CN107326517B - A kind of weaving method of vamp - Google Patents

A kind of weaving method of vamp Download PDF

Info

Publication number
CN107326517B
CN107326517B CN201710478376.7A CN201710478376A CN107326517B CN 107326517 B CN107326517 B CN 107326517B CN 201710478376 A CN201710478376 A CN 201710478376A CN 107326517 B CN107326517 B CN 107326517B
Authority
CN
China
Prior art keywords
needle
circulation
bed
mesh
needle bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710478376.7A
Other languages
Chinese (zh)
Other versions
CN107326517A (en
Inventor
孙平范
杨树
朱信忠
晋云秀
刘梦婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Cixing Co Ltd
Original Assignee
Ningbo Cixing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Cixing Co Ltd filed Critical Ningbo Cixing Co Ltd
Priority to CN201710478376.7A priority Critical patent/CN107326517B/en
Publication of CN107326517A publication Critical patent/CN107326517A/en
Application granted granted Critical
Publication of CN107326517B publication Critical patent/CN107326517B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • DTEXTILES; PAPER
    • D04BRAIDING; LACE-MAKING; KNITTING; TRIMMINGS; NON-WOVEN FABRICS
    • D04BKNITTING
    • D04B1/00Weft knitting processes for the production of fabrics or articles not dependent on the use of particular machines; Fabrics or articles defined by such processes
    • D04B1/22Weft knitting processes for the production of fabrics or articles not dependent on the use of particular machines; Fabrics or articles defined by such processes specially adapted for knitting goods of particular configuration
    • AHUMAN NECESSITIES
    • A43FOOTWEAR
    • A43BCHARACTERISTIC FEATURES OF FOOTWEAR; PARTS OF FOOTWEAR
    • A43B23/00Uppers; Boot legs; Stiffeners; Other single parts of footwear
    • A43B23/02Uppers; Boot legs
    • A43B23/0245Uppers; Boot legs characterised by the constructive form

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Woven Fabrics (AREA)
  • Treatment Of Fiber Materials (AREA)

Abstract

The invention discloses a kind of weaving method of vamp, from neckline, door towel, shoes doorway three simultaneously bottom, laterally weave.Neckline thickeies braiding in a manner of hanging mesh and idle running;Neckline radian is that the radian as defined in locally to stop to reach in a manner of needle at upper of a shoe is woven;Door towel knits out the effect come in a manner of hanging mesh and idle running keeps the firmness of towel stronger;Shoes doorway using and neckline, door towel play bottom together by the way of weave, also using with neckline weaving manner as, keep its firmness stronger, completed at upper of a shoe using locally stopping needle mode.

