CN107327598A CN201710529095.XA CN201710529095A CN107327598A CN 107327598 A CN107327598 A CN 107327598A CN 201710529095 A CN201710529095 A CN 201710529095A CN 107327598 A CN107327598 A CN 107327598A
Authority
CN
China
Prior art keywords
valve
forging
check
copper base
dcv
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710529095.XA
Other languages
Chinese (zh)
Inventor
王朝阳
梅静容
杨月红
林方杰
王晓晓
杨建标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO HUACHENG VALVE CO Ltd
Original Assignee
NINGBO HUACHENG VALVE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO HUACHENG VALVE CO Ltd filed Critical NINGBO HUACHENG VALVE CO Ltd
Priority to CN201710529095.XA priority Critical patent/CN107327598A/en
Publication of CN107327598A publication Critical patent/CN107327598A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K15/00Check valves
    • F16K15/02Check valves with guided rigid valve members
    • F16K15/06Check valves with guided rigid valve members with guided stems
    • F16K15/063Check valves with guided rigid valve members with guided stems the valve being loaded by a spring
    • F16K15/066Check valves with guided rigid valve members with guided stems the valve being loaded by a spring with a plurality of valve members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K1/00Making machine elements
    • B21K1/20Making machine elements valve parts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K27/00Construction of housing; Use of materials therefor
    • F16K27/02Construction of housing; Use of materials therefor of lift valves
    • F16K27/0209Check valves or pivoted valves

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)

Abstract

The present invention relates to a kind of compound double check valve (DCV) of copper modeling and its manufacture method, the double check valve (DCV) side of being provided with turn circle hot extrusion swage obtain inward hole concentrate tilt taper forging flow lines for first check-valve main body and second check-valve support column forge piece, be arranged on first check-valve and second check-valve centre and insert the first fluid passage and UNICOM's workpiece of the workpiece of working chamber, UNICOM's workpiece and first check-valve and the second fluid passage of second check-valve;The shell of double check valve (DCV) is the composite construction of polyether-ether-ketone outside, including tin bronze.The compound double check valve (DCV) of copper modeling of the present invention moulds composite using copper, cost is relatively low, it is lightweight to be easy to transport, and strengthen adhesion between plastics and copper by special process, simultaneously, the present invention is made due to the tin bronze forging that core bearing member obtains inward hole concentration tilt taper forging flow lines using being swaged by side turn circle hot extrusion, and intensity is high, antifatigue.

