CN107330257A - 利用3~5年长观水位及历史降雨量的抗浮水位取值方法 - Google Patents
利用3~5年长观水位及历史降雨量的抗浮水位取值方法 Download PDFInfo
- Publication number
- CN107330257A CN107330257A CN201710474372.1A CN201710474372A CN107330257A CN 107330257 A CN107330257 A CN 107330257A CN 201710474372 A CN201710474372 A CN 201710474372A CN 107330257 A CN107330257 A CN 107330257A
- Authority
- CN
- China
- Prior art keywords
- water level
- rainfall
- place
- water
- value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 63
- 238000000034 method Methods 0.000 title claims abstract description 10
- 230000002706 hydrostatic effect Effects 0.000 claims description 17
- 239000003673 groundwater Substances 0.000 claims description 13
- 238000007619 statistical method Methods 0.000 claims description 3
- 230000000630 rising effect Effects 0.000 claims description 2
- 238000004364 calculation method Methods 0.000 abstract description 3
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical group OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000000205 computational method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G16—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
- G16Z—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
- G16Z99/00—Subject matter not provided for in other main groups of this subclass
Landscapes
- Geophysics And Detection Of Objects (AREA)
Abstract
本发明公开了一种利用3~5年长观水位及历史降雨量的抗浮水位取值方法,依据近3~5年的场区长观水位及降雨量资料,得到长观水位随降雨量的变化规律及函数关系,然后根据勘察期间最高水位、勘察期间降雨量及历史最高降雨量资料,计算得到场区的最高历史水位值,作为场区的抗浮设防水位值。本发明利用近3~5年长观水位及历史降雨量资料,定量计算得到场区历史最高水位值,作为场区抗浮水位取值,有效克服由于勘察人员人为因素导致的抗浮设防水位取值的不合理和随意性,提供了一种具体的、可实现的抗浮水位计算方法,规范了行业取值的随意性。
Description
技术领域
本发明属于建筑结构抗浮工程技术领域,尤其涉及一种利用3~5年长观水位及历史降雨量的抗浮水位取值方法。
背景技术
现有规范、手册、文献对于抗浮设防水位的确定没有统一的、具体的方法或公式。大多的抗浮水位提供是按勘察实测最高水位,近3~5年最高水位或历史最高水位甚至室外地坪标高确定,或依据现场勘察期间的最高水位提高0~3m作为抗浮水位,由于历史最高水位往往不易得到,据此提供的抗浮水位往往依据存在不足,要么过于保守,造成很大的浪费,要么抗浮水位不足,存在安全隐患。
发明内容
本发明的目的是提供一种利用3~5年长观水位及历史降雨量的抗浮水位取值方法,以解决现有技术得到的抗浮水位过于保守或者不足的问题。
本发明的技术方案是这样的:
本发明依据近3~5年的场区长观水位及降雨量资料,得到长观水位随降雨量的变化规律及函数关系,然后根据勘察期间最高水位、勘察期间降雨量及历史最高降雨量资料,计算得到场区的最高历史水位值,作为场区的抗浮设防水位值。
本发明主要适用于平原、缓坡地带的多孔连续介质场地;
该类场地的抗浮水位通过下式求得:
H=Hkmax+ΔH0+ΔHe (1)
其中:
H:场区的抗浮水位取值(m);
Hkmax:勘察期间场区地下水最高水位(m),现场技术人员实测场区稳定水位最大值;
ΔH0:可能的意外补给造成该层地下水位的上升值(m),根据场地环境条件及水文地质条件进行判定;
ΔHe:该层地下水在勘察时的变幅值为(m),可以根据场区近3~5年长观水位及历史降雨资料获得。
ΔHe可以按以下步骤求得:
①利用收集到的场区3~5年长观水位及历史降雨量资料,统计分析得到近 3~5年观测孔水位升降随降雨量变化的函数关系(图3),ΔH=kΔX,其中k为对每一个场地为一确定常数。
②根据降雨资料,勘察期间当月的月均降雨量为X1(mm),历史最高月均降雨量为Xmax(mm),那么场区地下水勘察时的变幅值ΔHe=k(Xmax-X1)。
求得ΔHe后,式(1)可改写为:
H=Hkmax+ΔH0+k(Xmax-X1) (2)
k通过该场地观测孔3~5年观测水位及历史降雨量资料拟合求得,Xmax和X1通过查阅历史降雨量资料获得。
本发明利用近3~5年长观水位及历史降雨量资料,定量计算得到场区历史最高水位值,作为场区抗浮水位取值,有效克服由于勘察人员人为因素导致的抗浮设防水位取值的不合理和随意性,提供了一种具体的、可实现的抗浮水位计算方法,规范了行业取值的随意性。
附图说明
图1是观测孔地下水位与降雨量关系曲线;
图2是各观测孔地下水位值与降雨量值拟合线性关系;
图3是地下水位随降雨量变幅示意图。
具体实施方式
下面结合附图和实施例对本发明作进一步说明,但不作为对本发明的任何限制。
本发明是这样实施的:
如图1-图3所示:根据某地近3~5年的场区长观水位及降雨量资料,以其中几个观测孔得到的数据作为计算依据,包括5201010181孔,5201010184孔, 5201010211孔,5201030158孔和5201030168孔。
图1为5个观测孔地下水位与降雨量的关系曲线图。从图可以看出,除 5201030168孔外,其他观测孔地下水位变化曲线与多年平均降雨量曲线及最大日降雨量曲线特征相似,并在六、七月达到最大值,在十二、一月达到最小值。由前述分析,5201030168孔地下水位受地表径流控制,所以出现不规律变化。