Description

A kind of weaving method of vamp
Technical field
The invention belongs to vamp knitting skill field, in particular to a kind of weaving method of vamp.
Background technique
Traditional vamp braiding generally use from toe-cap or followed by bottom take up one's knitting, begin the compilation of to the punishment of two sides upper of a shoe and to knit Technology needs to splice toe-cap and footwear body, splice to flap after woven, is punched in buckle position, needs It will largely artificial subsequent operation.Meanwhile in this braiding, flower pattern at upper of a shoe be it is longitudinal knitted, limit upper pattern volume Knit the diversification of type.
Summary of the invention
The object of the present invention is to provide one kind from neckline, door towel, shoes doorway simultaneously bottom, can laterally weave at upper of a shoe The weaving method of vamp.
For this purpose, the technical scheme is that a kind of weaving method of vamp, the cross of a pair of of needle bed before and after having at least Woven on volume machine, at least one needle bed can move left and right in front and back a pair of needle bed, and forward and backward needle bed have turn over Needle function;Flat braiding machine has more than two systems, and with 16 above yarn mouth, a system drive one is yarn mouth;Its It is characterized in that:
Left and right faces preceding needle bed as reference using front;From left to right, preceding needle bed braiding is indicated with a ~ j, and rear needle bed braiding is used A ' ~ j ' indicates that preceding needle bed pressing is indicated with a& ~ j&, and rear needle bed pressing is indicated with a^ ~ j^, preceding needle bed hangs mesh a ↑ ~ j ↑ indicate, rear needle bed hangs mesh with a ↓ ~ j ↓ indicate, four flat coils are indicated with a* ~ j*, draw flotation line to be indicated with a "~j ", no Needle is indicated with a0~j 0 out;
The braiding original state is that head, yarn mouth are parked in leftward position, and preceding needle bed, rear needle bed are completely needle-shaped state;
1) head right lateral, the first system drive yarn mouth to carry out Siping City's braiding in front and back needle bed, a*, b*, c*, d*, e*, f*, G*, the braiding of the Siping City h*, i*, j* Jun Zhiyizhen are circuited sequentially to 2M+N needle, and wherein 2M is the needle number of neckline, and N is door towel and shoes The total needle amount on doorway;
2) head left lateral, the first system drive yarn mouth to be woven in preceding needle bed, needle bed before a, b, c, d, e, f, g, h, i, j A needle is respectively knitted, is circuited sequentially to 2M+N needle;
3) head right lateral, the first system drive yarn mouth to be woven in preceding needle bed, needle bed before a, b, c, d, e, f, g, h, i, j A needle is respectively knitted, is circuited sequentially to 2M+N needle;
4) head left lateral, the first system drive yarn mouth woven in rear needle bed, a ', b ', c ', d ', e ', f ', g ', h ', Needle bed respectively knits a needle afterwards by i ', j ', circuits sequentially to 2M+N needle;
5) head right lateral, the first system do not drive yarn mouth to carry out pressing in front and back needle bed, and needle bed is respectively pressed before a&, c&, e&, g& One needle, needle bed respectively presses a needle after b^, d^, f^, h^, and i0 and j0 do not go out needle, and wherein needle bed presses needle bed pressure one after a needle to h^ before a& This 8 needle of needle is A1 circulation, this 2 needle of i0, j0 is B1 circulation;A1 circulation carries out B1 circulation after circuiting sequentially M/8 times, B1 is recycled successively After circulation N/2 times, M/8 A1 circulation is carried out again;
6) while carrying out step 5), the needle bed after front and back needle bed pressing, a^, c^, e^, g^ is each without yarn mouth for second system A needle is pressed, needle bed respectively presses a needle before b&, d&, f&, h&, and i0 and j0 do not go out needle, and wherein needle bed presses needle bed pressure before a needle to h& after a^ This 8 needle of one needle is A2 circulation, this 2 needle of i0, j0 is B2 circulation;A2 circulation circuits sequentially and carries out B2 circulation after M/8 time, B2 recycle according to After secondary circulation N/2 times, M/8 A2 circulation is carried out again;
7) head left lateral, the first system do not drive yarn mouth to carry out pressing in front and back needle bed, and needle bed is respectively pressed before a&, c&, e&, g& One needle, needle bed respectively presses a needle after b^, d^, f^, h^, and i0 and j0 do not go out needle, and wherein needle bed presses needle bed pressure one after a needle to h^ before a& This 8 needle of needle is A1 circulation, this 2 needle of i0, j0 is B1 circulation;A1 circulation carries out B1 circulation after circuiting sequentially M/8 times, B1 is recycled successively After circulation N/2 times, M/8 A1 circulation is carried out again;
8) while carrying out step 7), the needle bed after front and back needle bed pressing, a^, c^, e^, g^ is each without yarn mouth for second system A needle is pressed, needle bed respectively presses a needle before b&, d&, f&, h&, and i0 and j0 do not go out needle, and wherein needle bed presses needle bed pressure before a needle to h& after a^ This 8 needle of one needle is A2 circulation, this 2 needle of i0, j0 is B2 circulation;A2 circulation circuits sequentially and carries out B2 circulation after M/8 time, B2 recycle according to After secondary circulation N/2 times, M/8 A2 circulation is carried out again;
9) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, b ↓ rear needle bed to hang mesh one Needle, c ", d ", e " respectively draw one needle of flotation line, and f ↑ preceding needle bed hangs one needle of mesh, and g ", h " is each to draw one needle of flotation line, and i ↑ preceding needle bed hangs one needle of mesh, J ↓ rear needle bed hangs one needle of mesh;It is that A3 is recycled that wherein a " draw one needle of flotation line to h ", which draws one needle of flotation line, i ↑ preceding needle bed hang one needle of mesh to j ↓ Needle bed hangs one needle of mesh as B3 circulation afterwards, and A3 circulation carries out B3 circulation after circuiting sequentially M/8 times, after B3 circulation circuits sequentially N/2 times, M/8 A3 circulation is carried out again;
10) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b " is each to draw one needle of flotation line, and c ↓ rear needle bed is hung One needle of mesh, d ", e ", f " respectively draw one needle of flotation line, and g ↑ preceding needle bed hangs one needle of mesh, and h " draws one needle of flotation line, and i ↓ rear needle bed hangs one needle of mesh, and j ↑ Preceding needle bed hangs one needle of mesh;A " drawing one needle of flotation line to h " draws one needle of flotation line for A4 circulation, and i ↓ rear needle bed hangs one needle of mesh to j ↑ preceding needle bed One needle of mesh is hung as B4 circulation, A4 circulation circuits sequentially and carries out B4 circulation after M/8 time, B4 is recycled circuit sequentially N/2 times after, again into M/8 A4 circulation of row;
11) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b ", c " respectively draw one needle of flotation line, d ↓ rear needle Bed hangs one needle of mesh, and e ", f ", g " respectively draw one needle of flotation line, and h ↑ preceding needle bed hangs one needle of mesh, and i0 and j0 do not go out needle;A " draws one needle of flotation line to h ↑ preceding needle bed hangs one needle of mesh as A5 circulation, and it is that B5 is recycled that i0, which does not go out needle and do not go out needle to j0, and A5 circulation circuits sequentially M/8 rear progress B5 circulation after B5 circulation circuits sequentially N/2 times, carries out M/8 A5 circulation again;
12) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ↑ preceding needle bed hangs one needle of mesh, and b ", c ", d " are each One needle of flotation line is drawn, e ↓ rear needle bed hangs one needle of mesh, and f ", g ", h " respectively draw one needle of flotation line, and i0 and j0 do not go out needle;A ↑ preceding needle bed hangs mesh one Needle draws one needle of flotation line for A6 circulation to h ", and i0 does not go out needle and do not go out needle to j0 for B6 circulation, and A6 circulation carries out after circuiting sequentially M/8 times B6 circulation after B6 circulation circuits sequentially N/2 times, carries out M/8 A6 circulation again;
13) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, and b ↑ preceding needle bed hangs mesh one Needle, c ", d ", e " respectively draw one needle of flotation line, and f ↓ rear needle bed hangs one needle of mesh, and g ", h " is each to draw one needle of flotation line, and i0 and j0 do not go out needle;A " is drawn One needle of flotation line draws one needle of flotation line for A7 circulation to h ", and i0 does not go out needle and do not go out needle to j0 for B7 circulation, and A7 circulation circuits sequentially M/8 times B7 circulation is carried out afterwards, after B7 circulation circuits sequentially N/2 times, carries out M/8 A7 circulation again;
14) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b " is each to draw one needle of flotation line, and c ↑ preceding needle bed is hung One needle of mesh, d ", e ", f " respectively draw one needle of flotation line, and g ↓ rear needle bed hangs one needle of mesh, and h " draws one needle of flotation line, and i0 and j0 do not go out needle;A " draws floating One needle of line draws one needle of flotation line for A8 circulation to h ", and i0 does not go out needle and do not go out needle to j0 for B8 circulation, after A8 circulation circuits sequentially M/8 times B8 circulation is carried out, after B8 circulation circuits sequentially N/2 times, carries out M/8 A8 circulation again;
15) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b ", c " respectively draw one needle of flotation line, d ↑ preceding needle Bed hangs one needle of mesh, and e ", f ", g " respectively draw one needle of flotation line, and h ↓ rear needle bed hangs one needle of mesh, and i ↑ preceding needle bed hangs one needle of mesh, and j ↓ rear needle bed is hung One needle of mesh;A " draws one needle of flotation line to h ↓ rear needle bed to hang one needle of mesh as A9 circulation, and i ↑ preceding needle bed hangs one needle of mesh to j ↓ rear needle bed and hangs mesh One needle is B9 circulation, and A9 circulation carries out B9 circulation and carries out M/ again after B9 circulation circuits sequentially N/2 times after circuiting sequentially M/8 times 8 A9 circulations;
16) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ↓ rear needle bed hangs one needle of mesh, and b ", c ", d " are each One needle of flotation line is drawn, e ↑ preceding needle bed hangs one needle of mesh, and f ", g ", h " respectively draw one needle of flotation line, and i ↓ rear needle bed hangs one needle of mesh, and j ↑ preceding needle bed is hung One needle of mesh;A ↓ rear needle bed hangs one needle of mesh and draws one needle of flotation line for A10 circulation to h ", and i ↓ rear needle bed hangs one needle of mesh to j ↑ preceding needle bed and hangs mesh One needle is B10 circulation, and A10 circulation circuits sequentially and carries out B10 circulation after M/8 time, B10 is recycled circuit sequentially N/2 times after, again into M/8 A10 circulation of row;
17) head right lateral, the first system band yarn mouth weave in preceding needle bed, and needle bed is respectively knitted before a, b, c, d, e, f, g, h, i, j One needle is circuited sequentially to 2M+N needle;