Description

A kind of compound double check valve (DCV) of copper modeling and its manufacture method
Technical field
The present invention relates to control wetting system field, more particularly to a kind of compound double check valve (DCV) of copper modeling and its manufacture method.
Background technology
Check-valves has butterfly valve, gate valve, check-valves, pressure-reducing valve, wet alarm valve, Signal butterfly bamper, automatic exhaust steam valve, explosion-proof Valve, flange-connection stainless steel metal flexible pipe, safety valve, relief valve.General double check valve (DCV) door uses rising stem (RS.) flanged gate valve.
Check-valves is industry, builds a kind of important accessory controlled on pipeline.Valve is the control in fluid delivery system Part, with cut-off, regulation, water conservancy diversion, prevents the functions such as adverse current, voltage stabilizing, shunting or overflow pressure relief.Valve is also divided into according to material Cast iron valve, cast steel valve, stainless valve, chrome-molybdenum steel valve, Chrominm-molybdenum-vanadium steel valve, dual phase steel valve, Plastic valve is nonstandard It is customized to wait valve material.
But double check valve (DCV) of the prior art does not mould composite using copper substantially, and cost is higher, and weight is difficult fortune again It is defeated, the compound double check valve (DCV)s of a small number of copper modeling also due between plastics and copper adhesion difference and feature is poor, meanwhile, in the prior art , because the mechanical property and material essential structure of core bearing member not enough optimize and by larger limitation especially set in large-scale water control It is standby above to become apparent from.
The content of the invention
To solve drawbacks described above present in prior art, the present invention is intended to provide a kind of at high temperature can self-complementary expansion The compound double check valve (DCV) of high security copper modeling and its manufacture method.
In order to realize foregoing invention purpose, the present invention uses following technical scheme:A kind of compound double check valve (DCV) of copper modeling, is set Have by side turn circle hot extrusion swage obtain inward hole concentrate tilt taper forging flow lines for the main body of first check-valve and the The forge piece of the support column of two check-valves, the work department for being arranged in the middle of first check-valve and second check-valve and inserting working chamber The first fluid passage and UNICOM's workpiece and the second fluid passage of second check-valve of part, UNICOM's workpiece and first check-valve;It is double The shell of check-valves is the composite construction of polyether-ether-ketone outside, including tin bronze.
A kind of method of forge piece, comprises the following steps:
1)Pre-preparation
1. it is raw material from tin bronze copper base;
2. select and be provided with pressure hydraulic generator, the forging equipment of rotation pusher and air cooling equipment, from vacuum resistance furnace For the forging firing equipment that begins;
3. in 90 ° of forging tups and supporting hydraulic output device it is respectively in order finish-forging and folder between axis from being provided with four Hold frock;Again from ceramic frock main body, damping liner plate and the support being arranged at the top of damping liner plate for including cone-shaped inner hole Bar is frock of swaging;
2)Forging
1. tin bronze copper base is heated above to the temperature of its theoretical 30 DEG C ~ 50 DEG C of solid solubility temperature value by vacuum resistance furnace, is protected Temperature 1.5min/mm ~ 1.8min/mm based on copper base diameter time, then come out of the stove, rotation pusher is fixed in copper base bottom On;
2. promoted by pressure hydraulic generator with rotating the forging tup that pusher links, to deform about 5% amount of feeding every time Final deformation ratio with 45% ~ 55% becomes forging base of the copper base extruding for section squarish with the once forging for deforming copper base Shape length is a forging cycle, completes forging tup after being forged for the last time in a cycle and is fixed on copper base surface as fixture Use;
3. with 0.35mm/s ~ 0.4mm/s speed by the forging base of section squarish is in rotation pusher and forges tup Promoted on the basis of linkage rotation along rotation axis into ceramic frock main body endoporus;
4. air cooling equipment is set in the exit of ceramic frock main body endoporus, with 3bar ~ 5bar pressure blowout nitrogen refrigeration;
5. repeat step 2. ~ 4. completed to the forging of whole copper base;
6. the copper base forged is used -85 ~ -75 DEG C in 10min after the completion of forging, is incubated the ice-cold processing of 1.5h ~ 2h;Then Using 300 DEG C ~ 330 DEG C, the time of 1.5min/mm ~ 1.8min/mm based on copper base diameter is incubated, intensive treatment is carried out, institute is obtained Need forge piece;
7. the forge piece 6. step obtained is processed into first check-valve main body and second check-valve using machining mode Support column.
A kind of method for manufacturing composite construction shell, comprises the following steps:
1. use tin bronze cast casing, profile thickness is the 3/5 of final thickness, die cavity in refine, and use shot-peening with 0.15A-0.22A shot peening strength spray hair outer surface, then in outer surface spraying ZS-1071 high temperature resistant inorganic adhesives;
2. the PEEK of preparation is heated to molten state, obtains subsurface fluid;
3. the tin bronze cast casing that 1. step obtains is put into the encapsulation subsurface fluid progress top layer encapsulation that 2. step obtains, obtained Obtain stand-by composite shell;
4. stand-by composite shell, closing inner chamber are taken out after temperature is down to 420 DEG C, then is placed in protective atmosphere gas booster, if Standby interior air pressure is promoted to 8MPa-10MPa, keeps 1.5h-2h, and composite shell blank is obtained after taking-up;
5. the composite shell blank outer surface that 4. conditioning step obtains, and obtain required composite construction shell.