图2为各观测孔地下水位值与降雨量值拟合线性关系。通过图2(a)可以得出各长观孔水位与月均降雨量拟合关系(y为地下水位标高,x为月降雨量值) 为:5201010181孔,y=0.005x+1065.698;5201010184孔,y=0.008x+1055.396;5 201010211孔,y=0.005x+1053.878;5201030158孔,y=0.007x+1112.517;52010 30168孔,y=0.001x+1084.140。
通过图2(b)可以得出各长观孔拟合关系(y为地下水位变化量,x为月降雨量变化量,增加量为正,减小量为负)为:5201010181孔,y=0.031x;520101 0184孔,y=0.045x;5201010211孔,y=0.031x;5201030158孔,y=0.039x;5201 030168孔,y=0.007x。
利用收集到的场区3~5年长观水位及历史降雨量资料,统计分析得到近3~5 年观测孔水位升降随降雨量变化的函数关系(图3)。然后根据勘察期间最高水位、勘察期间降雨量及历史最高降雨量资料,计算得到场区的最高历史水位值,作为场区的抗浮设防水位值。
当然,以上只是本发明的具体应用范例,本发明还有其他的实施方式,凡采用等同替换或等效变换形成的技术方案,均落在本发明所要求的保护范围之内。
Claims (3)
1.一种利用3~5年长观水位及历史降雨量的抗浮水位取值方法,其特征在于:依据近3~5年的场区长观水位及降雨量资料,得到长观水位随降雨量的变化规律及函数关系,然后根据勘察期间最高水位、勘察期间降雨量及历史最高降雨量资料,计算得到场区的最高历史水位值,作为场区的抗浮设防水位值。
2.根据权利要求1所述的利用3~5年长观水位及历史降雨量的抗浮水位取值方法,其特征在于:该抗浮水位通过下式求得:
H=Hkmax+ΔH0+ΔHe (1)
其中:
H:场区的抗浮水位取值;
Hkmax:勘察期间场区地下水最高水位;
ΔH0:可能的意外补给造成该层地下水位的上升值;
ΔHe:该层地下水在勘察时的变幅值。
3.根据权利要求2所述的利用3~5年长观水位及历史降雨量的抗浮水位取值方法,其特征在于:ΔHe按以下步骤求得:
1)利用收集到的场区3~5年长观水位及历史降雨量资料,统计分析得到近3~5年观测孔水位升降随降雨量变化的函数关系,ΔH=kΔX,其中k为对每一个场地为一确定常数;
2)根据降雨资料,勘察期间当月的月均降雨量为X1,历史最高月均降雨量为Xmax,那么场区地下水勘察时的变幅值ΔHe=k(Xmax-X1);
求得ΔHe后,式(1)改写为:
H=Hkmax+ΔH0+k(Xmax-X1) (2);
k通过该场地观测孔3~5年观测水位及历史降雨量资料拟合求得,Xmax和X1通过查阅历史降雨量资料获得。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710474372.1A CN107330257A (zh) | 2017-06-21 | 2017-06-21 | 利用3~5年长观水位及历史降雨量的抗浮水位取值方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710474372.1A CN107330257A (zh) | 2017-06-21 | 2017-06-21 | 利用3~5年长观水位及历史降雨量的抗浮水位取值方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107330257A true CN107330257A (zh) | 2017-11-07 |
Family
ID=60193958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710474372.1A Pending CN107330257A (zh) | 2017-06-21 | 2017-06-21 | 利用3~5年长观水位及历史降雨量的抗浮水位取值方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107330257A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110990762A (zh) * | 2019-11-07 | 2020-04-10 | 上海勘察设计研究院(集团)有限公司 | 一种快速确定潜水位波动特征的计算方法 |
CN111877416A (zh) * | 2020-07-31 | 2020-11-03 | 天津泰勘工程技术咨询有限公司 | 基于Mann-Kendall趋势分析的场地抗浮设防水位确定方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101582216B1 (ko) * | 2015-05-20 | 2016-01-04 | (주)그린텍아이엔씨 | 상관도 분석 및 추세 분석을 통한 배수지 수압 예측 방법 |
-
2017
- 2017-06-21 CN CN201710474372.1A patent/CN107330257A/zh active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101582216B1 (ko) * | 2015-05-20 | 2016-01-04 | (주)그린텍아이엔씨 | 상관도 분석 및 추세 분석을 통한 배수지 수압 예측 방법 |
Non-Patent Citations (3)
Title |
---|
李超: "建筑抗浮设计水位的合理取值", 《工程勘察》 * |
陈莎莎,郭维祥: "岩溶地区深埋地铁车站抗浮问题浅析", 《贵州科学》 * |
马培贤: "地铁车站抗浮设防水位确定方法浅析", 《西部探矿工程》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110990762A (zh) * | 2019-11-07 | 2020-04-10 | 上海勘察设计研究院(集团)有限公司 | 一种快速确定潜水位波动特征的计算方法 |
CN110990762B (zh) * | 2019-11-07 | 2023-06-20 | 上海勘察设计研究院(集团)有限公司 | 一种快速确定潜水位波动特征的计算方法 |
CN111877416A (zh) * | 2020-07-31 | 2020-11-03 | 天津泰勘工程技术咨询有限公司 | 基于Mann-Kendall趋势分析的场地抗浮设防水位确定方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Dunkerley | Effects of rainfall intensity fluctuations on infiltration and runoff: rainfall simulation on dryland soils, Fowlers Gap, Australia | |