18) head left lateral, the first system band yarn mouth weave in rear needle bed, a ', b ', c ', d ', e ', f ', g ', h ', i ', j ' Needle bed respectively knits a needle afterwards, circuits sequentially to 2M+N needle;
19) head right lateral, for the first system without yarn mouth in front and back needle bed pressing, a0, b0, c0, d0, e0, f0, g0, h0 are equal Do not go out needle, needle bed pressing before i&, needle bed pressing after j^;It is that A11 is recycled that a0, which does not go out needle and do not go out needle to h0, and needle bed pressing is to j^ before i& Needle bed pressing is B11 circulation afterwards, and A11 circulation carries out B11 circulation after circuiting sequentially M/8 times, after B11 circulation circuits sequentially N/2 times, M/8 A11 circulation is carried out again;
20) while carrying out step 19, second system without yarn mouth in front and back needle bed pressing, a0, b0, c0, d0, e0, F0, g0, h0 do not go out needle, needle bed pressing after i^, needle bed pressing before j&;A0 does not go out needle, and to h0, needle is A12 circulation, needle after i^ out Needle bed pressing is B12 circulation before bed pressing to j&, and A12 circulation carries out B12 circulation after circuiting sequentially M/8 times, B12 circulation is successively followed After ring N/2 times, M/8 A12 circulation is carried out again;
21) head left lateral, for the first system without yarn mouth in front and back needle bed pressing, a0, b0, c0, d0, e0, f0, g0, h0 are equal Do not go out needle, needle bed pressing before i&, needle bed pressing after j^;It is that A11 is recycled that a0, which does not go out needle and do not go out needle to h0, and needle bed pressing is to j^ before i& Needle bed pressing is B11 circulation afterwards, and A11 circulation carries out B11 circulation after circuiting sequentially M/8 times, after B11 circulation circuits sequentially N/2 times, M/8 A11 circulation is carried out again;
22) while carrying out step 21), second system without yarn mouth in front and back needle bed pressing, a0, b0, c0, d0, e0, F0, g0, h0 do not go out needle, needle bed pressing after i^, needle bed pressing before j&;A0 does not go out needle, and to h0, needle is A12 circulation, needle after i^ out Needle bed pressing is B12 circulation before bed pressing to j&, and A12 circulation carries out B12 circulation after circuiting sequentially M/8 times, B12 circulation is successively followed After ring N/2 times, M/8 A12 circulation is carried out again;
23) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, b ↓ rear needle bed to hang mesh one Needle, c ", d ", e " respectively draw one needle of flotation line, and f ↑ preceding needle bed hangs one needle of mesh, and g ", h " is each to draw one needle of flotation line, and i ↑ preceding needle bed hangs one needle of mesh, J ↓ rear needle bed hangs one needle of mesh;It is that A3 is recycled that wherein a " draw one needle of flotation line to h ", which draws one needle of flotation line, i ↑ preceding needle bed hang one needle of mesh to j ↓ Needle bed hangs one needle of mesh as B3 circulation afterwards, and A3 circulation carries out B3 circulation after circuiting sequentially M/8 times, after B3 circulation circuits sequentially N/2 times, M/8 A3 circulation is carried out again;
24) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b " is each to draw one needle of flotation line, and c ↓ rear needle bed is hung One needle of mesh, d ", e ", f " respectively draw one needle of flotation line, and g ↑ preceding needle bed hangs one needle of mesh, and h " draws one needle of flotation line, and i ↓ rear needle bed hangs one needle of mesh, and j ↑ Preceding needle bed hangs one needle of mesh;A " drawing one needle of flotation line to h " draws one needle of flotation line for A4 circulation, and i ↓ rear needle bed hangs one needle of mesh to j ↑ preceding needle bed One needle of mesh is hung as B4 circulation, A4 circulation circuits sequentially and carries out B4 circulation after M/8 time, B4 is recycled circuit sequentially N/2 times after, again into M/8 A4 circulation of row;
25) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b ", c " respectively draw one needle of flotation line, d ↓ rear needle Bed hangs one needle of mesh, and e ", f ", g " respectively draw one needle of flotation line, and h ↑ preceding needle bed hangs one needle of mesh, and i0 and j0 do not go out needle;A " draws one needle of flotation line to h ↑ preceding needle bed hangs one needle of mesh as A5 circulation, and it is that B5 is recycled that i0, which does not go out needle and do not go out needle to j0, and A5 circulation circuits sequentially M/8 rear progress B5 circulation after B5 circulation circuits sequentially N/2 times, carries out M/8 A5 circulation again;
26) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ↑ preceding needle bed hangs one needle of mesh, and b ", c ", d " are each One needle of flotation line is drawn, e ↓ rear needle bed hangs one needle of mesh, and f ", g ", h " respectively draw one needle of flotation line, and i0 and j0 do not go out needle;A ↑ preceding needle bed hangs mesh one Needle draws one needle of flotation line for A6 circulation to h ", and i0 does not go out needle and do not go out needle to j0 for B6 circulation, and A6 circulation carries out after circuiting sequentially M/8 times B6 circulation after B6 circulation circuits sequentially N/2 times, carries out M/8 A6 circulation again;
27) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, and b ↑ preceding needle bed hangs mesh one Needle, c ", d ", e " respectively draw one needle of flotation line, and f ↓ rear needle bed hangs one needle of mesh, and g ", h " is each to draw one needle of flotation line, and i0 and j0 do not go out needle;A " is drawn One needle of flotation line draws one needle of flotation line for A7 circulation to h ", and i0 does not go out needle and do not go out needle to j0 for B7 circulation, and A7 circulation circuits sequentially M/8 times B7 circulation is carried out afterwards, after B7 circulation circuits sequentially N/2 times, carries out M/8 A7 circulation again;
28) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b " is each to draw one needle of flotation line, and c ↑ preceding needle bed is hung One needle of mesh, d ", e ", f " respectively draw one needle of flotation line, and g ↓ rear needle bed hangs one needle of mesh, and h " draws one needle of flotation line, and i0 and j0 do not go out needle;A " draws floating One needle of line draws one needle of flotation line for A8 circulation to h ", and i0 does not go out needle and do not go out needle to j0 for B8 circulation, after A8 circulation circuits sequentially M/8 times B8 circulation is carried out, after B8 circulation circuits sequentially N/2 times, carries out M/8 A8 circulation again;
29) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b ", c " respectively draw one needle of flotation line, d ↑ preceding needle Bed hangs one needle of mesh, and e ", f ", g " respectively draw one needle of flotation line, and h ↓ rear needle bed hangs one needle of mesh, and i ↑ preceding needle bed hangs one needle of mesh, and j ↓ rear needle bed is hung One needle of mesh;A " draws one needle of flotation line to h ↓ rear needle bed to hang one needle of mesh as A9 circulation, and i ↑ preceding needle bed hangs one needle of mesh to j ↓ rear needle bed and hangs mesh One needle is B9 circulation, and A9 circulation carries out B9 circulation and carries out M/ again after B9 circulation circuits sequentially N/2 times after circuiting sequentially M/8 times 8 A9 circulations;
30) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ↓ rear needle bed hangs one needle of mesh, and b ", c ", d " are each One needle of flotation line is drawn, e ↑ preceding needle bed hangs one needle of mesh, and f ", g ", h " respectively draw one needle of flotation line, and i ↓ rear needle bed hangs one needle of mesh, and j ↑ preceding needle bed is hung One needle of mesh;A ↓ rear needle bed hangs one needle of mesh and draws one needle of flotation line for A10 circulation to h ", and i ↓ rear needle bed hangs one needle of mesh to j ↑ preceding needle bed and hangs mesh One needle is B10 circulation, and A10 circulation circuits sequentially and carries out B10 circulation after M/8 time, B10 is recycled circuit sequentially N/2 times after, again into M/8 A10 circulation of row;
31) multiple circulation step 3) ~ step 30), complete neckline, door towel and shoes doorway braiding after, start to carry out toe-cap, The knitting of upper of a shoe, heel.
Heretofore described neckline is when wearing shoes, and the welt position that foot protrudes into, door towel is the length where the buckle of two sides Structure, is located at flap two sides, and shoes doorway is the position of two side door towel connection.
The present invention from neckline, door towel, shoes doorway three simultaneously bottom, laterally weave.Neckline is in a manner of hanging mesh and idle running Thicken braiding;Neckline radian is that the radian as defined in locally to stop to reach in a manner of needle at upper of a shoe is woven;Door towel is to hang mesh and sky The mode turned, which knits out the effect come, keeps the firmness of towel stronger;Shoes doorway using and by the way of neckline, door towel plays bottom together Braiding keeps its firmness stronger also using as neckline weaving manner.Part is used to stop needle mode at upper of a shoe complete At.
Detailed description of the invention
It is described in further detail below in conjunction with attached drawing and embodiments of the present invention
Fig. 1 is braiding schematic diagram of the invention;
Fig. 2 is shoes position of the present invention schematic diagram.
Marked in the figure:Needle bed braiding before indicating,Needle bed weaves after expression,Indicate front and back needle bed braiding (four Flat sennit is knitted),Needle bed pressing before indicating,Needle bed pressing after expression,Needle bed hangs mesh before indicating,Needle bed after expression Mesh is hung,Indicate flotation line,It can not indicate needle;← indicate head from right to left, → indicating head from left to right, Y5 represents yarn Mouth, Y0 are represented without yarn mouth, and S1 represents the first system, and S2 represents second system.
Neckline part L1, door towel part L2, shoes doorway part L3 weave starting point P.
Specific embodiment
Referring to attached drawing.A kind of weaving method of vamp described in the present embodiment, in the cross for having a pair of of the needle bed at least front and back Woven on volume machine, at least one needle bed can move left and right in front and back a pair of needle bed, and forward and backward needle bed have turn over Needle function;Flat braiding machine has more than two systems, and with 16 above yarn mouth, a system drive one is yarn mouth;
Left and right faces preceding needle bed as reference using front;From left to right, preceding needle bed braiding is indicated with a ~ j, and rear needle bed braiding is used A ' ~ j ' indicates that preceding needle bed pressing is indicated with a& ~ j&, and rear needle bed pressing is indicated with a^ ~ j^, preceding needle bed hangs mesh a ↑ ~ j ↑ indicate, rear needle bed hangs mesh with a ↓ ~ j ↓ indicate, four flat coils are indicated with a* ~ j*, draw flotation line to be indicated with a "~j ", no Needle is indicated with a0~j 0 out;