Compared with prior art, the present invention has advantages below:In prior art frequently with stainless steel, cast iron, plastics, Brass, zinc alloy material etc., the service life and reliability of big-and-middle-sized environmentally friendly water control equipment are just ignored from material, is mainly adopted Safeguard that the mode for changing accessory carries out function holding with continuous, but deriving and develop, this height of original technology with the epoch Frequency is safeguarded and the shortcoming of basic property can no longer meet longevity of the existing Medium or severe type industry section control water field to double check valve (DCV) Life, high reliability request, tin bronze have anti-corrosion, wear-resisting, high tenacity, the comprehensive advantage of high elastic limit, very applicable to answer For double check valve (DCV) field, but directly on the one hand waste larger using the stingy system of blank, not on the one hand can not play the material completely Expect the performance boundary applied in double check valve (DCV) field, the mode that the present invention swages by using side turn circle hot extrusion makes to have in blank The forging flow lines that taper rotation is inwardly tightened up, then has excellent long-term creep resistance by being used in the not high structure position of stress Property and fatigue performance working of plastics mitigate weight, reduce cost, increase shock resistance, then by suitable mode improve copper mould Adhesion, this is also not precedented in the prior art, and the part of swaging especially in forging process is provided with the present invention should To the specific aim of the random rotary motion rule of current(High-end double check valve (DCV) in routine techniques is typically also obtained only with hot forging Linear pattern streamline, has certain improvement to performance but without the specific aim of the reply random rotary motion rule of current);Originally simultaneously Invention breaks through forging temperature in routine techniques and is higher than materials theory AC3The theoretical set for the temperature that 100 DEG C ~ 150 DEG C of temperature value, Find that precipitation-hardening stainless steel is different from other steel grades in long-term practice, higher than AC330 DEG C ~ 50 DEG C of temperature value(General material The hardening heat of material)When there is suitable plasticity, and at this moment forged, streamline, which changes, to be become apparent and rule, and use The form of hydraulic means extruding carries out the generation that deformation also contributes to control internal fissure(Existing conventional forging is general using impact Formula, forge crack is also easy to produce to underheated copper base), while hydraulic means extruding also makes what material discharged in plastic deformation Temperature is more stable controllable, initial forging temperature is more stablized compared to general forging and accurate, has also accomplished fluently base for swaging below Plinth;Blank is square during due to hot forging, easily clamps, when the tapered bore with ceramic frock main body contacts simultaneously rotary squeezing, The rotational deformation of square seamed edge is much larger than the deformation of cylindrical blank so that the double check valve (DCV) streamline curvature finally obtained is bigger, incline Rake angle is bigger, and the scouring capability for tackling random current is stronger;Surface that the present invention is used spray hair process combining high temperature resistant without Machine adhesive, greatly strengthen the adhesion between metal and plastics, simultaneously because material property, shock resistance has also been lifted, Again through the specific pressurized treatments of our company, make plastics essence finer and close, combined with adhesive and metallic matrix even closer.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
In figure:First check-valve 1, the first fluid passage 2, workpiece 3, second check-valve 4, the second fluid passage 5, working chamber 6.
Embodiment
Embodiment 1
A kind of copper, which is moulded, is combined double check valve (DCV), and the side of being provided with turn circle hot extrusion, which swages to obtain inward hole concentration tilt taper and forge, to flow Line for first check-valve 1 main body and second check-valve 4 support column forge piece, be arranged on first check-valve 1 and In the middle of two check-valves 4 and insert working chamber 6 workpiece 3, UNICOM's workpiece 3 and first check-valve 1 the first fluid passage 2 and Second fluid passage 5 of UNICOM's workpiece 3 and second check-valve 4;The shell of double check valve (DCV) be polyether-ether-ketone outside, including tin bronze Composite construction.
The method for manufacturing above-mentioned forge piece, comprises the following steps:
1)Pre-preparation
1. it is raw material from tin bronze copper base;
2. select and be provided with pressure hydraulic generator, the forging equipment of rotation pusher and air cooling equipment, from vacuum resistance furnace For the forging firing equipment that begins;
3. in 90 ° of forging tups and supporting hydraulic output device it is respectively in order finish-forging and folder between axis from being provided with four Hold frock;Again from ceramic frock main body, damping liner plate and the support being arranged at the top of damping liner plate for including cone-shaped inner hole Bar is frock of swaging;
2)Forging
1. tin bronze copper base is heated above to the temperature of its theoretical 40 DEG C of solid solubility temperature value by vacuum resistance furnace, copper is pressed in insulation Base diameter meter 1.6min/mm time, then come out of the stove, copper base bottom is fixed on rotation pusher;
2. promoted by pressure hydraulic generator with rotating the forging tup that pusher links, to deform about 5% amount of feeding every time With 50% final deformation ratio by copper base extrude for section squarish forging base, it is long with a forging deformation for deforming copper base Spend for a forging cycle, complete forging tup after last time is forged in a cycle and be fixed on copper base surface to make as fixture With;
3. with 0.38mm/s speed by the forging base of section squarish is in rotation pusher and forges tup linkage rotation On the basis of promoted along rotation axis into ceramic frock main body endoporus;