Zenebe et al. | Spatial and temporal variability of river flows in the degraded semi-arid tropical mountains of northern Ethiopia | |
Nachtergaele et al. | Spatial and temporal variations in resistance of loess‐derived soils to ephemeral gully erosion | |
R. Grove et al. | Quantifying different riverbank erosion processes during an extreme flood event | |
De Araújo et al. | Comparative hydrology: analysis of a semiarid and a humid tropical watershed | |
Sahoo et al. | Numerical groundwater-flow modeling to evaluate potential effects of pumping and recharge: implications for sustainable groundwater management in the Mahanadi delta region, India | |
Ramos‐Scharrón et al. | Runoff and suspended sediment yields from an unpaved road segment, St John, US Virgin Islands | |
Gasmo et al. | Instrumentation of an unsaturated residual soil slope | |
Narjary et al. | Impact of rainfall variability on groundwater resources and opportunities of artificial recharge structure to reduce its exploitation in fresh groundwater zones of Haryana | |
Papanicolaou et al. | Understanding mass fluvial erosion along a bank profile: using PEEP technology for quantifying retreat lengths and identifying event timing | |
Carling et al. | Mechanisms, timing, and rates of arid region mountain front recharge | |
Ala-Aho et al. | Estimation of temporal and spatial variations in groundwater recharge in unconfined sand aquifers using Scots pine inventories | |
Brakenhoff et al. | Tide‐induced variability in beach surface moisture: Observations and modelling | |
JP2019525046A (ja) | 地下水源から汲み上げ可能な水の最大許容量を経時的に決定する方法 | |
CN107330257A (zh) | 利用3~5年长观水位及历史降雨量的抗浮水位取值方法 | |
Mazaeva et al. | Model of erosion–landslide interaction in the context of the reservoir water level variations (East Siberia, Russia): factors, environment and mechanisms | |
Butler Jr et al. | Water well hydrographs: An underutilized resource for characterizing subsurface conditions | |
Amatya et al. | Long-term ecohydrologic monitoring: a case study from the Santee Experimental Forest, South Carolina | |
Pilgrim et al. | Spatial and temporal analysis of lake sedimentation under reforestation | |
JP2006249764A (ja) | 地下水揚水時の許容揚水量の算出方法 | |
Udayakumar et al. | Estimation of lateral subsurface flow in lateritic formations using well hydrograph analysis | |
Tuset et al. | Water and sediment budgets unveiling contrasting hydro-sedimentary patterns in a mountainous Mediterranean catchment | |
McCALLUM et al. | Hydrological investigations of surface water-groundwater interactions in a sub-catchment in the Namoi Valley, NSW, Australia | |
Davoodi et al. | Spatial and Temporal Analysis of Meteorological and Groundwater Droughts (Case Study: Northern Mahyar Plain of Esfahan) | |
Sutarto | Bank erosion processes in streams in the US Midwest |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171107 |
|
RJ01 | Rejection of invention patent application after publication |