The braiding original state is that head, yarn mouth are parked in leftward position, and preceding needle bed, rear needle bed are completely needle-shaped state;
1) head right lateral, the first system drive yarn mouth to carry out Siping City's braiding in front and back needle bed, and a* knits a needle, and b* knits a needle, C* knits a needle, and d* knits a needle, and e* knits a needle, and f* knits a needle, and g* knits a needle, and h* knits a needle, and i* knits a needle, and j* knits a needle, successively It is recycled to 2M+N needle, wherein 2M is the needle number of neckline, and N is the total needle amount of door towel and shoes doorway;
2) head left lateral, the first system drive yarn mouth to be woven in preceding needle bed, and a knits a needle, and b knits a needle, and c knits a needle, d A needle is knitted, e knits a needle, and f knits a needle, and g knits a needle, and h knits a needle, and i knits a needle, and j knits a needle, circuits sequentially to 2M+N needle;
3) head right lateral, the first system drive yarn mouth to be woven in preceding needle bed, and a knits a needle, and b knits a needle, and c knits a needle, d A needle is knitted, e knits a needle, and f knits a needle, and g knits a needle, and h knits a needle, and i knits a needle, and j knits a needle, circuits sequentially to 2M+N needle;
4) head left lateral, the first system drive yarn mouth to be woven in rear needle bed, and a ' knits a needle, and b ' knits a needle, and c ' knits one Needle, d ' knit a needle, and e ' knits a needle, and f ' knits a needle, and g ' knits a needle, and h ' knits a needle, and i ' knits a needle, and j ' knits a needle, circuit sequentially to 2M+N needle;
5) head right lateral, the first system do not drive yarn mouth to carry out pressing in front and back needle bed, and needle bed presses a needle, needle after b^ before a& Bed presses a needle, and needle bed presses a needle before c&, and needle bed presses a needle after d^, and needle bed presses a needle before e&, and needle bed presses a needle, needle bed before g& after f^ Press a needle, after h^ needle bed press a needle, i0 not go out needle, j0 not go out needle, wherein before a& needle bed press a needle to h^ after needle bed press a needle this 8 Needle is A1 circulation, this 2 needle of i0, j0 is B1 circulation;A1 circulation carries out B1 circulation after circuiting sequentially M/8 times, B1 circulation circuits sequentially After N/2 times, M/8 A1 circulation is carried out again;
6) while carrying out step 5), without yarn mouth, the needle bed after front and back needle bed pressing, a^ presses a needle to second system, before b& Needle bed presses a needle, and needle bed presses a needle after c^, and needle bed presses a needle before d&, and needle bed presses a needle after e^, and needle bed presses a needle, needle after g^ before f& Bed presses a needle, and needle bed presses a needle before h&, and i0 does not go out needle, and j0 does not go out needle, and wherein needle bed presses needle bed one needle of pressure before a needle to h& after a^ This 8 needle is A2 circulation, this 2 needle of i0, j0 is B2 circulation;A2 circulation carries out B2 circulation after circuiting sequentially M/8 times, B2 circulation is successively followed After ring N/2 times, M/8 A2 circulation is carried out again;
7) head left lateral, the first system do not drive yarn mouth to carry out pressing in front and back needle bed, and needle bed presses a needle, needle after b^ before a& Bed presses a needle, and needle bed presses a needle before c&, and needle bed presses a needle after d^, and needle bed presses a needle before e&, and needle bed presses a needle, needle bed before g& after f^ Press a needle, after h^ needle bed press a needle, i0 not go out needle, j0 not go out needle, wherein before a& needle bed press a needle to h^ after needle bed press a needle this 8 Needle is A1 circulation, this 2 needle of i0, j0 is B1 circulation;A1 circulation carries out B1 circulation after circuiting sequentially M/8 times, B1 circulation circuits sequentially After N/2 times, M/8 A1 circulation is carried out again;
8) while carrying out step 7), without yarn mouth, the needle bed after front and back needle bed pressing, a^ presses a needle to second system, before b& Needle bed presses a needle, and needle bed presses a needle after c^, and needle bed presses a needle before d&, and needle bed presses a needle after e^, and needle bed presses a needle, needle after g^ before f& Bed presses a needle, and needle bed presses a needle before h&, and i0 does not go out needle, and j0 does not go out needle, and wherein needle bed presses needle bed one needle of pressure before a needle to h& after a^ This 8 needle is A2 circulation, this 2 needle of i0, j0 is B2 circulation;A2 circulation carries out B2 circulation after circuiting sequentially M/8 times, B2 circulation is successively followed After ring N/2 times, M/8 A2 circulation is carried out again;
9) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, and b ↓ rear needle bed hangs mesh one Needle, c " draw one needle of flotation line, and d " draws one needle of flotation line, and e " draws one needle of flotation line, and f ↑ preceding needle bed hangs one needle of mesh, and g " draws one needle of flotation line, and h " is drawn One needle of flotation line, i ↑ preceding needle bed hang one needle of mesh, and j ↓ rear needle bed hangs one needle of mesh;Wherein a " drawing one needle of flotation line to h " drawing one needle of flotation line is A3 Circulation, i ↑ preceding needle bed hang one needle of mesh to j ↓ rear needle bed and hang one needle of mesh as B3 circulation, and A3 circulation carries out B3 after circuiting sequentially M/8 times and follows Ring after B3 circulation circuits sequentially N/2 times, carries out M/8 A3 circulation again;
10) head left lateral, the first system band yarn mouth weave in front and back needle bed, a " drawing one needle of flotation line, b " drawing one needle of flotation line, and c ↓ Needle bed hangs one needle of mesh afterwards, and d " draws one needle of flotation line, and e " draws one needle of flotation line, and f " draws one needle of flotation line, and g ↑ preceding needle bed hangs one needle of mesh, and h " is drawn One needle of flotation line, i ↓ rear needle bed hang one needle of mesh, and j ↑ preceding needle bed hangs one needle of mesh;A " drawing one needle of flotation line to h " draws one needle of flotation line to follow for A4 Ring, i ↓ rear needle bed hang one needle of mesh to j ↑ preceding needle bed and hang one needle of mesh as B4 circulation, and A4 circulation carries out B4 after circuiting sequentially M/8 times and follows Ring after B4 circulation circuits sequentially N/2 times, carries out M/8 A4 circulation again;
11) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, and b " draws one needle of flotation line, c " One needle of flotation line is drawn, d ↓ rear needle bed hangs one needle of mesh, and e " draws one needle of flotation line, and f " draws one needle of flotation line, and g " draws one needle of flotation line, and h ↑ preceding needle bed is hung One needle of mesh, i0 do not go out needle, and j0 does not go out needle;A " draws one needle of flotation line to h ↑ preceding needle bed to hang one needle of mesh as A5 circulation, and i0 does not go out needle to j0 Needle is not gone out for B5 circulation, A5 circulation carries out B5 circulation and carries out again after B5 circulation circuits sequentially N/2 times after circuiting sequentially M/8 times M/8 A5 circulation;
12) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ↑ preceding needle bed hangs one needle of mesh, and b " draws flotation line one Needle, c " draw one needle of flotation line, and d " draws one needle of flotation line, and e ↓ rear needle bed hangs one needle of mesh, and f " draws one needle of flotation line, and g " draws one needle of flotation line, and h " is drawn One needle of flotation line, i0 do not go out needle, and j0 does not go out needle;A ↑ preceding needle bed hangs one needle of mesh and draws one needle of flotation line for A6 circulation to h ", and i0 does not go out needle extremely It is that B6 is recycled that j0, which does not go out needle, and A6 circulation circuits sequentially progress B6 circulation after M/8 time, B6 is recycled circuit sequentially N/2 times after, again into M/8 A6 circulation of row;
13) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, and b ↑ preceding needle bed hangs mesh one Needle, c " draw one needle of flotation line, and d " draws one needle of flotation line, and e " draws one needle of flotation line, and f ↓ rear needle bed hangs one needle of mesh, and g " draws one needle of flotation line, and h " is drawn One needle of flotation line, i0 do not go out needle, and j0 does not go out needle;It is that A7 is recycled that a " draw one needle of flotation line to h ", which draws one needle of flotation line, i0 out needle to j0 not Needle is B7 circulation out, and A7 circulation carries out B7 circulation and carries out M/ again after B7 circulation circuits sequentially N/2 times after circuiting sequentially M/8 times 8 A7 circulations;
14) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, and b " draws one needle of flotation line, c ↑ preceding needle bed hangs one needle of mesh, and d " draws one needle of flotation line, and e " draws one needle of flotation line, and f " draws one needle of flotation line, and g ↓ rear needle bed hangs one needle of mesh, and h " is drawn One needle of flotation line, i0 do not go out needle, and j0 does not go out needle;It is that A8 is recycled that a " draw one needle of flotation line to h ", which draws one needle of flotation line, i0 out needle to j0 not Needle is B8 circulation out, and A8 circulation carries out B8 circulation and carries out M/ again after B8 circulation circuits sequentially N/2 times after circuiting sequentially M/8 times 8 A8 circulations;
15) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, and b " draws one needle of flotation line, c " One needle of flotation line is drawn, d ↑ preceding needle bed hangs one needle of mesh, and e " draws one needle of flotation line, and f " draws one needle of flotation line, and g " draws one needle of flotation line, and h ↓ rear needle bed is hung One needle of mesh, i ↑ preceding needle bed hang one needle of mesh, and j ↓ rear needle bed hangs one needle of mesh;A " draws one needle of flotation line to h ↓ rear needle bed to hang one needle of mesh and follows for A9 Ring, i ↑ preceding needle bed hang one needle of mesh to j ↓ rear needle bed and hang one needle of mesh as B9 circulation, and A9 circulation carries out B9 after circuiting sequentially M/8 times and follows Ring after B9 circulation circuits sequentially N/2 times, carries out M/8 A9 circulation again;
16) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ↓ rear needle bed hangs one needle of mesh, and b " draws flotation line one Needle, c " draw one needle of flotation line, and d " draws one needle of flotation line, and e ↑ preceding needle bed hangs one needle of mesh, and f " draws one needle of flotation line, and g " draws one needle of flotation line, and h " is drawn One needle of flotation line, i ↓ rear needle bed hang one needle of mesh, and j ↑ preceding needle bed hangs one needle of mesh;A ↓ rear needle bed hangs one needle of mesh to h " drawing one needle of flotation line A10 circulation, i ↓ rear needle bed hang one needle of mesh to j ↑ preceding needle bed hang one needle of mesh be B10 recycle, A10 recycle circuit sequentially M/8 times it is laggard Row B10 circulation after B10 circulation circuits sequentially N/2 times, carries out M/8 A10 circulation again;