4. air cooling equipment is set in the exit of ceramic frock main body endoporus, with 4bar pressure blowout nitrogen refrigeration;
5. repeat step 2. ~ 4. completed to the forging of whole copper base;
6. the copper base forged is used -85 DEG C in 10min after the completion of forging, is incubated the ice-cold processing of 2h;Then 320 are used DEG C, the time of the 1.6min/mm based on copper base diameter is incubated, intensive treatment is carried out, forge piece needed for obtaining;
7. the forge piece 6. step obtained is processed into the main body and second check-valve of first check-valve 1 using machining mode 4 support column.
The method for manufacturing above-mentioned composite construction shell, comprises the following steps:
1. tin bronze cast casing is used, profile thickness is die cavity in the 3/5 of final thickness, refine, and uses 0.20A shot-peenings strong Degree spray hair outer surface, then in outer surface spraying ZS-1071 high temperature resistant inorganic adhesives;
2. the PEEK of preparation is heated to molten state, obtains subsurface fluid;
3. the tin bronze cast casing that 1. step obtains is put into the encapsulation subsurface fluid progress top layer encapsulation that 2. step obtains, obtained Obtain stand-by composite shell;
4. stand-by composite shell, closing inner chamber are taken out after temperature is down to 420 DEG C, then is placed in protective atmosphere gas booster, if Standby interior air pressure is promoted to 10MPa, keeps 2h, and composite shell blank is obtained after taking-up;
5. the composite shell blank outer surface that 4. conditioning step obtains, and obtain required composite construction shell.
Embodiment 2
It is overall consistent with embodiment 1, it is in place of difference:
The method for manufacturing above-mentioned forge piece, comprises the following steps:
2)Forging
1. tin bronze copper base is heated above to the temperature of its theoretical 30 DEG C of solid solubility temperature value by vacuum resistance furnace, copper is pressed in insulation Base diameter meter 1.5min/mm time, then come out of the stove, copper base bottom is fixed on rotation pusher;
2. promoted by pressure hydraulic generator with rotating the forging tup that pusher links, to deform about 5% amount of feeding every time With 45% final deformation ratio by copper base extrude for section squarish forging base, it is long with a forging deformation for deforming copper base Spend for a forging cycle, complete forging tup after last time is forged in a cycle and be fixed on copper base surface to make as fixture With;
3. with 0.35mm/s ~ speed by the forging base of section squarish rotation pusher with forging tup linkage rotation On the basis of promoted along rotation axis into ceramic frock main body endoporus;
4. air cooling equipment is set in the exit of ceramic frock main body endoporus, with 3bar pressure blowout nitrogen refrigeration;
6. the copper base forged is used -85 DEG C in 10min after the completion of forging, is incubated the ice-cold processing of 1.5h;Then 300 are used DEG C, the time of the 1.5min/mm based on copper base diameter is incubated, intensive treatment is carried out, forge piece needed for obtaining;
The method for manufacturing above-mentioned composite construction shell, comprises the following steps:
1. tin bronze cast casing is used, profile thickness is die cavity in the 3/5 of final thickness, refine, and uses 0.15A shot-peenings strong Degree spray hair outer surface, then in outer surface spraying ZS-1071 high temperature resistant inorganic adhesives;
4. stand-by composite shell, closing inner chamber are taken out after temperature is down to 420 DEG C, then is placed in protective atmosphere gas booster, if Standby interior air pressure is promoted to 8MPa, keeps 1.5h, and composite shell blank is obtained after taking-up.
Embodiment 3
It is overall consistent with embodiment 1, it is in place of difference:
The method for manufacturing above-mentioned forge piece, comprises the following steps:
2)Forging
1. tin bronze copper base is heated above to the temperature of its theoretical 50 DEG C of solid solubility temperature value by vacuum resistance furnace, copper is pressed in insulation Base diameter meter 1.8min/mm time, then come out of the stove, copper base bottom is fixed on rotation pusher;
2. promoted by pressure hydraulic generator with rotating the forging tup that pusher links, to deform about 5% amount of feeding every time With 55% final deformation ratio by copper base extrude for section squarish forging base, it is long with a forging deformation for deforming copper base Spend for a forging cycle, complete forging tup after last time is forged in a cycle and be fixed on copper base surface to make as fixture With;
3. with 0.4mm/s speed by the forging base of section squarish is in rotation pusher and forges tup linkage rotation On the basis of promoted along rotation axis into ceramic frock main body endoporus;
4. air cooling equipment is set in the exit of ceramic frock main body endoporus, with 5bar pressure blowout nitrogen refrigeration;
6. the copper base forged is used -75 DEG C in 10min after the completion of forging, is incubated the ice-cold processing of 2h;Then 330 are used DEG C, the time of the 1.8min/mm based on copper base diameter is incubated, intensive treatment is carried out, forge piece needed for obtaining;
The method for manufacturing above-mentioned composite construction shell, comprises the following steps:
Tin bronze cast casing is used, profile thickness is die cavity in the 3/5 of final thickness, refine, and using the spray of 0.22A shot peening strengths Hair outer surface, then in outer surface spraying ZS-1071 high temperature resistant inorganic adhesives.
The foregoing description of the disclosed embodiments, only for enabling professional and technical personnel in the field to realize or using this Invention.A variety of modifications to these embodiments will be apparent for those skilled in the art, institute herein The General Principle of definition can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, The present invention is not intended to be limited to the embodiments shown herein, and is to fit to special with principles disclosed herein and novelty The consistent most wide scope of point.

