar Documents

Publication Publication Date Title
Sherwood et al. The DaVincis of dirt: Geoarchaeological perspectives on Native American mound building in the Mississippi River basin
Killion et al. Intensive surface collection of residential clusters at terminal classic Sayil, Yucatan, Mexico
Laporte et al. Megalithic monumentality in Africa: from graves to stone circles at Wanar, Senegal
CN105983562A (en) High-dimensional landfill method of waste landfill
Rosen et al. Investigations at Ramat Saharonim: a desert Neolithic sacred precinct in the Central Negev
CN107339006A (en) A kind of method recycled after refuse landfill reparation
Jones Excavations at Mucking, Essex: a second interim report
Bowden et al. Roman and late-antique Butrint: excavations and survey 2000-2001
Ashraf et al. GIS and multi criteria decision method based approach of identifying appropriate landfill sites for the city of Chittagong
Wheeler A ‘Romano-Celtic’Temple near Harlow, Essex; and a note on the type
Kenyon Excavations at Jericho, 1953
LIVITSANIS The Archaeological Work of the 35th Ephorate for Prehistoric and Classical Antiquities at Ithaca: A Brief Presentation
Frînculeasa Endangered monuments: in rescue of the mutilated and anonymous burial mounds of the steppe
CN102619379A (en) Method for constructing ecology landscape type cemetery
CN205276997U (en) Nature massif tunnel type bone ash memorial park
CN205370082U (en) Non - font bone ash memorial park of nature massif tunnel type
Giardino The farmhouse at San Biagio and the agricultural landscape of Basilicata in the Roman period
Branigan Romano-British rural settlement in the western Chilterns
Angelucci Geoarchaeological insights from a Roman age incineration feature (ustrinum) at Enconsta de Sant'Ana (Lisbon, Portugal)
Magid et al. Test excavations in the southern Red Sea Hills (Sudan): cultural linkages to the north
Ow et al. Urban stormwater management: can tree roots and structural soils improve hydraulic conductivity into compacted soils?
CN107838168A (en) A kind of refuse landfill of extendible capacity
Taxel et al. Ashqelon, Kh. Hammama
CN207695294U (en) A kind of refuse landfill of extendible capacity
Craig Memorial Earth Park© an Environmentally Sustainable Public Space: Synthesizing Burial Mounds, Family Trees and Human Body Composting in North Texas

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171110