17) head right lateral, the first system band yarn mouth weave in preceding needle bed, and a knits a needle, and b knits a needle, and c knits a needle, and d knits one Needle, e knit a needle, and f knits a needle, and g knits a needle, and h knits a needle, and i knits a needle, and j knits a needle;It circuits sequentially to 2M+N needle;
18) head left lateral, the first system band yarn mouth weave in rear needle bed, and a ' knits a needle, and b ' knits a needle, and c ' knits a needle, d ' A needle is knitted, e ' knits a needle, and f ' knits a needle, and g ' knits a needle, and h ' knits a needle, and i ' knits a needle, and j ' knits a needle;It circuits sequentially to 2M+N Needle;
19) head right lateral, for the first system without yarn mouth in front and back needle bed pressing, a0 does not go out needle, and b0 does not go out needle, and c0 does not go out Needle, d0 do not go out needle, and e0 does not go out needle, and f0 does not go out needle, and g0 does not go out needle, and h0 does not go out needle, needle bed pressing before i&, needle bed pressing after j^;a0 Do not go out needle and do not go out needle to h0 for A11 circulation, needle bed pressing is B11 circulation after needle bed pressing to j^ before i&, and A11 circulation circuits sequentially B11 circulation is carried out after M/8 times, after B11 circulation circuits sequentially N/2 times, carries out M/8 A11 circulation again;
20) while carrying out step 19, second system is without yarn mouth in front and back needle bed pressing, and a0 does not go out needle, and b0 does not go out Needle, c0 do not go out needle, and d0 does not go out needle, and e0 does not go out needle, and f0 does not go out needle, and g0 does not go out needle, and h0 does not go out needle, needle bed pressing after i^, needle before j& Bed pressing;A0 does not go out needle and does not go out needle to h0 for A12 circulation, and needle bed pressing is B12 circulation before needle bed pressing to j& after i^, and A12 is followed Ring carries out B12 circulation after circuiting sequentially M/8 times, after B12 circulation circuits sequentially N/2 times, carry out M/8 A12 circulation again;
21) head left lateral, for the first system without yarn mouth in front and back needle bed pressing, a0 does not go out needle, and b0 does not go out needle, and c0 does not go out Needle, d0 do not go out needle, and e0 does not go out needle, and f0 does not go out needle, and g0 does not go out needle, and h0 does not go out needle, needle bed pressing before i&, needle bed pressing after j^;a0 Do not go out needle and do not go out needle to h0 for A11 circulation, needle bed pressing is B11 circulation after needle bed pressing to j^ before i&, and A11 circulation circuits sequentially B11 circulation is carried out after M/8 times, after B11 circulation circuits sequentially N/2 times, carries out M/8 A11 circulation again;
22) while carrying out step 21), second system is without yarn mouth in front and back needle bed pressing, and a0 does not go out needle, and b0 does not go out Needle, c0 do not go out needle, and d0 does not go out needle, and e0 does not go out needle, and f0 does not go out needle, and g0 does not go out needle, and h0 does not go out needle, needle bed pressing after i^, needle before j& Bed pressing;A0 does not go out needle and does not go out needle to h0 for A12 circulation, and needle bed pressing is B12 circulation before needle bed pressing to j& after i^, and A12 is followed Ring carries out B12 circulation after circuiting sequentially M/8 times, after B12 circulation circuits sequentially N/2 times, carry out M/8 A12 circulation again;
23) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, and b ↓ rear needle bed hangs mesh one Needle, c " draw one needle of flotation line, and d " draws one needle of flotation line, and e " draws one needle of flotation line, and f ↑ preceding needle bed hangs one needle of mesh, and g " draws one needle of flotation line, and h " is drawn One needle of flotation line, i ↑ preceding needle bed hang one needle of mesh, and j ↓ rear needle bed hangs one needle of mesh;Wherein a " drawing one needle of flotation line to h " drawing one needle of flotation line is A3 Circulation, i ↑ preceding needle bed hang one needle of mesh to j ↓ rear needle bed and hang one needle of mesh as B3 circulation, and A3 circulation carries out B3 after circuiting sequentially M/8 times and follows Ring after B3 circulation circuits sequentially N/2 times, carries out M/8 A3 circulation again;
24) head left lateral, the first system band yarn mouth weave in front and back needle bed, a " drawing one needle of flotation line, b " drawing one needle of flotation line, and c ↓ Needle bed hangs one needle of mesh afterwards, and d " draws one needle of flotation line, and e " draws one needle of flotation line, and f " draws one needle of flotation line, and g ↑ preceding needle bed hangs one needle of mesh, and h " is drawn One needle of flotation line, i ↓ rear needle bed hang one needle of mesh, and j ↑ preceding needle bed hangs one needle of mesh;A " drawing one needle of flotation line to h " draws one needle of flotation line to follow for A4 Ring, i ↓ rear needle bed hang one needle of mesh to j ↑ preceding needle bed and hang one needle of mesh as B4 circulation, and A4 circulation carries out B4 after circuiting sequentially M/8 times and follows Ring after B4 circulation circuits sequentially N/2 times, carries out M/8 A4 circulation again;
25) head right lateral, the first port system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, and b " draws one needle of flotation line, C " draws one needle of flotation line, and d ↓ rear needle bed hangs one needle of mesh, and e " draws one needle of flotation line, and f " draws one needle of flotation line, and g " draws one needle of flotation line, h ↑ preceding needle bed One needle of mesh is hung, i0 does not go out needle, and j0 does not go out needle;A " draws one needle of flotation line to h ↑ preceding needle bed to hang one needle of mesh as A5 circulation, and i0 does not go out needle extremely It is that B5 is recycled that j0, which does not go out needle, and A5 circulation circuits sequentially progress B5 circulation after M/8 time, B5 is recycled circuit sequentially N/2 times after, again into M/8 A5 circulation of row;
26) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ↑ preceding needle bed hangs one needle of mesh, and b " draws flotation line one Needle, c " draw one needle of flotation line, and d " draws one needle of flotation line, and e ↓ rear needle bed hangs one needle of mesh, and f " draws one needle of flotation line, and g " draws one needle of flotation line, and h " is drawn One needle of flotation line, i0 do not go out needle, and j0 does not go out needle;A ↑ preceding needle bed hangs one needle of mesh and draws one needle of flotation line for A6 circulation to h ", and i0 does not go out needle extremely It is that B6 is recycled that j0, which does not go out needle, and A6 circulation circuits sequentially progress B6 circulation after M/8 time, B6 is recycled circuit sequentially N/2 times after, again into M/8 A6 circulation of row;
27) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, and b ↑ preceding needle bed hangs mesh one Needle, c " draw one needle of flotation line, and d " draws one needle of flotation line, and e " draws one needle of flotation line, and f ↓ rear needle bed hangs one needle of mesh, and g " draws one needle of flotation line, and h " is drawn One needle of flotation line, i0 do not go out needle, and j0 does not go out needle;It is that A7 is recycled that a " draw one needle of flotation line to h ", which draws one needle of flotation line, i0 out needle to j0 not Needle is B7 circulation out, and A7 circulation carries out B7 circulation and carries out M/ again after B7 circulation circuits sequentially N/2 times after circuiting sequentially M/8 times 8 A7 circulations;
28) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, and b " draws one needle of flotation line, c ↑ preceding needle bed hangs one needle of mesh, and d " draws one needle of flotation line, and e " draws one needle of flotation line, and f " draws one needle of flotation line, and g ↓ rear needle bed hangs one needle of mesh, and h " is drawn One needle of flotation line, i0 do not go out needle, and j0 does not go out needle;It is that A8 is recycled that a " draw one needle of flotation line to h ", which draws one needle of flotation line, i0 out needle to j0 not Needle is B8 circulation out, and A8 circulation carries out B8 circulation and carries out M/ again after B8 circulation circuits sequentially N/2 times after circuiting sequentially M/8 times 8 A8 circulations;
29) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, and b " draws one needle of flotation line, c " One needle of flotation line is drawn, d ↑ preceding needle bed hangs one needle of mesh, and e " draws one needle of flotation line, and f " draws one needle of flotation line, and g " draws one needle of flotation line, and h ↓ rear needle bed is hung One needle of mesh, i ↑ preceding needle bed hang one needle of mesh, and j ↓ rear needle bed hangs one needle of mesh;A " draws one needle of flotation line to h ↓ rear needle bed to hang one needle of mesh and follows for A9 Ring, i ↑ preceding needle bed hang one needle of mesh to j ↓ rear needle bed and hang one needle of mesh as B9 circulation, and A9 circulation carries out B9 after circuiting sequentially M/8 times and follows Ring after B9 circulation circuits sequentially N/2 times, carries out M/8 A9 circulation again;
30) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ↓ rear needle bed hangs one needle of mesh, and b " draws flotation line one Needle, c " draw one needle of flotation line, and d " draws one needle of flotation line, and e ↑ preceding needle bed hangs one needle of mesh, and f " draws one needle of flotation line, and g " draws one needle of flotation line, and h " is drawn One needle of flotation line, i ↓ rear needle bed hang one needle of mesh, and j ↑ preceding needle bed hangs one needle of mesh;A ↓ rear needle bed hangs one needle of mesh to h " drawing one needle of flotation line A10 circulation, i ↓ rear needle bed hang one needle of mesh to j ↑ preceding needle bed hang one needle of mesh be B10 recycle, A10 recycle circuit sequentially M/8 times it is laggard Row B10 circulation after B10 circulation circuits sequentially N/2 times, carries out M/8 A10 circulation again;
31) multiple circulation step 3) ~ step 30), complete neckline, door towel and shoes doorway braiding after, start to carry out toe-cap, The knitting of upper of a shoe, heel.
The present embodiment takes up one's knitting from P point in the top among neckline part L1, that is, heel, and it is half of to weave M needle before this Neckline part after then weaving N needle door towel part L2 and shoes doorway part L3, then weaves another half of neckline part point of M needle, Wen Zhong A class circulation be braiding neckline part L1, B class circulation be weave door towel part L2 and shoes doorway part L3.It, can when practical braiding With flap and the buckle of first taking up one's knitting, the part of then take up one's knitting neckline, door towel and shoes doorway, finally, starting laterally to compile Heel, upper of a shoe and toe part are knitted, thus integrated woven vamp, and the flower pattern at upper of a shoe laterally weaves, the selection of flower pattern More extensively.