Claims (3)

1. a kind of compound double check valve (DCV) of copper modeling, it is characterised in that:The double check valve (DCV) side of being provided with turns circle hot extrusion and swaged acquisition Inward hole concentrates the main body and the support column of second check-valve (4) for first check-valve (1) of tilt taper forging flow lines Forge piece, the workpiece (3) for being arranged in the middle of first check-valve (1) and second check-valve (4) and inserting working chamber (6), connection The of the first fluid passage (2) and UNICOM's workpiece (3) and second check-valve (4) of logical workpiece (3) and first check-valve (1) Two fluid passages (5);The shell of double check valve (DCV) is the composite construction of polyether-ether-ketone outside, including tin bronze.
2. a kind of method of forge piece described in manufacturing claims 1, it is characterised in that comprise the following steps:
1)Pre-preparation
1. it is raw material from tin bronze copper base;
2. select and be provided with pressure hydraulic generator, the forging equipment of rotation pusher and air cooling equipment, from vacuum resistance furnace For the forging firing equipment that begins;
3. in 90 ° of forging tups and supporting hydraulic output device it is respectively in order finish-forging and folder between axis from being provided with four Hold frock;Again from ceramic frock main body, damping liner plate and the support being arranged at the top of damping liner plate for including cone-shaped inner hole Bar is frock of swaging;
2)Forging
1. tin bronze copper base is heated above to the temperature of its theoretical 30 DEG C ~ 50 DEG C of solid solubility temperature value by vacuum resistance furnace, is protected Temperature 1.5min/mm ~ 1.8min/mm based on copper base diameter time, then come out of the stove, rotation pusher is fixed in copper base bottom On;
2. promoted by pressure hydraulic generator with rotating the forging tup that pusher links, to deform about 5% amount of feeding every time Final deformation ratio with 45% ~ 55% becomes forging base of the copper base extruding for section squarish with the once forging for deforming copper base Shape length is a forging cycle, completes forging tup after being forged for the last time in a cycle and is fixed on copper base surface as fixture Use;
3. with 0.35mm/s ~ 0.4mm/s speed by the forging base of section squarish is in rotation pusher and forges tup Promoted on the basis of linkage rotation along rotation axis into ceramic frock main body endoporus;
4. air cooling equipment is set in the exit of ceramic frock main body endoporus, with 3bar ~ 5bar pressure blowout nitrogen refrigeration;
5. repeat step 2. ~ 4. completed to the forging of whole copper base;
6. the copper base forged is used -85 ~ -75 DEG C in 10min after the completion of forging, is incubated the ice-cold processing of 1.5h ~ 2h;Then Using 300 DEG C ~ 330 DEG C, the time of 1.5min/mm ~ 1.8min/mm based on copper base diameter is incubated, intensive treatment is carried out, institute is obtained Need forge piece;
7. the forge piece 6. step obtained is processed into the main body and the second non-return of first check-valve (1) using machining mode The support column of valve (4).
3. a kind of method of composite construction shell described in manufacturing claims 1, it is characterised in that comprise the following steps:
1. tin bronze cast casing is used, profile thickness is die cavity in the 3/5 of final thickness, refine, and uses 0.15A-0.22A Shot peening strength spray hair outer surface, then in outer surface spraying ZS-1071 high temperature resistant inorganic adhesives;
2. the PEEK of preparation is heated to molten state, obtains subsurface fluid;
3. the tin bronze cast casing that 1. step obtains is put into the encapsulation subsurface fluid progress top layer encapsulation that 2. step obtains, obtained Obtain stand-by composite shell;
4. stand-by composite shell, closing inner chamber are taken out after temperature is down to 420 DEG C, then is placed in protective atmosphere gas booster, if Standby interior air pressure is promoted to 8MPa-10MPa, keeps 1.5h-2h, and composite shell blank is obtained after taking-up;
5. the composite shell blank outer surface that 4. conditioning step obtains, and obtain required composite construction shell.
CN201710529095.XA 2017-07-01 2017-07-01 A kind of compound double check valve (DCV) of copper modeling and its manufacture method Pending CN107327598A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710529095.XA CN107327598A (en) 2017-07-01 2017-07-01 A kind of compound double check valve (DCV) of copper modeling and its manufacture method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710529095.XA CN107327598A (en) 2017-07-01 2017-07-01 A kind of compound double check valve (DCV) of copper modeling and its manufacture method