Claims (1)

1. a kind of weaving method of vamp is woven, the front and back one on the flat knitting machine for having a pair of of the needle bed at least front and back At least one needle bed in needle bed can be moved left and right, and forward and backward needle bed has the function of needle overturning;Flat braiding machine band there are two with On system, with 16 above yarn mouth, a system is driven one yarn mouth;It is characterized by:
Left and right faces preceding needle bed as reference using front;From left to right, preceding needle bed braiding indicates with a ~ j, rear needle bed braiding with a ' ~ J ' indicates that preceding needle bed pressing is indicated with a& ~ j&, rear needle bed pressing is indicated with a^ ~ j^, preceding needle bed hang mesh with a ↑ ~ j ↑ come It indicates, rear needle bed hangs mesh with a ↓ ~ j ↓ indicate, four flat coils are indicated with a* ~ j*, are drawn flotation line to be indicated with a "~j ", are not gone out Needle is indicated with a0~j 0;
The braiding original state is that head, yarn mouth are parked in leftward position, and preceding needle bed, rear needle bed are completely needle-shaped state;
1) head right lateral, the first system drive yarn mouth to carry out Siping City's braiding in front and back needle bed, a*, b*, c*, d*, e*, f*, g*, H*, the braiding of the Siping City i*, j* Jun Zhiyizhen are circuited sequentially to 2M+N needle, and wherein 2M is the needle number of neckline, and N is door towel and shoes door The total needle amount of mouth;
2) head left lateral, the first system drive yarn mouth to be woven in preceding needle bed, and needle bed is respectively knitted before a, b, c, d, e, f, g, h, i, j One needle is circuited sequentially to 2M+N needle;
3) head right lateral, the first system drive yarn mouth to be woven in preceding needle bed, and needle bed is respectively knitted before a, b, c, d, e, f, g, h, i, j One needle is circuited sequentially to 2M+N needle;
4) head left lateral, the first system drive yarn mouth to be woven in rear needle bed, a ', b ', c ', d ', e ', f ', g ', h ', i ', j ' Needle bed respectively knits a needle afterwards, circuits sequentially to 2M+N needle;
5) head right lateral, the first system do not drive yarn mouth to carry out pressing in front and back needle bed, and needle bed respectively presses one before a&, c&, e&, g& Needle, needle bed respectively presses a needle after b^, d^, f^, h^, and i0 and j0 do not go out needle, and wherein needle bed presses needle bed after a needle to h^ to press a needle before a& This 8 needle is A1 circulation, this 2 needle of i0, j0 is B1 circulation;A1 circulation carries out B1 circulation after circuiting sequentially M/8 times, B1 circulation is successively followed After ring N/2 times, M/8 A1 circulation is carried out again;
6) while carrying out step 5), without yarn mouth, the needle bed after front and back needle bed pressing, a^, c^, e^, g^ respectively presses one to second system Needle, needle bed respectively presses a needle before b&, d&, f&, h&, and i0 and j0 do not go out needle, and wherein needle bed presses needle bed before a needle to h& to press a needle after a^ This 8 needle is A2 circulation, this 2 needle of i0, j0 is B2 circulation;A2 circulation carries out B2 circulation after circuiting sequentially M/8 times, B2 circulation is successively followed After ring N/2 times, M/8 A2 circulation is carried out again;
7) head left lateral, the first system do not drive yarn mouth to carry out pressing in front and back needle bed, and needle bed respectively presses one before a&, c&, e&, g& Needle, needle bed respectively presses a needle after b^, d^, f^, h^, and i0 and j0 do not go out needle, and wherein needle bed presses needle bed after a needle to h^ to press a needle before a& This 8 needle is A1 circulation, this 2 needle of i0, j0 is B1 circulation;A1 circulation carries out B1 circulation after circuiting sequentially M/8 times, B1 circulation is successively followed After ring N/2 times, M/8 A1 circulation is carried out again;
8) while carrying out step 7), without yarn mouth, the needle bed after front and back needle bed pressing, a^, c^, e^, g^ respectively presses one to second system Needle, needle bed respectively presses a needle before b&, d&, f&, h&, and i0 and j0 do not go out needle, and wherein needle bed presses needle bed before a needle to h& to press a needle after a^ This 8 needle is A2 circulation, this 2 needle of i0, j0 is B2 circulation;A2 circulation carries out B2 circulation after circuiting sequentially M/8 times, B2 circulation is successively followed After ring N/2 times, M/8 A2 circulation is carried out again;
9) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, b ↓ rear needle bed to hang one needle of mesh, c ", D ", e " is each to draw one needle of flotation line, and f ↑ preceding needle bed hangs one needle of mesh, and g ", h " is each to draw one needle of flotation line, and i ↑ preceding needle bed hangs one needle of mesh, j ↓ rear needle Bed hangs one needle of mesh;Wherein a " drawing one needle of flotation line to h " draws one needle of flotation line for A3 circulation, and i ↑ preceding needle bed hangs one needle of mesh to j ↓ rear needle bed One needle of mesh is hung as B3 circulation, A3 circulation circuits sequentially and carries out B3 circulation after M/8 time, B3 is recycled circuit sequentially N/2 times after, again into M/8 A3 circulation of row;
10) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b " is each to draw one needle of flotation line, and c ↓ rear needle bed hangs mesh one Needle, d ", e ", f " respectively draw one needle of flotation line, and g ↑ preceding needle bed hangs one needle of mesh, and h " draws one needle of flotation line, and i ↓ rear needle bed hangs one needle of mesh, j ↑ preceding needle Bed hangs one needle of mesh;A " drawing one needle of flotation line to h " draws one needle of flotation line for A4 circulation, and i ↓ rear needle bed hangs one needle of mesh to j ↑ preceding needle bed and hangs mesh One needle is B4 circulation, and A4 circulation carries out B4 circulation and carries out M/ again after B4 circulation circuits sequentially N/2 times after circuiting sequentially M/8 times 8 A4 circulations;
11) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b ", c " respectively draw one needle of flotation line, and d ↓ rear needle bed is hung One needle of mesh, e ", f ", g " respectively draw one needle of flotation line, and h ↑ preceding needle bed hangs one needle of mesh, and i0 and j0 do not go out needle;A " draws one needle of flotation line to h ↑ preceding Needle bed hangs one needle of mesh as A5 circulation, and i0 does not go out needle and do not go out needle to j0 for B5 circulation, and A5 circulation carries out B5 after circuiting sequentially M/8 times and follows Ring after B5 circulation circuits sequentially N/2 times, carries out M/8 A5 circulation again;
12) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ↑ preceding needle bed hangs one needle of mesh, and b ", c ", d " respectively draw floating One needle of line, e ↓ rear needle bed hang one needle of mesh, and f ", g ", h " respectively draw one needle of flotation line, and i0 and j0 do not go out needle;A ↑ preceding needle bed hangs one needle of mesh extremely H " draws one needle of flotation line for A6 circulation, and i0 does not go out needle and do not go out needle to j0 for B6 circulation, and A6 circulation carries out B6 after circuiting sequentially M/8 times and follows Ring after B6 circulation circuits sequentially N/2 times, carries out M/8 A6 circulation again;
13) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, and b ↑ preceding needle bed hangs one needle of mesh, C ", d ", e " respectively draw one needle of flotation line, and f ↓ rear needle bed hangs one needle of mesh, and g ", h " is each to draw one needle of flotation line, and i0 and j0 do not go out needle;A " draws flotation line One needle to h " draw one needle of flotation line be A7 recycle, i0 go out needle to j0 go out needle be B7 recycle, A7 recycle circuit sequentially M/8 times it is laggard Row B7 circulation after B7 circulation circuits sequentially N/2 times, carries out M/8 A7 circulation again;
14) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b " is each to draw one needle of flotation line, and c ↑ preceding needle bed hangs mesh one Needle, d ", e ", f " respectively draw one needle of flotation line, and g ↓ rear needle bed hangs one needle of mesh, and h " draws one needle of flotation line, and i0 and j0 do not go out needle;A " draws flotation line one Needle draws one needle of flotation line for A8 circulation to h ", and i0 does not go out needle and do not go out needle to j0 for B8 circulation, and A8 circulation carries out after circuiting sequentially M/8 times B8 circulation after B8 circulation circuits sequentially N/2 times, carries out M/8 A8 circulation again;
15) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b ", c " respectively draw one needle of flotation line, and d ↑ preceding needle bed is hung One needle of mesh, e ", f ", g " respectively draw one needle of flotation line, and h ↓ rear needle bed hangs one needle of mesh, and i ↑ preceding needle bed hangs one needle of mesh, and j ↓ rear needle bed hangs mesh one Needle;A " draws one needle of flotation line to h ↓ rear needle bed to hang one needle of mesh as A9 circulation, and i ↑ preceding needle bed hangs one needle of mesh to j ↓ rear needle bed and hangs one needle of mesh For B9 circulation, A9 circulation carries out B9 circulation and carries out M/8 times again after B9 circulation circuits sequentially N/2 times after circuiting sequentially M/8 times A9 circulation;
16) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ↓ rear needle bed hangs one needle of mesh, and b ", c ", d " respectively draw floating One needle of line, e ↑ preceding needle bed hang one needle of mesh, and f ", g ", h " respectively draw one needle of flotation line, and i ↓ rear needle bed hangs one needle of mesh, and j ↑ preceding needle bed hangs mesh one Needle;A ↓ rear needle bed hangs one needle of mesh and draws one needle of flotation line for A10 circulation to h ", and i ↓ rear needle bed hangs one needle of mesh to j ↑ preceding needle bed and hangs one needle of mesh For B10 circulation, A10 circulation carries out B10 circulation and carries out M/ again after B10 circulation circuits sequentially N/2 times after circuiting sequentially M/8 times 8 A10 circulations;
17) head right lateral, the first system band yarn mouth weave in preceding needle bed, and needle bed respectively knits a needle before a, b, c, d, e, f, g, h, i, j, It circuits sequentially to 2M+N needle;
18) head left lateral, the first system band yarn mouth weave in rear needle bed, a ', b ', c ', d ', e ', f ', g ', h ', i ', j ' needle afterwards Bed respectively knits a needle, circuits sequentially to 2M+N needle;
19) head right lateral, without yarn mouth in front and back needle bed pressing, a0, b0, c0, d0, e0, f0, g0, h0 do not go out the first system Needle, needle bed pressing before i&, needle bed pressing after j^;A0 does not go out needle, and to h0, needle is A11 circulation out, needle after needle bed pressing to j^ before i& Bed pressing is B11 circulation, and A11 circulation carries out B11 circulation after circuiting sequentially M/8 times, after B11 circulation circuits sequentially N/2 times, again Carry out M/8 A11 circulation;
20) while carrying out step 19, second system without yarn mouth in front and back needle bed pressing, a0, b0, c0, d0, e0, f0, g0, H0 does not go out needle, needle bed pressing after i^, needle bed pressing before j&;A0 does not go out needle, and to h0, needle is A12 circulation, needle bed pressing after i^ out Needle bed pressing is B12 circulation before to j&, and A12 circulation carries out B12 circulation after circuiting sequentially M/8 times, B12 circulation circuits sequentially N/2 After secondary, M/8 A12 circulation is carried out again;
21) head left lateral, without yarn mouth in front and back needle bed pressing, a0, b0, c0, d0, e0, f0, g0, h0 do not go out the first system Needle, needle bed pressing before i&, needle bed pressing after j^;A0 does not go out needle, and to h0, needle is A11 circulation out, needle after needle bed pressing to j^ before i& Bed pressing is B11 circulation, and A11 circulation carries out B11 circulation after circuiting sequentially M/8 times, after B11 circulation circuits sequentially N/2 times, again Carry out M/8 A11 circulation;
22) while carrying out step 21), second system without yarn mouth in front and back needle bed pressing, a0, b0, c0, d0, e0, f0, g0, H0 does not go out needle, needle bed pressing after i^, needle bed pressing before j&;A0 does not go out needle, and to h0, needle is A12 circulation, needle bed pressing after i^ out Needle bed pressing is B12 circulation before to j&, and A12 circulation carries out B12 circulation after circuiting sequentially M/8 times, B12 circulation circuits sequentially N/2 After secondary, M/8 A12 circulation is carried out again;
23) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, b ↓ rear needle bed to hang one needle of mesh, C ", d ", e " respectively draw one needle of flotation line, and f ↑ preceding needle bed hangs one needle of mesh, and g ", h " is each to draw one needle of flotation line, and i ↑ preceding needle bed hangs one needle of mesh, and j ↓ Needle bed hangs one needle of mesh afterwards;It is that A3 is recycled that wherein a " draw one needle of flotation line to h ", which draws one needle of flotation line, i ↑ preceding needle bed hang one needle of mesh to j ↓ after Needle bed hangs one needle of mesh as B3 circulation, and A3 circulation carries out B3 circulation after circuiting sequentially M/8 times, after B3 circulation circuits sequentially N/2 times, then It is secondary to carry out M/8 A3 circulation;
24) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b " is each to draw one needle of flotation line, and c ↓ rear needle bed hangs mesh one Needle, d ", e ", f " respectively draw one needle of flotation line, and g ↑ preceding needle bed hangs one needle of mesh, and h " draws one needle of flotation line, and i ↓ rear needle bed hangs one needle of mesh, j ↑ preceding needle Bed hangs one needle of mesh;A " drawing one needle of flotation line to h " draws one needle of flotation line for A4 circulation, and i ↓ rear needle bed hangs one needle of mesh to j ↑ preceding needle bed and hangs mesh One needle is B4 circulation, and A4 circulation carries out B4 circulation and carries out M/ again after B4 circulation circuits sequentially N/2 times after circuiting sequentially M/8 times 8 A4 circulations;
25) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b ", c " respectively draw one needle of flotation line, and d ↓ rear needle bed is hung One needle of mesh, e ", f ", g " respectively draw one needle of flotation line, and h ↑ preceding needle bed hangs one needle of mesh, and i0 and j0 do not go out needle;A " draws one needle of flotation line to h ↑ preceding Needle bed hangs one needle of mesh as A5 circulation, and i0 does not go out needle and do not go out needle to j0 for B5 circulation, and A5 circulation carries out B5 after circuiting sequentially M/8 times and follows Ring after B5 circulation circuits sequentially N/2 times, carries out M/8 A5 circulation again;
26) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ↑ preceding needle bed hangs one needle of mesh, and b ", c ", d " respectively draw floating One needle of line, e ↓ rear needle bed hang one needle of mesh, and f ", g ", h " respectively draw one needle of flotation line, and i0 and j0 do not go out needle;A ↑ preceding needle bed hangs one needle of mesh extremely H " draws one needle of flotation line for A6 circulation, and i0 does not go out needle and do not go out needle to j0 for B6 circulation, and A6 circulation carries out B6 after circuiting sequentially M/8 times and follows Ring after B6 circulation circuits sequentially N/2 times, carries out M/8 A6 circulation again;
27) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a " draws one needle of flotation line, and b ↑ preceding needle bed hangs one needle of mesh, C ", d ", e " respectively draw one needle of flotation line, and f ↓ rear needle bed hangs one needle of mesh, and g ", h " is each to draw one needle of flotation line, and i0 and j0 do not go out needle;A " draws flotation line One needle to h " draw one needle of flotation line be A7 recycle, i0 go out needle to j0 go out needle be B7 recycle, A7 recycle circuit sequentially M/8 times it is laggard Row B7 circulation after B7 circulation circuits sequentially N/2 times, carries out M/8 A7 circulation again;
28) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b " is each to draw one needle of flotation line, and c ↑ preceding needle bed hangs mesh one Needle, d ", e ", f " respectively draw one needle of flotation line, and g ↓ rear needle bed hangs one needle of mesh, and h " draws one needle of flotation line, and i0 and j0 do not go out needle;A " draws flotation line one Needle draws one needle of flotation line for A8 circulation to h ", and i0 does not go out needle and do not go out needle to j0 for B8 circulation, and A8 circulation carries out after circuiting sequentially M/8 times B8 circulation after B8 circulation circuits sequentially N/2 times, carries out M/8 A8 circulation again;
29) head right lateral, the first system band yarn mouth weave in front and back needle bed, and a ", b ", c " respectively draw one needle of flotation line, and d ↑ preceding needle bed is hung One needle of mesh, e ", f ", g " respectively draw one needle of flotation line, and h ↓ rear needle bed hangs one needle of mesh, and i ↑ preceding needle bed hangs one needle of mesh, and j ↓ rear needle bed hangs mesh one Needle;A " draws one needle of flotation line to h ↓ rear needle bed to hang one needle of mesh as A9 circulation, and i ↑ preceding needle bed hangs one needle of mesh to j ↓ rear needle bed and hangs one needle of mesh For B9 circulation, A9 circulation carries out B9 circulation and carries out M/8 times again after B9 circulation circuits sequentially N/2 times after circuiting sequentially M/8 times A9 circulation;
30) head left lateral, the first system band yarn mouth weave in front and back needle bed, and a ↓ rear needle bed hangs one needle of mesh, and b ", c ", d " respectively draw floating One needle of line, e ↑ preceding needle bed hang one needle of mesh, and f ", g ", h " respectively draw one needle of flotation line, and i ↓ rear needle bed hangs one needle of mesh, and j ↑ preceding needle bed hangs mesh one Needle;A ↓ rear needle bed hangs one needle of mesh and draws one needle of flotation line for A10 circulation to h ", and i ↓ rear needle bed hangs one needle of mesh to j ↑ preceding needle bed and hangs one needle of mesh For B10 circulation, A10 circulation carries out B10 circulation and carries out M/ again after B10 circulation circuits sequentially N/2 times after circuiting sequentially M/8 times 8 A10 circulations;
31) multiple circulation step 3) ~ step 30), after completing neckline, door towel and the braiding on shoes doorway, start to carry out toe-cap, shoes The knitting of side, heel.
CN201710478376.7A 2017-06-22 2017-06-22 A kind of weaving method of vamp Active CN107326517B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710478376.7A CN107326517B (en) 2017-06-22 2017-06-22 A kind of weaving method of vamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710478376.7A CN107326517B (en) 2017-06-22 2017-06-22 A kind of weaving method of vamp