Publications (1)

Publication Number Publication Date
CN107327598A true CN107327598A (en) 2017-11-07

Family

ID=60198832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710529095.XA Pending CN107327598A (en) 2017-07-01 2017-07-01 A kind of compound double check valve (DCV) of copper modeling and its manufacture method

Country Status (1)

Country Link
CN (1) CN107327598A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109027337A (en) * 2018-09-12 2018-12-18 苏州丹顿机电有限公司 A kind of check valve manually adjusting cut-off direction

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1182776A (en) * 1997-09-08 1999-03-26 Kurimoto Shoji Kk Pressure reduction type reverse flow preventing device
CN2685682Y (en) * 2004-03-30 2005-03-16 上海艾维科阀门有限公司 Antipolluting isolating valve
CN1884882A (en) * 2006-07-04 2006-12-27 何建初 Nylon ball valve and manufacturing method thereof
CN102072342A (en) * 2010-12-04 2011-05-25 福建高中压阀门科技有限公司 Coaxial difference path device with double check valve clacks
CN102369302A (en) * 2009-03-31 2012-03-07 奎斯泰克创新公司 Beryllium-free high-strength copper alloys
CN202597807U (en) * 2012-05-08 2012-12-12 宁波华成阀门有限公司 Copper-plastic composite decompression type backflow preventer
CN104847926A (en) * 2014-10-22 2015-08-19 青岛万力科技有限公司 Stainless steel backflow prevention device with double non-return valves
CN105568193A (en) * 2016-01-12 2016-05-11 天津理工大学 Method for machining high-strength copper wire
CN205978671U (en) * 2016-08-17 2017-02-22 杭州春江阀门有限公司 Decompression type hangs down resistance backflow preventer