Publications (2)

Publication Number Publication Date
CN107326517A CN107326517A (en) 2017-11-07
CN107326517B true CN107326517B (en) 2019-01-01

Family

ID=60194569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710478376.7A Active CN107326517B (en) 2017-06-22 2017-06-22 A kind of weaving method of vamp

Country Status (1)

Country Link
CN (1) CN107326517B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107974757B (en) * 2017-12-13 2019-06-25 慈星互联科技有限公司 A kind of weaving method of 3D vamp
CN108283336A (en) * 2018-01-11 2018-07-17 东莞市鸿鹏编织科技有限公司 A kind of integrated molding 4D knitting low shoes and its manufacture craft
CN113005617B (en) * 2021-03-05 2022-12-09 福建省莆田市双源鞋业有限公司 Fly-knitted collar and processing method thereof
CN114717729A (en) * 2022-04-14 2022-07-08 丁妈造 Method for weaving vamp material

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8448474B1 (en) * 2012-02-20 2013-05-28 Nike, Inc. Article of footwear incorporating a knitted component with a tongue
EP2805638A1 (en) * 2012-01-20 2014-11-26 Shima Seiki Mfg., Ltd Footwear, and knitting method for knit fabric
CN105636470A (en) * 2013-09-13 2016-06-01 株式会社岛精机制作所 Instep cover and method for knitting instep cover
CN106637639A (en) * 2017-01-20 2017-05-10 宁波慈星股份有限公司 Shoe heel forming and braiding method
CN106637638A (en) * 2017-01-20 2017-05-10 宁波慈星股份有限公司 Knitting method of longitudinal shoe eyelet pattern

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101824534B1 (en) * 2013-04-15 2018-02-01 가부시키가이샤 시마세이키 세이사쿠쇼 Method for manufacturing shoe upper and shoe upper

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2805638A1 (en) * 2012-01-20 2014-11-26 Shima Seiki Mfg., Ltd Footwear, and knitting method for knit fabric
US8448474B1 (en) * 2012-02-20 2013-05-28 Nike, Inc. Article of footwear incorporating a knitted component with a tongue
CN105264133A (en) * 2012-02-20 2016-01-20 耐克创新有限合伙公司 Method of knitting a knitted component with an integral knit tongue
CN105636470A (en) * 2013-09-13 2016-06-01 株式会社岛精机制作所 Instep cover and method for knitting instep cover
CN106637639A (en) * 2017-01-20 2017-05-10 宁波慈星股份有限公司 Shoe heel forming and braiding method
CN106637638A (en) * 2017-01-20 2017-05-10 宁波慈星股份有限公司 Knitting method of longitudinal shoe eyelet pattern

Also Published As

Publication number Publication date
CN107326517A (en) 2017-11-07

Similar Documents

Publication Publication Date Title
CN107326517B (en) A kind of weaving method of vamp
CN107385656B (en) It is knitted the weaving of integrated vamp
CN105121725B (en) The manufacture method of upper of a shoe and upper of a shoe
CN107348601B (en) Knitted integrated shoe with braid and knitting process thereof
CN107099920A (en) It is integrally formed the weaving method of elastic neckline on welt
CN105307530A (en) Shoe upper production method and shoe upper
CN107245800B (en) A kind of weaving method of telescopic full molding seamless knitting shoes
CN107217377B (en) Single layer is knitted the manufacture craft of integrated vamp
CN106617494B (en) The manufacture craft of venetian blind type three-dimensional stripe vamp and the vamp
CN108208999A (en) A kind of weaving of one-pass molding athleisure shoe
CN107974757B (en) A kind of weaving method of 3D vamp
CN106637638B (en) A kind of weaving method of longitudinal direction buckle flower pattern
CN109082764A (en) It is integrally formed and is knitted with shoes, with instep and its knitting
CN108588998A (en) A kind of fabric and its weaving method being knitted to form auricle structure
CN106637639B (en) A kind of heel of a shoe knitting and forming method
CN205848704U (en) A kind of slip-off preventing ship socks
CN107287748A (en) Integral vamp, which locally adds, plays structure and its weaving
CN103355858B (en) A kind of vamp and preparation method thereof
CN107012576A (en) Separate weaving method between the toe for dividing toe socks weaving method and point toe socks
CN108433233B (en) Single-layer type sock shoe and production method thereof
KR20090065441A (en) Knitted fabric with finger portions and knitting method thereof
CN103628237B (en) Weaving method of topline pattern
CN106757713B (en) A kind of buckle flower pattern weaving method
CN108685249A (en) A kind of novel 3D knitting stereo shaping shoes and preparation method thereof
CN107637908A (en) Shoe body forms part and its manufacture method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Sun Pingfan

Inventor after: Yang Shu

Inventor after: Zhu Xinzhong

Inventor after: Jin Yunxiu

Inventor after: Liu Mengting

Inventor before: Sun Pingfan

Inventor before: Yang Shu

Inventor before: Jin Yunxiu

Inventor before: Liu Mengting

GR01 Patent grant
GR01 Patent grant