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1182776A (en) * 1997-09-08 1999-03-26 Kurimoto Shoji Kk Pressure reduction type reverse flow preventing device
CN2685682Y (en) * 2004-03-30 2005-03-16 上海艾维科阀门有限公司 Antipolluting isolating valve
CN1884882A (en) * 2006-07-04 2006-12-27 何建初 Nylon ball valve and manufacturing method thereof
CN102369302A (en) * 2009-03-31 2012-03-07 奎斯泰克创新公司 Beryllium-free high-strength copper alloys
CN102072342A (en) * 2010-12-04 2011-05-25 福建高中压阀门科技有限公司 Coaxial difference path device with double check valve clacks
CN202597807U (en) * 2012-05-08 2012-12-12 宁波华成阀门有限公司 Copper-plastic composite decompression type backflow preventer
CN104847926A (en) * 2014-10-22 2015-08-19 青岛万力科技有限公司 Stainless steel backflow prevention device with double non-return valves
CN105568193A (en) * 2016-01-12 2016-05-11 天津理工大学 Method for machining high-strength copper wire
CN205978671U (en) * 2016-08-17 2017-02-22 杭州春江阀门有限公司 Decompression type hangs down resistance backflow preventer

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《稀有金属材料加工手册》编写组: "《稀有金属材料加工手册》", 31 March 1984, 冶金工业出版社 *
中国锻压协会: "《锻造加热与热处理及节能环保》", 30 June 2010, 国防工业出版社 *
罗晓东、赵亚东、周志明: "《有色金属塑性加工》", 31 May 2016, 冶金工业出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109027337A (en) * 2018-09-12 2018-12-18 苏州丹顿机电有限公司 A kind of check valve manually adjusting cut-off direction
CN109027337B (en) * 2018-09-12 2020-02-14 苏州丹顿机电有限公司 Check valve capable of manually adjusting stop direction

Similar Documents

Publication Publication Date Title
CN101890622B (en) Method for manufacturing hammer lever of electrohydraulic hammer
CN102019335B (en) Cold forging processing method of hardened and tempered structural steel
CN107414009B (en) Waveform combustion chamber forging steel piston head heat, cold forging near-net-shape technique
CN104963938A (en) Robot bearing and production process thereof
CN106002103B (en) The forming method of iron-base superalloy flow splitter
CN104074622A (en) Piston with integrated steel crown and iron skirt and production method thereof
CN101187295B (en) Super high intensity anti-corrosion pumping rod production method
CN104148574A (en) Precise cold forging formed cam sheet manufacturing method
CN108950543A (en) The thermally conductive wear-resisting endurance mold of one kind and its manufacturing process
CN107327598A (en) A kind of compound double check valve (DCV) of copper modeling and its manufacture method
CN107178635A (en) A kind of copper modeling composite pressure reducing formula backflow preventer and its manufacture method
CN101961730A (en) Method for making steel tube
CN106077252B (en) The forming method and its mold of iron-base superalloy thin-walled curved pipe
CN115074504A (en) Method for manufacturing large-caliber thick-wall seamless steel pipe of 630 ℃ ultra-supercritical unit G115
CN1952344A (en) Method for making super-high-strength anti-corrosion pumping polished rod
CN107186444A (en) A kind of hubbed flange processing technology
CN104929719B (en) A kind of hollow valve filled with sodium based on cross wedge rolling base
CN102886646A (en) Process for forging end head of electric upset steel pull rod
CN115121751A (en) Forming method of nickel-based high-temperature alloy hollow turbine disc shaft integrated forging
CN107321899B (en) Anti-fatigue impact-resistant pressure reducing valve and manufacturing method thereof
CN111230430B (en) Manufacturing process of front die of hub forging
CN104723027A (en) Method for forging, welding and manufacturing abrasion-resistant metal bent pipes
CN113211021A (en) Method for manufacturing hollow piston
CN207598508U (en) Rotary compressor piston
CN112963341A (en) Connecting rod for pump and assembling method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171107

RJ01 Rejection of invention patent application after publication